For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Tribal Welfare Engineering Department - TWED Tender

Works
Civil And Construction
Road Construction
Opening Date27 Sep 2023
Closing Date3 Oct 2023
Tender Amount₹ 6,16,52,450 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road work;Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

7.5

1030

7730

... More
Road work;Providing Plain/reinforced Cement Concrete (1:3:6) mix M10 Grade using 40mm (SS5) size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost and conveyance of all materials to site like cement, fine aggregate , and labour charges for centering, machine mixing, laying concrete in position, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., as per technical specification MoRT&H 1500, 1700, 2100 (4th Revision), and 802, 803, 1202 and 1203 MORDas directed by the Engineer-in-Charge complete for finished item of work for levelling course.

6.99

5648

39481

... More
Road work;Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations

62.7

122

7706

... More
Road work;Construction of improved subgrade/ Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively"&" and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement of Table 300.2 with as per Technical"&" Specification Clause 303 MORD / 305 MORTH, by using machinery including contractors profit & Over head charges

990

466

461340

... More
Road work;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, with water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

75

7702

577703

... More
Road work;Bituminous Concrete: Providing and laying bituminous concrete with 40 TO 60 TPH HMP/100-120 BMP batch type hot mix plnat producing an average uotput of 75 tonnes per hour using crushed aggregates of grading -II premixed with bitumonous binder 60/70 @ 5.4 to 5.6 percent of mix and filler with stone dust, trnsporting the hot mix to work site, laying with a mechanical paver to the required grade, level and alignment, rolling with smooth wheeled , vibratory and tandom rollers to achieve the desired compaction as per MORTH specification clause No 507 cmplete in all respects.

371.5

10808

4015291

... More
Road work;Tack Coat: Providing and applying tack coat with bitumen Emulsion (Rapid settting-1) using Emulsion pressure distributor at the rate of 0.275kgs per sqm on the prepared bituminous surface cleaned with hydralic broom as per MoRT&H Specification 503 (4th revision) and 503 MORD as directed by the Engineer-in-Charge complete for finished item of work.

12375

15

193669

... More
Road work;Prime Coat: Providing and applying Primer Coat (LOW POROSITY) with Bitumen emulsion SS-1 on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechincal measns as per technical specification Clause 502 of MORD.

12375

55

688669

... More
Road work;Wet Mix Macadam:Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate as per table 400.11 and 400.12 of MORD to Wet Mix macadem specification including cost,seignorage of all materials and including premixing the material with water at OMC in Mechanical mix plant (pug mill) carriag of mixed material by tipper to site , laying in uniform layers with motor grader on base course on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (4th revision) and 406 MORD complete for finished item of work. (Payment based on levels for finished item of work)

1857

3073

5706561

... More
Road work;GSB Grading-III: Construction of Granular sub-base by providing HBG material confirming to Grading - III of MoRT&H Table 400-2 and Table 400.1 of MORD including cost, and conveyance of all materials to work site and spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., as per technical specification 401 MORTH (4th revision) and 401 MORD and as directed by the Engineer-in-charge complete for finished item of work ( Payment will be made based on levels for finished item of work ).

1980

2414

4779918

... More
Road work;Embankment Carted earth:Forming embankment with approved material obtained from borrowpits with a lead upto 1000 meters useful from outside road boundary by mechanical means upto SDR with all leads and lifts, including pre-watering of soil at borrow area, removal of top soil, excavation and conveyance of soils and depositing the soil on the embankment, spreading, breaking clods, sectioning, grading and consilodation with vibratory roller at OMC to meet the requirement of table 300-2 of MoRT&H and table 300.1 and 300.2, of MORD including all hire and operational charges of T&P and, as per MoRT&H specification 305 (4th revision) 301.5 of MORD complete for finished item of work. (Payment will be made based on level for finished item of work).

12000

242

2914800

... More
Road work;Embankment Side Earth: Construction of embankment with approved materials deposited at site from roadway cutting and excaion from drain (not exceeding 0.6 m depth) and foundation of other structures including breaking clods, ramming, "&"spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per "&" requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD/ 305 MORTH including contractors profit & Over head charges

6243

106

665004

... More
Road work;Jungle clearence Clearing and grubbing road land by mechanical means including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201 MORD / MORTH complete for finished item of work.

9900

2

25245

... More
Road work;Providing, laying Reinforced cement concrete Hume pipes of 1000 mm diameter NP-3 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 1000 mm diameter R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H (4th Revision) Specification Clauses 2900, 2905 & 2906, IRC Special Publication No: 13 and 1106 MORD as directed by the Engineer-in-Charge, complete for finished item of work.

30

10969

329090

... More
Road work;Vibrated plain / reinforced cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and sconveyance of all materials to site, and all labour charges for machine mixing, laying concrete in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per technical specification MoRT&H 1500,1700, 2200 (4th Revision), and 802, 804, 805, 806, 807, 1202 and 1204 MORD complete for finished item of work for Sub structure for body walls, parapet walls, Abutments, Piers and wing walls.

40

6114

244568

... More
Road work;Vibrated plain / reinforced cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site, and all labour charges for machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., as per technical specification MoRT&H 1500,1700, 2100 (4th Revision), and 802, 803, 1202 and 1203 MORD complete for finished item of work for footings of Abutments, Piers, Wing walls and Raft foundations - Foundations

46.16

5780

266835

... More
Road work;Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

10

1030

10307

... More
Road work;Providing Plain/reinforced Cement Concrete (1:3:6) mix M10 Grade using 40mm (SS5) size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost and conveyance of all materials to site like cement, fine aggregate , and labour charges for centering, machine mixing, laying concrete in position, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., as per technical specification MoRT&H 1500, 1700, 2100 (4th Revision), and 802, 803, 1202 and 1203 MORDas directed by the Engineer-in-Charge complete for finished item of work for levelling course.

9.32

5648

52641

... More
Road work;Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations

83.6

122

10274

... More
Road work;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, with water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

80

7713

617096

... More
Road work;Construction of improved subgrade/ Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively"&" and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement of Table 300.2 with as per Technical"&" Specification Clause 303 MORD / 305 MORTH, by using machinery including contractors profit & Over head charges

1095

466

510270

... More
Road work;Bituminous Concrete: Providing and laying bituminous concrete with 40 TO 60 TPH HMP/100-120 BMP batch type hot mix plnat producing an average uotput of 75 tonnes per hour using crushed aggregates of grading -II premixed with bitumonous binder 60/70 @ 5.4 to 5.6 percent of mix and filler with stone dust, trnsporting the hot mix to work site, laying with a mechanical paver to the required grade, level and alignment, rolling with smooth wheeled , vibratory and tandom rollers to achieve the desired compaction as per MORTH specification clause No 507 cmplete in all respects.

411

10808

4442220

... More
Road work;Tack Coat: Providing and applying tack coat with bitumen Emulsion (Rapid settting-1) using Emulsion pressure distributor at the rate of 0.275kgs per sqm on the prepared bituminous surface cleaned with hydralic broom as per MoRT&H Specification 503 (4th revision) and 503 MORD as directed by the Engineer-in-Charge complete for finished item of work.

13688

15

214217

... More
Road work;Prime Coat: Providing and applying Primer Coat (LOW POROSITY) with Bitumen emulsion SS-1 on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechincal measns as per technical specification Clause 502 of MORD.

13688

55

761737

... More
Road work;Wet Mix Macadam:Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate as per table 400.11 and 400.12 of MORD to Wet Mix macadem specification including cost,seignorage of all materials and including premixing the material with water at OMC in Mechanical mix plant (pug mill) carriag of mixed material by tipper to site , laying in uniform layers with motor grader on base course on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (4th revision) and 406 MORD complete for finished item of work. (Payment based on levels for finished item of work)

2054

3073

6312147

... More
Road work;GSB Grading-III: Construction of Granular sub-base by providing HBG material confirming to Grading - III of MoRT&H Table 400-2 and Table 400.1 of MORD including cost, and conveyance of all materials to work site and spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., as per technical specification 401 MORTH (4th revision) and 401 MORD and as directed by the Engineer-in-charge complete for finished item of work ( Payment will be made based on levels for finished item of work ).

2190

2414

5287098

... More
Road work;Embankment Carted earth:Forming embankment with approved material obtained from borrowpits with a lead upto 1000 meters useful from outside road boundary by mechanical means upto SDR with all leads and lifts, including pre-watering of soil at borrow area, removal of top soil, excavation and conveyance of soils and depositing the soil on the embankment, spreading, breaking clods, sectioning, grading and consilodation with vibratory roller at OMC to meet the requirement of table 300-2 of MoRT&H and table 300.1 and 300.2, of MORD including all hire and operational charges of T&P and, as per MoRT&H specification 305 (4th revision) 301.5 of MORD complete for finished item of work. (Payment will be made based on level for finished item of work).

12385

242

3008317

... More
Road work;Embankment Side Earth: Construction of embankment with approved materials deposited at site from roadway cutting and excaion from drain (not exceeding 0.6 m depth) and foundation of other structures including breaking clods, ramming, "&"spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per "&" requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD/ 305 MORTH including contractors profit & Over head charges

5122

106

545595

... More
Road work;Jungle clearence Clearing and grubbing road land by mechanical means including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201 MORD / MORTH complete for finished item of work.

10950

2

27923

... More
Road work;Providing, laying Reinforced cement concrete Hume pipes of 1000 mm diameter NP-3 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 1000 mm diameter R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H (4th Revision) Specification Clauses 2900, 2905 & 2906, IRC Special Publication No: 13 and 1106 MORD as directed by the Engineer-in-Charge, complete for finished item of work.

37.5

10969

411362

... More
Road work;Vibrated plain / reinforced cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and sconveyance of all materials to site, and all labour charges for machine mixing, laying concrete in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per technical specification MoRT&H 1500,1700, 2200 (4th Revision), and 802, 804, 805, 806, 807, 1202 and 1204 MORD complete for finished item of work for Sub structure for body walls, parapet walls, Abutments, Piers and wing walls.

50

6114

305710

... More
Road work;Vibrated plain / reinforced cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site, and all labour charges for machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., as per technical specification MoRT&H 1500,1700, 2100 (4th Revision), and 802, 803, 1202 and 1203 MORD complete for finished item of work for footings of Abutments, Piers, Wing walls and Raft foundations - Foundations

57.7

5780

333544

... More
Road work;Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

12.5

1030

12884

... More
Road work;Providing Plain/reinforced Cement Concrete (1:3:6) mix M10 Grade using 40mm (SS5) size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost and conveyance of all materials to site like cement, fine aggregate , and labour charges for centering, machine mixing, laying concrete in position, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., as per technical specification MoRT&H 1500, 1700, 2100 (4th Revision), and 802, 803, 1202 and 1203 MORDas directed by the Engineer-in-Charge complete for finished item of work for levelling course.

15.55

5648

87829

... More
Road work;Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations

104.5

122

12843

... More
Road work;Bituminous Concrete: Providing and laying bituminous concrete with 40 TO 60 TPH HMP/100-120 BMP batch type hot mix plnat producing an average uotput of 75 tonnes per hour using crushed aggregates of grading -II premixed with bitumonous binder 60/70 @ 5.4 to 5.6 percent of mix and filler with stone dust, trnsporting the hot mix to work site, laying with a mechanical paver to the required grade, level and alignment, rolling with smooth wheeled , vibratory and tandom rollers to achieve the desired compaction as per MORTH specification clause No 507 cmplete in all respects.

326.5

10808

3528910

... More
Road work;Tack Coat: Providing and applying tack coat with bitumen Emulsion (Rapid settting-1) using Emulsion pressure distributor at the rate of 0.275kgs per sqm on the prepared bituminous surface cleaned with hydralic broom as per MoRT&H Specification 503 (4th revision) and 503 MORD as directed by the Engineer-in-Charge complete for finished item of work.

10875

15

170194

... More
Road work;Prime Coat: Providing and applying Primer Coat (LOW POROSITY) with Bitumen emulsion SS-1 on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechincal measns as per technical specification Clause 502 of MORD.

10875

55

605194

... More
Road work;Wet Mix Macadam:Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate as per table 400.11 and 400.12 of MORD to Wet Mix macadem specification including cost,seignorage of all materials and including premixing the material with water at OMC in Mechanical mix plant (pug mill) carriag of mixed material by tipper to site , laying in uniform layers with motor grader on base course on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (4th revision) and 406 MORD complete for finished item of work.

1632

3073

5015136

... More
Road work;Construction of improved subgrade/ Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively"&" and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement of Table 300.2 with as per Technical"&" Specification Clause 303 MORD / 305 MORTH, by using machinery including contractors profit & Over head charges

870

466

405420

... More
Road work;GSB Grading-III: Construction of Granular sub-base by providing HBG material confirming to Grading - III of MoRT&H Table 400-2 and Table 400.1 of MORD including cost, seigniorage charges and conveyance of all materials to work site and spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., as per technical specification 401 MORTH (4th revision) and 401 MORD and as directed by the Engineer-in-charge complete for finished item of work

1740

2414

4200534

... More
Road work;Embankment Carted earth:Forming embankment with approved material obtained from borrowpits with a lead upto 1000 meters useful from outside road boundary by mechanical means upto SDR with all leads and lifts, including pre-watering of soil at borrow area, removal of top soil, excavation and conveyance of soils and depositing the soil on the embankment, spreading, breaking clods, sectioning, grading and consilodation with vibratory roller at OMC to meet the requirement of table 300-2 of MoRT&H and table 300.1 and 300.2, of MORD including all hire and operational charges of T&P and , as per MoRT&H specification 305 (4th revision) 301.5 of MORD complete for finished item of work. (Payment will be made based on level for finished item of work).

11045

242

2682831

... More
Road work;Embankment Side Earth: Forming embankment with side earth by mechanical means including pre-watering of soil, removal of top soil, excavation of soils, depositing the soil on the embankment, spreading, breaking clods, sectioning, grading and consilodation with vibratory roller at OMC to meet the requirement of table 300-2 of MoRT&H including all hire and operational charges of T&P and seigniorage charges, as per MoRT&H specification 305 (4th revision) 301.5 of MORD complete for finished item of work. (Payment will be made based on level for finished item of work).

4732

106

504053

... More
Road work;Jungle clearence Clearing and grubbing road land by mechanical means including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201 MORD / MORTH complete for finished item of work.

8700

2

22185



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.