Balrampur Tender Results
Balrampur Tender Results
Select Contract Period
2023 onwards
2021 onwards
All Time
Ministry Of Road Transport And Highways Tender Result
Eprocure
Result Stage: Awarded (AOC Available)
Balrampur, Chhattisgarh
Strengthening Of Ambikapur Ramanujganj Garwa Road N.h 343 From Km. 58/8 To 59/8 And Km. 61/6 To 65/10 (intermediate Lane) And From Km. 59/10 To 61/4 And Km. 66/2 To 81/6 (2 Lane) In The State Of Chhattisgarh On Epc Mode
Contract DateNA
Contract Amount₹ 15.8 Cr
This is an estimated amount, exact amount may vary.
Chhattisgarh State Cooperative Dairy Federation Limited Tender Result
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Procurement of Hdpe Bags
Contract DateNA
Contract AmountNA
Ministry Of Micro Small And Medium Enterprises - MSME Tender Result
GEM
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Tender For Piping Erection Service.
Contract DateNA
Contract AmountNA
Shagun It World Tender Result
GEM
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Fogging Machine
Contract DateNA
Contract AmountNA
Shagun It World Tender Result
Textile, Apparel and Footwear
GEM
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Hdpe Woven Bed Vermiculture Vermibed
Contract DateNA
Contract AmountNA
Agriculture Development And Farmers Welfare Department Tender Result
Civil And Construction
GEM
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Layer Mess,starter Feed,drip Bundle,heching Tray,cheak Transportation Tra
Contract DateNA
Contract AmountRefer Documents
Ministry Of Micro Small And Medium Enterprises - MSME Tender Result
Electrical and Electronics...+1Electronics Equipment
GEM
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Television Tv
Contract DateNA
Contract AmountNA
Brihanmumbai Electric Supply And Transport Undertaking - BEST Tender Result
Civil And Construction
Result Stage: Awarded (AOC Available)
Balrampur, Chhattisgarh
Base Depo Ramanujganj Dpt (c) E-tender Kra/parivahan/2022-23/239 14-08-2023
Contract DateNA
Contract AmountRefer Documents
Public Health Engineering Department - PHED Tender Result
Civil And Construction...+1Water Storage And Supply
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Construction, Testing And Commissioning Ofr.c.c. Elevated Service Reservoir Of 40 Kl Capacities – 01no.& Staging 12 Mtr/ { Steel Structure 12 M Height & 10 Kl (5000l X 2no.)} Of 00 Nos. Pe Tank& Elevated Service Reservoirs Of Rcc Staging And Hdpe Slim Tankof Capacity 5000 Ltr Of 00 No. 9 Mtr Staging(with Switch Room Of Size 1.8mx1.8mx3m) And 10000 Ltr Of 00 No. 12 Mtr Staging.including Providing And Fixing Of Ci Double Flange Pipe, Double Flange Specials & Di Double Flange Soft Seated Sluice Valve Including Construction Of Suitable R.c.c. Valve Chamber. Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of Rising Main Upvc Class 10 Kg/sqcm 90 Mm Dia 00 M & Hdpe 75mm Dia 00 M & 63 Mm Dia 00 M.,distribution Upvc Class 6kg/sqcm 90mm Dia. 525 M., 110 Mm Dia. 00 M., 140 Mm Dia. 00 M. 160 Mm Dia. 00 M.& Distribution Hdpe Class 6kg/sqcm 63 Mm Dia. 11780 M., 75 Mm Dia. 19 M.with Suitable Joints Gi Pipe, Valve, Specials And All Fittings Including All Allied Civil Works, Supplying & Installation Of Energy Taging N Five Star Bee Rating Isi Marked Required Capacity Single Phase / Three Phase, 50 Hz, 220v,, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4”/6” Tube Well With Contral Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc. As Required As Per Specifications Butexcludingpipe,ss/nylonwireropeandconnection Cable Including Verification Of Tubewell Yield& Electric Connection From Cspdcl, Construction Of Brick Masonry Switch Room, Construction Of Boundary Wall Around The Over Head Tank, Installation Of Electro Chlorinator , Construction Of Chlorinator Room Of Providing Functional Household Tap Connection (f.h.t.c. 165 ) In Individual Households And Government Instiution Etc. Complete With Trial Run Of 03 Months After That O&mof 06 Months Under Piped Water Supply Scheme Under Jal Jeevan Mission For Village– Bhainsamunda (khaspara, Schoolpara, Uranon Tola), Block- Balrampur, District – Balrampur(c.g.)
Contract DateNA
Contract AmountNA
Public Health Engineering Department - PHED Tender Result
Civil And Construction...+1Water Storage And Supply
Result Stage: Under Evaluation
Balrampur, Chhattisgarh
Construction, Testing And Commissioning Ofr.c.c. Elevated Service Reservoir Of 180 Kl Capacities – 01no.& Staging 12mtr/ { Steel Structure 12 M Height & 10 Kl (5000l X 2no.)} Of 00 Nos. Pe Tank& Elevated Service Reservoirs Of Rcc Staging And Hdpe Slim Tankof Capacity5000ltr Of 00 No. 9 Mtr Staging(with Switch Room Of Size 1.8mx1.8mx3m) And 10000ltr Of 00 No. 12 Mtrstaging.including Providing And Fixing Of Ci Double Flange Pipe, Double Flange Specials & Di Double Flange Soft Seated Sluice Valve Including Construction Of Suitable R.c.c. Valve Chamber. Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of Rising Main Upvc Class 10 Kg/sqcm 90 Mm Dia 00 M & Hdpe 75mm Dia00 M & 63 Mm Dia00m.,distribution Upvc Class 6kg/sqcm 90mm Dia. 1465 M., 110 Mm Dia. 3266 M., 140 Mm Dia. 1118 M. 160 Mm Dia. 1103 M. 180 Mm Dia 15 M& Distribution Hdpe Class 6kg/sqcm 63 Mm Dia. 20798 M., 75 Mm Dia. 18m.with Suitable Joints Gi Pipe, Valve, Specials And All Fittings Including All Allied Civil Works, Supplying & Installation Of Energy Taging N Five Star Bee Rating Isi Marked Required Capacity Single Phase / Three Phase, 50 Hz, 220v,, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4”/6” Tube Well With Contral Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc. As Required As Per Specifications Butexcludingpipe,ss/nylonwireropeandconnection Cable Including Verification Of Tubewell Yield& Electric Connection From Cspdcl, Construction Of Brick Masonry Switch Room, Construction Of Boundary Wall Around The Over Head Tank, Installation Of Electro Chlorinator , Construction Of Chlorinator Room Of Providing Functional Household Tap Connection (f.h.t.c. 808 ) In Individual Households And Government Instiution Etc. Complete With Trial Run Of 03 Months After That O&mof 06 Months Under Piped Water Supply Scheme Under Jal Jeevan Mission For Village–mahabirganj(bagaipara, Baherakhand, Bairtola, Bartola, Barwatola, Bhattitola, Boditola, Chaurathan, Dhauradand, Gadhwatola,ghasiyapara, Harijanpara, Imalipara, Jarhadeeh, Khairwartola, Kodakupara, Kumhartola, Loharpara, Miyapara, Mudapara, Paschimpara, Pipartola, Purvtola,schooltola, Sendurpara, Uttartola ) Block- Ramchandrapur, District – Balrampur(c.g.)
Contract DateNA
Contract AmountRefer Documents
641-650 of 700 active Tender Results