Transmission Corporation Of Andhra Pradesh Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Transmission Corporation Of Andhra Pradesh Limited - APTRANSCO Tender

Works
Civil And Construction
Civil Works Others
Electrical and Electronics
Electrical Works
Opening Date27 Aug 2024
Closing Date22 Oct 2024
Tender Amount₹ 20,66,037 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Extension of Control room;Providing independent earthing by excavating a trench to a depth of 2.1m in all soils, as per size specified in the drawing, using 40mm dia 'B' class GI pipe of 2.5m length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of salt and charcoal in layers and including giving connections and labour charges and cost of materials complete as directed by the Engineer in charge for the finished item of work.

1

4969

4969.83

... More
Extension of Control room;Supply and fixing of 20A SP plug and socket (Legrand/Schindler make) for air conditioners including earth connection all labour charges, complete for finished item of work.

2

1832

3665.9

... More
Extension of Control room;Supply & installation of 1.5 TR 5 Star capable of delivering 18000 BTU/hr and above with operating on refrigerant R-32 / R-410 (Makes : Daikin / Toshibha/ Carrier/Blue Star/ Hitachi) INVERTER Model Cool type split AC unit with high wall mounted Single Split indoor unit and outdoor condencing unit Hermetically sealed compressor suitable for operation on 230V, 50Hz, 1Phase AC supply capable of performing Heat cool dehumidifying air circulating and filtering with cooling and condensing units with 3.5 mts of copper piping, insulation kit and 4 mts of 4 core copper flexible chord (Voltage range 160- 264 volts) and cordless remote control including all labour charges and cost of materials complete as directed by the Engineer in charge for the finished item of work.

2

48810

97620.02

... More
Extension of Control room;Supply and fixing in position 32A. Main Switch (Sputnik or equivalent make) and including giving connections and labour charges and cost of materials complete as directed by the Engineer in charge for the finished item of work at all levels of building.

1

885

885

... More
Extension of Control room;Run 2 of 36/0.30 (2.5 Sqmm) FR PVC insulated flexible Copper Cable (Makes: Finolex / RR kabel / Havells / APAR EBXL / KEI / L&T / VGuard) in existing pipe for Mains from Distribution board to 15Amps 3 pin Power Plug including giving connections and labour charges and cost of materials complete as directed by the Engineer in charge for the finished item of work at all levels of building.

30

105

3156.6

... More
Extension of Control room;Run 2 of 56/0.30 (4.0Sqmm) FR PVC insulated flexible copper cable (Makes: Finolex / RR kabel / Havells / APAR EBXL / KEI / L&T / VGuard) in existing pipe for run of Mains from Main switch to Distribution board as per colour code of wires including giving connections and labour charges and cost of materials complete as directed by the Engineer in charge for the finished item of work at all levels of building.

30

159

4798.8

... More
Extension of Control room;Supply and fixing of 8 Way SPN DB with IP 20 Protection as per IS:13032 and suitable for 6 Nos S.P out goings and for 1 No Incommer etc complete of makes Legrand / Schneider / Siemens / L&T / Cabtree Xpro. make) with IP-20 protection suitable for single phase ELCB/RCCB/DP Isolator (Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora /Cabtree) as incomer and 10KA SP MCBs (Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora /Cabtree as out-going including internal connection and labour charges and cost of materials complete as directed by the Engineer in charge for the finished item of work at all levels of building for surface/flush mounting.

1

5599

5599.99

... More
Extension of Control room;Supply and fixing of 6A/10A 3/2 pin modular socket of (Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina) etc with 6A modular switch control of same make on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete as per the directions of the Engineer in charge at site.

5

313

1565.15

... More
Extension of Control room;Supply and fixing of 16A /6 A, 1 way 2 Module Combi Socket with indicator lamp /fuse unit of (Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina.) etc with 16A modular switch control (same make.)on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete as per the directions of the Engineer in charge at site.

5

450

2252.05

... More
Extension of Control room;Supply and fixing of HID / batten holder / slanting holder (Wipro/G.E./Phillips) in lieu of ceiling rose of light point complete with all connections and all labour charges with 9 W LED lamp (Phillips / OSRAM / Crompton / Eveready / Bajaj / Havells / Pharox / Halonix / Greenlites / IB LED/ Jaquar / C&S / GM / Gold Medal / Million / Syska) (for new installation).

12

252

3031.08

... More
Extension of Control room;Supply, Transportation and Fixing of 90W +/-10% (>=9000 Lumens) LED Street light Body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, wide operating voltage range, P.F > 0.90, System having efficacy >100 lumens/watt, with Ingress protection IP66, Driver surge protection more than 4KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>80, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with 5 years warranty. LUMINAIRE MAKE : PHILIPS / OSRAM / GE / CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX / HAVELLS / HPL / SURYA / SYSKA. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs. including fixing on wall with 1.0mt 40mm dia GI pipe bracket and anti-tilting MS flat, 2.5 Sq.mm flexible copper cable etc.,including all labour charges for mason work and giving connections etc., with all accessories including giving connections, all labour charges and cost of materials complete as directed by the Engineer in charge for the finished item of work.

2

9061

18123.2

... More
Extension of Control room;Supply, Transportation and Fixing of 20W +/-10%, >/ 2000 lumens, 1200mm length LED retro tube light, housing made with PC body, wide operating voltage with Single / double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per IS specifications, minimum CRI=80,.etc complete with 5 years warranty with BIS Certification.. LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj /Havells / Jaquar / IB LED / Panasonic /Halonix / HPL / Syska. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs. including fixing on ceiling or wall with all accessories, giving connections, cost & conveyance of all materials and labour charges etc., complete as directed by the Engineer in charge for finished item of work.

10

600

6009.6

... More
Extension of Control room;Supply, Transportation and fixing of 36W Back lit, 2' x2' (600mm x 600mm) Recessed / Surface mounted LED luminaire made of CRCA sheet housing with powder coated with high efficiency acrylic wide diffuser, with wide operating voltage range, Power factor > 0.9, Surge protection >2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department, CRI >80, and THD is less than 15% etc., complete complete with 5 years warranty. LUMINAIRE MAKE : Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED/ HPL / Syska / Surya / Keselec. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM /SAMSUNG / LG LEDs. including cost & conveyance of all materials and labour charges etc., complete as directed by the Engineer in charge for finished item of work.

2

3450

6901.58

... More
Extension of Control room;Supply, Transportation and fixing of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle'kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.5, Air delivery minimum 235 CMM, 350 RPM (tolerance as per IS:374-2019), THD less than 10%. with remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including all standard accessories etc., complete.Makes : Atomberg (Efficio ) / Havells / Orient including cost of all fittings and fixtures, labour for fixing at all positions of building giving electrical connections with necessary tools complete as directed by the Engineer in charge for finished item of work.

4

3691

14767.72

... More
Extension of Control room;Wiring with 2 runs of 22/0.30(1.5 M2m) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) (Finolex / RR kabel / Havells / APAR EBXL / KEI / L&T / VGuard make) in existing pipe with 6A Modular switch (Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina.make, Ceiling rose (Anchor make), Hot dip galvanizes metal (Modular) control box (Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina) and 6 Modular cover frame (Legrand Myrius /Million Tap-Wood / Gold Medal Curve /Anchor Roma viola / GM Four-Five / Salzar / Stanjo Amron / Havells Fabio / C&S / Benlo make) including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings.

35

866

30316.3

... More
Extension of Control room;Supply and Fixing of 20 mm dia 1.5mm thick PVC pipe (ISI MARK) medium grade, FRLS with IS:9537 part 3 rigid PVC pipe Makes : Sudhakar / Finolex / Modi / VIP / Precision / Universal / Million Plast or equivalent concealed in wall for wiring with all required accessories and labour charges etc., complete as per the directions of the Engineer in charge for the finished item of work.

35

88

3112.55

... More
Extension of Control room;Supply and Fixing of 25 mm dia 1.5mm thick PVC pipe (ISI MARK) Medium grade, FRLS with IS:9537 part 3 rigid PVC pipe Makes : Sudhakar / Finolex / Modi / VIP / Precision / Universal / Million Plast or equivalent concealed in wall for wiring with all required accessories and labour charges etc., complete as per the directions of the Engineer in charge for the finished item of work.

40

98

3947.2

... More
Extension of Control room;Supply and Fixing of 25 mm dia 1.5mm thick PVC pipe (ISI MARK) Medium grade, FRLS with IS:9537 part 3 rigid PVC pipe Makes : Sudhakar / Finolex / Modi / VIP / Precision / Universal / Million Plast or equivalent concealed in roof slab for wiring with all required accessories and labour charges etc., complete as per the directions of the Engineer in charge for the finished item of work.

25

81

2027.5

... More
Extension of Control room;Removing old paintings by steel wire brushing /or scraping, sand papering and preparing the wall surface smooth including necessery repairs to scratches and cutting grooves to cracks filling with lappam wherever necessery complete including clearing away the debris from substation site etc., complete as directed by the Engineer in Charge.

850

13

11339

... More
Extension of Control room;Supply and fixing PVC down rain water pipe of 110mm dia. withstanding to the pressure of 6kg/sqcm, Supreme/APL Apollo/ Ashirvad/ Birla Aerocon make including cost and convence of all materials, MS brackets for fixing, labour chargs etc. Complete for finished item of work as per the directions of the Engineer-in-charge.

10

298

2988.2

... More
Extension of Control room;Supply and fixing in position G.I. chequered plates of required size of approved design and quality. over cable duct in control room including cost of galvanizing complete as per the directions of the Engineer in charge for the finished item of work.

339

118

40042.68

... More
Extension of Control room;Supply and fixing in position M.S. grills/Angles/gates of required size of approved design and quality. (for, gates, windows, hand railing in front of portico, retaining walls ,) and painting with two coats of synthetic enamel paint of approved quality, make, colour and shade over one coat of red oxide, complete as per the directions of the Engineer in charge for the finished item of work.

110

121

13339.7

... More
Extension of Control room;Providing 20 mm thick plain cement mortar bands with cement mortar 1 : 4 (1cement : 4 sand) upto 300 mm in width including cost & conveyance of all materials, labour charges, leads, lifts, scaffolding and curing complete as per the directions of the Engineer in charge for the finished item of work.

35

71

2503.55

... More
Extension of Control room;Providing and fixing of False ceiling in true horizontal level 600mmx600mm,14mm thick Mineral fibre sheet 600x600 of fissured-ANF(board/Tegular)edge tiles with a humidity resistance of 90% RH,average NRC 0.50,light Reflectance>80% thermal conductivity /\=0.052 to .057w/mk,fire performance class0/class1 using hot dipped galvanised steel section exposed surface with pre-coated capping,main Tee of size24x32mm at every 1200c/c maximum and rotary stiched cross tee of size 24x27mm at every 600mm c/c and sub-cross tee of size 24mmx25mm at 1200mm c/c and wall angle of size 19x19 mm fixed to periphery of the wall and the above grid is suspended at every 1200c/c in both directions using 2.0mmthick pre-straightened GI wire laying fine fissured butt edge ceiling tiles of 15mm thick mineral fibre board including cost and conveyance of all materials and labour charges such as cutting,fixing of standing of framework exposing roof making complete as per the directions of the engineer in charge for the finished item of work. (Recommended brands:Armstrong,Insula etc.,)

22

1312

28873.21

... More
Extension of Control room;Painting with 2 coats of Synthetic enamel paint to wood and iron works of approved quality, shade (Asian, Burger, ICI or equivalent make) and make over a coat of primer (Total 3 coats) at all heights, including cost and conveyance of all materials, all leads and lifts, labour charges complete for finished item of work as directed by Engineer in charge

20

184

3689.2

... More
Extension of Control room;Painting to External new walls with 2 coats of acrylic emulsion exterior grade having VOC (Volatile Organic Compound) content less than 50 gms/Ltr of approved brand ( Asian, Berger, Nippon ) and shade over a base coat of appropriate cement primer of exterior grade I quality approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc.complete for finished item of work as per the directions of the Engineer in charge as per SS 912 for External walls

500

193

96650

... More
Extension of Control room;Painting to inner new walls with 2 coats of acrylic emulsion interior grade having VOC(Volatile Organic Compound) content less than 50 gms/Ltr of approved brand ( Asian, Berger, Nippon ) and shade over a base coat of appropriate Cement Primer of Interior grade I of approved brand,making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc.complete for finished item of work as per the directions of the Engineer in charge as per SS 911 for internal walls

625

132

82593.75

... More
Extension of Control room;Providing skirting to internal walls to 15 cm height/risers of steps with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 800 x 800 mm and thickness 11 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per M2 and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., curing complete as per the directions of the Engineer in charge for the finished item of work.

3

1222

3668.85

... More
Extension of Control room;Flooring with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 800 x 800 mm and thickness 11 mm 1st quality conforming to IS:13711, IS:13712,IS:13630 (Parts 1 to 15) of any colour and finish in all in all shades and designs as directed by Engineer. in charge, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand, water and tiles etc., curing complete as per the directions of the Engineer in charge for the finished item of work.

40

1213

48533.6

... More
Extension of Control room;Laying of Cement Concrete (1:4:8) mix using 50% of 40mm size and 50% of 20mm HBG metal for bed flooring including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.

3.5

4297

15042.23

... More
Extension of Control room;Back Filling the foundation and Basement with borrowed gravel as per requirement and specification including cost & conveyance of all materials, labour charges, leads, lifts , watering and consolidating to required density complete as per the directions of the Engineer in charge for the finished item of the work . ( APSS No. 309&310)

35

375

13136.2

... More
Extension of Control room;Plastering to Uneven surfaces of RR /CR, PCC with CM(1:5) 20mm. thick including cost & conveyance of all materials, labour charges, leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work.

15

227

3418.35

... More
Extension of Control room;Plastering with CM (1:5), 12 mm thick without scaffolding

85

149

12688.8

... More
Extension of Control room;Plastering with CM (1:5), 12 mm thick with sponze finishing to the even wall surfaces including cost & conveyance of all materials, labour charges, leads, lifts , scaffolding and curing complete as per the directions of the Engineer in charge for the finished item of work.

70

161

11319

... More
Extension of Control room;Plastering with CM 2 coats, 20 mm thick,base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing.on the uneven surfaces of wall including cost & conveyance of all materials, labour charges, leads, lifts, scaffolding and curing complete as per the directions of the Engineer in charge for the finished item of work.

70

455

31870.3

... More
Extension of Control room;Plastering with CM (1:3), 12 mm thick ceiling and projections of beams with sponge finishing at all heights including cost & conveyance of all materials, scaffloding, labour charges, leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work.

65

192

12489.75

... More
Extension of Control room;Providing RCM facia 50 MM thick in CM (1:3) for drop walls, fins with Rabbit wire mesh (chicken mesh) of not less than 30 gauge of nominal reinforcement as directed by Engineer-in-charge with dubara sponge finishing, including cost & conveyance of all materials to site, operational & incidental, cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work, lift charges etc., complete for finished items of work but excluding cost of steel & its fabrication charges. (APSS No.403 & 903)

5

1649

8246.05

... More
Extension of Control room;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of impervious water proof compound per bag of cement laid over roof when it is green including cost of all materials, operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc, complete for finished item of work as per the directions of the Engineer-in-charge.

65

479

31149.3

... More
Extension of Control room;Supply and fixing Aluminium Anodised Two Track/ Three Track Sliding Windows as per approved drawing with aluminium anodised sections of Series B Jindal sections and outer frame top horizontals & both verticals of 20829 of size 61.85 x 31.75 mm x 1.50mm thick and bottom horizontal - two track frame of 20830 of size 61.85 x 31.75 mm x 1.50mm thick, Shutter frame top, bottom and verticals of 20736 of size 40 mm x 18 mm x 1.55 mm thick and Weather interlocking frame of 20737 of size 40 x 18 x 1.45 mm thick with plain clear float glass 5 mm thick fixed including supply and fixing aluminium handles of 100 mm for each shutter, nylon rollers assembly and all labour charges for fixing the fixtures with required no.of screws, bolts and nuts and including labour charges for fixing the frame in position, fixing shutter to frame etc. completed for finished item of work as per the directions of the Engineer-in-charge.

6

3779

22677.42

... More
Extension of Control room;Supply and fixing Aluminium Anodised Doors - Single Shutter ( Panneled) as per approved drawing with aluminium anodised sections of Jindal sections and outer frame top horizontals & both verticals of 14021 of size 101.6 x 44.75 x 2.40 mm, Shutter frame top of size 44.45 mm x 47.62 mm x 1.95 section 19571 , bottom of size 44.45 mm x 114.30 mm x 2.15 section 19574 and verticals of 19569 of size 44.45 mm x 47.62 mm x 2.02 and Middle lock rail of 19525 of size 83.50 x 44.45 x 2.40 mm and fitted with 12mm thick both sides prelaminated cement particle board for shutter including supply and fixing aluminium handles of 100 mm for each shutter, Providing and fixing Cast Iron Body Bottle Type Hydraulic Door Closer (IS: 3564) with double speed adjustment door closure assembly and all labour charges for fixing the fixtures with required no.of screws, bolts and nuts and including labour charges for fixing the frame in position, fixing shutter to frame etc. completed for finished item of work as per the directions of the Engineer-in-charge.

3

6793

20379.09

... More
Extension of Control room;Supply, fabrication and erection of Anodized Aluminium Double leaf door (partly glazed & partly panelled) using sections of size 101.60mmx44.75mmx2.40mm @ 1.834 Kg/m (Jindal Sec 14021) for frame and 47.62mmx44.45mmx2.02mm @ 1.052 Kg/m (Jindal Sec 19569) for shutter verticals, 47.62mmx44.45mmx1.95mm @ 0.974 Kg/m (Jindal Sec 19571) for shutter top, 114.30mmx44.45mmx2.15mm @ 1.824 Kg/m (Jindal Sec 19574) for shutter bottom, 83.50mmx44.45mmx2.40 mm @ 1.679 Kg/m (Jindal Sec 19525) for shutter middle and fitted with 5mm thick plain glass on upper half and 12mm thick both sides prelaminated cement particle board for lower half of the shutters including cost & conveyance of all materials, 1st quality Double action brass cover plate and cast brass body Floor spings (for inner & outer rotation), central pivots, rubber beading, heavy duty Mortice lock 6/7 levers with PC/CP handles, labour charges & other incidental charges complete as per the drawing and as per the directions of the Engineer-in-charge for finished item of work.

6

6711

40268.04

... More
Extension of Control room;Laying of Plain Cement concrete (PCC) - Nominal Mix (1:2:4) with 12 to 20mm HBG metal including cost and conveyance of all materials, labour charges, curing and water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (IS-456)

5

5911

29558.3

... More
Extension of Control room;Laying of Plain Cement concrete (PCC) - Nominal Mix (1:3:6) with 12 to 20mm HBG metal for encasing/embedding the structural steel supportng 'Y' angles with necessary form work including cost and conveyance of all materials, labour charges, curing and water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (IS-456)

0.75

5260

3945.05

... More
Extension of Control room;For Brick Masonry without scaffolding

23

7681

176666.68

... More
Extension of Control room;Construction of Brick Masonry in CM (1:6) with common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cms of approved quality, including cost & conveyance of all materials, labour charges, scaffolding leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work .

10

8221

82210.3

... More
Extension of Control room;Construction of RR Masonry with CM (1:6) using hard CRS , rough granite stone and bond stones (0.16 cum) including cost and conveyance of all matreials., labour charges, water lead , curing, all leads and lifts etc., complete for finished item of work as per directions of the Engineer-in-charge.

11

3795

41755.23

... More
Extension of Control room;Laying of Reinforced Cement Concrete (RCC) M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge. For roof slab 125mm thick & staircase slab

10

9694

96942.9

... More
Extension of Control room;Laying of Reinforced Cement Concrete (RCC) M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge. For Beams

3.5

10056

35197.43

... More
Extension of Control room;Laying of Reinforced Cement Concrete (RCC) M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge. For Sunshades 600mm wide ( 75mm avg thk ) GF

8

934

7477.84

... More
Extension of Control room;Laying of Reinforced Cement Concrete (RCC) M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge. For Lintels (GF)

1.5

11027

16541.26

... More
Extension of Control room;Laying of Reinforced Cement Concrete (RCC) M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge. For Columns GF

3

11012

33038.94

... More
Extension of Control room;Laying of Reinforced Cement Concrete (RCC) M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge. For plinth beam

3

9617

28853.67

... More
Extension of Control room;Laying of Reinforced Cement Concrete (RCC) M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge. For Pedastals

0.6

9480

5688.25

... More
Extension of Control room;Laying of Reinforced Cement Concrete (RCC) M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge. For Foundations

10

8901

89014.8

... More
Extension of Control room;Supply, fabrication and erection of Structural steel channels/angles suitable for fixing cables in control room of required size of approved design and quality and painting with two coats of synthetic enamel paint of approved quality, make, colour and shade over one coat of red oxide, including cost & conveyance of steel and all labour charges etc., complete as per the directions of the Engineer in charge for the finished item of work.

440

104

45826

... More
Extension of Control room;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 500/ 500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors as per the directions of the Engineer-in-charge. ( APSS No.126)

2.55

83879

213893.06

... More
Extension of Control room;Laying of Cement Concrete (1:4:8) mix using 40mm size HBG Machine crushed metal for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.

8.2

4197

34421.06

... More
Extension of Control room;Providing Stone Crusher dust filling below the foundations as per the standard specifications of APDSS in uniform horizontal layers including cost and conveyance of all materials, watering and ramming, tools & tackles, all labour charges, all leads & lifts etc, complete for finished item of work as per directions of the Engineer-in-charge. ( APSS No. 309&310)

3

1034

3102.57

... More
Extension of Control room;Excavation in Ordinary rock (HDR, soft rock ) (not requiring blasting) The rate includes labour charges, cost of tools and tackles, disposing of unuseful excavated materail at all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge. (For Foundation Works)

10

384

3840.1

... More
Extension of Control room;Earthwork excavation in all types of soils (upto stone matrix) which can be excavated in combination of mechanically and manually with pick axe and crow bars and do not require blasting in all conditions such as dry, wet, slushy etc., covering initial lead and lift etc., and backfilling the foundations (after laying foundations) with excavated earth including watering, compacting as per standard specification and disposing of surplus earth within site (up to 1KM lead) complete as per directions of Engineer in charge at site for finished item of work.

85

159

13588.1

... More
Extension of Control room;Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction and backfillng and stacking of serviceable material by manual means with all leads & lifts as per the directions of the Engineer-in-charge and technical specification clause 201 MORD/MORTH (Girth above 300mm. To 600 mm)

2

420

840.3

... More
Extension of Control room;Dismantling the existing RCC by mannual means and carefully stacking the reuseful material at site and disposing the unserviceable metraial to any remote place 1000 mts distance away from site with all leads and lifts includung cost of T&P ,labour and as per the directions of the Engineer-in - charge for finished item of work.

2

2045

4091.02

... More
Extension of Control room;Dismantling of existing Brick masonry including clearing away and carefully stacking materials useful for re use and all debris away from the site with lead & lift labour charges, T&P complete as per the directions of the Engineer in charge for the finished item of work.

5

249

1245.65

... More
Extension of Control room;Dismantling of existing stone masonry up to 3 m height, including carefully stacking materials useful for re use and clearing all debris away from the site with initial lead & lift labour charges, T&P complete as per the directions of the Engineer in charge for the finished item of work.

1

503

503.69

... More
Extension of Control room;Dismantling doors, windows and clear storey windows, ventilators etc.; (wood or steel) shutters including chowkhats, architraves, hold fasts and other attachments etc., complete and stacking them at departmental stores ( By departmental Vehicle) and disposing the unserviceable metraial away from site premises by contractors own transport as specified and directed by the engineer-in - charge.

7

219

1533.42



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.