For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Urban Development Authority - UDD Tender
Civil And Construction
Excavation
Opening Date18 Oct 2024
Closing Date25 Oct 2024
Tender Amount₹ 30,71,945
Costs
EMD
₹ 30,719Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
552044Tender No
D/1616/2024 Dated:18-10-2024Tender Authority
Urban Development Authority ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Horticulture works;TERMINALIA BENTZOE
20
930
18600
Horticulture works;SYNGONIUM SNOW WHIT
200
20
4000
Horticulture works;SYNGONIUM RED HEART
200
20
4000
Horticulture works;RAPHIS EXCELSA
200
90
18000
Horticulture works;POTHOS NEON
200
45
9000
Horticulture works;POTHOS MARBLE QUEEN
200
45
9000
Horticulture works;PLUMBAGO ARICULATA
200
25
5000
Horticulture works;PANDANAS YELLOW
200
20
4000
Horticulture works;ODOLLAM RUBRA
20
1050
21000
Horticulture works;NERIUM OLIANDER
250
210
52500
Horticulture works;MILLINGTONIA HORTENSIS
25
930
23250
Horticulture works;LEUCOPHYLLUM FRUTESCENS
200
35
7000
Horticulture works;LANTANA WHITE
200
20
4000
Horticulture works;LANTANA BLUE
200
20
4000
Horticulture works;JATROPHA INTEGERRIMA
200
35
7000
Horticulture works;IXORA CHINENSIS YELLOW
200
57
11400
Horticulture works;HYMENOCALYS LITEROLIS VARIEGATA NARROW LEAF
200
20
4000
Horticulture works;HYMENOCALYS LITEROLIS NARROW LEAF
200
20
4000
Horticulture works;HAMELIA PATENS
200
30
6000
Horticulture works;FICUS MICROCARPA
200
980
196000
Horticulture works;EUPHORBIA MILLII RED DWARF
200
60
12000
Horticulture works;DRACAENA MAHATMA
150
45
6750
Horticulture works;DRACAENA COLORAMA RED
150
30
4500
Horticulture works;DIANELLA VARIEGATA
150
28
4200
Horticulture works;CUPHEA HYSSOPIFOLIA
150
20
3000
Horticulture works;CROTON VERIGATUM DUCK FOOT
150
45
6750
Horticulture works;CORDIA SEBESTENA
25
910
22750
Horticulture works;CASSIA FISTULA
25
980
24500
Horticulture works;CAESALPINIA PULCHERRIMA
250
45
11250
Horticulture works;ARECA PALM
250
255
63750
Horticulture works;ALTERNENTHERA RED
250
20
5000
Horticulture works;ALPINIA ZERUMBET
250
80
20000
Horticulture works;cost of plant:- ALAMANDA YELLOW
250
20
5000
Horticulture works;Topiary / Palms / Garden tree planting ? Digging of 60x60x60 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt)) UFSR 2019-20 (371 (4a)). Tall plats of 21"x 21" size bags
50
385
19250
Horticulture works;Topiary / Palms / Garden tree planting ? Digging of 75x75x75 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt))
50
746
37300
Horticulture works;Hedge / shrub planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material. UFSR 2019-20 (371- 3(b))
1226.99
756
928206
Horticulture works;Regular watering and removal of weeds, protection etc for 45 days for initial establishment. 371 (1) d.
3906.98
9
38640
Horticulture works;Carpet grass laying and Ramming (371 (c)
2579.99
58
149897
Horticulture works;Cost of the Carpet grass (371 (b)
2579.99
161
416410
Horticulture works;Bed preparation: Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller (4? thickness after rolling), including the cost of red earth, sand and labour charges etc complete but excluding the cost of fertilizers, chemicals and grass. (371 (a) i.Lawns
2579.99
333
861072