Transmission Corporation Of Andhra Pradesh Limited Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Transmission Corporation Of Andhra Pradesh Limited - APTRANSCO Tender
Electrical and Electronics
Electrical Works
Opening Date4 Feb 2025
Closing Date5 Mar 2025
Tender Amount₹ 5,46,860
Costs
EMD
₹ 10,937Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
574072Tender No
EMWT-36/2024-25Tender Authority
Transmission Corporation Of Andhra Pradesh Limited ViewPurchaser Address
-Website
http://https://www.tstransco.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
EMWT 36 2024 25;Providing And Fixing In Position At All Levels Of Masonry Walls With 110 Mm Dia(4kg/cm2) Pvc Pipes Of Supreme/apl Apollo/ Ashirvad/ Birla Aerocon Make As Weep HolesWherever Necessary Including Fixing In Position & At All Leads & Lifts Etc. Complete AsPer The Directions Of The Engineer In Charge For The Finished Item Of Work.
10.35
226
2348.62
... More
EMWT 36 2024 25;Plastering To Uneven Surfaces Of Rr /cr, Pcc With Cm(1:5) 20mm. Thick Including Cost &Conveyance Of All Materials, Labour Charges, Leads, Lifts And Curing Complete As PerThe Directions Of The Engineer In Charge For The Finished Item Of Work.
3
257
772.41
... More
EMWT 36 2024 25;Plastering With Cm (1:3), 20 Mm Thick Including Cost & Conveyance Of All Materials,Labour Charges, Leads, Lifts And Curing Complete As Per The Directions Of TheEngineer In Charge For The Finished Item Of Work.
80
279
22367.2
... More
EMWT 36 2024 25;Plastering In Cm (1:3), 12 Mm Thick At All Heights Including Cost And Conveyance Of AllMaterials, Labour Charges , Water Lead, Curing, All Leads And Lifits Etc Complete ForFinished Item Of Work As Per Directions Of The Engineer-in-charge
85
183
15638.3
... More
EMWT 36 2024 25;Construction Of Rr Masonry In Cm (1:6) Using Hard Crs, Rough Granite Stone And BondStones (0.16 Cum) Including Cost And Conveyance Of All Materials., Labour Charges,Water Lead , Curing, All Leads And Lifts Etc., Complete For Finished Item Of Work As PerDirections Of The Engineer-in-charge.
1
4167
4167.07
... More
EMWT 36 2024 25;Brick Masonry In Cm (1:6) With Common Burnt Clay Bricks Of Class As Per Table-1 OfIs:1077-1992 Non-modular Or Traditional Size 23 X 11 X 7 Cms Of Approved Quality,Including Cost & Conveyance Of All Materials, Labour Charges, Scaffolding Leads, LiftsAnd Curing Complete As Per The Directions Of The Engineer In Charge For The FinishedItem Of Work . - Without Scaffolding
13
7852
102082.63
... More
EMWT 36 2024 25;Laying Of Plain Cement Concrete (pcc) - Nominal Mix (1:3:6) With 20mm Graded Hbg MetalFor Encasing/embedding The Structural Steel Supportng 'y' Angles With Necessary FormWork Including Cost And Conveyance Of All Materials, Labour Charges, Curing And WaterCharges, Tools And Tackles, All Leads & Lifts Etc., Complete For Finished Item Of WorkAs Per Directions Of The Engineer-in-charge. (is-456)
3
5555
16667.94
... More
EMWT 36 2024 25;Laying Of Cement Concrete (1:4:8) Mix Using 40mm Size Hbg Metal Machine Crushed ForFoundations Including Cost And Conveyance Of All Materials At All Leads And Lifts,Ramming, Consolidating, Curing Etc,complete. For Finished Item Of Work As Per DirectionsOf The Engineer-in-charge.
7
4451
31159.94
... More
EMWT 36 2024 25;Supply And Spreading Of 20mm Size Graded Hard Broken Granite Metal In Switch Yard(100mm Thick) Providing Suitable Pcc Guage Block Of Size 100x100x100mm At 2m X2mIntervals , Cost & Conveyance Of All Materials, Labour Charges, Head Load Lead Upto100mts And Initial Lift Etc. Complete As Per The Directions Of The Engineer In ChargeFor The Finished Item Of Work (live Ss Works)
7
1723
12062.12
... More
EMWT 36 2024 25;Supply And Laying Of 180 Gsm Ldpe Sheet Of Approved Make In The Switch Yard IncludingLaying The Sheet Neatly In Between Layers Of Crusher Dust Without Folds To Avoid TheVegetation And Weed Growth, Cutting And Jointing The Sheet Properly Including Cost &Conveyance Of All Materials, All Leads , Labour Charges For Laying Complete As Per TheDirections Of The Engineer In Charge For The Finished Item Of Work.
130
20
2600
... More
EMWT 36 2024 25;Supply And Spreading Of Crusher Dust In The Switch Yard Area (100mm Thick) In TwoLayers Of 50mm Each Including Suitable Antiweed Treatment After Completion Of FinalLevelling And Grading Including Disposal Of Surplus Earth And Filling Within Switch YardArea Including Cost Of All Materials, Head Load Lead Upto 100 Mts And Initial LiftEtc., Labour Charges Complete As Per The Directions Of The Engineer In Charge For TheFinished Item Of Work. (live Ss Work)
13
1193
15521.09
... More
EMWT 36 2024 25;Spreading The Useful 20mm Graded Metal Available From The Stacks Picked From ExistingSwitchyard Area To 100mm Thickness As Directed After Doing The Micro Levelling AndProviding Suitable Pcc Guage Block Of Size 100x100x100mm At 2m X2m Intervals , Cost &Conveyance Of All Materials, Labour Charges, Head Load Lead Upto 100mts And Initial LiftEtc. Complete As Per The Directions Of The Engineer In Charge For The Finished ItemOf Work.
6
288
1729.98
... More
EMWT 36 2024 25;Labour Charges For Picking Old Metal In The Existing Switch Yard Area 50 To 100mmThickness Grading And Stacking The Useful 20mm Graded Metal For Re-using Including CostAndconveyance Of All Materials Labour Charges, Head Load Lead Upto 100mts And InitialLift Etc., Complete For Finished Item Of Work As Directed By The Engineer-in-charge AtSite.
19
266
5060.27
... More
EMWT 36 2024 25;Dismantling Of Existing Brick Masonry Including Clearing Away And Carefully StackingMaterials Useful For Re Use And All Debris Away From The Site With Lead & Lift LabourCharges, T&p Complete As Per The Directions Of The Engineer In Charge For The FinishedItem Of Work.
3
290
872.79
... More
EMWT 36 2024 25;Dismantling Of Existing Stone Masonry Up To 3 M Height, Including Carefully StackingMaterials Useful For Re Use And Clearing All Debris Away From The Site With Initial Lead& Lift Labour Charges, T&p Complete As Per The Directions Of The Engineer In Charge ForThe Finished Item Of Work.
1
566
566.56
... More
EMWT 36 2024 25;Dismantling The Existing Unreinforced Cement Concrete Upto 15 Cm Thickness And DisposingThe Unserviceable Material Away From The Site With All Leads And Lifts Including T&pComplete As Per The Directions Of The Engineer-in - Charge For Finished Item Of Work.
3.5
1735
6074.71
... More
EMWT 36 2024 25;disposing Off Excess Excavated Earth Available(not Usable) After Back Filling (obtainedFrom#the Excavation Of Foundations) With A Lead Up To 1km , Complete As Per TheDirections Of The Engineer In Charge For The Finished Item Of Work.
28
176
4953.2
... More
EMWT 36 2024 25;Earthwork Excavation In All Types Of Soils (up To Stone Matrix) Which Can Be ExcavatedWith Pick Axe And Crow Bars And Do Not Require Blasting In All Conditions Such As Dry,Wet And Slushy Etc. Covering Initial Lead And Lift Etc And Backfilling The Foundations(after Laying Foundations) With Excavated Earth Including Watering, Compacting As PerStandard Specification And Disposing Of Surplus Earth Within Site Complete As PerDirections Of Engineer In Charge At Site For Finished Item Of Work.
28
267
7493.92
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%