Transmission Corporation Of Andhra Pradesh Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Transmission Corporation Of Andhra Pradesh Limited - APTRANSCO Tender

Works
Civil And Construction
Opening Date19 Dec 2024
Closing Date15 Jan 2025
Tender Amount₹ 20,10,921 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Seignorage charges including SMET 2% (AT PASHAMAILARAM)

1

14428

14428

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Seignorage charges including SMET 2% (AT YEDDUMAILARAM)

1

1940

1940

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Laying of Plain Cement concrete (PCC) - Nominal Mix (1:3:6) with 12 to 20mm HBG metal for encasing/embedding the structural steel supportng 'Y' angles with necessary form work including cost and conveyance of all materials, labour charges, curing and water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (IS-456) (AT PASHAMAILARAM)

2

5661

11322.94

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Supply and laying of 180 GSM LDPE sheet of approved make in the switch yard including laying the sheet neatly in between layers of crusher dust without folds to avoid the vegetation and weed growth, cutting and jointing the sheet properly including cost & conveyance of all materials, all leads , labour charges for laying complete as per the directions of the Engineer in charge for the finished item of work. (AT PASHAMAILARAM)

300

20

6000

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Supply and spreading of crusher dust in the switch yard area (100mm thick) in two layers of 50mm each including Suitable antiweed treatment after completion of final levelling and grading including disposal of surplus earth and filling within switch yard area including cost of all materials, all leads and lifts, labour charges complete as per the directions of the Engineer in charge for the finished item of work. (AT PASHAMAILARAM)

30

1040

31225.5

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Supply and Spreading of 20mm size graded Hard Broken Granite metal in switch yard (100mm thick) providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of work (AT PASHAMAILARAM)

30

1585

47559

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Flush Pointing with CM (1:4) to RR Masonry including cost and conveyance of all materials, all leads and lifts, curing complete as per the directions of the Engineer in charge for the finished item of work. (AT PASHAMAILARAM)

45

104

4720.5

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Plastering with CM (1:5), 12 mm thick with sponze finishing to the even wall surfaces including cost & conveyance of all materials, labour charges, leads, lifts , scaffolding and curing complete as per the directions of the Engineer in charge for the finished item of work. (AT PASHAMAILARAM)

60

174

10445.4

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Plastering with CM (1:5), 12 mm thick and finishing smooth to the required slope and painting two coats of Janatha Cem including cost & conveyance of all materials, labour charges, leads, lifts and curing including cost of Janatha Cem paint two coats, complete as per the directions of the Engineer in charge for the finished item of work. (AT PASHAMAILARAM)

40

221

8873.2

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Construction of RR Masonry with CM (1:6) using hard CRS , rough granite stone and bond stones (0.16 cum) including cost and conveyance of all matreials., labour charges, water lead , curing, all leads and lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (AT PASHAMAILARAM)

19

4205

79897.28

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Construction of Brick Masonry in CM (1:6) with common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cms of approved quality, including cost & conveyance of all materials, labour charges, scaffolding leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work . (AT PASHAMAILARAM)

7

8075

56531.23

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Laying of Reinforced Cement Concrete (RCC) M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge. RCC Cover Slabs (AT PASHAMAILARAM)

2

8865

17731.96

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Laying of Reinforced Cement Concrete (RCC) M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge. Switch yard foundations & Fire protection wall upto GL (AT PASHAMAILARAM)

30

10030

300925.8

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 500/ 500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work in all floors as per the directions of the Engineer-in-charge. (SWITCHYARD WORK) Upto 3.66m Height (AT PASHAMAILARAM)

0.92

72830

67003.69

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Providing Sand filling below the foundations as per the standard specifications of APDSS in uniform horizontal layers including cost and conveyance of all materials,watering and ramming,tools & tackles,all labour charges,all leads & lifts etc., complete for finished item of work as per the directions of the Engineer-in-charge.( APSS No. 309&310) (AT PASHAMAILARAM)

6

1650

9905.58

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Laying of Cement Concrete (1:4:8) mix using 40mm size HBG Machine crushed metal for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge. (AT PASHAMAILARAM)

15

4526

67896.45

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Dismantling of existing stone masonry up to 3 m height, including carefully stacking materials useful for re use and clearing all debris away from the site with initial lead & lift labour charges, T&P complete as per the directions of the Engineer in charge for the finished item of work. (AT PASHAMAILARAM)

13

582

7568.34

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Earthwork excavation in all types of soils (upto stone matrix) which can be excavated in combination of mechanically and manually with pick axe and crow bars and do not require blasting in all conditions such as dry, wet, slushy etc., covering initial lead and lift etc., and backfilling the foundations (after laying foundations) with excavated earth including watering, compacting as per standard specification and disposing of surplus earth within site (up to 1KM lead) complete as per directions of Engineer in charge at site for finished item of work.(AT PASHAMAILARAM)

280

177

49677.6

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Back Filling The Foundation And Basement With Borrowed Gravel As Per Requirement AndSpecification Including Cost & Conveyance Of All Materials, Labour Charges, Leads,Lifts , Watering And Consolidating To Required Density Complete As Per The DirectionsOf The Engineer In Charge For The Finished Item Of The Work . (AT YEDDUMAILARAM)

10

410

4109.6

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Spreading The Useful 20mm Graded Metal Available From The Stacks Picked From ExistingSwitchyard Area To 100mm Thickness As Directed After Doing The Micro Levelling AndProviding Suitable Pcc Guage Block Of Size 100x100x100mm At 2m X2m Intervals , Cost &Conveyance Of All Materials, Labour Charges, Head Load Lead Upto 100mts And Initial LiftEtc. Complete As Per The Directions Of The Engineer In Charge For The Finished ItemOf Work. (AT YEDDUMAILARAM)

3

293

879.72

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Supply And Laying Of 180 Gsm Ldpe Sheet Of Approved Make In The Switch Yard IncludingLaying The Sheet Neatly In Between Layers Of Crusher Dust Without Folds To Avoid TheVegetation And Weed Growth, Cutting And Jointing The Sheet Properly Including Cost &Conveyance Of All Materials, All Leads , Labour Charges For Laying Complete As Per TheDirections Of The Engineer In Charge For The Finished Item Of Work. (AT YEDDUMAILARAM)

30

20

600

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Supply And Spreading Of Crusher Dust In The Switch Yard Area (100mm Thick) In TwoLayers Of 50mm Each Including Suitable Antiweed Treatment After Completion Of FinalLevelling And Grading Including Disposal Of Surplus Earth And Filling Within Switch YardArea Including Cost Of All Materials, All Leads And Lifts, Labour Charges Complete AsPer The Directions Of The Engineer In Charge For The Finished Item Of Work. (AT YEDDUMAILARAM)

3

1301

3905.55

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Plastering With Cm (1:5), 12 Mm Thick And Finishing Smooth To The Required Slope AndPainting Two Coats Of Janatha Cem Including Cost & Conveyance Of All Materials,Labour Charges, Leads, Lifts And Curing Including Cost Of Janatha Cem Paint Two Coats,Complete As Per The Directions Of The Engineer In Charge For The Finished Item Of Work. (AT YEDDUMAILARAM)

3

222

668.97

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Brick Masonry In Cm (1:6) With Common Burnt Clay Bricks Of Class As Per Table-1 OfIs:1077-1992 Non-modular Or Traditional Size 23 X 11 X 7 Cms Of Approved Quality,Including Cost & Conveyance Of All Materials, Labour Charges, Scaffolding Leads, LiftsAnd Curing Complete As Per The Directions Of The Engineer In Charge For The FinishedItem Of Work . - Without Scaffolding (AT YEDDUMAILARAM)

2

8090

16180.78

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Laying Of Reinforced Cement Concrete (rcc) M- 20 Nominal Mix (cement 400 Kgs ) Using20mm Size Graded Machine Crushed Hard Granite Metal (coarse Aggregate) From ApprovedQuarry Including Cost And Conveyance Of All Materials Like Cement, Fine Aggregate,Coarse Aggregate, Water Etc., To Site And Including All Operational, Incidental AndLabour Charges Such As Machine Mixing, Laying Concrete, Curing And Centering,Etc.,complete But Excluding Cost Of Steel And Its Fabrication Charges For Finished ItemOf Work (sand 0.45 Cum And Metal 0.90 Cum) As Directed By The Engineer In Charge.Centering Should Be With Casuarinas Ballies, Bamboos, Wooden Reapers, Runners, WoodPosts, Wall Plates Etc. Complete. - Switchyard Foundation (AT YEDDUMAILARAM)

4

10298

41193.52

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Providing High Yield Strength Deformed (hysd)/ Thermo Mechanically Treated (tmt) (fe500/ 500d/550d) Grade As Per Is 1786-1979) Of Tisco/ Sail/ Vsp/jindal Make, DifferentDiameters For Rcc Works , Including Labour Charges For Straightening, Cutting, BendingTo Required Sizes And Shapes, Placing In Position With Cover Blocks Of ApprovedMaterials And Size And Tying And Lap-splicing With Binding Wire Of 18 Swg, FormingGrills For Reinforcement Work As Per Approved Designs And Drawings, Including Cost AndConveyance Of Steel Bars, Including All Wastages Such As Overlaps, Couplings, Chairs,Spacer Bars Including Cost And Conveyance Of Binding Wire, Cover Blocks And AllIncidental, Operational, Labour Charges Such As Cutting, Bending, Placing In Position,Tying Including Sales And Other Taxes On All Materials Etc., Complete For Finished ItemOf Work In All Floors.( Apss No.126) -fire Protection Wall - Upto 3.66m Height (AT YEDDUMAILARAM)

0.2

72830

14566.02

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Providing Sand Filling Below The Foundations As Per The Standard Specifications Of ApdssIn Uniform Horizontal Layers Including Cost And Conveyance Of All Materials,wateringAnd Ramming,tools & Tackles,all Labour Charges,all Leads & Lifts Etc., Complete ForFinished Item Of Work As Per The Directions Of The Engineer-in-charge.( Apss No.309&310) (AT YEDDUMAILARAM)

13

1723

22404.59

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Laying Of Cement Concrete (1:4:8) Mix Using 40mm Size Hbg Metal Machine Crushed ForFoundations Including Cost And Conveyance Of All Materials At All Leads And Lifts,Ramming, Consolidating, Curing Etc,complete. For Finished Item Of Work As Per DirectionsOf The Engineer-in- charge. (AT YEDDUMAILARAM)

2.5

4793

11984.9

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Earthwork Excavation In All Types Of Soils (upto Stone Matrix) Which Can Be ExcavatedIn Combination Of Mechanically And Manually With Pick Axe And Crow Bars And Do NotRequire Blasting In All Conditions Such As Dry, Wet, Slushy Etc., Covering Initial LeadAnd Lift Etc., And Backfilling The Foundations (after Laying Foundations) With ExcavatedEarth Including Watering, Compacting As Per Standard Specification And Disposing OfSurplus Earth Within Site (up To 1km Lead) Complete As Per Directions Of Engineer InCharge At Site For Finished Item Of Work. (AT YEDDUMAILARAM)

16

177

2838.72

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Labour Charges For Picking Old Metal In The Existing Switch Yard Area 50 To 100mmThickness Grading And Stacking The Useful 20mm Graded Metal For Re-using Including CostAndconveyance Of All Materials Labour Charges, Head Load Lead Upto 100mts And InitialLift Etc., Complete For Finished Item Of Work As Directed By The Engineer-in-charge AtSite. (AT YEDDUMAILARAM)

3

271

813.72

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Loading And Unloading Of 2 Nos LAs (AT PASHAMAILARAM)

2

482

965.2

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Loading And Unloading Of solid Core Insulator For Isolators (AT PASHAMAILARAM)

18

79

1432.08

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Loading And Unloading Of Isolator (AT PASHAMAILARAM)

2

723

1447.56

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Loading And Unloading Of Single Tension H/w Panther - 12 No.s (AT PASHAMAILARAM)

12

22

271.68

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Loading And Unloading Of Control Panel (AT PASHAMAILARAM)

1

803

803.12

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Loading And Unloading Of 1CT & 2 CVTs (AT PASHAMAILARAM)

3

970

2912.04

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Loading And Unloading Of Cables (AT PASHAMAILARAM)

1.7

291

494.9

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Loading And Unloading Of steel (AT PASHAMAILARAM)

0.7

441

308.94

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Loading / Unloading Of Panther Acsr 220 & 132kv Of Condcutor (AT PASHAMAILARAM)

1

485

485.56

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Transportation Of Sub-station Material / Equipment / Scrap From One SiteTo Another Site (AT PASHAMAILARAM)

2.87

3454

9914.59

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Stringing Of Power Conductor: Hoisting Of Tension Insulators And Suspension Insulators,Paving Out The Conductor, Rough Sagging,jointing, Tensioning, Clipping And Fixing OfPreformed Armour Rods And Vibration Dampers. Measuring Ground Clearances WhereverNecessary.which Excludes The Works Involved In The Crossing Of Lt, 11kv & 33kv PowerLines Viz Dismantling And Restringing Of Conductor 220 & 132kv 3 Nos. Panther Conductors ((stringing Of 3 No.s Panther Conductors From Loc No.36 To 37c At Psml SsD)) (AT PASHAMAILARAM)

0.5

71008

35504

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Cable Terminations To The Switchgear, Marshalling Boxes / Panel TerminalBlocks/control And Relay Panels, Ltac Panel Including Providng SuitableFerrules And Lugs As Per Specification (including Cost Of Ferrules AndLugs) (for 220kv And 132kv). 220 And 132kv 1.5/2.5 Sq.mm. Copper WithCopper Lugs Each Core At Both Ends.. (AT PASHAMAILARAM)

200

39

7800

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Laying Of Control Cables Of All Sizes (from 2 Core. 1.5/2.5 / 4.0 Sq.Mm. To 20 Core, 1.5/2.5/4.0sqmm , Both Copper And Alluminium In CableTrenches Including Cost Of Suitable Metalic Cable Glands With RubberLining. Note: This Includes Running Of Cables In Control Room WhereCables Are Run On Cable Racks In Cable Duct. ((laying Of Cables)) (AT PASHAMAILARAM)

1700

13

22100

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Erection Of Control / Relay Panels, Ltac Panels, Announciation, PtdbPanels Etc.,in The Control Room Duly Mounting Them On Channels AndGrouting Them With Foundation Bolts Excluding Cost Of Channels AndFoundation Bolts (for 220kv And 132kv), Including Man Power SupportTomrt Wing For Commissioning. 220 And 132kv . ((C&R Panel Erection)) (AT PASHAMAILARAM)

1

3245

3245

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Erection Of The Following Equipment With Crane / Derrick At SiteIncluding Handling The Material / Equipment Carefully At Site IncludingLabour Charges For All Incidental And Operational Items Of Work.(excluding Cost Of Transport Charges From Dept. Stores To The Site). 132Kv Capacitve Voltage Transformers. ((CVT Erection)) (AT PASHAMAILARAM)

2

3720

7440

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Erection Of The Following Equipment With Crane / Derrick At SiteIncluding Handling The Material / Equipment Carefully At Site IncludingLabour Charges For All Incidental And Operational Items Of Work.(excluding Cost Of Transport Charges From Dept. Stores To The Site). 132Kv Current Tranformers. ((erection Of 1 No.CT)) (AT PASHAMAILARAM)

1

3720

3720

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Erection Of The Following Equipment With Crane / Derrick At SiteIncluding Handling The Material / Equipment Carefully At Site IncludingLabour Charges For All Incidental And Operational Items Of Work.(excluding Cost Of Transport Charges From Dept. Stores To The Site). 132Kv Current Tranformers. ((dismantling Of CT)) (AT PASHAMAILARAM)

1

2790

2790

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Erection Of The Following Equipment With Crane / Derrick At SiteIncluding Handling The Material / Equipment Carefully At Site IncludingLabour Charges For All Incidental And Operational Items Of Work.(excluding Cost Of Transport Charges From Dept. Stores To The Site). 132Kv Lightning Arrestors. (AT PASHAMAILARAM)

2

1756

3512

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Erection Of The Following Equipment With Crane / Derrick At SiteIncluding Handling The Material / Equipment Carefully At Site IncludingLabour Charges For All Incidental And Operational Items Of Work.(excluding Cost Of Transport Charges From Dept. Stores To The Site). 132Kv Isolators Without Earth Swtich Including Solid Core InsulatorsErection, Alignment In Full Shape For Smooth Operation By Manually. (AT PASHAMAILARAM)

2

6571

13142

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Excavation Of Earth Pit, Putting Cast Iron Pipe With Flange On One End(as Per Iss7181/86) Of Nominal Dia 125mm And 2.75 Meters Long In SideThe Pit Including Supply And Fixing Rcc Collars 0.75 Meter Dia (od),50mm Thick And 0.60meters Long In Side The Pit, Backfill The Pit In The25mm Size Granules Of Bhcoke For Full Depth Of The Pit With AlternateLayers Of Bh Coke And Salt Of 300mm Thick Around The Earth Pipe Of 150mmOn All The Sides Of The Pipe Including Cost And Conveyance Of Bh Coke,Salt, Clamps, C.i.pipes And Rcc Collars, Labour Charges For AllOperational And Incidental Items Of Work Etc., Complete. 220 And 132kv (AT PASHAMAILARAM)

5

15077

75385

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Connection Of Equipment To Bus And Or Another Equipment With SingleZebra/moose/panther Conductor Including Measuring, Cutting,clamping AndHoisting Of Suspension Insulator Assembly To Support The ConductorWherever Necessary. 220 And 132kv ((re-connection After Eqipment Erection)) (AT PASHAMAILARAM)

20

354

7080

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Connection Of Equipment To Bus And Or Another Equipment With SingleZebra/moose/panther Conductor Including Measuring, Cutting,clamping AndHoisting Of Suspension Insulator Assembly To Support The ConductorWherever Necessary. 220 And 132kv ((disconnecting Of Jumpers)) (AT PASHAMAILARAM)

20

265

5310

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Transportation Of Sub-station Material / Equipment / Scrap From One SiteTo Another Site (AT YEDDUMAILARAM)

5.53

3454

19103.72

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Hoisting Of Insulators And Hardware, Stretching The Conductor AndStringing Of 132 Kv Bus Comprising Of Three Phases With Single ZebRa/moose Conductor To A Tension Of 900kgs.( The Maximum Length Or Up To A Length Of Bus Section Of 45m). 220 And 132kv (AT YEDDUMAILARAM)

1

10143

10143

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Erection Of The Main And Auxiliary Structures Etc., Using Bolts AndNuts. 220 & 132kv (AT YEDDUMAILARAM)

0.21

3653

767.13

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Setting Of Stubs With Stub Setting Template For Sub-stationStructure:erection Of Stub Template, Fixing Of Jacks For Supporting TheTemplate, Alignment And Leveling Of Exact Location Of Stubs OfStubsetting Template, Dismantling Of Template After Completion Of InItial Curing Of Cc 33kv Towers And Cpl's (AT YEDDUMAILARAM)

1

845

845

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Erection Of Marshalling Boxes 220 And 132kv (AT YEDDUMAILARAM)

2

530

1060

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Writing Letters In Control Room Panels, Lettering On Panels,Marshalling Boxes Etc.... (AT YEDDUMAILARAM)

50

110

5500

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Stringing Of Power Conductor: Hoisting Of Tension Insulators And Suspension Insulators,Paving Out The Conductor, Rough Sagging,jointing, Tensioning, Clipping And Fixing OfPreformed Armour Rods And Vibration Dampers. Measuring Ground Clearances WhereverNecessary.which Excludes The Works Involved In The Crossing Of Lt, 11kv & 33kv PowerLines Viz Dismantling And Restringing Of Conductor 220 & 132kv 3 Nos. Panther Conductors (AT YEDDUMAILARAM)

0.5

71008

35504

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Erection Of The Following Equipment With Crane / Derrick At SiteIncluding Handling The Material / Equipment Carefully At Site IncludingLabour Charges For All Incidental And Operational Items Of Work.(excluding Cost Of Transport Charges From Dept. Stores To The Site). 132Kv Capacitve Voltage Transformers. (132 Kv Capacitve Voltage Transformers.) (AT YEDDUMAILARAM)

2

4690

9381.36

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Erection Of Control / Relay Panels, Ltac Panels, Announciation, PtdbPanels Etc.,in The Control Room Duly Mounting Them On Channels AndGrouting Them With Foundation Bolts Excluding Cost Of Channels AndFoundation Bolts (for 220kv And 132kv), Including Man Power SupportTomrt Wing For Commissioning. 220 And 132kv . (132kv Control / Relay Panels) (AT YEDDUMAILARAM)

1

4048

4048.12

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Erection Of The Following Equipment With Crane / Derrick At SiteIncluding Handling The Material / Equipment Carefully At Site IncludingLabour Charges For All Incidental And Operational Items Of Work.(excluding Cost Of Transport Charges From Dept. Stores To The Site). 132Kv Isolators Without Earth Swtich Including Solid Core InsulatorsErection, Alignment In Full Shape For Smooth Operation By Manually. (132 Kv Isolators Without Earth Swtich) (AT YEDDUMAILARAM)

2

8010

16021.64

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Erection Of The Following Equipment With Crane / Derrick At SiteIncluding Handling The Material / Equipment Carefully At Site IncludingLabour Charges For All Incidental And Operational Items Of Work.(excluding Cost Of Transport Charges From Dept. Stores To The Site). 132Kv Current Tranformers. (132 Kv Current Tranformers.) (AT YEDDUMAILARAM)

3

4690

14072.04

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Erection Of The Following Equipment With Crane / Derrick At SiteIncluding Handling The Material / Equipment Carefully At Site IncludingLabour Charges For All Incidental And Operational Items Of Work.(excluding Cost Of Transport Charges From Dept. Stores To The Site). 132Kv Lightning Arrestors. (132kv LAs) (AT YEDDUMAILARAM)

3

2238

6715.8

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Erection Of The Following Equipment With Crane / Derrick At SiteIncluding Handling The Material / Equipment Carefully At Site IncludingLabour Charges For All Incidental And Operational Items Of Work.(excluding Cost Of Transport Charges From Dept. Stores To The Site). 132Kv Isolators With Earth Swtich Including Solid Core Insulators Erection,Alignment In Full Shape For Smooth Operation By Electrical And Manual. (132kv Isolator With Earth Switch) (AT YEDDUMAILARAM)

1

8743

8743

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Erection Of The Following Equipment With Crane / Derrick At SiteIncluding Handling The Material / Equipment Carefully At Site IncludingLabour Charges For All Incidental And Operational Items Of Work.(excluding Cost Of Transport Charges From Dept. Stores To The Site). 132Kv Circuit Breakers With Support Structure And Marshalling BoxesIncluding Ploe To Pole Cable Wiring And Terminations (132kv CB) (AT YEDDUMAILARAM)

1

22122

22122.76

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Cable Terminations To The Switchgear, Marshalling Boxes / Panel TerminalBlocks/control And Relay Panels, Ltac Panel Including Providng SuitableFerrules And Lugs As Per Specification (including Cost Of Ferrules AndLugs) (for 220kv And 132kv). 220 And 132kv 1.5/2.5 Sq.mm. Copper WithCopper Lugs Each Core At Both Ends.. (AT YEDDUMAILARAM)

100

39

3900

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Instalation Of Lighting Fixtures On Switch Yard Structures IncludingCabling And Connections, Labour Charges Etc., Including 40mm Dia G.iBent Pipe Of 0.75m Length With Suitable Clamps For Fixing To StructuresIn Complete Shape (excluding Cost Of Lighting Fixtures) 220 And 132kv (AT YEDDUMAILARAM)

4

1462

5848

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Laying Of Control Cables Of All Sizes (from 2 Core. 1.5/2.5 / 4.0 Sq.Mm. To 20 Core, 1.5/2.5/4.0sqmm , Both Copper And Alluminium In CableTrenches Including Cost Of Suitable Metalic Cable Glands With RubberLining. Note: This Includes Running Of Cables In Control Room WhereCables Are Run On Cable Racks In Cable Duct. (AT YEDDUMAILARAM)

2700

13

35100

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Excavation Of Earth Pit, Putting Cast Iron Pipe With Flange On One End (as PerIss7181/86) Of Nominal Dia 125mm And 2.75 Meters Long In Side The Pit Including SupplyAnd Fixing Rcc Collars 0.75 Meter Dia (od), 50mm Thick And 0.60meters Long In Side ThePit, Backfill The Pit In The 25mm Size Granules Of Bhcoke For Full Depth Of The Pit WithAlternate Layers Of Bh Coke And Salt Of 300mm Thick Around The Earth Pipe Of 150mm OnAll The Sides Of The Pipe Including Cost And Conveyance Of Bh Coke, Salt, Clamps,C.i.pipes And Rcc Collars, Labour Charges For All Operational And Incidental Items OfWork Etc., Complete. (in Hard Rock Also (AT YEDDUMAILARAM)

6

15077

90462

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Laying Of Earth Mat Including Excavation Of Trenches, Welding,Connecting To Equipment And Connecting Lightning Shield To Earth Mat AndEarthing Of Fence Posts, Drilling And Connecting Earth Rods IncludingConnecting Cast Iron Pipes As Per Drg. No.set(p)/149/82 With TheFollowing Sizes Of Ms Flats / Gi Flats.(for 220kv And 132kv) IncludingFabrication. 220 And 132kv 75x 8mm Ms Flat / Gi Flat. (75 X 8 Gi Flat) (AT YEDDUMAILARAM)

62.84

101

6346.84

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Laying Of Earth Mat Including Excavation Of Trenches, Welding,Connecting To Equipment And Connecting Lightning Shield To Earth Mat AndEarthing Of Fence Posts, Drilling And Connecting Earth Rods IncludingConnecting Cast Iron Pipes As Per Drg. No.set(p)/149/82 With TheFollowing Sizes Of Ms Flats / Gi Flats.(for 220kv And 132kv) IncludingFabrication. 220 And 132kv 75x 8mm Ms Flat / Gi Flat. (75 X 8 Ms Flat) (AT YEDDUMAILARAM)

10

101

1010

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Laying Of Earth Mat Including Excavation Of Trenches, Welding,Connecting To Equipment And Connecting Lightning Shield To Earth Mat AndEarthing Of Fence Posts, Drilling And Connecting Earth Rods IncludingConnecting Cast Iron Pipes As Per Drg. No.set(p)/149/82 With TheFollowing Sizes Of Ms Flats / Gi Flats.(for 220kv And 132kv) IncludingFabrication. 220 And 132kv 100x16mm Ms Flat / Gi Flat. (100x16 Gi Flat) (AT YEDDUMAILARAM)

21

113

2373

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Marking Of Bay As Per Approved Layout With The Help Of Surveyor (AT YEDDUMAILARAM)

1

15292

15292

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Connection Of Equipment To Bus And Or Another Equipment With SingleZebra/moose/panther Conductor Including Measuring, Cutting,clamping AndHoisting Of Suspension Insulator Assembly To Support The ConductorWherever Necessary. (AT YEDDUMAILARAM)

26

354

9204

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Laying Of Earth Mat Including Excavation Of Trenches, Welding,Connecting To Equipment And Connecting Lightning Shield To Earth Mat AndEarthing Of Fence Posts, Drilling And Connecting Earth Rods IncludingConnecting Cast Iron Pipes As Per Drg. No.set(p)/149/82 With TheFollowing Sizes Of Ms Flats / Gi Flats.(for 220kv And 132kv) IncludingFabrication. 220 And 132kv 100x16mm Ms Flat / Gi Flat. (100 X 16 Ms Flat) (AT YEDDUMAILARAM)

6

113

678

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;Setting Of Stubs With Stub Setting Template For Sub-stationStructure:erection Of Stub Template, Fixing Of Jacks For Supporting TheTemplate, Alignment And Leveling Of Exact Location Of Stubs OfStubsetting Template, Dismantling Of Template After Completion Of InItial Curing Of Cc 132 Kv Breaker (For 132kv CB) (AT YEDDUMAILARAM)

1

2294

2294

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;CT STUD CLAMP FOR ZEBRA 35MM (AT PASHAMAILARAM)

6

808

4848

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;3BOLTED PG CLAMP FOR ACSR PANTHER (AT PASHAMAILARAM)

12

557

6686.76

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;PG CLAMP ZEBRA TO ZEBRA (AT PASHAMAILARAM)

16

370

5920

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;T CLAMP PANTHER TO ZEBRA (AT PASHAMAILARAM)

5

684

3420

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;120W LED LIGHT (AT PASHAMAILARAM)

4

4600

18400

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;STRUCTURE ,132 KV NORMAL ' ABS ' SUBSTATION (AT PASHAMAILARAM)

0.7

94463

66124.1

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;PAD CLAMP FOR ZEBRA 120X120X15MM (AT PASHAMAILARAM)

6

750

4500

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;132KV CT MARSHALLING BOX (AT PASHAMAILARAM)

2

3924

7849.6

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;GI LATTICE STRUCTURES FOR SUBSTATIONS (AT YEDDUMAILARAM)

0.21

94463

19837.23

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;75X8MM GI FLAT (AT YEDDUMAILARAM)

350

89

31300.5

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;75X8MM MS FLAT (AT YEDDUMAILARAM)

50

68

3400.5

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;100X16MM GI FLAT (AT YEDDUMAILARAM)

300

89

26829

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;100X16MM MS FLAT (AT YEDDUMAILARAM)

80

68

5440.8

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;ELECTRICALLY INSULATED RUBBER MATS (AT YEDDUMAILARAM)

2

1059

2118.6

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;GI EARTH BONDS (AT YEDDUMAILARAM)

50

222

11124

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;FIRE EXTINGUISHERS 15 LBS (AT YEDDUMAILARAM)

2

6924

13848.16

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;SPACER T CLAMP F/TZ TO ZEBRA 400MM SPACE (AT YEDDUMAILARAM)

3

852

2558.52

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;3BOLTED PG CLAMP FOR ACSR PANTHER (AT YEDDUMAILARAM)

16

557

8915.68

... More
Erection of Bay extensions at Yeedumailaram and Pashamailaram;T-CLAMP FOR MOOSE ALL 3 WAYS (AT YEDDUMAILARAM)

11

492

5415.74



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.