Tribal Welfare Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Tribal Welfare Engineering Department - TWED Tender

Opening Date6 Aug 2019
Closing Date21 Aug 2019
Tender Amount₹ 2,12,98,717 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Gravel shoulders with naturally occuring gravel including cost, , and conveyance of all materials to work site and spreading in uniform layers by with motor grader on prepared surface, by mixing by mix in place method with rotovator and compacting with smooth wheeled roller to achieve the desired density at OMC etc., as per MoRT&H Specification 401& 407 (4th revision) and 408 MORD as directed by the Engineer-in-charge complete for finished item of work. Excluding Seignorage & GST Charges

1485

-

597.65

... More
Wet Mix Macadam:- Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate as per table 400.11 and 400.12 of MORD to Wet Mix macadem specification including cost,, of all materials and including premixing the material with water at OMC in Mechanical mix plant (pug mill) carrying of mixed material by tipper to site , laying in uniform layers with motor grader on base course on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (4th revision) and 406 MORD complete for finished item of work. (Payment based on levels for finished item of work) Excluding Seignorage & GST Charges

1856.25

-

2795

... More
Providing and applying Primer Coat (LOW POROSITY) with Bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechincal measns as per technical specification Clause 502 of MORD. Excluding Seignorage & GST Charges

12375

-

29.1

... More
Providing and applying tack coat with bitumen Emulsion (Rapid settting-1) using Emulsion pressure distributor at the rate of 0.275kgs per sqm on the prepared bituminous surface cleaned with hydralic broom as per MoRT&H Specification 503 (4th revision) and 503 MORD as directed by the Engineer-in-Charge complete for finished item of work. Excluding Seignorage & GST Charges

12375

-

12.15

... More
Providing, laying and rolling of Open Graded Premix Carpet of 20mm thickness composed of 13.2mm to 5.60mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base including mixing a suitable plant, laying and rolling with a three wheel 0-100KN static roller capacity, finished to required level and grades to be followed by seal coat of either type A or Type B or Type C as per technical specification clause 508 of MoRD including overhead charges & Contractors profit but excluding GST.& Seigneorage charges.

12375

-

160.55

... More
Providing and laying bituminous premixed seal coat (Type A) comprising of stone chipping of grading as defined in table 500.16 of MOST with Crushed stone chips of 6.7 mm size 100% passing through 9.5mm seive and retained on 2.36 mm sieve applied @ 0.09 cum per 10 sqm, chips to be premixed by manual means with the bitumunous binder using 6.50 kgs of bitumen VG 30 grade for 10 sqm and rolling with power roller including of required line, level, grade to serve as wearing course on previously prepared surface and finishing to required level and grades including cost and conveyance of all materials from approved sources and stacking at site to departmental gauge for premeasurements, labour charges and hire and operational charges of power road roller 8 to 10 tonnes capacity and all other machinery, tools and plants, providing barricading for diversion of traffic, erecting red flags other incidental and operational charges etc., complete for finished item of work as per technical specification clause 510 of MORD including contractors profit & Over head charges, Excluding GST and Seigneorage etc., complete for seal coat.

12375

-

69.25

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, with water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.Excluding Seignorage & GST Charges

180

-

-

... More
CONSTRUCTION OF SING ROW OF 1000MM DIA PIPE CULVERT

-

-

-

... More
Earthwork in excavation by mechanical means for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material and , as per Technical Specification 305 MORD / 304 MORTH Excluding Seignorage & GST Charges

200

-

105.25

... More
Providing and laying Type 'B' (first class) bedding for pipe of well compacted granular material (gravel) including cost and conveyance of all materials to site, labour charges and seigniorage charges etc., complete for finished item of work as per technical specification clause 1105 of MORD Excluding Seignorage & GST Charges

25

-

424

... More
Providing Plain Cement Concrete (1:3:6) mix M10 Grade using 40mm (SS5) size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, , conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., as per technical specification MoRT&H 1500, 1700, 2100 (4th Revision), and 802, 803, 1202 and 1203 MORDas directed by the Engineer-in-Charge complete for finished item of work for levelling course. Excluding Seignorage & GST Charges

30

-

4489.7

... More
Vibrated plain / reinforced cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, , and conveyance of all materials to site and all labour charges for machine mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per technical specification MoRT&H 1500,1700, 2200 (4th Revision), and 802, 804, 805, 806, 807, 1202 and 1204 MORD complete for finished item of work for Sub structure for Foundation. Excluding Seignorage & GST Charges

260

-

4702.25

... More
Providing, laying Reinforced cement concrete Hume pipes of 1000 mm diameter NP-3 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 1000 mm diameter R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H (4th Revision) Specification Clauses 2900, 2905 & 2906, IRC Special Publication No: 13 and 1106 MORD as directed by the Engineer-in-Charge, complete for finished item of work. Excluding Seignorage & GST Charges

75

-

8809.15

... More
CONSTRUCTION OF 1 VENT OF 3.00x2.00 Mtr Span RCC SLAB CULVERT

-

-

-

... More
Earthwork in excavation by mechanical means for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material and , as per Technical Specification 305 MORD / 304 MORTH Excluding Seignorage & GST Charges

116.48

-

105.25

... More
Providing Plain Cement Concrete (1:3:6) mix M10 grade using 40mm (SS5) size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, , conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., as per technical specification MoRT&H 1500, 1700, 2100 (4th Revision), and 802, 803, 1202 and 1203 MORDas directed by the Engineer-in-Charge complete for finished item of work for foundations. Excluding Seignorage & GST Charges

18.68

-

4489.7

... More
Vibrated plain / reinforced cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, , and conveyance of all materials to site and all labour charges for machine mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per technical specification MoRT&H 1500,1700, 2200 (4th Revision), and 802, 804, 805, 806, 807, 1202 and 1204 MORD complete for finished item of work for Sub structure for footings and raft foundations Excluding Seignorage & GST Charges

50.69

-

4702.25

... More
Vibrated plain / reinforced cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, , and conveyance of all materials to site and all labour charges for machine mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per technical specification MoRT&H 1500,1700, 2200 (4th Revision), and 802, 804, 805, 806, 807, 1202 and 1204 MORD complete for finished item of work for Sub structure for Aboutments, Piers, cut off wallsw above Bed level.Excluding Seignorage & GST Charges

48.09

-

4973.6

... More
Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site, and labour charges for centering, machine mixing, laying concrete in position, vibrating, curing etc., including other incidental hire and operational charges of all T&P etc., complete as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRTH specification 1500,1600,1700 & 2200 (4th revision ) and 800, 1205.4, 1205.5 MORD and as directed by the Engineer-in-Charge Execluding Seigniorage Charges for Bed Blocks

2.33

-

6747.4

... More
Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site, and labour charges for centering, machine mixing, laying concrete in position, vibrating, curing etc., including other incidental hire and operational charges of all T&P etc., complete as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRTH specification 1500,1600,1700 & 2200 (4th revision ) and 800, 1205.4, 1205.5 MORD and as directed by the Engineer-in-Charge Execluding Seigniorage Charges for Deck Slab

7.43

-

6747.4

... More
Plain cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, , and conveyance of all materials to site and all labour charges for machine mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per technical specification MoRT&H 1500,1700, 2200 (4th Revision), and 802, 804, 805, 806, 807, 1202 and 1204 MORD complete for finished item of work for Opne foundation. Excluding Seignorage & GST Charges

2.4

-

2484.4

... More
Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site, and labour charges for centering, machine mixing, laying concrete in position, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing BD/1-69 (A) but excluding cost of steel and its fabrication charges as per technical specification MoRT&H 1500, 1600,1700, & 2702 (4th Revision) and 800, 1206.3 MORD as directed by the Engineer-in-Charge complete for finished item of work Execluding Seigniorage Charges for wearing coat over Deck Slab

2.03

-

6312.8

... More
Vibrated reinforced cement concrete M.25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site, and labour charges for centering, machine mixing, laying concrete in position, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing, excluding cost of steel and its fabrication charges as per technical specification MoRT&H 1500, 1600, 1700 & 2704 (4th Revision) and 800, 1211 MORD as directed by the Engineer-in-Charge for complete for finished item of work Execluding Seigniorage Charges for Approach slab.

0.43

-

5351.2

... More
Back filling behind Abutments with gravel including cost and conveyance of all materials to site, and seigniorage charges of all materials and labour charges etc., complete as per Clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 (4th Revision) and 1204.3.8 MORD as per Drawing and complete for finished item of work. Excluding Seignorage & GST Charges

33.28

-

739

... More
Forming embankment with approved material obtained from borrowpits with a lead upto 1000 meters useful from outside road boundary by mechanical means upto SDR with all leads and lifts, including pre-watering of soil at borrow area, removal of top soil, excavation and conveyance of soils and depositing the soil on the embankment, spreading, breaking clods, sectioning, grading and consilodation with vibratory roller at OMC to meet the requirement of table 300-2 of MoRT&H and table 300.1 and 300.2, of MORD including all hire and operational charges of T&P and as per MoRT&H specification 305 (4th revision) 301.5 of MORD complete for finished item of work. (Payment will be made based on level for finished item of work). Execluding Seigniorage Charges for Approach

120.75

-

193

... More
Plain cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, , and conveyance of all materials to site and all labour charges for machine mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per technical specification MoRT&H 1500,1700, 2200 (4th Revision), and 802, 804, 805, 806, 807, 1202 and 1204 MORD complete for finished item of work for Levelling Course but Excluding Seignorage & GST Charges

2.63

-

4973.6

... More
Vibrated reinforced cement concrete M.25 grade using 40mm, 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site, and labour charges for centering, machine mixing, laying concrete in position, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing, excluding cost of steel and its fabrication charges as per technical specification MoRT&H 1500, 1600, 1700 & 2704 (4th Revision) and 800, 1211 MORD as directed by the Engineer-in-Charge for complete for finished item of work Execluding Seigniorage Charges for Approach slab.

7.88

-

5351.2

... More
Providing and laying stone boulders for apron for bed protection with jeddy stone of minimum size 450 to 600mm other than granite (OTG) and weight as per Table 1300.1, laid dry including cost and conveyance of all materials to site, and labour charges as per drawing and technical specifications Clause 1301 MORD / 2503 MORTH complete for finished item of work. Execluding Seigniorage Charges

14.85

-

2199.5

... More
Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per technical specification MoRT&H 1600 & 2200 (4th revision) and 1002, 1005, 1010, 1202 MORD and as per I.S.1786 of 1985 complete for finished item of work for Foundation, Substructure & Super structure.

2

-

63013.8

... More
CONSTRUCTION OF 3 Vent OF 1000MM DIA PIPE CULVERT

-

-

-

... More
Earthwork in excavation by mechanical means for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material and , as per Technical Specification 305 MORD / 304 MORTH Excluding Seignorage & GST Charges

160.55

-

105.25

... More
Providing Plain Cement Concrete (1:3:6) mix M10 Grade using 40mm (SS5) size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, , conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., as per technical specification MoRT&H 1500, 1700, 2100 (4th Revision), and 802, 803, 1202 and 1203 MORDas directed by the Engineer-in-Charge complete for finished item of work for levelling course. Excluding Seignorage & GST Charges

36.67

-

4489.7

... More
Vibrated plain / reinforced cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, , and conveyance of all materials to site and all labour charges for machine mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per technical specification MoRT&H 1500,1700, 2200 (4th Revision), and 802, 804, 805, 806, 807, 1202 and 1204 MORD complete for finished item of work for Sub structure for Foundation. Excluding Seignorage & GST Charges

185.24

-

4702.25

... More
Providing, laying Reinforced cement concrete Hume pipes of 1000 mm diameter NP-3 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 1000 mm diameter R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H (4th Revision) Specification Clauses 2900, 2905 & 2906, IRC Special Publication No: 13 and 1106 MORD as directed by the Engineer-in-Charge, complete for finished item of work. Excluding Seignorage & GST Charges

22.5

-

8809.15

... More
Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site, and labour charges for centering, machine mixing, laying concrete in position, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing BD/1-69 (A) but excluding cost of steel and its fabrication charges as per technical specification MoRT&H 1500, 1600,1700, & 2702 (4th Revision) and 800, 1206.3 MORD as directed by the Engineer-in-Charge complete for finished item of work Execluding Seigniorage Charges for wearing coat over Deck Slab

18.86

-

6312.8

... More
Back filling behind Abutments with gravel including cost and conveyance of all materials to site, and seigniorage charges of all materials and labour charges etc., complete as per Clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 (4th Revision) and 1204.3.8 MORD as per Drawing and complete for finished item of work. Excluding Seignorage & GST Charges

27.45

-

739

... More
RUPEES TWO CROES THIRTEEN LAKHS SEVENTY FIVE THOUSAND SIX HUNDRED SEVENTY ONLY

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.