Transmission Corporation Of Andhra Pradesh Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 250
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
497925Tender No
eWT-06/2023-24 of SE/OMC/Sangareddy (Earmarked for Scheduled Tribe Contractor)Tender Authority
Transmission Corporation Of Andhra Pradesh Limited ViewPurchaser Address
-Website
http://https://www.tstransco.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);LOADING / UNLOADING OF EQUIPMENT / MATERIAL(Loading & Unloading of STrutcures, Bolts & Nuts)
1
567
567.12
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);LOADING / UNLOADING OF EQUIPMENT / MATERIAL (For MS,GI Earth flats)
1
635
635.53
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Cases containing CTs, PTs, CVTs 220 and 132kV Above 33kV and up to 132kV (Loading &unloading of PTS)
3
970
2912.04
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Loading / Unloading of Loading / Unloading of 220 and 132kV 132kV solid core insulators
9
79
716.04
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Loading / Unloading of Loading / Unloading of 220 and 132kV 132 kV Isolators (without soild core insulators)
1
723
723.78
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);LOADING / UNLOADING OF EQUIPMENT / MATERIAL (For 4Core cable and zebra conductor)
1
125
125.57
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Seignioarage charges including SMET
4409
1
4409
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Supply & Fixing of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 (Jaquar/CERA/ H & R Johnson make) including cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of work .
2
317
635.72
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Supplying and fixing 22.2 mm OD CPVC pipes of SDR 13.50 pipesof premium make Supreme/ Prince/ Astral/ Birla Aerocon including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge.
3
360
1081.68
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Supplying and fixing 28.6 mm OD CPVC pipes of SDR 13.50 pipes of premium make Supreme/ Prince/ Astral/ Birla Aerocon including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge.
10
448
4488.5
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);White washing with Birla/JK White cement of approved quality with two coats to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered material including cost of all materials, labour charges and incidental charges such as scaffolding , lift etc, complete for finished item of work as directed by the Engineer in charge. - Ground level (upto 3.66m Height)
16
47
763.84
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Supply and spreading of crusher dust in the switch yard area (100mm thick) in two layers of 50mm each including Suitable antiweed treatment after completion of final levelling and grading including disposal of surplus earth and filling within switch yard area including cost of all materials, head load lead upto 100 mts and initial lift etc., labour charges complete as per the directions of the Engineer in charge for the finished item of work. (Live SS Work)
23
1181
27175.65
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Supply and laying of 180 GSM LDPE sheet of approved make in the switch yard including laying the sheet neatly in between layers of crusher dust without folds to avoid the vegetation and weed growth, cutting and jointing the sheet properly including cost & conveyance of all materials, all leads , labour charges for laying complete as per the directions of the Engineer in charge for the finished item of work.
230
20
4600
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Supply and Spreading of 20mm size graded Hard Broken Granite metal in switch yard (100mm thick) providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, head load lead upto 100mts and initial lift etc. complete as per the directions of the Engineer in charge for the finished item of work (Live SS Works)
8
1726
13808
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Spreading the useful 20mm graded Metal available from the stacks picked from existing switchyard area to 100mm thickness as directed after doing the micro levelling and providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, head load lead upto 100mts and initial lift etc. complete as per the directions of the Engineer incharge for the finished item of work.
15
293
4398.6
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Labour charges for picking old metal in the existing switch yard area 50 to 100mm thickness grading and stacking the useful 20mm graded metal for re-using including cost andconveyance of all materials labour charges, head load lead upto 100mts and initial lift etc., complete for finished item of work as directed by the Engineer-in-charge at site.
23
271
6238.52
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Plastering with CM (1:5), 12 mm thick to the even wall surfaces with sponze finishing including cost & conveyance of all materials, labour charges, leads, lifts , scaffolding and curing complete as per the directions of the Engineer in charge for the finished item of work. - Without Scaffolding
16
177
2835.2
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational,incidental and labour charges such as machine mixing, laying concrete, curing and steel centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work. - SWITCHYARD FOUNDATION
10
10289
102892.9
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 500/ 500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including other taxes on all materials etc., complete for finished item of work in all floors as per the directions of the Engineer-in-charge.( APSS No.126) -Fire Protection Wall - UPTO 3.66m HEIGHT
0.2
77524
15504.85
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Laying of Cement Concrete (1:4:8) mix using 40mm size HBG metal Machine crushed for foundations including cost and conveyance of all materials at all leads and lifts,ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.
2
4678
9356.92
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Excavation in Ordinary rock (HDR, soft rock ) (not requiring blasting) The rate includes labour charges, cost of tools and tackles, disposing of unuseful excavated materail at all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge. (For Levelling Works)
50
223
11178
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Earthwork excavation in all types of soils (up to stone matrix) which can be excavated with pick axe and crow bars and do not require blasting in all conditions such as dry, wet and slushy etc. covering initial lead and lift etc and backfilling the foundations (after laying foundations) with excavated earth including watering, compacting as per standard specification and disposing of surplus earth within site complete as per directions of Engineer in charge at site for finished item of work.
19
274
5220.82
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Dismantling of existing Brick masonry including clearing away and carefully stacking materials useful for re use and all debris away from the site with lead & lift labour charges, T&P complete as per the directions of the Engineer in charge for the finished item of work.
3
298
896.88
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Connection of equipment to bus and or another equipment with single Zebra/Moose/panther Conductor including measuring, cutting,clamping and Hoisting of suspension insulator assembly to support the Conductor wherever necessary. 220 and 132kV (Connecting Jumpers from 132 KV PTs to Isolator)
3
354
1062
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Erection of control / relay panels, LTAC panels, announciation, PTDB panels etc.,in the control room duly mounting them on channels and grouting them with foundation bolts excluding cost of channels and foundation bolts (for 220kV and 132kV), including man power support toMRT wing for commissioning. 220 and 132kV . (Erection of 132kV PTDB)
1
3245
3245
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);WRITING LETTERS ON CONTROL ROOM PANELS, MARSHALLING BOXES, STRUCTURESETC....
2
110
220
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Cable terminations to the switchgear, Marshalling boxes / panel terminal blocks/control and relay Panels, LTAC panel including providng suitable ferrules and lugs as per specification (including cost of ferrules and lugs) (for 220kV and 132kV). 220 and 132kV 1.5/2.5 Sq.mm. Copper with copper lugs each core at both ends..
80
39
3120
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Laying of control cables of all sizes (from 2 core. 1.5/2.5 / 4.0 Sq. mm. to 20 core, 1.5/2.5/4.0sqmm , both copper and alluminium in cable trenches including cost of suitable metalic cable glands with rubber lining. Note: This includes running of cables in control room where cables are run on cable racks in cable duct.
250
13
3250
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Excavation of earth pit, putting cast iron pipe with flange on one end (as per ISS7181/86) of nominal dia 125mm and 2.75 meters long in side the pit including supply and Fixing RCC collars 0.75 meter dia (OD), 50mm thick and 0.60meters long in side the pit, backfill the pit in the 25mm size granules of BHcoke for full depth of the pit with alternate layers of BH coke and salt of 300mm thick around the earth pipe of 150mm on all the sides of the pipe including cost and conveyance of BH coke, salt, clamps, C.I.Pipes and RCC collars, labour charges for all operational and incidental items of work etc., complete. 220 and 132kV
2
15077
30154
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Laying of earth mat including Excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg. No.SET(P)/149/82 with the following sizes of MS Flats / GI Flats.(for 220kV and 132kV) including fabrication. 220 and 132kV 75x 8mm MS Flat / GI Flat. (Laying of earth mat of 75X8mm MS/GI flat)
105
101
10605
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Laying of earth mat including Excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg. No.SET(P)/149/82 with the following sizes of MS Flats / GI Flats.(for 220kV and 132kV) including fabrication. 220 and 132kV 100x16mm MS Flat / GI Flat. (100X16mm MS/GI flat laying)
75
113
8475
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Connection of equipment to bus and or another equipment with single Zebra/Moose/panther Conductor including measuring, cutting,clamping and Hoisting of suspension insulator assembly to support the Conductor wherever necessary. 220 and 132kV (Connecting jumpers from Isolator to Bus) A)Works under SD
3
531
1593
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Erection of Marshalling boxes 220 and 132kV (Erection of Marshalling boxes)
2
530
1060
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labourcharges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv Isolators without earth swtich including solid core insulators Erection, alignment in full shape for smooth operation by manually. (Erection of 132kV Isolator without earth switch including solid coresulator erection, alignment in full shape for smooth operation bynually)
1
6571
6571
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv Potential Transformers. (Erection of 132kV Potential Transformers)
3
3720
11160
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);ERECTION OF THE MAIN AND AUXILIARY STRUCTURES ETC., USING BOLTS AND NUTS. 220 & 132KV (Erection of Main and Auxiliary structures etc using bolts and nuts)
1.23
3653
4493.19
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Setting of stubs with stub setting template for sub-station structure:Erection of stub template, Fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubSetting template, dismantling of template after completion of initial curing of CC 33kV towers and CPL's (For 132kV Isolator Structure)
1
2539
2539
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);Setting of stubs with stub setting template for sub-station structure:Erection of stub template, Fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubSetting template, dismantling of template after completion of initial curing of CC 33kV towers and CPL's (For 132kV CPL Structures)
3
845
2535
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);SPACER T CLAMP F/TZ TO ZEBRA 400MM SPACE
3
852
2558.52
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);GI EARTH BONDS
15
222
3337.2
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);C CHANNEL
20
52
1040
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);75X8MM GI FLAT
246
77
19035.48
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);75X8MM MS FLAT
186
62
11532
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);100X16MM GI FLAT
265
77
20505.7
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);100X16MM MS FLAT
682
62
42284
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);132KV PT MARSHALLING BOX
3
5162
15488.4
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);GI BOLTS & NUTS
55
79
4364.25
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);132KV SS CPL STRUCTURE(REV-1)
125
876
109583.75
... More
Erection of second set of PTs for 132 KV Bus at 220/132 KV Siddipet SS (Electrical and Civil);132KV PT DISTRIBUTION PANEL
1
41600
41600.14
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements