For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Transmission Corporation Of Andhra Pradesh Limited - APTRANSCO Tender

Works
Civil And Construction
Electrical and Electronics
Consultancy Services
Opening Date18 Jan 2025
Closing Date28 Jan 2025
Tender Amount₹ 1,18,55,653 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Seignorage charges including SMET 2% (Feeder Bay)

1

21319

21319

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Seignorage charges including SMET 2% (PTR Bay)

1

51690

51690

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Construction of Brick masonry chamber over the CI gully trap or peet valves & fitted with 304.8mm X 228.6mm size CI frame & Hinged cover as including cost & conveyance of all materials, labour charges, curing complete for finished item of work as per the directions of the Engineer-in-charge (Feeder Bay)

1

752

752.63

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Supply & Fixing of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 (Jaquar/ CERA/ H & R Johnson make) including cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of work . (Feeder Bay)

4

323

1292.88

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Providing and fixing in position at all levels of the buildings Bronze Gate (GM peet) Valve (Tata/Zenith make) as per IS-778 class- 1, Indian make heavy type for water services with hand wheel at all elevations for following sizes including cost of all materials, labour charges, jointing complete as per the directions of the Engineer in charge for the finished item of work. 20mm dia Nominal Bore (Feeder Bay)

1

1071

1071.83

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Supplying and fixing CPVC pipes - SDR 13.5 of premium make Supreme/ Prince/ Astral/ Birla Aerocon including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge. ' 22.20 mm Outer dia Pipe (Feeder Bay)

5

361

1809.5

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Supplying and fixing CPVC pipes - SDR 13.5 of premium make Supreme/ Prince/ Astral/ Birla Aerocon including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge. ' 28.6 mm Outer dia Pipe (Feeder Bay)

50

450

22509.5

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Laying of Plain Cement concrete (PCC) - Nominal Mix (1:3:6) with 20mm graded HBG metal with necessary form work including cost and conveyance of all materials, labour charges, curing and water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (IS-456) (Feeder Bay)

1

6071

6071.48

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Supply and laying of 180 GSM LDPE sheet of approved make in the switch yard including laying the sheet neatly in between layers of crusher dust without folds to avoid the vegetation and weed growth, cutting and jointing the sheet properly including cost & conveyance of all materials, all leads , labour charges for laying complete as per the directions of the Engineer in charge for the finished item of work. (Feeder Bay)

720

20

14400

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Supply and spreading of crusher dust in the switch yard area (100mm thick) in two layers of 50mm each including Suitable antiweed treatment after completion of final levelling and grading including disposal of surplus earth and filling within switch yard area including cost of all materials, head load lead upto 100 mts and initial lift etc., labour charges complete as per the directions of the Engineer in charge for the finished item of work. (Live SS Work) (Feeder Bay)

72

1756

126495.36

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Supply and Spreading of 20mm size graded Hard Broken Granite metal in switch yard (100mm thick) providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, head load lead upto 100mts and initial lift etc. complete as per the directions of the Engineer in charge for the finished item of work (Live SS Works) (Feeder Bay)

22

2018

44396.66

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Spreading the useful 20mm graded Metal available from the stacks picked from existing switchyard area to 100mm thickness as directed after doing the micro levelling and providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, head load lead upto 100mts and initial lift etc. complete as per the directions of the Engineer in charge for the finished item of work. (Feeder Bay)

50

306

15328.5

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Labour charges for picking old metal in the existing switch yard area 50 to 100mm thickness grading and stacking the useful 20mm graded metal for re-using including cost andconveyance of all materials labour charges, head load lead upto 100mts and initial lift etc., complete for finished item of work as directed by the Engineer-in-charge at site. (Feeder Bay)

72

284

20489.04

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Plastering with CM (1:5), 12 mm thick and finishing smooth to the required slope and painting two coats of Janatha Cem including cost & conveyance of all materials, labour charges, leads, lifts and curing including cost of Janatha Cem paint two coats, complete as per the directions of the Engineer in charge for the finished item of work. (Feeder Bay)

55

232

12771.55

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Construction of Brick Masonry in CM (1:6) with common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cms of approved quality, including cost & conveyance of all materials, labour charges, scaffolding leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work . (Feeder Bay)

4

8134

32536.88

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Laying of Reinforced Cement Concrete (RCC) M25 Grade with standard mix design as per IS 10262:1982 containing minimum cement content 380 kgs, Coarse aggregate 20mm size graded machine crushed hard granite metal and fine aggregate of zone - II as per the mix design approved by the departmental from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as volumetric batching, machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as directed by the Engineer in charge. Centering should be with steel scaffolded pipes, jack props, wallers, foot plates, brackets, steel centering plates etc. complete.RCC Cover Slab (Feeder Bay)

1

9065

9065.61

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Laying of Reinforced Cement Concrete (RCC) M25 Grade with standard mix design as per IS 10262:1982 containing minimum cement content 380 kgs, Coarse aggregate 20mm size graded machine crushed hard granite metal and fine aggregate of zone - II as per the mix design approved by the departmental from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as volumetric batching, machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as directed by the Engineer in charge. Centering should be with steel scaffolded pipes, jack props, wallers, foot plates, brackets, steel centering plates etc. complete. Footings (Feeder Bay)

35

9917

347098.85

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 500/ 500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work in all floors as per the directions of the Engineer-in-charge. (SWITCHYARD WORK) Upto 3.66m Height (Feeder Bay)

0.9

73261

65935.76

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Laying of Cement Concrete (1:4:8) mix using 40mm size HBG Machine crushed metal for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.(Feeder Bay)

6

4869

29214

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Providing Sand filling below the foundations as per the standard specifications of APDSS in uniform horizontal layers including cost and conveyance of all materials,watering and ramming,tools & tackles,all labour charges,all leads & lifts etc., complete for finished item of work as per the directions of the Engineer-in-charge.( APSS No. 309&310) (Feeder Bay)

21

1724

36214.29

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Excavation in Ordinary rock (HDR, soft rock ) (not requiring blasting) The rate includes labour charges, cost of tools and tackles, disposing of unuseful excavated materail at all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge. (For Foundation Works) (Feeder Bay)

50

277

13895

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Earthwork excavation in all types of soils (upto stone matrix) which can be excavated in combination of mechanically and manually with pick axe and crow bars and do not require blasting in all conditions such as dry, wet, slushy etc., covering initial lead and lift etc., and backfilling the foundations (after laying foundations) with excavated earth including watering, compacting as per standard specification and disposing of surplus earth within site (up to 1KM lead) complete as per directions of Engineer in charge at site for finished item of work. (Feeder Bay)

95

182

17336.55

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Levelling by filling with borrowed Gravel by mechanical means including cost & conveyance of gravel, prewatering of soils, depositing the soils in filling areas , spreading soils, breaking clods, sectioning and consolidation with three wheel 8 to 10 MT static Road Roller @ OMC to meet requirement as per standard specification , including all hire and operational charges of T&P, contour Surveying, etc. complete for finished item of work as per the directions of the Engineer in Charge. (Payment will be made based on the initial and final levels as per contour survey for finished item of work). (Feeder Bay)

216

283

61279.2

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Dismantling of existing Brick masonry including clearing away and carefully stacking materials useful for re use and all debris away from the site with lead & lift labour charges, T&P complete as per the directions of the Engineer in charge for the finished item of work. (Feeder Bay)

3

315

946.23

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Construction of Brick masonry chamber over the CI gully trap or peet valves & fitted with 304.8mm X 228.6mm size CI frame & Hinged cover as including cost & conveyance of all materials, labour charges, curing complete for finished item of work as per the directions of the Engineer-in-charge (PTR Bay)

2

752

1505.26

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Supply & Fixing of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 (Jaquar/ CERA/ H & R Johnson make) including cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of work . (PTR Bay)

12

323

3878.64

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Providing and fixing in position at all levels of the buildings Bronze Gate (GM peet) Valve (Tata/Zenith make) as per IS-778 class- 1, Indian make heavy type for water services with hand wheel at all elevations for following sizes including cost of all materials, labour charges, jointing complete as per the directions of the Engineer in charge for the finished item of work. 20mm dia Nominal Bore (PTR Bay)

2

1071

2143.66

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;'Supplying and fixing CPVC pipes - SDR 13.5 of premium make Supreme/ Prince/ Astral/ Birla Aerocon including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge 22.20 mm Outer dia Pipe (PTR Bay)

12

361

4342.8

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Supplying and fixing CPVC pipes - SDR 13.5 of premium make Supreme/ Prince/ Astral/ Birla Aerocon including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge. 28.6 mm Outer dia Pipe (PTR Bay)

150

450

67528.5

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;White washing with Birla/JK White cement of approved quality with two coats to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered material including cost of all materials, labour charges and incidental charges such as scaffolding , lift etc, complete for finished item of work as directed by the Engineer in charge. Ground level upto 3.66m Height (PTR Bay)

350

50

17524.5

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Laying of Plain Cement concrete (PCC) - Nominal Mix (1:3:6) with 20mm graded HBG metal with necessary form work including cost and conveyance of all materials, labour charges, curing and water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (IS-456) (PTR Bay)

2

6096

12193.58

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Supply and laying of 180 GSM LDPE sheet of approved make in the switch yard including laying the sheet neatly in between layers of crusher dust without folds to avoid the vegetation and weed growth, cutting and jointing the sheet properly including cost & conveyance of all materials, all leads , labour charges for laying complete as per the directions of the Engineer in charge for the finished item of work. (PTR Bay)

1500

20

30000

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Supply and spreading of crusher dust in the switch yard area (100mm thick) in two layers of 50mm each including Suitable antiweed treatment after completion of final levelling and grading including disposal of surplus earth and filling within switch yard area including cost of all materials, head load lead upto 100 mts and initial lift etc., labour charges complete as per the directions of the Engineer in charge for the finished item of work. (Live SS Work) (PTR Bay)

150

1756

263472

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Supply and Spreading of 20mm size graded Hard Broken Granite metal in switch yard (100mm thick) providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, head load lead upto 100mts and initial lift etc. complete as per the directions of the Engineer in charge for the finished item of work (Live SS Works) (PTR Bay)

45

1989

89545.5

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Spreading the useful 20mm graded Metal available from the stacks picked from existing switchyard area to 100mm thickness as directed after doing the micro levelling and providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, head load lead upto 100mts and initial lift etc. complete as per the directions of the Engineer in charge for the finished item of work. (PTR Bay)

105

306

32189.85

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Labour charges for picking old metal in the existing switch yard area 50 to 100mm thickness grading and stacking the useful 20mm graded metal for re-using including cost andconveyance of all materials labour charges, head load lead upto 100mts and initial lift etc., complete for finished item of work as directed by the Engineer-in-charge at site. (PTR Bay)

150

284

42685.5

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Plastering with CM (1:5), 12 mm thick with sponze finishing to the even wall surfaces including cost & conveyance of all materials, labour charges, leads, lifts , scaffolding and curing complete as per the directions of the Engineer in charge for the finished item of work. Fire protection wall Up to 3.66 mts height (PTR Bay)

390

197

77099.1

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Construction of Brick Masonry in CM (1:6) with common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cms of approved quality, including cost & conveyance of all materials, labour charges, scaffolding leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work . (PTR Bay)

15

8134

122013.3

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Laying of Reinforced Cement Concrete (RCC) M25 Grade with standard mix design as per IS 10262:1982 containing minimum cement content 380 kgs, Coarse aggregate 20mm size graded machine crushed hard granite metal and fine aggregate of zone - II as per the mix design approved by the departmental from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as volumetric batching, machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as directed by the Engineer in charge. Centering should be with steel scaffolded pipes, jack props, wallers, foot plates, brackets, steel centering plates etc. complete. RCC Cover Slab (PTR Bay)

2

9065

18131.24

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Laying of Reinforced Cement Concrete (RCC) M25 Grade with standard mix design as per IS 10262:1982 containing minimum cement content 380 kgs, Coarse aggregate 20mm size graded machine crushed hard granite metal and fine aggregate of zone - II as per the mix design approved by the departmental from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as volumetric batching, machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as directed by the Engineer in charge. Centering should be with steel scaffolded pipes, jack props, wallers, foot plates, brackets, steel centering plates etc. complete.Fire protection wall upto 7.5m Unsupported height (PTR Bay)

4.9

17715

86806.88

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Laying of Reinforced Cement Concrete (RCC) M25 Grade with standard mix design as per IS 10262:1982 containing minimum cement content 380 kgs, Coarse aggregate 20mm size graded machine crushed hard granite metal and fine aggregate of zone - II as per the mix design approved by the departmental from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as volumetric batching, machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as directed by the Engineer in charge. Centering should be with steel scaffolded pipes, jack props, wallers, foot plates, brackets, steel centering plates etc. complete.Fire protection wall up to 3.66 mts height (PTR Bay)

7.35

14566

107060.61

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Laying of Reinforced Cement Concrete (RCC) M25 Grade with standard mix design as per IS 10262:1982 containing minimum cement content 380 kgs, Coarse aggregate 20mm size graded machine crushed hard granite metal and fine aggregate of zone - II as per the mix design approved by the departmental from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as volumetric batching, machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as directed by the Engineer in charge. Centering should be with steel scaffolded pipes, jack props, wallers, foot plates, brackets, steel centering plates etc. complete. Footings (PTR Bay)

136.75

9939

1359243.04

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 500/ 500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work in all floors as per the directions of the Engineer-in-charge. (SWITCHYARD WORK) Above 3.66m Height (PTR Bay)

0.35

73960

25886.25

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 500/ 500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work in all floors as per the directions of the Engineer-in-charge. (SWITCHYARD WORK) Upto 3.66m Height (PTR Bay)

8.4

73261

615400.46

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Laying of Cement Concrete (1:4:8) mix using 40mm size HBG Machine crushed metal for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge. (PTR Bay)

28

4869

136332

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Providing Sand filling below the foundations as per the standard specifications of APDSS in uniform horizontal layers including cost and conveyance of all materials,watering and ramming,tools & tackles,all labour charges,all leads & lifts etc., complete for finished item of work as per the directions of the Engineer-in-charge.( APSS No. 309&310) (PTR Bay)

112

1724

193142.88

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Excavation in Ordinary rock (HDR, soft rock ) (not requiring blasting) The rate includes labour charges, cost of tools and tackles, disposing of unuseful excavated materail at all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge. (For Foundation Works) (PTR Bay)

50

277

13895

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Earthwork excavation in all types of soils (upto stone matrix) which can be excavated in combination of mechanically and manually with pick axe and crow bars and do not require blasting in all conditions such as dry, wet, slushy etc., covering initial lead and lift etc., and backfilling the foundations (after laying foundations) with excavated earth including watering, compacting as per standard specification and disposing of surplus earth within site (up to 1KM lead) complete as per directions of Engineer in charge at site for finished item of work. (PTR Bay)

511

182

93252.39

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Levelling by filling with borrowed Gravel by mechanical means including cost & conveyance of gravel, prewatering of soils, depositing the soils in filling areas , spreading soils, breaking clods, sectioning and consolidation with three wheel 8 to 10 MT static Road Roller @ OMC to meet requirement as per standard specification , including all hire and operational charges of T&P, contour Surveying, etc. complete for finished item of work as per the directions of the Engineer in Charge. (Payment will be made based on the initial and final levels as per contour survey for finished item of work). (PTR Bay)

230

283

65251

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Dismantling of existing Brick masonry including clearing away and carefully stacking materials useful for re use and all debris away from the site with lead & lift labour charges, T&P complete as per the directions of the Engineer in charge for the finished item of work. (PTR Bay)

3

315

946.23

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Dismantling the existing RCC by mannual means and carefully stacking the reuseful material at site and disposing the unserviceable materail to any remote place 1000 mts distance away from site with all (PTR Bay)

28

2560

71681.12

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;stringing of earthwire: fixing hardware, paving out earth wire, jointing, tensioning, stringing and clamping of 7/3.15 mm high tensile galvanised steel wire. 220 132kv (Feeder Bay)

0.5

10698

5349

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;writing letters in control room panels, lettering on panels, marshalling boxes etc.... (Feeder Bay)

40

144

5797.6

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of marshalling boxes 220 and 132kv (Feeder Bay)

2

698

1396.7

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the following equipment with crane / derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv isolators without earth swtich including solid core insulators erection, alignment in full shape for smooth operation by manually.(dismantling of isolators) (Feeder Bay)

2

7015

14031.06

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the following equipment with crane / derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv isolators with earth swtich including solid core insulators erection, alignment in full shape for smooth operation by electrical and manual.(dismantling of isolator) (Feeder Bay)

1

7797

7797.05

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the following equipment with crane / derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv capacitve voltage transformers.(dismantling of CVT) (Feeder Bay)

2

3971

7943.32

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the following equipment with crane / derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv current tranformers.(dismantling of CTs) (Feeder Bay)

3

3971

11914.98

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the following equipment with crane / derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv lightning arrestors.(dismantling of LAs) (Feeder Bay)

3

1874

5624.37

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the following equipment with crane / derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv circuit breakers with support structure and marshalling boxes including ploe to pole cable wiring and terminations.(dismantling of CB) (Feeder Bay)

1

19500

19500.63

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the following equipment with crane / derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv bus post type insulators. (Feeder Bay)

2

513

1027.76

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the following equipment with crane / derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv isolators without earth swtich including solid core insulators erection, alignment in full shape for smooth operation by manually. (Feeder Bay)

2

8658

17316.56

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the following equipment with crane / derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv isolators with earth swtich including solid core insulators erection, alignment in full shape for smooth operation by electrical and manual. (Feeder Bay)

1

9622

9622.8

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the following equipment with crane / derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv lightning arrestors. (Feeder Bay)

3

2313

6941.37

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the following equipment with crane / derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv capacitve voltage transformers. (Feeder Bay)

2

4901

9803.32

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the following equipment with crane / derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv current tranformers. (Feeder Bay)

3

4901

14704.98

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the following equipment with crane / derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv circuit breakers with support structure and marshalling boxes including ploe to pole cable wiring and terminations. (Feeder Bay)

1

24066

24066.88

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;cable terminations to the switchgear, marshalling boxes / panel terminal blocks/control and relay panels, ltac panel including providng suitable ferrules and lugs as per specification (including cost of ferrules and lugs) (for 220kv and 132kv). 220 and 132kv 1.5/2.5 sq.mm. copper with copper lugs each core at both ends.. (Feeder Bay)

50

51

2569.5

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;laying of control cables of all sizes (from 2 core. 1.5/2.5 / 4.0 sq. mm. to 20 core, 1.5/2.5/4.0sqmm , both copper and alluminium in cable trenches including cost of suitable metalic cable glands with rubber lining. note: this includes running of cables in control room where cables are run on cable racks in cable duct. (Feeder Bay)

500

17

8565

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;excavation of earth pit, putting cast iron pipe with flange on one end (as per iss7181/86) of nominal dia 125mm and 2.75 meters long in side the pit including supply and fixing rcc collars 0.75 meter dia (od), 50mm thick and 0.60meters long in side the pit, backfill the pit in the 25mm size granules of bhcoke for full depth of the pit with alternate layers of bh coke and salt of 300mm thick around the earth pipe of 150mm on all the sides of the pipe including cost and conveyance of bh coke, salt, clamps, c.i.pipes and rcc collars, labour charges for all operational and incidental items of work etc., complete. (in hard rock also) (Feeder Bay)

4

19866

79464.84

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;laying of earth mat including excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per drg. no.set(p)/149/82 with the following sizes of ms flats / gi flats.(for 220kv and 132kv) including fabrication. 220 and 132kv 75x 8mm ms flat / gi flat.(75x8 GI flat)

250

593

148305

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;laying of earth mat including excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per drg. no.set(p)/149/82 with the following sizes of ms flats / gi flats.(for 220kv and 132kv) including fabrication. 220 and 132kv 75x 8mm ms flat / gi flat.(75x8 MS flat) (Feeder Bay)

135

490

66252.6

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;laying of earth mat including excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per drg. no.set(p)/149/82 with the following sizes of ms flats / gi flats.(for 220kv and 132kv) including fabrication. 220 and 132kv 100x16mm ms flat / gi flat.(100x16 GI flat) (Feeder Bay)

35

1376

48178.2

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;laying of earth mat including excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per drg. no.set(p)/149/82 with the following sizes of ms flats / gi flats.(for 220kv and 132kv) including fabrication. 220 and 132kv 100x16mm ms flat / gi flat.(100x16 MS flat) (Feeder Bay)

15

1103

16547.4

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;connection of equipment to bus and or another equipment with single zebra/moose/panther conductor including measuring, cutting,clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary. 220 and 132kv(under shutdown condition) (Feeder Bay)

6

643

3860.7

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;connection of equipment to bus and or another equipment with single zebra/moose/panther conductor including measuring, cutting,clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary. 220 and 132kv (Feeder Bay)

23

466

10728.35

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;hoisting of insulators and hardware, stretching the conductor and stringing of 132 kv bus comprising of three phases with single zeb ra/moose conductor to a tension of 900kgs.( the maximum length or up to a length of bus section of 45m). 220 and 132kv(under shutdown) (Feeder Bay)

1

12290

12290.95

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the main and auxiliary structures etc., using bolts and nuts. 220 132kv(erection under shutdown) (Feeder Bay)

1.2

6639

7967.86

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;stringing of power conductor: hoisting of tension insulators and suspension insulators, paving out the conductor, rough sagging,jointing, tensioning, clipping and fixing of preformed armour rods and vibration dampers. measuring ground clearances wherever necessary.which excludes the works involved in the crossing of lt, 11kv & 33kv power lines viz dismantling and restringing of conductor 220 & 132kv 3 nos. panther conductors(dismantling of 3 nos panther cond under shutdown) (Feeder Bay)

0.5

43320

21660.49

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;stringing of power conductor: hoisting of tension insulators and suspension insulators, paving out the conductor, rough sagging,jointing, tensioning, clipping and fixing of preformed armour rods and vibration dampers. measuring ground clearances wherever necessary.which excludes the works involved in the crossing of lt, 11kv & 33kv power lines viz dismantling and restringing of conductor 220 & 132kv 3 nos. panther conductors(stringing under shutdown) (Feeder Bay)

0.5

73752

36876.49

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;setting of stubs with stub setting template for sub-station structure:erection of stub template, fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubsetting template, dismantling of template after completion of in itial curing of cc 132 kv breaker (Feeder Bay)

1

3022

3022.69

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;setting of stubs with stub setting template for sub-station structure:erection of stub template, fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubsetting template, dismantling of template after completion of in itial curing of cc 132kv isolator (Feeder Bay)

3

3345

10036.53

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;setting of stubs with stub setting template for sub-station structure:erection of stub template, fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubsetting template, dismantling of template after completion of in itial curing of cc 33kv towers and cpl's (Feeder Bay)

10

1113

11134.1

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;transportation of material/ equipment/ scrap from one site to another site per lorry load.(trans of 132kv iso with insulators to stores EACH set) (PTR Bay)

3

3332

9998.79

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;transportation of material/ equipment/ scrap from one site to another site per lorry load.(trans of 132kv CT/CVT to stores EACH) (PTR Bay)

3

2232

6698.25

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;transportation of material/ equipment/ scrap from one site to another site per lorry load.(trans of 132KV LA to stores EACH) (PTR Bay)

3

1113

3340.92

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;transportation of material/ equipment/ scrap from one site to another site per lorry load.(trans of 132kv Breaker to stores EACH) (PTR Bay)

1

9537

9537.08

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;transportation of material/ equipment/ scrap from one site to another site per lorry load.(trans of 220 kv Iso to stores EACH) (PTR Bay)

2

5914

11829.9

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;transportation of material/ equipment/ scrap from one site to another site per lorry load.(trasn of 220kv CT to stores EACH) (PTR Bay)

3

3340

10022.01

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;transportation of material/ equipment/ scrap from one site to another site per lorry load.(trans of 220kv LA to stores EACH) (PTR Bay)

3

1275

3825.84

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;transportation of material/ equipment/ scrap from one site to another site per lorry load.(trans of old 220 kv breaker to stores EACH) (PTR Bay)

1

12392

12392.2

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;transportation of material/ equipment/ scrap from one site to another site per lorry load.(trans of old panels to stores EACH) (PTR Bay)

3

1434

4302.48

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;supply and fixing of 50 lbs co2 portablefire extinguishers of standard make with isi certification like fire flex / sharathy industries complete with first filling horn and hose. (PTR Bay)

4

15626

62505.88

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;supply and fixing of 15 lbs co2 portablefire extinguishers of standard make with isi certification like fire flex / sharathy industries complete with first filling horn and hose. (PTR Bay)

2

6924

13848.16

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;supply and laying of insulation rubber mats in the control room confirming to is 5424/96. (PTR Bay)

2

1059

2118

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;writing letters in control room panels, lettering on panels, marshalling boxes etc.... (PTR Bay)

60

144

8696.4

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of marshalling boxes 220 and 132kv (PTR Bay)

2

698

1396.7

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of control / relay panels, ltac panels, announciation, ptdb panels etc.,in the control room duly mounting them on channels and grouting them with foundation bolts excluding cost of channels and foundation bolts (for 220kv and 132kv), including man power support tomrt wing for commissioning. 220 and 132kv . (PTR Bay)

3

4275

12827.31

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of marshalling boxes 400kv (PTR Bay)

1

49909

49909.57

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the following equipment with crane / derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv bus post type insulators. (PTR Bay)

1

513

513.88

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the following equipment with crane / derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 220 kv bus post type insulators. (PTR Bay)

1

681

681.23

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the following equipment with crane / derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv isolators without earth swtich including solid core insulators erection, alignment in full shape for smooth operation by manually. (PTR Bay)

3

8658

25974.84

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the following equipment with crane / derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv lightning arrestors. (PTR Bay)

3

2313

6941.37

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the following equipment with crane / derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv current tranformers. (PTR Bay)

3

4901

14704.98

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the following equipment with crane / derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv circuit breakers with support structure and marshalling boxes including ploe to pole cable wiring and terminations. (PTR Bay)

1

24066

24066.88

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the following equipment with crane / derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 220 kv isolators without earth swtich including solid core insulators erection, alignment in full shape for smooth operation by electrical and manually. (PTR Bay)

2

12035

24070.84

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the following equipment with crane / derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 220 kv lightning arrestors. (PTR Bay)

3

4901

14704.98

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the following equipment with crane / derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 220 kv rcuit breakers with support structure and marshalling boxes including grouting of foundation bolts and wiring of cables from ploe to pole including terminations. (PTR Bay)

1

33687

33687.04

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the following equipment with crane / derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 220 kv current tranformers. (PTR Bay)

3

7579

22737.36

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;instalation of lighting fixtures on switch yard structures including cabling and connections, labour charges etc., including 40mm dia g.i bent pipe of 0.75m length with suitable clamps for fixing to structures in complete shape (excluding cost of lighting fixtures) 220 and 132kv (PTR Bay)

12

7926

95116.8

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;cable terminations to the switchgear, marshalling boxes / panel terminal blocks/control and relay panels, ltac panel including providng suitable ferrules and lugs as per specification (including cost of ferrules and lugs) (for 220kv and 132kv). 220 and 132kv 1.5/2.5 sq.mm. copper with copper lugs each core at both ends.. (PTR Bay)

300

51

15417

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;laying of control cables of all sizes (from 2 core. 1.5/2.5 / 4.0 sq. mm. to 20 core, 1.5/2.5/4.0sqmm , both copper and alluminium in cable trenches including cost of suitable metalic cable glands with rubber lining. note: this includes running of cables in control room where cables are run on cable racks in cable duct. (PTR Bay)

10400

17

178152

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;excavation of earth pit, putting cast iron pipe with flange on one end (as per iss7181/86) of nominal dia 125mm and 2.75 meters long in side the pit including supply and fixing rcc collars 0.75 meter dia (od), 50mm thick and 0.60meters long in side the pit, backfill the pit in the 25mm size granules of bhcoke for full depth of the pit with alternate layers of bh coke and salt of 300mm thick around the earth pipe of 150mm on all the sides of the pipe including cost and conveyance of bh coke, salt, clamps, c.i.pipes and rcc collars, labour charges for all operational and incidental items of work etc., complete. (in hard rock also) (PTR Bay)

14

19866

278126.94

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;laying of earth mat including excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per drg. no.set(p)/149/82 with the following sizes of ms flats / gi flats.(for 220kv and 132kv) including fabrication. 220 and 132kv 75x 8mm ms flat / gi flat.(75x8mm GI flat) (PTR Bay)

410

593

243220.2

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;laying of earth mat including excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per drg. no.set(p)/149/82 with the following sizes of ms flats / gi flats.(for 220kv and 132kv) including fabrication. 220 and 132kv 75x 8mm ms flat / gi flat.(75x8mm MS flat) (PTR Bay)

250

490

122690

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;laying of earth mat including excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per drg. no.set(p)/149/82 with the following sizes of ms flats / gi flats.(for 220kv and 132kv) including fabrication. 220 and 132kv 100x16mm ms flat / gi flat.(100x16 mm GI flat) (PTR Bay)

110

1376

151417.2

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;laying of earth mat including excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per drg. no.set(p)/149/82 with the following sizes of ms flats / gi flats.(for 220kv and 132kv) including fabrication. 220 and 132kv 100x16mm ms flat / gi flat.(100x16 mm MS flat) (PTR Bay)

60

1103

66189.6

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;connection of equipment to bus and or another equipment with twin zebra/moose/panther conductor including measuring, cutting,clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary. 220 and 132kv.(under shutdown) (PTR Bay)

3

997

2993.67

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;connection of equipment to bus and or another equipment with twin zebra/moose/panther conductor including measuring, cutting,clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary. 220 and 132kv. (PTR Bay)

21

723

15191.19

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;connection of equipment to bus and or another equipment with single zebra/moose/panther conductor including measuring, cutting,clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary. 220 and 132kv((under shutdown condition)) (PTR Bay)

9

643

5791.05

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;connection of equipment to bus and or another equipment with single zebra/moose/panther conductor including measuring, cutting,clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary. 220 and 132kv (PTR Bay)

21

466

9795.45

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;hoisting of insulators and hardware, stretching the conductor and stringing of 132 kv bus comprising of three phases with twin zebra/moose conductor to a tension of 1800kgs including fixing of spacer clamps.( the maximum length or up to a length of bus section of 45m). 220 and 132kv (PTR Bay)

2

17823

35647.7

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;hoisting of insulators and hardware, stretching the conductor and stringing of 220 kv bus comprising of three phases with single zeb ra/moose conductor to a tension of 900kgs.( the maximum length or up to a length of bus section of 40m) 220 and 132kv (PTR Bay)

1

8909

8909.95

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;erection of the main and auxiliary structures etc., using bolts and nuts. 220 132kv (PTR Bay)

12

4813

57760.56

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;stringing of earth wire to a tension of 450kgs from pinacle to ground. (PTR Bay)

1

1330

1330.83

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;fixing of hardware,stretching the ground wire and stringing of earth wire to a tension of 450kgs from pinacle to pinacle. 220 and 132kv. (PTR Bay)

4

1330

5323.32

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;setting of stubs with stub setting template for sub-station structure:erection of stub template, fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubsetting template, dismantling of template after completion of in itial curing of cc 132 kv breaker (PTR Bay)

1

3022

3022.69

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;setting of stubs with stub setting template for sub-station structure:erection of stub template, fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubsetting template, dismantling of template after completion of in itial curing of cc 220 kv breaker (PTR Bay)

1

4030

4030.69

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;setting of stubs with stub setting template for sub-station structure:erection of stub template, fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubsetting template, dismantling of template after completion of in itial curing of cc 132kv isolator (PTR Bay)

3

3345

10036.53

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;setting of stubs with stub setting template for sub-station structure:erection of stub template, fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubsetting template, dismantling of template after completion of initial curing of cc 220kv isolator (PTR Bay)

2

4660

9321.06

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;setting of stubs with stub setting template for sub-station structure:erection of stub template, fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubsetting template, dismantling of template after completion of in itial curing of cc 33kv towers and cpl's (PTR Bay)

18

1113

20041.38

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;setting of stubs with stub setting template for sub-station structure:erection of stub template, fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubsetting template, dismantling of template after completion of in itial curing of cc 220kv towers (PTR Bay)

1

6214

6214.04

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;fixing of 105lb rail poles over the transformer plinths. 220 and 132kv (PTR Bay)

14

6097

85364.16

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;providing of transportation to field officers for line works (PTR Bay)

4080

5

21583.2

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;5 Bolted single tension hw for single zebra/moose (Feeder Bay)

6

2152

12916.2

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;T Clamps for zebra all three ways (Feeder Bay)

9

492

4431.06

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;T Clamps for panther to zebra (Feeder Bay)

8

492

3938.72

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;spacer T-off clamps with 400mm spacing twin to single zebra (Feeder Bay)

6

852

5117.04

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;3 bolted PG clamps for ACSR zebra (Feeder Bay)

37

557

20617.51

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Supply & Fixing of GI Flexible earth Bonds (Feeder Bay)

50

222

11124

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Single Suspension H/W for Panther (pilot type) (Feeder Bay)

6

2049

12298.2

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Single Suspension H/W for ACSR(pilot type) (Feeder Bay)

12

1390

16686

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Supply of hot dip galvanised bolts and nuts (Feeder Bay)

0.04

79351

3174.05

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Supply of fabricated GI structures from raw steel such as M.S.Angles, Plates,channels R.S.Joists M.S rounds etc., including cost of steel, fabrication and galvanisation of main and auxiliary structures, booms, stubsetting template and foundation bolts 'U' bolts with suitable galvanised nuts for foundation bolts, transportation to substation site (Feeder Bay)

1200

1035

1242492

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;3 Bolted earthwire tension clamp (PTR Bay)

8

990

7926.88

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;5 Bolted single tension hw for single zebra/moose (PTR Bay)

6

2152

12916.2

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Single Suspension H/W for Zebra (pilot type) (PTR Bay)

6

1452

8713.8

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;5 Bolted tension hw for twin moose with 400mm spacing for 132 0r 220kV bus (PTR Bay)

12

4058

48698.4

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;132kV or 220kV Rigid spacer clamp for Twin moose with 400mm spacing (PTR Bay)

48

574

27587.52

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Single Suspension H/W for Twin Moose ACSR conductor (PTR Bay)

6

3986

23916.6

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;T Clamps for zebra all three ways (PTR Bay)

45

492

22155.3

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;spacer T-off clamps with 400mm spacing twin to single zebra (PTR Bay)

12

852

10234.08

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;3 bolted PG clamps ACSR-Zebra (PTR Bay)

90

557

50150.7

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;GI Flexible earth Bonds (PTR Bay)

100

222

22248

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Supply of hot dip galvanised bolts and nuts (PTR Bay)

0.6

79351

47610.72

... More
Augmentation of PTR capacity at 220/132 kV Yeddumailaram SS;Supply of fabricated GI structures from raw steel such as M.S.Angles, Plates,channels R.S.Joists M.S rounds etc., including cost of steel, fabrication and galvanisation of main and auxiliary structures, booms, stubsetting template and foundation bolts 'U' bolts with suitable galvanised nuts for foundation bolts, transportation to substation site (PTR Bay)

1330

1035

1377095.3



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.