Department Of Agriculture Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.

Department Of Agriculture - DoA Tender

Works
Civil And Construction
Civil Works Others
Building Construction
Eprocure
Opening Date22 Jan 2024
Closing DateCancelled
Tender Amount₹ 16,27,764 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering All work upto plinth level: a) 1:4:8 ( 1 Cement: 4 fine sand : 8 graded well burnt brick aggregate 40 mm nominal size).

5.89

46190

7844.8

... More
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to floor five level. Thermo-Mechanically Treated bars/ Cold twisted deformed steel bars

4504.9

352283

78.2

... More
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement- -All work upto plinth level: 1:11/2:3 ( 1 Cement: 11/2 fine sand : 3 graded stone aggregate 20 mm nominal size).

18.9

207387

10974.6

... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centering, shuttering, finishing and reinforcement-1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)

21.18

249693

11791.9

... More
Centering shuttering including struttings, propping etc. and removal of form work for: a) Foundations, footings, bases for columns etc. for mass concrete with timber plank.

25.68

6905

268.9

... More
b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. using shuttering ply

172.05

63658

370

... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be leveled and neatly dressed. -All kinds of soil.

73.27

9884

134.9

... More
First class brick work in foundation and plinth including cost of all materials as required complete:- 6.1.5 In cement mortar 1:6 ( 1 cement : 6 fine sand ).

6.22

53616

8624.1

... More
12 mm cement plaster of mix 12.1.2 Cement mortar 1:4 (1 cement : 4 fine sand)

18

3146

174.8

... More
Neat cement punning.

18

811

45.1

... More
6 mm cement plaster of mix : 12.4.2 Cement mortar 1:4 (1 cement : 4 fine sand)

17.6

2409

136.9

... More
Finishing walls with acrylic smooth exterior paint of required shade of approved brand and manufacture [Payment shall be made after submission of Test Certificate issued by the Manufacturer] : 12.30.1 New work ( two or more coats applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)

459

54804

119.4

... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade [Payment shall be made after submission of Test Certificate issued by the Manufacturer]: 12.47.1 Two or more coats on new work

33.45

2769

82.8

... More
Preparation and consolidation of sub grade with power road roller of 8 to 12 tone capacity after excavating earth to an average or 22.5 cm depth, dressing to camber and consolidation with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 meters as per direction of the Engineer- in Charge

232

166297

716.8

... More
i) Brick on edge soling Providing and laying brick on edge soling layer on prepared subgrade according to lines, grades and cross- section shown on drawing, filling joints with sand , watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412.

232

216525

933.3

... More
ii) Flat Brick soling Providing and laying flat brick soling layer on prepared subgrade according to line, grades and cross-section shown on the drawing, filling joints with earth, free from clay with a Plasticity Index not exceeding 6,watering and rolling the same with three wheeled road roller 80-100 kn as per MoRD Technical Specification Clause 412.

232

127228

548.4

... More
iii) Brick edging laid in full brick width Providing and laying brick edging on prepared sub grade according to line, grades and cross- section shown on the drawing, filling joint with Earth, free from clay with a Plasticity Index not exceeding 6,watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412.

132

31107

235.66

... More
Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. complete as required:- 9.15.2 In grating, frames, guard bar, railing, brackets, gates and similar works, all complete.

145.8

12932

88.7



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.