For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Transmission Corporation Of Andhra Pradesh Limited - APTRANSCO Tender
Civil And Construction
Civil Works Others
Opening Date13 Dec 2024
Closing Date24 Jan 2025
Tender Amount₹ 8,92,988
Costs
EMD
₹ 17,860Document Cost
Refer DocumentsTender Fee
₹ 317
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
562520Tender No
01 of 2024-25 of SE Civil Metro Erg HyderabadTender Authority
Transmission Corporation Of Andhra Pradesh Limited ViewPurchaser Address
-Website
http://https://www.tstransco.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Raising of cable duct and other miscellaneous works at 132 KV GIS Hussainsagar SS;Road cutting and restoration charges for BT road of length 15mtrs and road of length 18 mtrs near 132 KV GIS Hussainsagar including Centage charges of 16.5% complete for the finished item of work. (Centage Charges and 18% GST on centage charges to be paid to GHMC & Road restoration charges including 18% GST to be paid to Megha Engineering & Infrasructures Ltd.)
1
78424
78424
... More
Raising of cable duct and other miscellaneous works at 132 KV GIS Hussainsagar SS;White washing with Birla/JK White cement of approved quality with two coats to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered material including cost of all materials, labour charges and incidental charges such as scaffolding , lift etc, complete for finished item of work as directed by the Engineer in charge.
350
53
18578
... More
Raising of cable duct and other miscellaneous works at 132 KV GIS Hussainsagar SS;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg. weight including cost and conveyance of all materials, labour charges, curing complete as per the directions of the Engineer in charge for the finished item of work.
8
5086
40693.76
... More
Raising of cable duct and other miscellaneous works at 132 KV GIS Hussainsagar SS;Supplying, laying and jointing of un-plasticized Non- Pressure Polyvinyl Chloride (PVC-U) pipes of size OD 110mm S16.5 series of dark (any shade of Brown) for use in underground drainage & sewerage system conforming to IS 15328/2003) with Elastomeric Seal Ring Joints (Ringtite PVC Pipes) as per specification inclusive of transportation, laying, jointing, cost of all materials and labour charges complete for finished item of work as directed by the Engineer in charge.
80
397
31776.8
... More
Raising of cable duct and other miscellaneous works at 132 KV GIS Hussainsagar SS;Laying of Plain Cement concrete (PCC) - Nominal Mix (1:3:6) with 12 to 20mm HBG metal for encasing/embedding the structural steel supportng 'Y' angles with necessary form work including cost and conveyance of all materials, labour charges, curing and water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (IS-456)
1.8
6416
11549.2
... More
Raising of cable duct and other miscellaneous works at 132 KV GIS Hussainsagar SS;Providing Sand filling below the foundations as per the standard specifications of APDSS in uniform horizontal layers including cost and conveyance of all materials,watering and ramming,tools & tackles,all labour charges,all leads & lifts etc., complete for finished item of work as per the directions of the Engineer-in-charge.( APSS No. 309&310)
10
2143
21438.2
... More
Raising of cable duct and other miscellaneous works at 132 KV GIS Hussainsagar SS;Plastering with CM 2 coats, 20 mm thick,base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing.on the uneven surfaces of wall including cost & conveyance of all materials, labour charges, leads, lifts, scaffolding and curing complete as per the directions of the Engineer in charge for the finished item of work.
20
595
11910.6
... More
Raising of cable duct and other miscellaneous works at 132 KV GIS Hussainsagar SS;Plastering with CM (1:5), 12 mm thick with sponze finishing to the even wall surfaces including cost & conveyance of all materials, labour charges, leads, lifts , scaffolding and curing complete as per the directions of the Engineer in charge for the finished item of work.
320
197
63321.6
... More
Raising of cable duct and other miscellaneous works at 132 KV GIS Hussainsagar SS;Construction of Brick Masonry in CM (1:6) with fly ash cement/ lime solid blocks with compressive strength of 50 kg/sq.cm confirmiung to IS:12894-1990 class 5 of size 225 x 100 x 60 mm of approved quality, including cost & conveyance of all materials, labour charges, scaffolding leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work .
35
8772
307038.55
... More
Raising of cable duct and other miscellaneous works at 132 KV GIS Hussainsagar SS;Construction of RR Masonry with CM (1:6) using hard CRS , rough granite stone and bond stones (0.16 cum) including cost and conveyance of all matreials., labour charges, water lead , curing, all leads and lifts etc., complete for finished item of work as per directions of the Engineer-in-charge.
5.5
5055
27807.23
... More
Raising of cable duct and other miscellaneous works at 132 KV GIS Hussainsagar SS;Laying of Reinforced Cement Concrete (RCC) M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (50% each)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge.
6.5
9904
64377.56
... More
Raising of cable duct and other miscellaneous works at 132 KV GIS Hussainsagar SS;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 500/ 500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work in all floors as per the directions of the Engineer-in-charge. (SWITCHYARD WORK)
0.82
75373
61806.09
... More
Raising of cable duct and other miscellaneous works at 132 KV GIS Hussainsagar SS;Laying of Cement Concrete (1:4:8) mix using 40mm size HBG Machine crushed metal for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.
2
5215
10431.44
... More
Raising of cable duct and other miscellaneous works at 132 KV GIS Hussainsagar SS;Earthwork excavation in all types of soils (upto stone matrix) which can be excavated in combination of mechanically and manually with pick axe and crow bars and do not require blasting in all conditions such as dry, wet, slushy etc., covering initial lead and lift etc., and backfilling the foundations (after laying foundations) with excavated earth including watering, compacting as per standard specification and disposing of surplus earth within site (up to 1KM lead) complete as per directions of Engineer in charge at site for finished item of work.
22
189
4179.78