Tribal Welfare Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Tribal Welfare Engineering Department - TWED Tender

Opening Date24 Dec 2020
Closing Date7 Jan 2021
Tender Amount₹ 68,93,773 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
CIVIL WORK;Supply and transportation of 90WATT . LED Flood light Luminaire made of pressure die cast aluminum housing with powdercoated, having toughened glass cover,IP 65/66 (Silicon gasket ensures Optical & Electrical compartments are IP 66 )protected, input voltage range of 100 to 270 volts AC,power factor = 0.90, high power LED's having efficacy 130lumens/watt and junction temperature < 85 degree centigrade of IP65 with optics, total harmonic distortion less than 125% at 110 Volts AC, driver efficiency =925% etc complete. LUMINAIRE MAKE : PHILIPS / OSRAM / GE / CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX / HAVELLS / HPL.LED MAKE : PHILIPS LUMILEDS / CREE / N

15

-

178881

... More
CIVIL WORK;Supply and transportation of 22W,+/10% > 2300 lumens,1200mm length LED light houding made with allumnium anodised body , wide operating voltage with PF=0.9, Surge protection: 2KV,THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K, as desired by the partment as per IS minimum CRI=80,.etc., complete 5 Years Warranty with BIS Certification with BIS Certification. LUMINAIRE MAKE: Phillips / OSRAM / GE / Crompton / VIN / Bajaj / Havells / Halonix / HPL. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs

55

-

55429

... More
CIVIL WORK;Supply and fixing 8 way SPN Distribution board with IP-20 protection of make Standard / Havells / HPL/Toyoma/ C &S.. suitable for single phase 40A Double pole Isolator of make Standard / Havells / HPL/Toyoma/ C &S. as incomer and 10KA-6-32A range single pole miniature circuit breakers Six numbers (6Nos) as out going with internal connections including cost and conveyance of all materials to site, labour charges for surface / flush mounting etc., sales tax complete for finished item of work.

2

-

8701

... More
CIVIL WORK;Supply and fixing of batten holder / slanting holder Anchor / Gold medal olive / Million zoom make with ISI mark in lieu of ceiling rose of light point with 40W bulb all connections including cost and conveyance of all materials to site, labour charges and sales tax etc., complete for finished item of work.

10

-

1079

... More
CIVIL WORK;Supply and Fixing of 16A 3pin and 6A 3pin plug socket with indicator lamp and 16A fuse unit and 16A switch control (5 in 1) of Milltec / Vimal opel / Maru mantero / Starex smil / CPL make with ISI mark duly recessed in wall with wooden deep box of 6" x8" x2 1/2" size covered with hylam sheet including earth ontinuity including cost and conveyance of all materials to site, labour charges and sales tax etc. complete for finished item of work

35

-

14483

... More
CIVIL WORK;Supply and fixing of 6A 3/2 pin flush type socket with 6A switch control of Anchor / Gold medal olive / Million zoom make with ISI mark on a common switch board with earth continuity including wire leads, earth connections including cost and conveyance of all materials to site, labour charges and sales tax etc. complete, excluding seignerage & GST charges for finished item of work

55

-

8021

... More
CIVIL WORK;Supplying and wiring with 2 runs of 14/0.3m (1.00 Sq.mm) FRLS / HFFR P.V.C. insulated ISI Copper Cable GM/L&T/RPG/Havells/V-Guard/Power Flex/Polycab/Gold Medal/ Standard /Milion/ Vimal/ Suncab/ Paragaon/FortuneArt make in the existing metallic / non-metallic conduct pipe with 6A 1 Way flush type switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including cost and conveyance of all materials to site, labour charges and sales tax etc. complete, excluding seignerage & GST charges for finished item of work for light, bell, fan and exhaust fan points in Non-Residential Buildings

50

-

33740

... More
CIVIL WORK;Providing, laying Reinforced cement concrete Hume pipes of 1000 mm diameter NP-3 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 1000 mm diameter R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H (4th Revision) Specification Clauses 2900, 2905 & 2906, IRC Special Publication No: 13 and 1106 MORD as directed by the Engineer-in-Charge, complete for finished item of work.

15

-

158832

... More
CIVIL WORK;Vibrated plain / reinforced cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, seignorage and conveyance of all materials to site and all labour charges for machine mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per technical specification MoRT&H 1500,1700, 2200 (4th Revision), and 802, 804, 805, 806, 807, 1202 and 1204 MORD complete for finished item of work for Sub structure for body walls and parapet walls.

41.48

-

244790

... More
CIVIL WORK;Plain Cement Concrete (1:4:8) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, mixing concrete in concrete mixer, sales & other taxes on all materials, all operational, incidental, and labour charges such as laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work (APSS No. 402), excluding seignerage & GST charges for Levelling Course and Flooring Bed

10.86

-

57951

... More
CIVIL WORK;Earth work excavation and depositing on bank (manual means) with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work excluding seignerage charges and dewatering charges etc., complete for Foundation of Building.(APSS No. 308)

43.48

-

16725

... More
CIVIL WORK;Supply and fixing of Door size 0.98 x 1.98 M Double leaf with Door Frame of Medium Teak wood Section 100 mm x 75 mm and shutter of 35mm thick of solid bond wood block board type with commercial play on both faces, Hardware fixtures ie., MSPC Butt hinges 150mm long 6 Nos, MSPC Handles 150mm long 2 Nos, MSPC tower bolts 300mm long 1 No. MSPC Aldrop 300mm long 1 Nos MS Hold Fast 6 Nos. including cost and conveyane of all materials and all labour charges etc., complete

29.1

-

130921

... More
CIVIL WORK;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20{Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including contractors profit & Over head charges, But Excluding GST.

198.9

-

1376446

... More
CIVIL WORK;Dismantalling of existing Window and Doors and removing all the debries away from the site and including remaining the Bed Blocks etc., complete for finished item of work

85

-

20250

... More
CIVIL WORK;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20{Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including contractors profit & Over head charges, But Excluding GST.

160

-

1244320

... More
CIVIL WORK;Painting to New External Walls with two coats of Polymer Plastic Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 911)

209.6

-

40464

... More
CIVIL WORK;Roofing:- Labour Charges for Roofing of provided with 0.50mm thick Galvanzed /Prepainted GI Profiled Sheets fixed to the purlins with 14 size self drilling screws with Neoprence washers side laps are stitched with self topping/Drilling screws end laps are to be sealed with 25x3mm butyle taps. The shets are provided with anti capilary group.

210

-

12600

... More
CIVIL WORK;Supply of CENTURYWELLS or equivalent pre-painted Galvalume Trapezondal Profile Roofting sheets with 0.50mm thickness, coating Alu- Zinc Coating AZ 150 GSM, Tensile Strength 550 Mpa Paint Coating Regular Modified Polyester painting, Painting thickness (Top) 18 to 20 Micons (Bottom) 5 to 7 Microns Sheet Width 1.020, Length Maximum 12 Meters with Regular Range Colours.

210

-

92335

... More
CIVIL WORK;Manufacturing, Supply and fixing of 50.00 MM dia MS Tubular Purlins including cost and conveyance of all materials and labour charges etc., complete for finished item of work.

249

-

86826

... More
CIVIL WORK;Providing Skirting to internal walls and Risers of Steps to 15 cm height with Polished shabad / Tandur stone minimum 15 to 18 mm thick of size (0.254M x0.254M) length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete, etc., complete for finished item of work, Ground Floor

8.94

-

7877

... More
CIVIL WORK;Flooring and Treads with Polished shabad / Tandur stone minimum 15 to 18 mm thick of size (0.254M x0.254M) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete,, labour charges for dressing of flooring stones etc., complete for finished item of work. Ground Floor

100.6

-

80629

... More
CIVIL WORK;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for finished item of work. (APSS 901,903 & 904)

209.6

-

107743

... More
CIVIL WORK;Brick Masonry in superstructure with CM (1:8) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm, for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust with a compresive strength not lessthan 50 kg/sqm including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., for Superstructure Walls.

31.51

-

243616

... More
CIVIL WORK;Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, vibrating, curing etc, excluding seignerage & GST charges. complete for Columns.

3.81

-

52059

... More
CIVIL WORK;Painting to new internal walls with two (2) coats of ready mixed oil bound washable distemper acrylic base of approved brand and shade over a base coat of cement primer water base interior Grade-I of approved brand, makind three (3) coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work in all floors for internal walls (SS 911)

41.24

-

5106

... More
CIVIL WORK;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for finished item of work. (APSS 901,903 & 904)

41.24

-

20279

... More
CIVIL WORK;Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal, sand and water etc., complete, including seigniorage charges, etc., complete for finished item of work,

193.11

-

82497

... More
CIVIL WORK;Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement: fine aggregate: Coarse aggregate) using 40mm, 20mm, 10mm size Hard Broken Granite (IS383, 1970) Machine Crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing concrete in Concrete Mixer, laying, curing concrete, etc., complete for finished item of work (APSS No. 402) Bed Blocks and Hold fasts

14.44

-

100282

... More
CIVIL WORK;Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using Granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615)

70.37

-

293907

... More
CIVIL WORK;Construction of Gravel with naturally occuring gravel including cost, seigniorage charges and conveyance of all materials to work site and spreading in uniform layers by with motor graded on prepared surface, by mixing by mix in place method with rotovator and compacting with smooth wheeled roller to achieve the desired density at OMC etc., as per MoRT&H Specification 401& 407 (4th revision) and 408 MORD as directed by the Engineer-in-charge complete for finished item of work.

158.4

-

98865

... More
CIVIL WORK;Manufacturing, Supply and fixing of MS Angle 80.00mm and including cost and conveyance of all materials and labour charges etc., complete for finished item of work.

7.21

-

7946

... More
CIVIL WORK;Plain Cement Concrete (1:4:8) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, mixing concrete in concrete mixer, sales & other taxes on all materials, all operational, incidental, and labour charges such as laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work (APSS No. 402), excluding seignerage & GST charges for Levelling Course and Flooring Bed

9.56

-

51014

... More
CIVIL WORK;Earth work excavation and depositing on bank (manual means) with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work excluding seignerage charges and dewatering charges etc., complete for Foundation of Building.(APSS No. 308)

629.83

-

242264

... More
CIVIL WORK;Construction of Gravel with naturally occuring gravel including cost, seigniorage charges and conveyance of all materials to work site and spreading in uniform layers by with motor graded on prepared surface, by mixing by mix in place method with rotovator and compacting with smooth wheeled roller to achieve the desired density at OMC etc., as per MoRT&H Specification 401& 407 (4th revision) and 408 MORD as directed by the Engineer-in-charge complete for finished item of work.

708.75

-

442366

... More
CIVIL WORK;Earth work excavation for foundations and depositing on bank for all lifts and with initial lead of 10m including operational, incidental, seigniorage charges, labour charges such as shoring, sheeting, planking, strutting, dewatering etc., complete for finished item of work as per SS-20B (APSS No. 308) for Building Foundation

1417.5

-

545241

... More
CIVIL WORK;Construction of Granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with Rotavator at OMC and compacting with vibratory roller 80-100 kN capacity to to achieve the desired density etc., as per technical specification 402 MORD including overhead cahrgesw & contractor profit, But Excluding VAT & Seignorage Charges

1206.33

-

1588194

... More
CIVIL WORK;Cutting of Ground by mechanical means and cutting earth is leveled in low level areas and breaking clods and leveled with tractor blade etc., complete for finished item of work (Payment will be made based on level for finished item of work)

8909.45

-

526548

... More
CIVIL WORK;Clearing and grubbing road land by mechanical means including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201 MORD / MORTH complete for finished item of work.

10800

-

25380



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.