Tribal Welfare Engineering Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Tribal Welfare Engineering Department - TWED Tender
Civil And Construction
Bridge Construction
Opening Date27 Sep 2023
Closing Date3 Oct 2023
Tender Amount₹ 7,29,16,221
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
467720Bid Award Id
ViewTender No
SE/TW/WGL/NIT/711/2023-2024, Dt:23.09.2023Tender Authority
Tribal Welfare Engineering Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Road work;Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
7.5
1030
7730
... More
Road work;Providing Plain/reinforced Cement Concrete (1:3:6) mix M10 Grade using 40mm (SS5) size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost and conveyance of all materials to site like cement, fine aggregate , and labour charges for centering, machine mixing, laying concrete in position, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., as per technical specification MoRT&H 1500, 1700, 2100 (4th Revision), and 802, 803, 1202 and 1203 MORDas directed by the Engineer-in-Charge complete for finished item of work for levelling course.
9.33
5716
53330
... More
Road work;Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations
63
122
7743
... More
Road work;Bituminous Concrete: Providing and laying bituminous concrete with 40 TO 60 TPH HMP/100-120 BMP batch type hot mix plnat producing an average uotput of 75 tonnes per hour using crushed aggregates of grading -II premixed with bitumonous binder 60/70 @ 5.4 to 5.6 percent of mix and filler with stone dust, trnsporting the hot mix to work site, laying with a mechanical paver to the required grade, level and alignment, rolling with smooth wheeled , vibratory and tandom rollers to achieve the desired compaction as per MORTH specification clause No 507 cmplete in all respects.
197
10837
2134938
... More
Road work;Tack Coat: Providing and applying tack coat with bitumen Emulsion (Rapid settting-1) using Emulsion pressure distributor at the rate of 0.275kgs per sqm on the prepared bituminous surface cleaned with hydralic broom as per MoRT&H Specification 503 (4th revision) and 503 MORD as directed by the Engineer-in-Charge complete for finished item of work.
6563
15
101398
... More
Road work;Prime Coat: Providing and applying Primer Coat (LOW POROSITY) with Bitumen emulsion SS-1 on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechincal measns as per technical specification Clause 502 of MORD.
6563
54
358340
... More
Road work;Wet Mix Macadam:Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate as per table 400.11 and 400.12 of MORD to Wet Mix macadem specification including cost,seignorage of all materials and including premixing the material with water at OMC in Mechanical mix plant (pug mill) carriag of mixed material by tipper to site , laying in uniform layers with motor grader on base course on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (4th revision) and 406 MORD complete for finished item of work. (Payment based on levels for finished item of work)
985
3073
3027004
... More
Road work;Construction of improved subgrade/ Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively"&" and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement of Table 300.2 with as per Technical"&" Specification Clause 303 MORD / 305 MORTH, by using machinery including contractors profit & Over head charges
525
465
244629
... More
Road work;GSB Grading-III: Construction of Granular sub-base by providing HBG material confirming to Grading - III of MoRT&H Table 400-2 and Table 400.1 of MORD including cost, and conveyance of all materials to work site and spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., as per technical specification 401 MORTH (4th revision) and 401 MORD and as directed by the Engineer-in-charge complete for finished item of work ( Payment will be made based on levels for finished item of work ).
1050
2414
2534910
... More
Road work;Embankment Carted earth:Forming embankment with approved material obtained from borrowpits with a lead upto 1000 meters useful from outside road boundary by mechanical means upto SDR with all leads and lifts, including pre-watering of soil at borrow area, removal of top soil, excavation and conveyance of soils and depositing the soil on the embankment, spreading, breaking clods, sectioning, grading and consilodation with vibratory roller at OMC to meet the requirement of table 300-2 of MoRT&H and table 300.1 and 300.2, of MORD including all hire and operational charges of T&P and, as per MoRT&H specification 305 (4th revision) 301.5 of MORD complete for finished item of work. (Payment will be made based on level for finished item of work).
6276
242
1524440
... More
Road work;Embankment Side Earth: Construction of embankment with approved materials deposited at site from roadway cutting and excaion from drain (not exceeding 0.6 m depth) and foundation of other structures including breaking clods, ramming, "&"spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per "&" requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD/ 305 MORTH including contractors profit & Over head charges
2753
106
293250
... More
Road work;Jungle clearence Clearing and grubbing road land by including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201 MORD / MORTH complete for finished item of work.
5250
2
13388
... More
Road work;Construction of improved subgrade/ Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively"&" and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement of Table 300.2 with as per Technical"&" Specification Clause 303 MORD / 305 MORTH, by using machinery including contractors profit & Over head charges
750
288
216353
... More
Road work;Providing 30mm thick compacted Bituminous Concrete with 100-120 TPH batch type hot mix plant/ 40-60 TPH using HBG crushed stone aggregate of Graing-2 as per table 500-17 of specification 507 of MoRT&H (5th revision), premixed with bitumen VG-30 grade @ 5.4% of mix and filter, transporting the hot mix to work site, laying with mechanical paver finisher tothe required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification 507 (5th revision) complete for finished iem of work
112.5
10952
1232198
... More
Road work;Tack Coat: Providing and applying tack coat with bitumen Emulsion (Rapid settting-1) using Emulsion pressure distributor at the rate of 0.275kgs per sqm on the prepared bituminous surface cleaned with hydralic broom as per MoRT&H Specification 503 (4th revision) and 503 MORD as directed by the Engineer-in-Charge complete for finished item of work.
3750
15
58313
... More
Road work;Prime Coat: Providing and applying Primer Coat (LOW POROSITY) with Bitumen emulsion SS-1 on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechincal measns as per technical specification Clause 502 of MORD.
3750
56
213113
... More
Road work;Wet Mix Macadam:Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate as per table 400.11 and 400.12 of MORD to Wet Mix macadem specification including cost,seignorage of all materials and including premixing the material with water at OMC in Mechanical mix plant (pug mill) carriag of mixed material by tipper to site , laying in uniform layers with motor grader on base course on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (4th revision) and 406 MORD complete for finished item of work. (Payment based on levels for finished item of work)
562.5
3013
1694953
... More
Road work;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H (Table 400-1 & 400-2) including cost, and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix-in-place method with rotavator / approved means at OMC and compacting with vibratory roller to achieve CBR value minimum of 30% at 98% of dry density and PI value maximum 6, complete for finished item of work as per MoRT&H Specification 401 (5th revision) including contractors profit & Over head charges excluding Seignarage charges etc
600
2696
1617876
... More
Road work;Construction of Granular Sub - Base by proaviding well graded grading - C material (Table 400.2) having soaked CBR not less than 15% and Plasticity Index <6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreading the same with grader in uniform layers of loose thickness of not more than 225 mm including mixing by mix in place method with rotavator to OMC and compacting with vibratory roller of 80 KN to 100 KN capacity to achieve the desired density, comlplete as per IRC technical specification clause 402.3 of MORD. including all over heads, and contractors profit but excluding GST and Seignorage charges.
400
1072
428872
... More
Road work;Embankment Carted earth:Forming embankment with approved material obtained from borrowpits with a lead upto 1000 meters useful from outside road boundary by mechanical means upto SDR with all leads and lifts, including pre-watering of soil at borrow area, removal of top soil, excavation and conveyance of soils and depositing the soil on the embankment, spreading, breaking clods, sectioning, grading and consilodation with vibratory roller at OMC to meet the requirement of table 300-2 of MoRT&H and table 300.1 and 300.2, of MORD including all hire and operational charges of T&P and , as per MoRT&H specification 305 (4th revision) 301.5 of MORD complete for finished item of work. (Payment will be made based on level for finished item of work).
8000
270
2167520
... More
Road work;Jungle clearence Clearing and grubbing road land by including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201 MORD / MORTH complete for finished item of work.
2400
3
9408
... More
Road work;Construction of RCC guide posts of 250 mm dia M 20 grade cast-in-situ with 20 mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2 including contractors profit & Over head charges, excluding GST and seigneorage etc., complete.
210
890
186961
... More
Road work;Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm.
812
152
123424
... More
Road work;Forming Embankment with material obtained from borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P, complete for finished item of work as per MoRT&H specification 305 (5th revision). (The soil CBR>10%, PI<18% & MDD>1.8 g/cc)
2040
270
552718
... More
Road work;Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, VAT etc., complete
79.63
991
78913
... More
Road work;Drainage spouts complete as per drawing and technical specifications Clause 1209 MORD & 2705 MORTH
48
3072
147479
... More
Road work;Providing weep holes in plain / reinforced concrete Abutments, Return walls and wing walls with 110mm Diameter PVC pipe extending through the full width of the structure at 1.00m C/C in both horizontal and vertical direction so that the weep holes in each horizontal direction is staggered from the weep holes laying above and below lines as shown in drawing including cost and conveyance of the A.C pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream side face etc., as per technical specification MoRT&H 2706 & 2200 (4th Revision), 614, 709, 1204.3.7 MORD complete for finished item of work for weep holes.
150
375
56358
... More
Road work;Back filling behind Abutments Wing walls and return wall complete with gravel including cost and conveyance of all materials to site, and , of all materials and labour charges etc., complete as per Clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 (4th Revision) and 1204.3.8 MORD as per Drawing and complete for finished item of work.
1230.76
658
810212
... More
Road work;Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBG metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveyance of all metal seignorage charges ,and all labour charges as directed by the departmental officers as per drawing and Technical specifications as per clause 710.1.4 of IRC:78 and Clause 2200 of MoRT&H (4th Revision) and 1204.3.8 MORD complete for finished item of work.
79.32
2467
195704
... More
Road work;Providing and laying boulders apron for bed protection against scour with stone boulders weighing not less than 40kg each complete as per drawing and specification. complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge
73.49
1989
146226
... More
Road work;Providing HYSD bars (Fe-500) of different diameters, wrought and put up bars of all diameters Like TATA, SAIL, VSP Jindals & Shyam Steel Etc) including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per technical specification MoRT&H 1600 & 2200 (4th revision) and 1002, 1005, 1010, 1202 MORD and as per I.S.1786 of 1985 complete for finished item of work for Foundation
34
73931
2513673
... More
Road work;Providing HYSD bars (Fe-500) of different diameters, wrought and put up bars of all diameters Like TATA, SAIL, VSP Jindals & Shyam Steel Etc) including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per technical specification MoRT&H 1600 & 2200 (4th revision) and 1002, 1005, 1010, 1202 MORD and as per I.S.1786 of 1985 complete for finished item of work for Sub Structure
42
74201
3116468
... More
Road work;Providing HYSD bars (Fe-500) of different diameters, wrought and put up bars of all diameters Like TATA, SAIL, VSP Jindals & Shyam Steel Etc) including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per technical specification MoRT&H 1600 & 2200 (4th revision) and 1002, 1005, 1010, 1202 MORD and as per I.S.1786 of 1985 complete for finished item of work for Super Structure
72
76076
5477532
... More
Road work;Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-20 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified 809 MORTH
259.84
5325
1383648
... More
Road work;Vibrated cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregates( 50% of Manufactured sand and 50% of natural river sand)) conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification 1500, 1600, 1700 & 2702 as directed by the Engineer-in-Charge for Wearing Coat.
218.33
7211
1574482
... More
Road work;Vibrated reinforced cement concrete M30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregates( 50% of Manufactured sand and 50% of natural river sand)) conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing but excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2704 (5th Revision) and as directed by the Engineer-in-Charge for Approach slab.
15.75
7311
115161
... More
Road work;Plain Cement Concrete M 15 Grade (1:2.5:5) using 40mm, 20mm, and 10mm size HBG crushed strone aggregate (coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying concrete in position, compacting, vibrating and curing including all other incidential and all other operational charges of T&P required etc., complete as per MoRT&H specification 1500, 1700, 2100 and 2700 (4th Revision) and 800 and 1211 MORD complete for finished item of work for Levelling course below approach slab
110.78
6624
733837
... More
Road work;Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregates( 50% of Manufactured sand and 50% of natural river sand)) conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for superstructure (Deck Slab)
861.94
8653
7459039
... More
Road work;Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregates( 50% of Manufactured sand and 50% of natural river sand)) conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200 (5th revision ) and as directed by the Engineer-in-Charge for Bed blocks & Backing walls
78.73
7863
619103
... More
Road work;Providing PCC M20 mix using 40mm, 20mm & 10mm size HBG crushed stone aggregate and fine aggregates( 50% of Manufactured sand and 50% of natural river sand) conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for Sub-structure.
2107.03
7422
15639346
... More
Road work;Vibrated cement concrete M20 Grade Concrete using 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate (Natural sand 50%+Manufactured sand(Rock Sand)50% ) conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for footing ( Body walls, Wing wall)
1720.38
7090
12198561
... More
Road work;Providing Plain/reinforced Cement Concrete (1:3:6) mix M10 Grade using 40mm (SS5) size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost and conveyance of all materials to site like cement, fine aggregate ( natural river sand and Manufactured Sand (Rock sand) in the ratio of 50:50), and labour charges for centering, machine mixing, laying concrete in position, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., as per technical specification MoRT&H 1500, 1700, 2100 (4th Revision), and 802, 803, 1202 and 1203 MORDas directed by the Engineer-in-Charge complete for finished item of work for levelling course.
151.53
5962
903431
... More
Road work;Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations
2461.53
122
302645