Transmission Corporation Of Andhra Pradesh Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Transmission Corporation Of Andhra Pradesh Limited - APTRANSCO Tender
Metals and Non-Metals
Opening Date20 Jun 2019
Closing Date16 Jul 2019
Tender Amount₹ 13,11,665 This is an estimated amount, exact amount may vary.
Costs
EMD
0Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Tender for Providing Of Metal Spreading.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
127670Bid Award Id
ViewTender No
e-ceknr-08/19-20 of CE/Z/KNRTender Authority
Transmission Corporation Of Andhra Pradesh Limited ViewPurchaser Address
-Website
http://https://www.tstransco.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation in Hard Rock requiring blasting where ever necessary. The rate includes labour charges, cost of blasting materials, tools and tackles, safety measures, disposal of unuseful excavted material at all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge.
-
-
430.37
... More
Excavation in Hard Rock (blasting prohibited)where ever necessary. The rate includes labour charges, cost of blasting materials, tools and tackles, safety measures, disposal of unuseful excavted material at all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge.( For Switch yard levelling works)
-
-
1009.99
... More
Excavation in Hard Rock requiring control blasting where ever necessary. The rate includes labour charges, cost of blasting materials, tools and tackles, safety measures, disposal of unuseful excavted material at all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge.
-
-
594.04
... More
Excavation with balance depth of cutting in all types of soils (up to stone matrix)which can be excavated with pick axe and crow bars and do not require blasting in all conditions such as dry, wet and slushy etc. covering initial lead and lift etc. complete.and disposing of excess excavated earth avilable not usable after cutting with a lead upto1 KM complete as per the the directions of the Engineer in charge for the finished item of work.
550
95095
172.9
... More
Supply and spreading of crusher dust in the switch yard(100mm thick) area including Suitable antiweed treatment after completion of final levelling and grading including disposal of surplus earth and filling within switch yard area including cost of all materials, all leads and lifts, labour charges complete as per the directions of the Engineer in charge for the finished item of work..
370
289214
781.66
... More
Supply and laying of 180 GSM LDPE sheet of approved make in the switch yard including laying the sheet neatly in between layers of crusher dust without folds to avoid the vegetation and weed growth, cutting and jointing the sheet properly including cost & conveyance of all materials, all leads , labour charges for laying complete as per the directions of the Engineer in charge for the finished item of work..
3710
64924
17.5
... More
Supply amd spreding of 20mm size hard broken granite metal in switch yard (100mm thick) providing suitable pcc guage block size 100*100*100mm at 2m*2m intervels,cost&conveyance of all materials ,labours charges, leads, lifts,complete as per the direction of the engineer incharge for the finished item of work
370
607865
1642.88
... More
Plain Cement concrete - Nominal Mix (1:3:6) with 12 to 20mm HBG metal for kerbs including cost and conveyance of all materials, labour charges, water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (IS-456)
7
32050
4578.62
... More
Goods and services Tax at 18% on total value of above civil work items including labour cess
0.18
196047
1089150.23
... More
Cess towards NAC
-
1089
1089150.23
... More
Seignorage charges including SMET 2%
-
57220
-
... More
Grand TOTAL Amount in Rs.
-
1343506
-
... More
Or Say in Rs.
-
-
-
... More
(Rupees Thirteen lakhs forty three thousand five hundred and seven only)
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements