Tribal Welfare Engineering Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Tribal Welfare Engineering Department - TWED Tender
Civil And Construction
Bridge Construction
Opening Date20 Sep 2023
Closing Date25 Sep 2023
Tender Amount₹ 1,97,66,666
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
460664Bid Award Id
ViewTender No
SE/TW/WGL/NIT/610/2023-2024, Dt: 14.09.2023Tender Authority
Tribal Welfare Engineering Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Road work;Construction of RCC railing of M25 grade using HBG crushed stone aggregate of size not exceeding 20mm and fine aggregate conforming to table 1000-2 true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical posts not to exceed 2000mm, leaving adequate space between vertical posts for expansion including cost and conveyance of all materials to site and labour charges for centring, machine mixing, laying concrete in position vibrating , curing etc., includinH other incidential hire and operational charges of all T&P as per approved drawings and as direted during execution, excluding cost of steel and its fabriaction charges as per approved drawings and technical specifications per MoRT&H 2703, 1500, 1600, 1700(4th Revision) and 800, 900 and 1208.3 MORD comp0lete for finished itemof work as per standard plans of MORTH visde drawings No.SD/202.
100.4
1200
120500
... More
Road work;Providing weep holes in plain / reinforced concrete Abutments, Return walls and wing walls with 110mm Diameter PVC pipe extending through the full width of the structure at 1.00m C/C in both horizontal and vertical direction so that the weep holes in each horizontal direction is staggered from the weep holes laying above and below lines as shown in drawing including cost and conveyance of the A.C pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream side face etc., as per technical specification MoRT&H 2706 & 2200 (4th Revision), 614, 709, 1204.3.7 MORD complete for finished item of work for weep holes.
44
343
15123
... More
Road work;Back filling behind Abutments Wing walls and return wall complete with gravel including cost and conveyance of all materials to site, and , of all materials and labour charges etc., complete as per Clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 (4th Revision) and 1204.3.8 MORD as per Drawing and complete for finished item of work.
1314
1029
1352369
... More
Road work;Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBG metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveyance of all metal seignorage charges ,and all labour charges as directed by the departmental officers as per drawing and Technical specifications as per clause 710.1.4 of IRC:78 and Clause 2200 of MoRT&H (4th Revision) and 1204.3.8 MORD complete for finished item of work.
72.5
3778
273920
... More
Road work;Providing and laying pitching with stone boulders(not less than 40 kgs) on slopes laid over prepared filter media including boulders apron laid dry in front of toe of embankment complete as per drawing and MORT&H specification 2504 and as directed by the Engineer-in-charge including cost and conveyance of all materials to the site and labour charges & includes contractors profit and etc., complete for finished item of work.
589.41
4325
2549375
... More
Road work;Providing HYSD bars (Fe-500) of different diameters, wrought and put up bars of all diameters Like TATA, SAIL, VSP Jindals & Shyam Steel Etc) including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per technical specification MoRT&H 1600 & 2200 (4th revision) and 1002, 1005, 1010, 1202 MORD and as per I.S.1786 of 1985 complete for finished item of work for Sub Structure
50
79074
3953720
... More
Road work;Vibrated Reinforced cement concrete M25 grade using 40mm, 20mm, and 10mm size HBG crushed strone aggregate (coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying concrete in position, compacting, vibrating and curing including all other incidential and all other operational charges of T&P required etc., complete as per MoRT&H specification 1500, 1600, 1700, 2704 and (4th Revision) and 800 and 1211 MORD complete for finished item of work for approach slab
21.99
7470
164267
... More
Road work;Vibrated reinforced cement concrete M30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site and labour charges for centering, machine mixing, laying concrete in position, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing BD/1-69 (A) but excluding cost of steel and its fabrication charges as per technical specification MoRT&H 1500, 1600,1700, & 2702 (4th Revision) and 800, 1206.3 MORD as directed by the Engineer-in-Charge complete for finished item of work for wearing coat over Deck Slab
77.91
8685
676711
... More
Road work;Vibrated reinforced cement concrete design mix M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site, , and labour charges for centering, machine mixing, laying concrete in position, vibrating, curing etc., including other incidental hire and operational charges of all T&P etc., complete as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRTH specification 1500,1600,1700 & 2200 (4th revision ) and 800, 1205.4, 1205.5 MORD and as directed by the Engineer-in-Charge for Deck slab.
286.12
9930
2841286
... More
Road work;Vibrated reinforced cement concrete design mix M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site, , and labour charges for centering, machine mixing, laying concrete in position, vibrating, curing etc., including other incidental hire and operational charges of all T&P etc., complete as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRTH specification 1500,1600,1700 & 2200 (4th revision ) and 800, 1205.4, 1205.5 MORD and as directed by the Engineer-in-Charge for Bed Blocks
15.51
9930
154021
... More
Road work;Vibrated plain / reinforced cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and sconveyance of all materials to site, and all labour charges for machine mixing, laying concrete in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per technical specification MoRT&H 1500,1700, 2200 (4th Revision), and 802, 804, 805, 806, 807, 1202 and 1204 MORD complete for finished item of work for Sub structure for body walls, parapet walls, Abutments, Piers and wing walls.
434.99
7133
3102784
... More
Road work;Vibrated plain / reinforced cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and sconveyance of all materials to site, and all labour charges for machine mixing, laying concrete in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per technical specification MoRT&H 1500,1700, 2200 (4th Revision), and 802, 804, 805, 806, 807, 1202 and 1204 MORD complete for finished item of work for Sub structure for body walls, parapet walls, Abutments, Piers and wing walls.
405.21
7133
2890363
... More
Road work;Vibrated plain / reinforced cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site, and all labour charges for machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., as per technical specification MoRT&H 1500,1700, 2100 (4th Revision), and 802, 803, 1202 and 1203 MORD complete for finished item of work for footings of Abutments, Piers, Wing walls and Raft foundations - Foundations
70.73
6743
476993
... More
Road work;Providing Plain/reinforced Cement Concrete (1:3:6) mix M10 Grade using 40mm (SS5) size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost and conveyance of all materials to site like cement, fine aggregate , and labour charges for centering, machine mixing, laying concrete in position, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., as per technical specification MoRT&H 1500, 1700, 2100 (4th Revision), and 802, 803, 1202 and 1203 MORDas directed by the Engineer-in-Charge complete for finished item of work for levelling course.
86.9
6724
584372
... More
Road work;Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations
3229.92
128
414399
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements