Balrampur Tender Results

Balrampur Tender Results

Rural Engineering Service - RES Tender Result

Works
Building Construction...+1Civil And Construction
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
All Type Of Construction Work For Gram Panchayat Of Janpad Panchayat Kusmi Gr- 04
Contract DateNA
Contract AmountNA 

Public Health Engineering Department - PHED Tender Result

Civil And Construction...+1Water Storage And Supply
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Construction, Testing And Commissioning Of R.c.c. Elevated Service Reservoir Of 30 Kl Capacities – 01 No.and Staging 12 Mtr & / { Steel Structure 12 M Height & 10 Kl-02no. And Steel Structure 09 M Height & 10 Kl-0 No. (5000l X 2no.)} Of Total 02 Nos. Pe Tank & Elevated Service Reservoirs Of Rcc Staging And Hdpe Slim Tank Of Capacity 10000 Ltr Of 00 No. 12 Mtr Staging & 00kl Of Sump Well. Including Providing And Fixing Of Ci Double Flange Pipe, Double Flange Specials & Di Double Flange Soft Seated Sluice Valve Including Construction Of Suitable R.c.c. Valve Chamber. Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of Rising Main Upvc Class 10 Kg/sqcm 90 Mm Dia 00 M & Hdpe 75 Mm Dia 450 M & 63 Mm Dia 400 M .,distribution Upvc Class 6kg/sqcm 90mm Dia. 00 M., 110 Mm Dia. 00 M., 140 Mm Dia. 00 M. 160 Mm Dia. 00 M.& Distribution Hdpe Class 6kg/sqcm 63 Mm Dia. 3961 M, 75 Mm Dia. 1693 M.with Suitable Joints Gi Pipe, Valve, Specials And All Fittings Including All Allied Civil Works, Supplying & Installation Of Energy Efficiant Five Star Bee Rating Isi Marked Required Capacity Single Phase / Three Phase, 50 Hz, 220v,, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4"/6" Tube Well With Contral Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc. As Required As Per Specifications Butexcludingpipe,ss/nylonwireropeandconnection Cable Including Verification Of Tubewell Yield& Electric Connection Fromcspdcl, Construction Of Brick Masonry Switch Room, Construction Of Boundary Wall Around The Over Head Tank, Installation Of Electro Chlorinator , Construction Of Chlorinator Room Of Providing Functional Household Tap Connection (f.h.t.c. 213 ) In Individual Households And Government Instiution Etc. Complete With Trial Run Of 03 Months After That O&mof 06 Months Under Piped Water Supply Scheme Under Jaljeevanmissionfor. Village- Aiyari (ghutrapara,khaspara,patelpara) Changaro (damhatoli,chulhakona) Block-sankargarh District – Balrampur(c.g)
Contract DateNA
Contract AmountRefer Documents 

Department Of Rural Development And Panchayats Tender Result

Civil And Construction...+1Road Construction
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Nit 906 Pmgsy Road Renewal Maintenance Pkg No Cg-24-m 44 District- Balrampur
Contract DateNA
Contract AmountRefer Documents 

Chhattisgarh State Civil Supplies Corporation Limited Tender Result

Services
Civil And Construction
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Base Depo Ramanujgunj Dpt (c) E-tender Kra/parivahan/2023-24/387 Dated 06-03-2024
Contract DateNA
Contract AmountRefer Documents 

Department Of Rural Development And Panchayats Tender Result

Works
Civil And Construction
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Nit-14 Zonal Contract For Patch Repair, Maintenance, Renewal, Special Repair, Piu-rajpur Distt.-balrampur (c.g.)
Contract DateNA
Contract AmountNA 

Ministry Of Micro Small And Medium Enterprises - MSME Tender Result

Civil And Construction...+1Construction Material
GEM
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Precast Concrete Reinforced Bench (rdso Specification),frp Strip Cast Iron Bench
Contract DateNA
Contract AmountNA 

Department Of Animal Husbandry Dairying And Fisheries Tender Result

GEM
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Supply of Veterinary Vitamin And Mineral Mixture
Contract DateNA
Contract AmountNA 

Revenue And Disaster Department Tender Result

Electrical and Electronics...+1Electronics Equipment
GEM
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Television Tv
Contract DateNA
Contract AmountNA 

Public Health Engineering Department - PHED Tender Result

Civil And Construction...+1Water Storage And Supply
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Construction, Testing And Commissioning Of R.c.c. Elevated Service Reservoir Of 00 Kl Capacities – 00no.& Staging 12 Mtr, / {steel Structure 12 M Height & 10 Kl(5000l X 2no.)} Of 11 Nos. Pe Tank& Elevated Service Reservoirs Of Rcc Staging And Hdpe Slim Tankof Capacity 5000 Ltr Of 00 No. 9 Mtr Staging(with Switch Room Of Size 1.8mx1.8mx3m) And 10000 Ltr Of 00 No. 12 Mtr Staging. Including Providing And Fixing Of Ci Double Flange Pipe, Double Flange Specials & Di Double Flange Soft Seated Sluice Valve Including Construction Of Suitable R.c.c. Valve Chamber. Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of Rising Main Upvc Class 10 Kg/sqcm 90 Mm Dia 00 M & Hdpe 75mm Dia 7516 M & 63 Mm Dia 00 M.,distribution Upvc Class 6kg/sqcm 90mm Dia. 00 M., 110 Mm Dia. 00 M., 140 Mm Dia. 00 M. 160 Mm Dia. 00 M.& Distribution Hdpe Class 6kg/sqcm 63 Mm Dia. 9664 M., 75 Mm Dia. 4201 M.with Suitable Joints Gi Pipe, Valve, Specials And All Fittings Including All Allied Civil Works, Supplying & Installation Of Energy Taging N Five Star Bee Rating Isi Marked Required Capacity Single Phase / Three Phase, 50 Hz, 220v,, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4”/6” Tube Well With Contral Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc. As Required As Per Specifications Butexcludingpipe,ss/nylonwireropeandconnection Cable Including Verification Of Tubewell Yield& Electric Connection From Cspdcl, Construction Of Brick Masonry Switch Room, Construction Of Boundary Wall Around The Over Head Tank, Installation Of Electro Chlorinator , Construction Of Chlorinator Room Of Providing Functional Household Tap Connection (f.h.t.c. 360 ) In Individual Households And Government Instiution Etc. Complete With Trial Run Of 03 Months After That O&mof 06 Months Under Piped Water Supply Scheme Under Jal Jeevan Mission For Village–kotsaripondi (ghutrapara, Khaspara, Majhapara) Kotsaripondi (pondipara, Purvtola, Roadpara, Saraipara), Block- Balrampur, District – Balrampur(c.g.)
Contract DateNA
Contract AmountRefer Documents 

Public Health Engineering Department - PHED Tender Result

Civil And Construction...+1Water Storage And Supply
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Construction, Testing And Commissioning Ofr.c.c. Elevated Service Reservoir Of 120 Kl Capacities – 01no.& Staging 12mtr/ { Steel Structure 12 M Height & 10 Kl (5000l X 2no.)} Of 00 Nos. Pe Tank& Elevated Service Reservoirs Of Rcc Staging And Hdpe Slim Tankof Capacity5000ltr Of 00 No. 9 Mtr Staging(with Switch Room Of Size 1.8mx1.8mx3m) And 10000ltr Of 00 No. 12 Mtrstaging.including Providing And Fixing Of Ci Double Flange Pipe, Double Flange Specials & Di Double Flange Soft Seated Sluice Valve Including Construction Of Suitable R.c.c. Valve Chamber. Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of Rising Main Upvc Class 10 Kg/sqcm 90 Mm Dia 00 M & Hdpe 75mm Dia00 M & 63 Mm Dia00m.,distribution Upvc Class 6kg/sqcm 90mm Dia. 2685 M., 110 Mm Dia. 1245 M., 140 Mm Dia. 266 M. 160 Mm Dia. 732 M. 180 Mm Dia 00 M& Distribution Hdpe Class 6kg/sqcm 63 Mm Dia. 12198 M., 75 Mm Dia. 470 M.with Suitable Joints Gi Pipe, Valve, Specials And All Fittings Including All Allied Civil Works, Supplying & Installation Of Energy Taging N Five Star Bee Rating Isi Marked Required Capacity Single Phase / Three Phase, 50 Hz, 220v,, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4”/6” Tube Well With Contral Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc. As Required As Per Specifications Butexcludingpipe,ss/nylonwireropeandconnection Cable Including Verification Of Tubewell Yield& Electric Connection From Cspdcl, Construction Of Brick Masonry Switch Room, Construction Of Boundary Wall Around The Over Head Tank, Installation Of Electro Chlorinator , Construction Of Chlorinator Room Of Providing Functional Household Tap Connection (f.h.t.c. 543 ) In Individual Households And Government Instiution Etc. Complete With Trial Run Of 03 Months After That O&mof 06 Months Under Piped Water Supply Scheme Under Jal Jeevan Mission For Village–putsura(bedmi, Devipara, Harijanpara, Kathwash, Khaspara, Schoolpara, Uttartola) Block- Balrampur, District – Balrampur(c.g.)
Contract DateNA
Contract AmountNA 
661-670 of 699 active Tender Results