Transmission Corporation Of Andhra Pradesh Limited Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Transmission Corporation Of Andhra Pradesh Limited - APTRANSCO Tender

Works
Civil And Construction
Opening Date5 Sep 2024
Closing Date21 Oct 2024
Tender Amount₹ 30,24,942 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Construction of Brick masonry chamber over the cully trap or peet valves & fitted with 304.8mm X 228.6mm size CI frame & Hinged cover as including cost & conveyance of all materials, labour charges, curing complete for finished item of work as per the directions of the Engineer-in-charge

2

676

1353.26

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Supply & Fixing of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 (Jaquar/CERA/ H & R Johnson make) including cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of work .

11

317

3496.46

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Providing and fixing in position at all levels of the buildings 20mm Nominal Bore Bronze Gate (GM peet) Valve / Globe Valve (Tata/Zenith make)as per IS-778 class- 1, Indian make heavy type for water services with hand wheel at all elevations forfollowing sizes including cost of all materials, labour charges, jointing complete as per the directions of the Engineer in charge for the finished item of work.

2

1531

3062.36

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Supplying and fixing 15.9 mm OD CPVC pipes of SDR 13.50 pipes of premium make Supreme/ Prince/ Astral/ Birla Aerocon including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental, labour charges, etc. complete for finished item of work as directed by Engineer-in-charge.

20

360

7211.2

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Supplying and fixing 28.6 mm OD CPVC pipes of SDR 13.50 pipes of premium make Supreme/Prince/ Astral/ Birla Aerocon including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge.

50

448

22442.5

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Back Filling the foundations and Basement with excavated earth available at site as per equirement and specification including cost & conveyance of all materials, labour charges, leads, lifts, watering and consolidating to required density complete as per the directions of the Engineer in charge for the finished item of the work .(APSS No. 309&310)

80

215

17236

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Laying of Plain Cement concrete (PCC) - Nominal Mix (1:3:6) with 12 to 20mm HBG metal for encasing/ embedding the structural steel supportng 'Y' angles with necessary form work including cost and conveyance of all materials, labour charges, curing and water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (IS-456)

0.5

6407

3203.82

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Supply and laying of 180 GSM LDPE sheet of approved make in the switch yard including laying the sheet neatly in between layers of crusher dust without folds to avoid the vegetation and weed growth, cutting and jointing the sheet properly including cost & conveyance of all materials, all leads , labour charges for laying complete as per the directions of the Engineer in charge for the finished item of work.

100

20

2000

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Supply and spreading of crusher dust in the switch yard area (100mm thick) in two layers of 50mm each including Suitable antiweed treatment after completion of final levelling and grading including disposal of surplus earth and filling within switch yard areaincludind cost of all materials, all leads and lifts, labour charges complete as per the directions of the Engineer in charge for the finished item of work

10

1477

14773.5

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Supply and Spreading of 20mm size graded Hard Broken Granite metal in switch yard (100mm thick) including providing suitable PCC guage block of size 100x 100x 100mm at 2m x2m intervals, cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of work

10

2021

20218

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Labour charges for picking old metal in the existing switch yard area 50 to 100mm thickness grading and stacking the useful 20mm graded metal for re-using including cost andconveyance of all materials labour charges, head load lead upto 100mts and initial lift etc., complete for finished item of work as directed by the Engineer-in-charge at site.

5

271

1356.2

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Plastering with CM (1:5), 12 mm thick and finishing smooth to the required slope and painting two coats of Janatha Cem including cost & conveyance of all materials, labour charges, leads, lifts and curing including cost of Janatha Cem paint two coats, complete as per the directions of the Engineer in charge for the finished item of work.

120

237

28502.4

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Construction of Brick Masonry in CM (1:6) with common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cms of approved quality, including cost & conveyance of all materials, labour charges, scaffolding leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work . - without Scaffolding

14

8269

115779.72

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and steel centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work.Centering should be with steel centering plates etc. complete. -FIRE PROTECTION WALL- Vertical wall upto 3.66m height

2

9672

19345.04

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and steel centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work. - SWITCHYARD FOUNDATION

55

10837

596057

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 500/ 500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including other taxes on all materials etc., complete for finished item of work in all floors as per the directions of the Engineer-in-charge.( APSS No.126) -Fire Protection Wall - UPTO 3.66m HEIGHT

1.86

75177

139829.52

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Laying of Cement Concrete (1:4:8) mix using 40mm size HBG metal Machine crushed for foundations including cost and conveyance of all materials at all leads and lifts,ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.

12

5253

63038.16

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Providing Sand filling below the foundations as per the standard specifications of APDSS in uniform horizontal layers including cost and conveyance of all materials,watering and ramming,tools & tackles,all labour charges,all leads & lifts etc., complete for finished item of work as per the directions of the Engineer-in-charge. ( APSS No. 309&310)

6

2532

15195.96

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Earthwork excavation in all types of soils (upto stone matrix) which can be excavated in combination of mechanically and manually with pick axe and crow bars and do not require blasting in all conditions such as dry, wet, slushy etc., covering initial lead and lift etc., and backfilling the foundations (after laying foundations) with excavated earth including watering, compacting as per standard specification and disposing of surplus earth within site (up to 1KM lead) complete as per directions of Engineer in charge at site for finished item of work.

150

274

41217

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;33/11KV S.S 75x8mm MS Flats for earthmat;SSR:SWR20017 (GI flat)

403.15

375

151350.57

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;33/11KV S.S 75x8mm MS Flats for earth mat; SSR:SWR20017 (MS flat)

438.35

286

125674.95

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;MS EARTH FLAT OF 100X16 MM FOR EARTHING /EARTH GRID; SSR:SWR21742, DSCM:SWR21742 (GI flat)

84.43

1006

84970.35

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;MS EARTH FLAT OF 100X16 MM FOR EARTHING /EARTH GRID; SSR:SWR21742, DSCM:SWR21742 (MS flat)

238.15

768

183042.09

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;TRANSPORTATION OF SUB-STATION MATERIAL /EQUIPMENT / SCRAP FROM ONE SITE TO ANOTHER SITE

1

55090

55090.31

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;LOADING / UNLOADING OF EQUIPMENT / MATERIAL

1

25973

25973.23

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Erection of Marshalling boxes 220 and 132kV

3

636

1908

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Erection of control / relay panels, LTAC panels, announciation, PTDB panels etc.,in the control room duly mounting them on channels and grouting them with foundation bolts excluding cost of channels and foundation bolts (for 220kV and 132kV), including man power support toMRT wing for commissioning. 220 and 132kV .

2

3894

7788

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Solid Core Insulators

6

313

1879.2

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept.stores to the site). 33 kv Potential Transformers.

3

1378

4136.4

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Isolators including solid core insulators Erection, alignment in full shape for smooth operation.

2

4035

8071.6

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept.stores to the site). 132 kv Bus Post Type Insulators.

3

663

1989

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept.stores to the site). 132 kv Isolators without earth swtich including solid core insulators Erection, alignment in full shape for smooth operation by manually.

1

7885

7885.2

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Lightning Arrestors.

3

823

2469.6

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept.stores to the site). 132 kv Lightning Arrestors.

3

2107

6321.6

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept.stores to the site). 33 kv Current Tranformers.

3

1378

4136.4

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept.stores to the site). 132 kv Current Tranformers.

3

4464

13392

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept.stores to the site). 33 kv Circuit breakers including Ploe to Pole cable wiring and terminations.

1

8832

8832

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv Circuit breakers with support structure and Marshalling boxes including Ploe to Pole cable wiring and terminations.

1

21918

21918

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Cable terminations to the switchgear, Marshalling boxes /panel terminal blocks/control and relay Panels, LTAC panel including providng suitable ferrules and lugs as per specification (including cost of ferrules and lugs) (for 220kV and 132kV). 220 and 132kV 1.5/2.5 q.mm. Copper with copper lugs each core at both ends..

80

46

3744

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Laying of control cables of all sizes (from 2 core. 1.5/2.5 / 4.0 Sq. mm. to 20 core, 1.5/2.5/4.0sqmm , both copper and alluminium in cable trenches including cost of suitable metalic cable glands with rubber lining. Note: This includes running of cables in control room where cables are run on cable racks in cable duct.

5000

15

78000

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Excavation of earth pit, putting cast iron pipe with flange on one end (as per ISS7181/86) of nominal dia 125mm and 2.75 meters long in side the pit including supply and Fixing RCC collars 0.75 meter dia (OD), 50mm thick and 0.60meters long in side the pit, backfill the pit in the 25mm size granules of BHcoke for full depth of the pit with alternate layers of BH coke and salt of 300mm thick around the earth pipe of 150mm on all the sides of the pipe including cost and conveyance of BH coke, salt, clamps, C.I.Pipes and RCC collars, labour charges for all operational and incidental items of work etc.,complete. 220 and 132kV

11

18092

199016.4

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Laying of earth mat including Excavation of trenches, welding,connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg.No.SET(P)/149/82 with the following sizes of MS Flats / GI Flats.(for 220kV and 132kV) including fabrication. 220 and 132kV 75x 8mm MS Flat / GI Flat.

403.15

121

48861.78

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Laying of earth mat including Excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg.No.SET(P)/149/82 with the following sizes of MS Flats / GI Flats.(for 220kV and 132kV) including fabrication. 220 and 132kV 75x 8mm MS Flat / GI Flat.

438.35

121

53128.02

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Laying of earth mat including Excavation of trenches, welding,connecting to equipment and connecting lightning shield toearth mat and earthing of fence posts, drilling and connectingearth rods including connecting cast iron pipes as per Drg.No.SET(P)/149/82 with the following sizes of MS Flats / GIFlats.(for 220kV and 132kV) including fabrication. 220 and 132kV 100x16mm MS Flat / GI Flat.

84.43

135

11448.71

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Laying of earth mat including Excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg. No.SET(P)/149/82 with the following sizes of MS Flats / GI Flats.(for 220kV and 132kV) including fabrication. 220 and 132kV 100x16mm MS Flat / GI Flat.

238.15

135

32293.14

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Stringing of earth wire to a tension of 450kgs from pinacle to ground.

15

1212

18180

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Fixing of Hardware,stretching the ground wire and stringing of earth wire to a tension of 450kgs from pinacle to pinacle. 220 and 132kV.

2

1212

2424

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Connection of equipment to bus and or another equipment with Twin Zebra/Moose/panther Conductor including measuring, cutting,clamping and Hoisting of suspension insulator assembly to support the Conductor wherever necessary. 220 and 132kV.

3

933

2799.9

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Connection of equipment to bus and or another equipment with Twin Zebra/Moose/panther Conductor including measuring, cutting,clamping and Hoisting of suspension insulator assembly to support the Conductor wherever necessary. 220 and 132kV.

24

658

15811.2

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Connection of equipment to bus and or another equipment with single Zebra/Moose/panther Conductor including measuring cutting,clamping and Hoisting of suspension insulator assembly to support the Conductor wherever necessary. 220 and 132kV

6

601

3610.8

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Connection of equipment to bus and or another equipment with single Zebra/Moose/panther Conductor including measuring, cutting,clamping and Hoisting of suspension insulator assembly to support the Conductor wherever necessary. 220 and 132kV

18

424

7646.4

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Hoisting of Insulators and hardware, stretching the Conductor and stringing of 33 kv bus comprising of three phases with twin Zebra/Moose Conductor to a tension of 900kgs including Fixing of spacer clamps.( the maximum length or up to a length of bus section of 0m). 220 and 132kV

1

10149

10149.6

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Erection of the Main and auxiliary structures etc., using bolts and nuts. 220 and 132kV

8.6

4383

37698.96

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Fixing of 90lb rail poles over the transformer plinths. 220 and 132KV

10

872

8724

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Setting of stubs with stub setting template for sub-station structure:Erection of stub template, Fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubsetting template, dismantling of template after completion of initial uring of CC 33KV Breaker

1

1836

1836

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Setting of stubs with stub setting template for sub-station structure:Erection of stub template, Fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubsetting template, dismantling of template after completion of initial uring of CC 132 kV Breaker

1

2752

2752.8

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Setting of stubs with stub setting template for sub-station structure:Erection of stub template, Fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubsetting template, dismantling of template after completion of initial curing of CC 132kV Isolator

1

3046

3046.8

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Setting of stubs with stub setting template for sub-station structure:Erection of stub template, Fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubSetting template, dismantling of template after completion of initial uring of CC 33kV towers and CPL's

13

1014

13182

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Setting of stubs with stub setting template for sub-station structure: Erection of stub template, Fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stub setting template, dismantling of template after completion of initial curing of CC 132KV towers

1

4063

4063.2

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Writing letters in control room panels,lettering on panels, marshalling boxes etc....

18

132

2376

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Auto-CADD drawing with 12 copies indicate complete land with dimensions, plan of SS with equipments, location of control room, equipments, roads, duct routes, earth mat of 100x16mm and 50x 8mm flat earth pits,yard lighting fixtures etc., 220 and 132kV 132kV SS layout drawing

1

9322

9322.8

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Marking of bay as per approved layout with the help of surveyor

1

18350

18350

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Twin moose spacer clamp with 150mm spacing

27

302

8176.14

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Grounding Clamp

6

990

5945.18

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;D Shackle

6

252

1514.1

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;GI Earth bonds

42

222

9344.16

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;90W Led Street lightning fixture

5

7621

38105

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Spacer t-clamp twin moose to zebra 150mm spacing

9

714

6433.38

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;33KV Post Insulator clamp for twin moose

6

618

3708

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;T-Clamp for Moose all 3 Ways

21

492

10339.14

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;3 bolted tension hardware for twin moose with 150mm spacing for 33kv bus

6

3502

21012

... More
Erection of additional 31.5MVA PTR (3rd PTR) at 132/33KV SS Srirangapur.;Pole, Rail, 90LB Rail

0.44

61000

26840



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.