Transmission Corporation Of Andhra Pradesh Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Transmission Corporation Of Andhra Pradesh Limited - APTRANSCO Tender

Works
Civil And Construction
Opening Date18 Dec 2024
Closing Soon27 Dec 2024
Tender Amount₹ 47,52,936 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Seignorage charges including SMET 2%

1

38662

38662

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Supply and fixing of 20A SP plug and socket (Legrand/Schindler/ Seimens make) for air conditioners including earth connection all labour charges, complete for finished item of work.

1

1923

1923.48

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Supply & installation of 1.5 TR 5 Star capable of delivering 18000 BTU/hr and above with operating on refrigerant R-32 / R-410 (Makes : Daikin / Toshibha/ Carrier/Blue Star/ Hitachi) INVERTER Model Cool type split AC unit with high wall mounted Single Split 100% copper indoor unit and outdoor condencing unit Hermetically sealed compressor suitable for operation on 230V, 50Hz, 1Phase AC supply capable of performing Heat cool dehumidifying air circulating and filtering with cooling and condensing units with 3.0 mts of copper piping, insulation kit and 4 mts of 4 core copper flexible chord (Voltage range 160- 264 volts) and cordless remote control with warranty of compressor for 5 years and comprehensive maintenance for 2 years including all labour charges and cost of materials complete as directed by the Engineer in charge for the finished item of work. (Concealed outlet water piping has to be provided for collection and disposal- Rate not included)

1

51143

51143.66

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Run 2 of 56/0.30 (4.0Sqmm) FRLSH / HFFR PVC insulated 1100V grade as per IS:694 / 2010, IS 17048 specification for Copper cable (Makes: Finolex / RR kabel / Havells /Polycab / Beljin (HFFR) / Finecab Gold (HFFR) / GM (HFFR) / Gold Medal (HFFR) / Million(HFFR) /KEI (HFFR) / V-Guard (HFFR)) in existing pipe for run of Mains from Main switch to Distribution board as per colour code of wires including giving connections and labour charges and cost of materials complete as directed by the Engineer in charge for the finished item of work at all levels of building.

10

168

1682.6

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Supply & Fixing of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 (Jaquar/ CERA/ H & R Johnson make) including cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of work .

10

307

3073.5

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Supplying and fixing CPVC pipes - SDR 13.5 of premium make Supreme/ Prince/ Astral/ Birla Aerocon including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge.15.90 mm Outer dia Pipe

15

255

3839.1

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Supplying and fixing CPVC pipes - SDR 13.5 of premium make Supreme/ Prince/ Astral/ Birla Aerocon including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge. 28.6 mm Outer dia Pipe

100

426

42694

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Supply and laying of 180 GSM LDPE sheet of approved make in the switch yard including laying the sheet neatly in between layers of crusher dust without folds to avoid the vegetation and weed growth, cutting and jointing the sheet properly including cost & conveyance of all materials, all leads , labour charges for laying complete as per the directions of the Engineer in charge for the finished item of work.

1200

20

24000

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Supply and spreading of crusher dust in the switch yard area (100mm thick) in two layers of 50mm each including Suitable antiweed treatment after completion of final levelling and grading including disposal of surplus earth and filling within switch yard area including cost of all materials, all leads and lifts, labour charges complete as per the directions of the Engineer in charge for the finished item of work.

120

1473

176866.8

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Supply and Spreading of 20mm size graded Hard Broken Granite metal in switch yard (100mm thick) providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of work

120

1711

205321.2

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Plastering with CM (1:5), 12 mm thick and finishing smooth to the required slope and painting two coats of Janatha Cem including cost & conveyance of all materials, labour charges, leads, lifts and curing including cost of Janatha Cem paint two coats, complete as per the directions of the Engineer in charge for the finished item of work.

155

205

31888.15

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Plastering with CM (1:5), 12 mm thick with sponze finishing to the even wall surfaces including cost & conveyance of all materials, labour charges, leads, lifts , scaffolding and curing complete as per the directions of the Engineer in charge for the finished item of work.

225

176

39609

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;White washing with Birla/JK White cement of approved quality with two coats to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered material including cost of all materials, labour charges and incidental charges such as scaffolding , lift etc, complete for finished item of work as directed by the Engineer in charge.

305

42

13084.5

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Flush Pointing with CM (1:4) to RR Masonry including cost and conveyance of all materials, all leads and lifts, curing complete as per the directions of the Engineer in charge for the finished item of work.

80

94

7559.2

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Laying of Plain Cement concrete (PCC) - Nominal Mix (1:3:6) with 20mm graded HBG metal over RR wall with necessary form work including cost and conveyance of all materials, labour charges, curing and water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (IS-456)

5.5

5611

30863.8

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Construction of RR Masonry with CM (1:6) using hard CRS , rough granite stone and bond stones (0.16 cum) including cost and conveyance of all matreials., labour charges, water lead , curing, all leads and lifts etc., complete for finished item of work as per directions of the Engineer-in-charge.

26

4088

106288.78

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Construction of Brick Masonry in CM (1:6) with fly ash cement/ lime solid blocks with compressive strength of 50 kg/sq.cm confirmiung to IS:12894-1990 class 5 of size 225 x 100 x 60 mm of approved quality, including cost & conveyance of all materials, labour charges, scaffolding leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work .

36

8849

318567.24

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Laying of Reinforced Cement Concrete (RCC) M25 Grade with standard mix design as per IS 10262:1982 containing minimum cement content 380 kgs, Coarse aggregate 20mm size graded machine crushed hard granite metal and fine aggregate of zone - II as per the mix design approved by the departmental from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as volumetric batching, machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as directed by the Engineer in charge. Centering should be with steel scaffolded pipes, jack props, wallers, foot plates, brackets, steel centering plates etc. complete.RCC Cover Slab

5

8209

41047.85

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Laying of Reinforced Cement Concrete (RCC) M25 Grade with standard mix design as per IS 10262:1982 containing minimum cement content 380 kgs, Coarse aggregate 20mm size graded machine crushed hard granite metal and fine aggregate of zone - II as per the mix design approved by the departmental from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as volumetric batching, machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as directed by the Engineer in charge. Centering should be with steel scaffolded pipes, jack props, wallers, foot plates, brackets, steel centering plates etc. complete.Pedestal

29

9607

278624.75

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Laying of Reinforced Cement Concrete (RCC) M25 Grade with standard mix design as per IS 10262:1982 containing minimum cement content 380 kgs, Coarse aggregate 20mm size graded machine crushed hard granite metal and fine aggregate of zone - II as per the mix design approved by the departmental from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as volumetric batching, machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as directed by the Engineer in charge. Centering should be with steel scaffolded pipes, jack props, wallers, foot plates, brackets, steel centering plates etc. complete. Footings

32

8991

287741.44

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 500/ 500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work in all floors as per the directions of the Engineer-in-charge. (SWITCHYARD WORK) Upto 3.66m Height

3.3

72097

237921.32

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Laying of Cement Concrete (1:4:8) mix using 40mm size HBG Machine crushed metal for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.

29

4481

129963.21

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Providing Sand filling below the foundations as per the standard specifications of APDSS in uniform horizontal layers including cost and conveyance of all materials,watering and ramming,tools & tackles,all labour charges,all leads & lifts etc., complete for finished item of work as per the directions of the Engineer-in-charge.( APSS No. 309&310)

18

1821

32788.8

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Excavation in Hard rock ( Blasting Prohibited) upto 3m depth. The rate includes labour charges, tools and tackles, safety measures, disposal of unuseful excavted material at all leads and lifts, as per drawing removal of stumps and other deleterious material and disposal upto a lead of 50m, complete for finished item of work as per directions of the Engineer-in-charge.

20

2096

41932.8

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Earthwork excavation in all types of soils (upto stone matrix) which can be excavated in combination of mechanically and manually with pick axe and crow bars and do not require blasting in all conditions such as dry, wet, slushy etc., covering initial lead and lift etc., and backfilling the foundations (after laying foundations) with excavated earth including watering, compacting as per standard specification and disposing of surplus earth within site (up to 1KM lead) complete as per directions of Engineer in charge at site for finished item of work.

277

163

45414.15

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Levelling by cutting and filling by mechanical means including pre-watering of soil, excavation of soils, depositing the soils in filling areas , spreading soils, breaking clods, sectioning and consolidation (150mm thickness in layers ) with three wheel 8 to 10 MT static Road Roller @ OMC to meet requirement as per standard specification , including all hire and operational charges of T&P, contour Surveying, etc. complete for finished item of work as per the directions of the Engineer in Charge. (Payment will be made based on the initial and final levels as per contour survey for finished item of work).

540

181

98134.2

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Clearing thick jungle growth (less than 50 percent open space) including bushes up to 30 cm /parthenium and other weeds including burning or disposing off the same as directed by Engineer in charge for the finished item of work.

1900

3

6916

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Supply of Insulation of Rubber mats and laying in the Control Room including the cost of rubber mat

2

1059

2118.6

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Supply and fixing of CO2 fire extinguishers of 50 Lbs capacity with trolley and hose pipe confirming to relevant IS.

4

15626

62505.88

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Supply and fixing of CO2 portable fire extinguishers of 15 Lbs capacity without trolley and hose pipe confirming to relevant IS in complete.

2

6924

13848.16

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Writing of names and other details on equipment, marshalling boxes marshalling kiosks, control and relay panels on main gate setc. with superior quality white enamel paint including cost of brushes, cost of paint, labour charges etc. complete.

50

122

6147

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Supply & Fixing of Copper Flexible earth Bonds suitable for PTR Neutrals.

2

525

1050

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Supply and fixing of GI of Earthbonds

50

222

11124

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Erection of 33 KV CT Marshalling Boxes on the structures of equipment in full shape

1

592

592.35

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Erection of 132 KV CT Marshalling Boxes on the structures of equipment in full shape

1

592

592.35

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Erection of 132 or 33KV PT / CVT Marshalling Boxes on the structures of equipment in full shape

1

592

592.35

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Transportation Charges for 132kV C & R Panel including Loading and Unloading.

2

1766

3533.46

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Erection of PTR OLTC Panel in the control room duly mounting them on channels provided on the cable duct and grouting them with foundation bolts.excluding cost of channels & foundation bolts , including man power support to MRT wing for commissioning

1

3626

3626.77

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Erection of 132KV Transformer Control & Relay Panel in the control room duly mounting them on channels provided on the cable duct and grouting them with foundation bolts.excluding cost of channels & foundation bolts , including man power support to MRT wing for commissioning

1

3626

3626.77

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;33 KV Solid Core Insulators erection, alignment in full shape for smooth functioning

3

291

875.13

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;33 KV Isolator (1200A) including solid core insualtors , erection, alignment in full shape for smooth functioning

1

2653

2653.3

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;33 KV Isolator (2000 A) including solid core insualtors , erection, alignment in full shape for smooth functioning

1

2653

2653.3

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Erection of the following equipment at site including handling the material equipment carefully at site including labour charges and insurance for all incidental and operational items of work. 33 KV Lightning Arrestors

3

766

2300.13

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Erection of the following equipment at site including handling the material equipment carefully at site including labour charges and insurance for all incidental and operational items of work. 33 KV Potential Transformer

3

1284

3852.54

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Erection of the following equipment at site including handling the material equipment carefully at site including labour charges and insurance for all incidental and operational items of work. 33 KV PTR Current Transformer (1200-800-400/1-1-1A)

3

1284

3852.54

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Erection of the following equipment at site including handling the material equipment carefully at site including labour charges and insurance for all incidental and operational items of work. 132 KV Isolator without E/S(800A) including SCI

2

7344

14688.16

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Erection of the following equipment at site including handling the material equipment carefully at site including labour charges and insurance for all incidental and operational items of work. 132 KV Lightning Arrestors

3

1962

5887.77

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Erection of the following equipment at site including handling the material equipment carefully at site including labour charges and insurance for all incidental and operational items of work. 132KV PTR Current Transformers(300-200-100/1-1-1A)

3

4157

12472.98

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Erection of the following equipment at site including handling the material equipment carefully at site including labour charges and insurance for all incidental and operational items of work. 132 kV Bus post type insulators

1

435

435.88

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Erection of the following equipment at site including handling the material equipment carefully at site including labour charges and insurance for all incidental and operational items of work. 33 kV Circuit breakers including Ploe to Pole cable wiring and terminations.

1

8225

8225.9

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Erection of the following equipment at site including handling the material equipment carefully at site including labour charges and insurance for all incidental and operational items of work. 132 KV SF6 Circuit Breaker with support structure and marshalling boxes including pole to pole cable wiring and terminations.

2

20413

40827.76

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Fixing of 90 lb Rail Poles over the transformer plinth & black painting(Labour)

13

5123

66611.74

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Supply of 90W LED lamps

6

6480

38880

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Instalation of lighting fixtures on switch yard structures including cabling and connections, labour charges etc., including 40mm dia G.I bent pipe of 0.75m length with suitable clamps for fixing to structures in complete shape (excluding cost of lighting fixtures)

6

1634

9804

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Cable termination to the switch-gear, marshalling boxes/ panel terminal blocks/control & relay panels, LTAC panel, including cost of suitable ferrules and lugs.2.5 Sqmm Copper Cable with copper lugs each core at both ends.

250

43

10897.5

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Laying of control cables of all sizes (from 2 core, 2.5/4.0 sqmm to 12 core, 2.5/4.0 sqmm, both copper and alluminium in cable trenches including cost of suitable metallic cable glands with rubber lining and handling charges etc. Note:This includes running of cables in control room where cables are run on cable racks in cable duct.

3600

14

52308

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Excavation of earth pit, putting cast iron pipe with flange on one end (as per ISS7181/86) of nominal dia 125 mm and 2.75 metres long inside the pit including supply and fixing of RCC Collars 0.75mtr dia (OD) ,50mm thick and 0.6 mtrs long inside the pit back fill the pit in the 25mm size granules of BH coke for full depth of the pit with alternate layers of BH coke and salt of 300mm thick around the earth pipe of 150mm on all the sides of the pipe including cost and conveyance of BH Coke, salt, clamps, C.I. Pipes and RCC collars, labour charges for all operational and incidental items of work etc., complete

10

16850

168508.1

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Laying of earth mat(75X8 MM GI Flat) including excavation of trenches, welding & fixing of lugs, connecting to equipment & connecting lightninig shield to earthmat & earthing of fence posts, driling and connecting earthrods including connecting cast iron pipes as per Drg.Drg.No.SET(SS)1/99 with the following sizes of M.S.Flats & G.I Flats Incl. cost of Flats & Earthrods

560

573

321199.2

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Laying of earth mat(75X8 MM MS Flat) including excavation of trenches, welding & fixing of lugs, connecting to equipment & connecting lightninig shield to earthmat & earthing of fence posts, driling and connecting earthrods including connecting cast iron pipes as per Drg.Drg.No.SET(SS)1/99 with the following sizes of M.S.Flats & G.I Flats Incl. cost of Flats & Earthrods

330

471

155456.4

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Laying of earth mat(100 X1 6 MM GI Flat) including excavation of trenches, welding & fixing of lugs, connecting to equipment & connecting lightninig shield to earthmat & earthing of fence posts, driling and connecting earthrods including connecting cast iron pipes as per Drg.Drg.No.SET(SS)1/99 with the following sizes of M.S.Flats & G.I Flats Incl. cost of Flats & Earthrods

240

1358

326088

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Laying of earth mat(100 X1 6 MM MS Flat) including excavation of trenches, welding & fixing of lugs, connecting to equipment & connecting lightninig shield to earthmat & earthing of fence posts, driling and connecting earthrods including connecting cast iron pipes as per Drg.Drg.No.SET(SS)1/99 with the following sizes of M.S.Flats & G.I Flats Incl. cost of Flats & Earthrods

90

1084

97606.8

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Connecting equipment to bus and/or another equipment with Twin Moose including measuring, cutting, clamping and also hoisting of suspension insulator assembly to support the conductor wherever necessary.With/Without Clamps under normal condition

27

613

16566.93

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Supply of T Clamps for single zebra or Moose all three ways

36

492

17724.24

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Connecting equipment to bus and/or another equipment with Single Moose including measuring, cutting, clamping and also hoisting of suspension insulator assembly to support the conductor wherever necessary.with/without clamps under normal condition

15

395

5934.75

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Supply of 3 bolted earth wire tension clamp

6

990

5945.16

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Fixing of hardware, stretching ground wire and stringing of earth wire to a tension of 450 Kgs from pinacle to ground.

2

1128

2257.66

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Fixing of hardware, stretching ground wire and stringing of earth wire to a tension of 450 Kgs from pinacle to pinacle

3

1128

3386.49

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Supply of T-off clamps for twin moose to single moose with 150mm spacing

6

714

4288.92

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Fixing of spacers for twin moose conductor

45

149

6739.65

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Supply of spacer clamps with 150mm spacing for twin moose

45

302

13626.9

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Suppy of 3 bolted tension hardware for twin moose with 150mm spacing to 33KV bus

12

3502

42024

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Hoisting of insulators and hardware, stretching the conductor and stringing of 33 KV Bus section comprising 3-phases with TWIN ZEBRA/ MOOSE CONDUCTOR to a tension of 900 Kgs. (The maximum length or upto a length of bus section of 20m) (main bus-1, aux bus-1)

2

9453

18906.16

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Erection of Main & Auxiliary Structures etc., using bolts and nuts

10.05

4082

41031.94

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Setting of stubs with stub setting templates for SS structures - Erection of stubs, stub setting template, fixing of jacks for supporting template, alignment and levelling for exact location of stubs of stub setting template, dismantling of template after completion of initial curing of C.C., (The templates are to be arranged by the contractor) 33 KV Breaker

1

1710

1710

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Setting of stubs with stub setting templates for SS structures - Erection of stubs, stub setting template, fixing of jacks for supporting template, alignment and levelling for exact location of stubs of stub setting template, dismantling of template after completion of initial curing of C.C., (The templates are to be arranged by the contractor) 132 kV Breaker

2

2563

5127.78

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Setting of stubs with stub setting templates for SS structures - Erection of stubs, stub setting template, fixing of jacks for supporting template, alignment and levelling for exact location of stubs of stub setting template, dismantling of template after completion of initial curing of C.C., (The templates are to be arranged by the contractor) 132 kV Isolators

2

2837

5675.42

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Setting of stubs with stub setting templates for SS structures - Erection of stubs, stub setting template, fixing of jacks for supporting template, alignment and levelling for exact location of stubs of stub setting template, dismantling of template after completion of initial curing of C.C., (The templates are to be arranged by the contractor) 33 KV Towers & CPL's

11

944

10388.51

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Setting of stubs with stub setting templates for SS structures - Erection of stubs, stub setting template, fixing of jacks for supporting template, alignment and levelling for exact location of stubs of stub setting template, dismantling of template after completion of initial curing of C.C., (The templates are to be arranged by the contractor) 132 KV TNS & TND Towers

2

3784

7568.72

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Providing Transportation to AEs/AAEs to supervise and record the measurement of Works till the completion of Total project i.e., Substation works (including electrical and civil works)

5100

5

26979

... More
Erection of 3rd 31.5 MVA PTr at 132/33 kV Boraptla SS;Marking as per approved layout with the help of surveyor for Bay / Bays in one Substation

1

17091

17091.1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.