Balrampur Tender Results

Balrampur Tender Results

Public Health Engineering Department - PHED Tender Result

Civil And Construction...+1Water Storage And Supply
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Contract DateNA
Contract AmountNA 
Construction, Testing And Commissioning Of R.c.c. Elevated Service Reservoir Of 00 Kl Capacities – 0 No., 00 Kl Capacities – 0 No. And 00 Kl Capacities – 00 No. & Staging 15 Mtr / { Steel Structure 12 M Height & 10 Kl-20 No. And Steel Structure 09 M Height & 10 Kl-0 No. (5000l X 2no.)} Of Total 00 Nos. Pe Tank & Elevated Service Reservoirs Of Rcc Staging And Hdpe Slim Tank Of Capacity 10000 Ltr Of 00 No. 12 Mtr Staging & 00 Kl Of Sump Well. Including Providing And Fixing Of Ci Double Flange Pipe, Double Flange Specials & Di Double Flange Soft Seated Sluice Valve Including Construction Of Suitable R.c.c. Valve Chamber. Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of Rising Main Upvc Class 10 Kg/sqcm 90 Mm Dia 00 M & Hdpe 75 Mm Dia 00 M & 63 Mm Dia 12106 M .,distribution Upvc Class 6kg/sqcm 90mm Dia. 00 M., 110 Mm Dia. 00 M., 140 Mm Dia. 00 M. 160 Mm Dia. 00 M.& Distribution Hdpe Class 6kg/sqcm 63 Mm Dia. 31410 M, 75 Mm Dia. 10289 M.with Suitable Joints Gi Pipe, Valve, Specials And All Fittings Including All Allied Civil Works, Supplying & Installation Of Energy Efficiant Five Star Bee Rating Isi Marked Required Capacity Single Phase / Three Phase, 50 Hz, 220v,, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4"/6" Tube Well With Contral Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc. As Required As Per Specifications Butexcludingpipe,ss/nylonwireropeandconnection Cable Including Verification Of Tubewell Yield& Electric Connection From Cspdcl, Construction Of Brick Masonry Switch Room, Construction Of Boundary Wall Around The Over Head Tank, Installation Of Electro Chlorinator , Construction Of Chlorinator Room Of Providing Functional Household Tap Connection (f.h.t.c. 567 ) In Individual Households And Government Instiution Etc. Complete With Trial Run Of 03 Months After That O&m Of 06 Months Under Piped Water Supply Scheme Under Jal Jeevan Mission For Village- Kogwar(kenadand), Kogwar(khaspara), Kogwar(machandand), Kogwar(paschimpara), Kogwar(pisiyapara), Kogwar(pokharatola), Kogwar(yadavpara)block- Wadrafnagar, District - Balrampur

Public Health Engineering Department - PHED Tender Result

Civil And Construction...+1Water Storage And Supply
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Contract DateNA
Contract AmountNA 
Construction, Testing And Commissioning Ofr.c.c. Elevated Service Reservoir Of 80 Kl Capacities – 01 No. And 40 Kl Capacities – 01 & Staging 15 Mtr / { Steel Structure 12 M Height & 10 Kl-07 No. And Steel Structure 09 M Height & 10 Kl-0 No. (5000l X 2no.)} Of Total 00 Nos. Pe Tank & Elevated Service Reservoirs Of Rcc Staging And Hdpe Slim Tank Of Capacity 10000 Ltr Of 00 No. 12 Mtr Staging & 30 Kl Of Sump Well.including Providing And Fixing Of Ci Double Flange Pipe, Double Flange Specials & Di Double Flange Soft Seated Sluice Valve Including Construction Of Suitable R.c.c. Valve Chamber. Providing, Laying, Jointing, Interconnection, Testing And Commissioning Ofrising Main Upvc Class 10 Kg/sqcm 90 Mm Dia 00 M & Hdpe 75 Mm Dia 00 M & 63 Mm Dia 8938 M .,distribution Upvc Class 6kg/sqcm 90mm Dia. 3063 M., 110 Mm Dia. 2223 M., 140 Mm Dia. 1273 M. 160 Mm Dia. 00 M.& Distribution Hdpe Class 6kg/sqcm 63 Mm Dia. 13832m, 75 Mm Dia. 5864 M.with Suitable Joints Gi Pipe, Valve, Specials And All Fittings Including All Allied Civil Works, Supplying & Installation Of Energy Efficiant Five Star Bee Rating Isi Marked Required Capacity Single Phase / Three Phase, 50 Hz, 220v,, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4"/6" Tube Well With Contral Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc. As Required As Per Specifications Butexcludingpipe,ss/nylonwireropeandconnection Cable Including Verification Of Tubewell Yield& Electric Connection Fromcspdcl, Construction Of Brick Masonry Switch Room, Construction Of Boundary Wall Around The Over Head Tank, Installation Of Electro Chlorinator , Construction Of Chlorinator Room Of Providing Functional Household Tap Connection (f.h.t.c. 697 ) In Individual Households And Government Instiution Etc. Complete With Trial Run Of 03 Months After That O&mof 06 Months Under Piped Water Supply Scheme Under Jal Jeevan Mission For Village- Harigawan (bhandaripara), Harigawan (gawatiyapara), Harigawan (harijanpara, Khaspara), Harigawan (laldongapara), Harigawan (maghardand), Bharhibansh (chaukpara, Khaspara, Sugakarma), Block-wardrafnagar District – Balrampur(c.g)

Revenue And Disaster Department Tender Result

Software and IT Solutions
GEM
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Contract DateNA
Contract AmountNA 
Web Camera

Public Health Engineering Department - PHED Tender Result

Civil And Construction...+1Water Storage And Supply
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Contract DateNA
Contract AmountRefer Documents 
Construction, Testing And Commissioning Ofr.c.c. Elevated Service Reservoir Of 90 Kl Capacities – 01no.& Staging 12 Mtr/ { Steel Structure 12 M Height & 10 Kl (5000l X 2no.)} Of 00 Nos. Pe Tank& Elevated Service Reservoirs Of Rcc Staging And Hdpe Slim Tankof Capacity5000 Ltr Of 00 No. 9 Mtr Staging(with Switch Room Of Size 1.8mx1.8mx3m) And 10000 Ltr Of 00 No. 12 Mtr Staging.including Providing And Fixing Of Ci Double Flange Pipe, Double Flange Specials & Di Double Flange Soft Seated Sluice Valve Including Construction Of Suitable R.c.c. Valve Chamber. Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of Rising Main Upvc Class 10 Kg/sqcm 90 Mm Dia 00 M & Hdpe 75mm Dia 00 M & 63 Mm Dia 00 M.,distribution Upvc Class 6kg/sqcm 90mm Dia. 1638 M., 110 Mm Dia. 2110 M., 140 Mm Dia. 00 M. 160 Mm Dia. 00 M.& Distribution Hdpe Class 6kg/sqcm 63 Mm Dia. 16810 M., 75 Mm Dia. 1144 M.with Suitable Joints Gi Pipe, Valve, Specials And All Fittings Including All Allied Civil Works, Supplying & Installation Of Energy Taging N Five Star Bee Rating Isi Marked Required Capacity Single Phase / Three Phase, 50 Hz, 220v,, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4”/6” Tube Well With Contral Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc. As Required As Per Specifications Butexcludingpipe,ss/nylonwireropeandconnection Cable Including Verification Of Tubewell Yield& Electric Connection From Cspdcl, Construction Of Brick Masonry Switch Room, Construction Of Boundary Wall Around The Over Head Tank, Installation Of Electro Chlorinator , Construction Of Chlorinator Room Of Providing Functional Household Tap Connection (f.h.t.c. 369 ) In Individual Households And Government Instiution Etc. Complete With Trial Run Of 03 Months After That O&mof 06 Months Under Piped Water Supply Scheme Under Jal Jeevan Mission For Village–sauni (bhadaibathan, Bhitarsawni, Bichpara, Dadartola, Khaspara, Kodakupara, Mithkapara, Tongripara),block- Balrampur, District – Balrampur(c.g.)

Chhattisgarh State Civil Supplies Corporation Limited Tender Result

Services
Civil And Construction
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Contract DateNA
Contract AmountRefer Documents 
Base Depo Balrampur Dpt (c) E-tender Kra/parivahan/2022-23/239 14-08-2023

Department Of Rural Development And Panchayats Tender Result

Civil And Construction...+1Road Construction
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Contract DateNA
Contract AmountRefer Documents 
Nit 906 Pmgsy Road Renewal Maintenance Pkg No Cg-24-m 41 District- Balrampur

Chhattisgarh State Civil Supplies Corporation Limited Tender Result

Services
Civil And Construction
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Contract DateNA
Contract AmountRefer Documents 
Base Depo Pratappur Dpt (b) E-tender Kra/parivahan/2023-24/350 11-01-2024

Public Health Engineering Department - PHED Tender Result

Civil And Construction
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Contract DateNA
Contract AmountNA 
Construction, Testing And Commissioning Of R.c.c. Elevated Service Reservoir Of 00 Kl Capacities – 0 No., 00 Kl Capacities – 0 No. And 00 Kl Capacities – 00 No. & Staging 15 Mtr / { Steel Structure 12 M Height & 10 Kl-14 No. And Steel Structure 09 M Height & 10 Kl-0 No. (5000l X 2no.)} Of Total 00 Nos. Pe Tank & Elevated Service Reservoirs Of Rcc Staging And Hdpe Slim Tank Of Capacity 10000 Ltr Of 00 No. 12 Mtr Staging & 00 Kl Of Sump Well. Including Providing And Fixing Of Ci Double Flange Pipe, Double Flange Specials & Di Double Flange Soft Seated Sluice Valve Including Construction Of Suitable R.c.c. Valve Chamber. Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of Rising Main Upvc Class 10 Kg/sqcm 90 Mm Dia 00 M & Hdpe 75 Mm Dia 00 M & 63 Mm Dia 7707 M .,distribution Upvc Class 6kg/sqcm 90mm Dia. 00 M., 110 Mm Dia. 00 M., 140 Mm Dia. 00 M. 160 Mm Dia. 00 M.& Distribution Hdpe Class 6kg/sqcm 63 Mm Dia. 18406 M, 75 Mm Dia. 6048 M.with Suitable Joints Gi Pipe, Valve, Specials And All Fittings Including All Allied Civil Works, Supplying & Installation Of Energy Efficiant Five Star Bee Rating Isi Marked Required Capacity Single Phase / Three Phase, 50 Hz, 220v,, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4"/6" Tube Well With Contral Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc. As Required As Per Specifications Butexcludingpipe,ss/nylonwireropeandconnection Cable Including Verification Of Tubewell Yield& Electric Connection From Cspdcl, Construction Of Brick Masonry Switch Room, Construction Of Boundary Wall Around The Over Head Tank, Installation Of Electro Chlorinator , Construction Of Chlorinator Room Of Providing Functional Household Tap Connection (f.h.t.c. 376 ) In Individual Households And Government Instiution Etc. Complete With Trial Run Of 03 Months After That O&m Of 06 Months Under Piped Water Supply Scheme Under Jal Jeevan Mission For Village- Kamalpur (bardand), Kamalpur (khaspara), Kamalpur (pandopara), Kamalpur (sahupara),block- Wadrafnagar, District - Balrampur

Public Health Engineering Department - PHED Tender Result

Civil And Construction...+1Water Storage And Supply
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Contract DateNA
Contract AmountNA 
Construction, Testing And Commissioning Ofr.c.c. Elevated Service Reservoir Of 50 Kl Capacities – 01no.& Staging 12 Mtr/ { Steel Structure 12 M Height & 10 Kl (5000l X 2no.)} Of 00 Nos. Pe Tank& Elevated Service Reservoirs Of Rcc Staging And Hdpe Slim Tankof Capacity5000 Ltr Of 00 No. 9 Mtr Staging(with Switch Room Of Size 1.8mx1.8mx3m) And 10000 Ltr Of 00 No. 12 Mtr Staging.including Providing And Fixing Of Ci Double Flange Pipe, Double Flange Specials & Di Double Flange Soft Seated Sluice Valve Including Construction Of Suitable R.c.c. Valve Chamber. Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of Rising Main Upvc Class 10 Kg/sqcm 90 Mm Dia 00 M & Hdpe 75mm Dia 00 M & 63 Mm Dia 00 M.,distribution Upvc Class 6kg/sqcm 90mm Dia. 441 M., 110 Mm Dia. 00 M., 140 Mm Dia. 00 M. 160 Mm Dia. 00 M.& Distribution Hdpe Class 6kg/sqcm 63 Mm Dia. 6893 M., 75 Mm Dia. 304 M.with Suitable Joints Gi Pipe, Valve, Specials And All Fittings Including All Allied Civil Works, Supplying & Installation Of Energy Taging N Five Star Bee Rating Isi Marked Required Capacity Single Phase / Three Phase, 50 Hz, 220v,, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4”/6” Tube Well With Contral Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc. As Required As Per Specifications Butexcludingpipe,ss/nylonwireropeandconnection Cable Including Verification Of Tubewell Yield& Electric Connection From Cspdcl, Construction Of Brick Masonry Switch Room, Construction Of Boundary Wall Around The Over Head Tank, Installation Of Electro Chlorinator , Construction Of Chlorinator Room Of Providing Functional Household Tap Connection (f.h.t.c. 227 ) In Individual Households And Government Instiution Etc. Complete With Trial Run Of 03 Months After That O&mof 06 Months Under Piped Water Supply Scheme Under Jal Jeevan Mission For Village– Chiniya (badichiniya, Chhotichiniya, Jamunpara, Khairwartola, Khaspara, Korhatipara, Pahadpara, Paschimpara, Purvtola, Yadavpara), Block- Ramchandrapur, District – Balrampur(c.g.)

Rural Engineering Service - RES Tender Result

Works
Electrical Works...+1Electrical and Electronics
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Contract DateNA
Contract AmountNA 
Electrification Work In 2 Nos Additional Room In School Buildings Of Shankargarh Sub-division Of Rural Engineering Service Division Balrampur
651-660 of 700 active Tender Results