Tribal Welfare Engineering Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 62,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
559889Tender No
SE/TW/WGL/NIT/206/2024-2025, Dt: 26.11.2024Tender Authority
Tribal Welfare Engineering Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Road work;Prime Coat: Providing and applying Primer Coat (LOW POROSITY) with Bitumen emulsion SS-1 on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechincal measns as per technical specification Clause 502 of MORD.
3938
54
215409
... More
Road work;Wet Mix Macadam:Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate as per table 400.11 and 400.12 of MORD to Wet Mix macadem specification including cost,seignorage of all materials and including premixing the material with water at OMC in Mechanical mix plant (pug mill) carriag of mixed material by tipper to site , laying in uniform layers with motor grader on base course on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (4th revision) and 406 MORD complete for finished item of work.
591
3325
1965075
... More
Road work;GSB Grading-III: Construction of Granular sub-base by providing HBG material confirming to Grading - III of MoRT&H Table 400-2 and Table 400.1 of MORD including cost, seigniorage charges and conveyance of all materials to work site and spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., as per technical specification 401 MORTH (4th revision) and 401 MORD and as directed by the Engineer-in-charge complete for finished item of work
630
2623
1653089
... More
Road work;Embankment Carted earth:Forming embankment with approved material obtained from borrowpits with a lead upto 1000 meters useful from outside road boundary by mechanical means upto SDR with all leads and lifts, including pre-watering of soil at borrow area, removal of top soil, excavation and conveyance of soils and depositing the soil on the embankment, spreading, breaking clods, sectioning, grading and consilodation with vibratory roller at OMC to meet the requirement of table 300-2 of MoRT&H and table 300.1 and 300.2, of MORD including all hire and operational charges of T&P and , as per MoRT&H specification 305 (4th revision) 301.5 of MORD complete for finished item of work. (Payment will be made based on level for finished item of work).
3213
244
785900
... More
Road work;Jungle clearence Clearing and grubbing road land by mechanical means including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201 MORD / MORTH complete for finished item of work.
3150
2
8190
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements