Transmission Corporation Of Andhra Pradesh Limited Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Transmission Corporation Of Andhra Pradesh Limited - APTRANSCO Tender

Works
Electrical Generators And Transformers
Electrical and Electronics
Opening Date4 Oct 2023
Closing Date18 Nov 2023
Tender Amount₹ 61,00,521 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Providing independent earthing by excavating a trench to a depth of 2.1m in all soils, as per size specified in the drawing, using 40mm dia 'B' class GI pipe of 2.5m length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of salt and charcoal in layers and including givingconnections and labour charges and cost of materials complete as directed by the Engineer in charge for the finished item of work.

1

4947

4947.71

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply and Laying of P.V.C casing and caping ( Modi make or equivalent) (ISI MARK) with double locking arrangments with groover trunking of size not below 12.5mm height of size 25mm x 12.5mm height with all accessories, duly sealed at points and erected on Wall / Ceiling including cost of all materials and labour charges complete for the finished item of work as directed by the Engineer-in-charge.

15

74

1114.5

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply and Laying of P.V.C casing and caping ( Modi make or equivalent) (ISI MARK) with double locking arrangments with groover trunking of size not below 12.5mm height of size 19mm / 20mm x 12.5 mm height with all accessories, duly sealed at points and erected on Wall / Ceiling including cost of all materials and labour charges complete for the finished item of work as directed by the Engineer-in-charge.

15

65

980.25

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply and fixing of 20A SP plug and socket (Legrand/Schindler make) for air conditioners including earth connection all labour charges, complete for finished item of work.

2

1778

3557.48

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply & installation of 1.5 TR 5 Star capable of delivering 18000 BTU/hr and above with operating on refrigerant R-32 / R-410 (Makes : Daikin / Toshibha/ Carrier/Blue Star/ Hitachi) INVERTER Model Cool type split AC unit with high wall mounted Single Split indoor unit and outdoor condencing unit Hermetically sealed compressor suitable for operation on 230V, 50Hz, 1Phase AC supply capable of performing Heat cool dehumidifying air circulating and filtering with cooling and condensing units with 3.5 mts of copper piping, insulation kit and 4 mts of 4 core copper flexible chord (Voltage range 160- 264 volts) and cordless remote control including all labour charges and cost of materials complete as directed by the Engineer in charge for the finished item of work.

2

54024

108049.94

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Run 2 of 36/0.30 (2.5 Sqmm) FR PVC insulated flexible Copper Cable (Makes: Finolex / RR kabel / Havells / APAR EBXL / KEI / L&T / VGuard) in existing pipe for Mains from Distribution board to 15Amps 3 pin Power Plug including giving connections and labour charges and cost of materials complete as directed by the Engineer in charge for the finished item of work at all levels of building.

20

105

2108.6

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Run 2 of 56/0.30 (4.0Sqmm) FR PVC insulated flexible copper cable (Makes: Finolex / RR connections and labour charges and cost of materials complete as directed by the Engineer in charge for the finished item of work at all levels of building. kabel / Havells / APAR EBXL / KEI / L&T / VGuard) in existing pipe for run of Mains from Main switch to Distribution board as per colour code of wires including giving

20

160

3203

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply and fixing of 4 Way SPN DB with IP 20 Protection as per IS:13032 and suitable for 4Nos S.P out goings and for 1 No Incommer etc complete of makes Legrand / Schneider / Siemens / L&T / Cabtree Xpro make) with IP-20 protection suitable for single phase ELCB/RCCB/DP Isolator (Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora /Cabtree) as incomer and 10KA SP MCBs (Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora /Cabtree) as out-going including internal connection and labour charges and cost of materials complete as directed by the Engineer in charge for the finished item of work at all levels of building for surface/flush mounting.

1

4787

4787.18

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply and fixing of 6A/10A 3/2 pin modular socket of (Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina) etc with 6A modular switch control of same make on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete as per the directions of the Engineer in charge at site.

2

330

661.26

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply and fixing of 16A /6 A, 1 way 2 Module Combi Socket with indicator lamp /fuse unit of (Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina.) etc with 16A modular switch control (same make.)on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete as per the directions of the Engineer in charge at site.

2

476

953.36

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply and fixing of HID / batten holder / slanting holder (Wipro/G.E./Phillips) in lieu of ceiling rose of light point complete with all connections and all labour charges with 9 W LED lamp (Phillips / OSRAM / Crompton / Eveready / Bajaj / Havells / Pharox / Halonix / Greenlites / IB LED/ Jaquar / C&S / GM / Gold Medal / Million / Syska) (for new installation).

2

272

544.86

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply, Transportation and Fixing of 20W, 2000 lumens, T8,1200mm length LED retro tube light,wide operating voltage with double side connection, PF#0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per IS specifications, minimum CRI#80,.etc complete with 5 years warranty. LUMINAIRE MAKE: Phillips / OSRAM / GE / Crompton / VIN / Bajaj / Havells Halonix / HPL. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs. including supply & fixing of LED patty type batten frame made with CRCA sheet powder coated, fixing an ceiling or wall with all accessories including giving connections, all labour charges and cost of all materials complete as directed by the Engineer in charge for the finished item of work.

4

835

3340.24

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Wiring with 2 runs of 22/0.30(1.5 M2m) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) (Finolex / RR kabel / Havells / APAR EBXL / KEI / L&T / VGuard make) in existing pipe with 6A Modular switch (Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina.make, Ceiling rose (Anchor make), Hot dip galvanizes metal (Modular) control box (Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina) and 6 Modular cover frame (Legrand Myrius /Million Tap-Wood / Gold Medal Curve /Anchor Roma viola / GM Four-Five / Salzar / Stanjo Amron / Havells Fabio / C&S / Benlo make) including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings.

8

896

7169.36

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Providing and fixing of false ceiling in true horizontal level 600 mm x 600 mm, 14 mm thick Mineral Fibre sheet 600 x 600 of fissured-ANF (Board / Tegular) Edge tiles with a Humidity Resistance of 90% RH, Average NRC 0.50, Light Reflectance >80%, Thermal Conductivity # = 0.052 to 0.057 w/mk, Fire Performance Class 0/Class 1 using hot dipped Galvanised Steel section exposed surface with pre-coated capping, main Tee of size 24 x 32 mm at every 1200 mm c/c maximum and rotary stiched cross tee of size 24 x 27 mm at evry 600 mm c/c and sub-cross tee of size 24 mm x 25 mm at 1200 mm c/c and wall angle of size 19 x 19 mm fixed to periphery of the wall and the above grid is suspended at every 1200 mm c/c in both directions using 2.0 mm thick pre-straightened GI Wire laying fine fissured butt edge ceiling tiles of 15 mm thick mineral fiber Board including Cost &conveyance of all materials and labour charges such as cutting , fixing of standing of frame work exposing roof making complete as per the directions of the Engineer in charge for the finished item of work. (Recommended brands:Armstrong, Gypsum India, Saintgobain, Innsula)

20

1323

26473.2

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Providing & Fixing of Scientific Doors with metal door frames and door shutters made of galvanize steel (base steel as per IS 513 of 0.58 mm thick D quality, galvanized as per IS 277 with Zinc of 120 GSM). coated with Zinc Phosphate Primer to receive anypaint on site or finished with Thermosetting Polyurethane paint of Aliphatic Grade providing high levels of scratch resistance and durability/Epoxy polyester powder for powder coating paint thickness 50-60 microns (Dry film thickness) outer frame section of 100 x 58 mm x 1.2 mm thick, shutter section of 0.80 mm thick galvanized steel sheet pressed (roll formed) for 46mm thick fully flush, double skin door shell seam joints at stile edges, in-fill of honeycomb Kraft paper used to give the required rigidity and effective acoustic insulation with 6# Tower bolt # 2 Nos., 6# D handles # 2 Nos., 10# Aldrops # 1 No., Butt Hinges # 6 Nos, Mortise Lock of approved quality # 1 No, frames fixed to the concrete/masonry wall by means of self expanding screws complete as per the directions of Engineer-in-charge for finished item of work- Double leaf Door

3

13924

41774.4

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Painting to External new walls with 2 coats of acrylic emulsion paint exterior grade having VOC (Volatile Organic Compound) content less than 50 grams/ liter of approved brand ( Asian, Berger, Nippon ) and shade over a base coat of appropriate cement primer of exterior grade I quality approved brand,making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc.complete for finished item of work as per the directions of the Engineer in charge as per SS 912 for External walls

120

223

26791.2

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Painting to inner new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 50 grams/ liter of approved brand ( Asian, Berger, Nippon ) and shade over a base coat of appropriate Cement Primer of Interior grade I of approved brand,making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc.complete for finished item of work as per the directions of the Engineer in charge as per SS 911 for internal walls.

60

150

9055.8

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Providing and applying Birla wallcare putty of average 1 to 2mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials , applying emery paper, sand the surface, clean and wipe off loose dust, applying putty by putty knife/ muslin pad, air dry for 2 to 3 hours, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational , incidental, labour charges etc complete for finished item of work as per the directions of the Engineer in charge. ( for internal walls) .

60

247

14865.6

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Flooring plastering with CM (1:3) 12mm thick and finishing smooth to the required slope and thread lining for flooring including cost & conveyance of all materials, labour charges, leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work.

10

205

2059.9

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Laying of Cement Concrete (1:4:8) mix using 50% of 40mm size and 50% of 20mm HBG machine crushed metal for bed flooring including cost and conveyance of all materials atall leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.

1

5149

5149.04

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Plastering with CM (1:5), 12 mm thick to the even wall surfaces with sponze finishing including cost & conveyance of all materials, labour charges, leads, lifts , scaffolding and curing complete as per the directions of the Engineer in charge for the finished item of work.

80

198

15886.4

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Plastering with CM 2 coats, 20 mm thick,base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing.on the uneven surfaces of wall including cost & conveyance of all materials, labour charges, leads, lifts, scaffolding and curing complete as per the directions of the Engineer in charge for the finished item of work.

75

550

41257.5

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Plastering with CM (1:3), 12 mm thick ceiling and projections of beams with sponze finishing at all heights including cost & conveyance of all materials, scaffloding, labour charges, leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work.

30

230

6916.8

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of impervious water proof compound per bag of cement laid over roof when it is green including cost of all materials, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing,rounding off junctions of wall and slab etc complete for finished item of work as per the directions of the Engineer-in-charge.

30

570

17125.5

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply and fixing of Ramco hylux wall panelling using 8mm Ramco hylux with frame work made of Aluminium sections of size 50.8mm x50.8mm x1.6mm thick @ 0.890Kg/m fixed at bottom & ceiling of the brick wall covered with Ramco hylux wall panelling. 50mm thick thermocole is fixed in the cavity of wall panelling and Ramco hylux calcium silicate board 8mm is to be fixed using jointing compound and glass fibre tape . The rate inclusive of cost and conveyance of all materials to site and inclusive of two coats synthetic enamel painting over one coat primer, all other materials, labour and incidental charges complete as per the directions of engineer in Charge for finished item of work.( For Bay kiosk )

50

2267

113362

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Construction of Brick Masonry in CM (1:6) with common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cms of approved quality, including cost & conveyance of all materials, labour charges, scaffolding leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work .

15

8848

132730.2

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Construction of RR Masonry with CM (1:6) using hard CRS, rough granite stone and bond stones (0.16 cum) including cost and conveyance of all materials., labour charges, water lead , Curing, all leads and lifts etc., complete for finished item of work as per directions of the Engineer-in-charge.

11

4689

51582.85

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and steel centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work. - SLAB

3

10927

32781.3

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and steel centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work. - BEAM

1.1

11319

12451.65

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and steel centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work. -SUNSHADE

1.1

1049

1154.51

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and steel centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work.- LINTEL

0.1

12617

1261.76

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and steel centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work. - COLUMN

1.6

12766

20426.91

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and steel centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work. - PLINTH BEAM

1.1

10952

12048.14

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and steel centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work. -FOOTING / RAFT

1.5

10222

15333.48

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply, fabrication and erection of Structural steel channels/angles suitable for fixing cables in control room of required size of approved design and quality and painting with two coats of synthetic enamel paint of approved quality, make, colour and shade over one coat of red oxide, including cost & conveyance of steel and all labour charges etc., complete as per the directions of the Engineer in charge for the finished item of work.

600

107

64392

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 500/ 500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including other taxes on all materials etc., complete for finished item of work in all floors as per the directions of the Engineer-in-charge.( APSS No.126) - FOR CONTROL ROOM/ BUILDINGS

1

87722

87722.67

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Laying of Cement Concrete (1:4:8) mix using 40mm size HBG metal Machine crushed for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.

3.5

5049

17674.86

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Earthwork excavation in all types of soils (up to stone matrix) which can be excavated with pick axe and crow bars and do not require blasting in all conditions such as dry, wet and slushy etc. covering initial lead and lift etc and backfilling the foundations (after laying foundations) with excavated earth including watering, compacting as per standard specification and disposing of surplus earth within site complete as per directions of Engineer in charge at site for finished item of work.

30

272

8188.8

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Construction of Brick masonry chamber over the cully trap or peet valves & fitted with 304.8mm X 228.6mm size CI frame & Hinged cover as including cost & conveyance of all materials, labour charges, curing complete for finished item of work as per the directions of the Engineer-in-charge

1

663

663.88

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply & Fixing of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 (Jaquar/ CERA/ H & R Johnson make) including cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of work .

15

309

4643.85

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Providing and fixing in position at all levels of the buildings 20mm Nominal Bore Bronze Gate (GM peet) Valve / Globe Valve (Tata/Zenith make)as per IS-778 class- 1, Indian make heavy type for water services with hand wheel at all elevations for following sizes including cost of all materials, labour charges, jointing complete as per the directions of the Engineer in charge for the finished item of work.

1

1038

1038.57

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supplying and fixing 22.2 mm OD CPVC pipes of SDR 13.50 pipes Medium Grade as per IS 15778 of approved make for water supply line to toilets including cost and conveyance of pipe, specials such as elbows, Tees concealing same in walls and floors by cutting 25/ 20/ 15mm dia to be included grooves, packing, finishing after laying pipe in position as per the directions of the Engineer in charge for the finished item of work.

75

218

16408.5

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supplying and fixing 28.6 mm OD CPVC pipes of SDR 13.50 pipes Medium Grade as per IS 15778 of approved make for water supply line to toilets including cost and conveyance of pipe, specials such as elbows, Tees concealing same in walls and floors by cutting 25/ 20/ 15mm dia to be included grooves, packing, finishing after laying pipe in position as per the directions of the Engineer in charge for the finished item of work.

80

280

22420

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply and laying of 180 GSM LDPE sheet of approved make in the switch yard including laying the sheet neatly in between layers of crusher dust without folds to avoid the vegetation and weed growth, cutting and jointing the sheet properly including cost & conveyance of all materials, all leads , labour charges for laying complete as per the directions of the Engineer in charge for the finished item of work.

550

20

11000

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply and spreading of crusher dust in the switch yard area (100mm thick) in two layers of 50mm each including Suitable antiweed treatment after completion of final levelling and grading including disposal of surplus earth and filling within switch yard area including cost of all materials, head load lead upto 100 mts and initial lift etc., labour charges complete as per the directions of the Engineer in charge for the finished item of work. (Live SS Work)

55

1310

72102.25

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply and Spreading of 20mm size graded Hard Broken Granite metal in switch yard (100mm thick) providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, head load lead upto 100mts and initial lift etc. complete as per the directions of the Engineer in charge for the finished item of work (Live SS Works)

35

1877

65705.5

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Spreading the useful 20mm graded Metal available from the stacks picked from existing switchyard area to 100mm thickness as directed after doing the micro levelling and providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, head load lead upto 100mts and initial lift etc. complete as per the directions of the Engineer in charge for the finished item of work.

18.75

288

5400.19

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Labour charges for picking old metal in the existing switch yard area 50 to 100mm thickness grading and stacking the useful 20mm graded metal for re-using including cost andconveyance of all materials labour charges, head load lead upto 100mts and initial lift etc., complete for finished item of work as directed by the Engineer-in-charge at site.

18.75

266

4987.69

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Plastering to Uneven surfaces of RR /CR, PCC with CM(1:5) 20mm. thick including cost & conveyance of all materials, labour charges, leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work.

15

279

4195.95

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Plastering with CM (1:5), 12 mm thick and finishing smooth to the required slope and painting two coats of Janatha Cem including cost & conveyance of all materials, labour charges, leads, lifts and curing including cost of Janatha Cem paint two coats, complete as per the directions of the Engineer in charge for the finished item of work.

180

231

41666.4

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Construction of Brick Masonry in CM (1:6) with common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cms of approved quality, including cost & conveyance of all materials, labour charges, scaffolding leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work . - without Scaffolding

35

8219

287674.8

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and steel centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work. - ROAD CULVERT

3.5

9170

32095.56

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm 50% each) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and steel centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work. - RCC COVER SLAB

5

9417

47085.3

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and steel centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work. - SWITCHYARD FOUNDATION

60

10560

633633

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 500/ 500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including other taxes on all materials etc., complete for finished item of work in all floors as per the directions of the Engineer-in-charge.( APSS No.126) -Fire Protection Wall - UPTO 3.66m HEIGHT

3.75

77451

290443.01

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Providing Sand filling below the foundations as per the standard specifications of APDSS in uniform horizontal layers including cost and conveyance of all materials,watering and ramming,tools & tackles,all labour charges,all leads & lifts etc., complete for finished item of work as per the directions of the Engineer-in-charge. ( APSS No. 309&310)

30

2427

72814.2

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Providing and fixing in position at all levels of Masonry walls with 110 mm dia (4kg/cm2) PVC pipes of prince / sudhakar or any ISI brand make as weep holes wherever necessary including fixing in position & at all leads & lifts etc. complete as per the directions of the Engineer in charge for the finished item of work.

25

224

5624.5

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Plastering with CM (1:5), 12 mm thick to the even wall surfaces with sponze finishing including cost & conveyance of all materials, labour charges, leads, lifts , scaffolding and curing complete as per the directions of the Engineer in charge for the finished item of work. - Without Scaffolding

270

184

49707

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Flush Pointing with CM (1:4) to RR Masonry walls including cost and conveyance of all materials, labour charges, curing, all leads and lifts complete as per the directions of the Engineer in charge for the finished item of work.

15

106

1592.7

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Laying of Plain Cement concrete (PCC) - Nominal Mix (1:2:4) with 12 to 20mm HBG metal including cost and conveyance of all materials, labour charges, curing and water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (IS-456)

4

6827

27309.92

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Laying of Plain Cement concrete (PCC) - Nominal Mix (1:3:6) with 12 to 20mm HBG metal over RR wall with necessary form work including cost and conveyance of all materials, labour charges, curing and water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (IS-456)

1.5

6188

9282.27

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;White washing with Birla/JK White cement of approved quality with two coats to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered material including cost of all materials, labour charges and incidental charges such as scaffolding , lift etc, complete for finished item of work as directed by the Engineer in charge. - Ground level (upto 3.66m Height)

15

47

710.7

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Construction of RR Masonry with CM (1:6) using hard CRS, rough granite stone and bond stones (0.16 cum) including cost and conveyance of all materials., labour charges, water lead , Curing, all leads and lifts etc., complete for finished item of work as per directions of the Engineer-in-charge.

15

4689

70340.25

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Laying of Cement Concrete (1:4:8) mix using 40mm size HBG metal Machine crushed for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.

33

5049

166648.68

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Excavation in Hard rock ( Blasting Prohibited) upto 3m depth.The rate includes labour charges, tools and tackles, safety measures, disposal of unuseful excavted material at all leads and lifts, as per drawing removal of stumps and other deleterious material and disposal upto a lead of 50m, complete for finished item of work as per directions of the Engineer-in-charge.

50

2270

113505

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Earthwork excavation in all types of soils (up to stone matrix) which can be excavated with pick axe and crow bars and do not require blasting in all conditions such as dry, wet and slushy etc. covering initial lead and lift etc and backfilling the foundations (after laying foundations) with excavated earth including watering, compacting as per standard specification and disposing of surplus earth within site complete as per directions of Engineer in charge at site for finished item of work.

360

272

98265.6

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Dismantling the existing Unreinforced Cement Concrete upto 15 cm thickness and disposing the unserviceable material away from the site with all leads and lifts including T&P complete as per the directions of the Engineer-in - charge for finished item of work.

1.5

1772

2658.88

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Project Insurance @ 0.5% (on cost of equipment + erection charges)

1

25723

25723.44

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Post type insulator suuppor T-clamps33KV;SSR:SWR10904

1

627

627.27

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;LOADING / UNLOADING OF EQUIPMENT /MATERIAL

1

37188

37188

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;TRANSPORTATION OF SUB-STATION MATERIAL / EQUIPMENT / SCRAP FROM ONE SITE TO ANOTHER SITE

1

22370

22370.22

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply and Fixing of GI flexible Earth Bonds

40

222

8899.2

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply of clamps as per is 5561- 1970 , 12mm thickness with alluminum and alluminum alloy conforming to A6 of is 617 1994 & hot dip galvanised with nuts & bolts including spring washers conforming to is 2633-1964, is 1363-1967, is1367-1961);alluminum alloy pad clamps conforming to A6 of is 617, 4 bolted with hot dip galvanised bolts and double nuts with spring and flat washers of size m10 x 65 i.e(3/8" x 21/2 " to suit for twin PANTHER ACSR / ZEBRA of pad size 100 x 100 x 15mm for carrying 1;SSR:SMR40021

12

390

4680.48

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply of clamps as per is 5561- 1970 , 12mm thickness with alluminum and alluminum alloy conforming to A6 of is 617 1994 & hot dip galvanised with nuts & bolts including spring washers conforming to is 2633-1964, is 1363-1967, is1367-1961);alluminum alloy pad clamps conforming to A6 of is 617, 4 bolted with hot dip galvanised bolts and double nuts with spring and flat washers of size m10 x 65 i.e(3/8" x 21/2 " to suit for PANTHER ACSR / ZEBRA of pad size 75 x 75 x 15mm for carrying 600 a cu;SSR:SMR40018

9

232

2090.34

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply of clamps as per is 5561- 1970 , 12mm thickness with alluminum and alluminum alloy conforming to A6 of is 617 1994 & hot dip galvanised with nuts & bolts including spring washers conforming to is 2633-1964, is 1363-1967, is1367-1961);alluminum alloy pad clamps conforming to A6 of is 617, 4 bolted with hot dip galvanised bolts and double nuts with spring and flat washers of size m10 x 65 i.e(3/8" x 21/2 " to suit for PANTHER ACSR / ZEBRA of pad size 100 x 100 x 15mm for carrying 600 a ;SSR:SMR40019

12

320

3845.52

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;WRITING LETTERS IN CONTROL ROOM PANELS, LETTERING ON PANELS, MARSHALLING BOXES ETC....

30

101

3054.3

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply rubber mats ( 6#x3#) size for indoor ss;SSR:SMR40068

3

1059

3177.9

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply and fixing of 50 lbs CO2 portablefire extinguishers of standard make with ISI certification like Fire flex / Sharathy industries complete with first filling Horn and Hose.

2

15626

31252.94

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply and fixing of 15 lbs CO2 portablefire extinguishers of standard make with ISI certification like Fire flex / Sharathy industries complete with first filling Horn and Hose.

3

6924

20772.24

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply and erection of LED Lamps

8

1600

12800

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply and erection of LT distribution box containg three sets of etc

1

11909

11909.96

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Erection of 33kv HG Fuse set Erection of 33kV HG Fuse set 220 and 132kV

1

817

817.19

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply of 33Kv HG Fuse set;SSR:SMR40138

1

12844

12844.74

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Fabrication and connecting to risers from earth mat to structures, equipment, marshall ing boxes, electrical panels, PLCC panels, fencing posts etc.;M.S./ G.I. Flat 75x8mm / 75 x 12 mm ;SSR:SWR10918

2

4088

8176.66

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Erection of Marshalling boxes 220 and 132kV

3

490

1471.74

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Erection of control / relay panels, LTAC panels, announciation, PTDB panels etc.,in the control room duly mounting them on channels and grouting them with foundation bolts excluding cost of channels and foundation bolts (for 220kV and 132kV), including man power support toMRT wing for commissioning. 220 and 132kV

2

3004

6008.6

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Cable terminations to the switchgear, Marshalling boxes / panel terminal blocks/control and relay panels, LTAC panel including providng suitable ferrules and lugs as per specification (including cost of ferrules and lugs) (for 220kV and 132kV). 220 and 132kV up to 50 sqmm Power Cable with lugs each core at both ends.

15

152

2280.9

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Cable terminations to the switchgear, Marshalling boxes / panel terminal blocks/control and relay Panels, LTAC panel including providng suitable ferrules and lugs as per specification (including cost of ferrules and lugs) (for 220kV and 132kV). 220 and 132kV 1.5/2.5 Sq.mm. Copper with copper lugs each core at both ends..

350

35

12495

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Laying of power cables. 220 and 132kV above 50 sqmm

150

21

3174

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Laying of control cables of all sizes (from 2 core. 1.5/2.5 / 4.0 Sq. mm. to 20 core, 1.5/2.5/4.0sqmm , both copper and alluminium in cable trenches including cost of suitable metalic cable glands with rubber lining. Note: This includes running of cables in control room where cables are run on cable racks in cable duct.

700

11

8330

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Laying of control cables of all sizes (from 2 core. 1.5/2.5 / 4.0 Sq. mm. to 20 core, 1.5/2.5/4.0sqmm , both copper and alluminium in cable trenches including cost of suitable metalic cable glands with rubber lining. Note: This includes running of cables in control room where cables are run on cable racks in cable duct.

400

11

4760

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Laying of control cables of all sizes (from 2 core. 1.5/2.5 / 4.0 Sq. mm. to 20 core, 1.5/2.5/4.0sqmm , both copper and alluminium in cable trenches including cost of suitable metalic cable glands with rubber lining. Note: This includes running of cables in control room where cables are run on cable racks in cable duct.

200

11

2380

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Laying of control cables of all sizes (from 2 core. 1.5/2.5 / 4.0 Sq. mm. to 20 core, 1.5/2.5/4.0sqmm , both copper and alluminium in cable trenches including cost of suitable metalic cable glands with rubber lining. Note: This includes running of cables in control room where cables are run on cable racks in cable duct.

350

11

4165

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Laying of control cables of all sizes (from 2 core. 1.5/2.5 / 4.0 Sq. mm. to 20 core, 1.5/2.5/4.0sqmm , both copper and alluminium in cable trenches including cost of suitable metalic cable glands with rubber lining. Note: This includes running of cables in control room where cables are run on cable racks in cable duct.

400

11

4760

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Excavation of earth pit, putting cast iron pipe with flange on one end (as per ISS7181/86) of nominal dia 125mm and 2.75 meters long in side the pit including supply and Fixing RCC collars 0.75 meter dia (OD), 50mm thick and 0.60meters long in side the pit, backfill the pit in the 25mm size granules of BHcoke for full depth of the pit with alternate layers of BH coke and salt of 300mm thick around the earth pipe of 150mm on all the sides of the pipe including cost and conveyance of BH coke, salt, clamps, C.I.Pipes and RCC collars, labour charges for all operational and incidental items of work etc., complete. 220 and 132kV

15

15077

226155.15

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Laying of earth mat including Excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg. No.SET(P)/149/82 with the following sizes of MS Flats / GI Flats.(for 220kV and 132kV) including fabrication. 220 and 132kV 75x 8mm MS Flat / GI Flat.

300

131

39435

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Laying of earth mat including Excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg. No.SET(P)/149/82 with the following sizes of MS Flats / GI Flats.(for 220kV and 132kV) including fabrication. 220 and 132kV 75x 8mm MS Flat / GI Flat.

200

131

26290

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Laying of earth mat including Excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg. No.SET(P)/149/82 with the following sizes of MS Flats / GI Flats.(for 220kV and 132kV) including fabrication. 220 and 132kV 100x16mm MS Flat / GI Flat.

20

146

2925

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Laying of earth mat including Excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg. No.SET(P)/149/82 with the following sizes of MS Flats / GI Flats.(for 220kV and 132kV) including fabrication. 220 and 132kV 100x16mm MS Flat / GI Flat.

80

146

11700

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Connection of equipment to bus and or another equipment with Twin Zebra/Moose/panther Conductor including measuring, cutting,clamping and Hoisting of suspension insulator assembly to support the Conductor wherever necessary. 220 and 132kV.

6

768

4609.62

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Connection of equipment to bus and or another equipment with Twin Zebra/Moose/panther Conductor including measuring, cutting,clamping and Hoisting of suspension insulator assembly to support the Conductor wherever necessary. 220 and 132kV.

9

548

4938.84

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Connection of equipment to bus and or another equipment with single Zebra/Moose/panther Conductor including measuring, cutting,clamping and Hoisting of suspension insulator assembly to support the Conductor wherever necessary. 220 and 132kV

10

496

4961.3

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Connection of equipment to bus and or another equipment with single Zebra/Moose/panther Conductor including measuring, cutting,clamping and Hoisting of suspension insulator assembly to support the Conductor wherever necessary. 220 and 132kV

15

354

5315.7

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Fixing of spacers for Twin Moose Conductor 220 and 132kV

40

133

5342

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Fixing of Hardware,stretching the ground wire and stringing of earth wire to a tension of 450kgs from pinacle to ground. 220 and 132kV.

50

68

3438

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Fixing of Hardware,stretching the ground wire and stringing of earth wire to a tension of 450kgs from pinacle to pinacle. 220 and 132kV.

12

1010

12123

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Tension clamps for earth wire 3 Bolted.;SSR:SWR10892

12

804

9653.16

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Supply of HTGS earth wire 7/3.15;SSR:SMR22304

100

33

3321

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;SUP AL T-CLAMPS FOR ZEEBRA CONDUCT#&FIX#;SSR:SWR21925 (FOR MOOSE CONDUCTOR)

16

492

7877.44

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;SUPPLY & FIXING OF ALLUMINIUN ALLOY PAD THRO CLAMPS FOR SUPPORTING 33 KV POST INSULATORS TO HOLD ALUMINIUM RIGID BUS CONDUCTOR

6

618

3708

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;T.CLAMPS FOR TWIN MOOSE WITH 150MM SPACING

12

714

8577.84

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;SPACER CLAMPS WITH 150MM SPACING FOR MOOSE

40

303

12148

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;T-CLAMPS FOR TWIN MOOSE TO SINGLE MOOSE WITH (SPACER T CLAMPS WITH 400MM SPACING)

4

853

3415.72

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Erection of 33 kV /400 V (100/ 250KVA) Station Transformer including all necessary connections on HV & LV side including cost of lugs (But excluding cost of transformer and HG fuse set)

1

7639

7639

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv Bus Post Type Insulators.

1

360

360.99

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Isolators including solid core insulators Erection, alignment in full shape for smooth operation.

2

3076

6153.54

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv Isolators without earth swtich including solid core insulators Erection, alignment in full shape for smooth operation by manually.

1

6083

6083.96

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Lightning Arrestors.

3

686

2058.84

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv Lightning Arrestors.

3

1756

5268.09

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Current Tranformers.

3

1149

3447.27

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv Current Tranformers.

3

3719

11158.98

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Circuit breakers including Ploe to Pole cable wiring and terminations.

1

6815

6815.2

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Erection of the following equipment with Crane / Derrick at site including handling the material equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv Circuit breakers with support structure and Marshalling boxes including Ploe to Pole cable wiring and terminations.

1

16912

16912.38

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;3 BOLTED TENSION HARDWARE

6

3502

21012

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Hoisting of Insulators and hardware, stretching the Conductor and stringing of 33 kv bus comprising of three phases with twin Zebra/Moose Conductor to a tension of 900kgs including Fixing of spacer clamps.( the maximum length or up to a length of bus section of 20m). 220 and 132kV

1

8457

8457.51

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Fixing of 90LB Rail Poles over the transformer plinths. ;SSR:SWR11008

1

7403

7403.66

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;S/o Rail poles 90/105lb (250x2n);SSR:SMR22718

1

30690

30690

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Erection of the Main and auxiliary structures etc., using bolts and nuts. 220 and 132kV

9.51

3382

32180.91

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Setting of stubs with stub setting template for sub-station structure:Erection of stub template, Fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubsetting template, dismantling of template after completion of initial curing of CC 33 kV Breaker

1

1416

1416.2

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Setting of stubs with stub setting template for sub-station structure:Erection of stub template, Fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubsetting template, dismantling of template after completion of initial curing of CC 132 kV Breaker

1

2123

2123.64

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Setting of stubs with stub setting template for sub-station structure:Erection of stub template, Fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubsetting template, dismantling of template after completion of initial curing of CC 132kV Isolator

1

2351

2351.08

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Setting of stubs with stub setting template for sub-station structure:Erection of stub template, Fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubSetting template, dismantling of template after completion of initial curing of CC 33kV towers and CPL's

6

782

4696.86

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Setting of stubs with stub setting template for sub-station structure:Erection of stub template, Fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubSetting template, dismantling of template after completion of initial curing of CC 132kV towers

2

3135

6270.4

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;Setting of stubs with stub setting template for sub-station structure:Erection of stub template, Fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubSetting template, dismantling of template after completion of initial curing of CC 33kV towers and CPL's

7

782

5479.67

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;GI BOLTS & NUTS, SPRING & PACK WASHERS

0.5

79351

39358.2

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;RS JOISTS, MS CHANNELS & MISC. STRUCTURAL STEEL FOR 33KV SWITCHYARD CT'S, LA'S, PT'S , ISOLATORS & HG FUSE SETS

9.86

91695

904387.78

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;75X8MM GI FLAT

1410

81

114788.1

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;75X8MM MS FLAT

940

62

58280

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;100X16MM MS FLAT

252

62

15624

... More
Augmentation of 50MVA Power Transformer (3rd PTR) at 220/132/33KV Fabcity SS;100X16MM GI FLAT

1008

81

82061.28



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.