Transmission Corporation Of Andhra Pradesh Limited Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Transmission Corporation Of Andhra Pradesh Limited - APTRANSCO Tender

Works
Civil And Construction
Opening Date4 Oct 2023
Closing Date30 Oct 2023
Tender Amount₹ 65,80,990 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Seignioarage charges including SMET

1

27229

27229.49

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 415 grade as per IS 1786-1979) of TISCO/ SAIL/ VSP make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work ( APSS No.126) -Switch Yard Works and Line Works

0.18

78239

14083.03

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm 50% each) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and steel centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work. - RCC COVER SLAB

1.6

9971

15954.62

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Providing Sand filling below the foundations as per the standard specifications of APDSS in uniform horizontal layers including cost and conveyance of all materials,watering and ramming,tools & tackles,all labour charges,all leads & lifts etc., complete for finished item of work as per the directions of the Engineer-in-charge. ( APSS No. 309&310)

10

2306

23069.3

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Plastering with CM (1:5), 12 mm thick and finishing smooth to the required slope and painting two coats of Janatha Cem including cost & conveyance of all materials, labour charges, leads, lifts and curing including cost of Janatha Cem paint two coats, complete as per the directions of the Engineer in charge for the finished item of work.

82.4

248

20478.05

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Laying of Plain Cement concrete (PCC) - Nominal Mix (1:2:4) with 12 to 20mm HBG metal including cost and conveyance of all materials, labour charges, curing and water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (IS-456)

1.2

7125

8550.04

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Construction of Brick Masonry in CM (1:6) with common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cms of approved quality, including cost & conveyance of all materials, labour charges, scaffolding leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work . - without Scaffolding

8.4

8612

72349.12

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Laying of Cement Concrete (1:4:8) mix using 40mm size HBG metal Machine crushed for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.

4.4

5281

23239.92

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Earthwork excavation in all types of soils (up to stone matrix) which can be excavated with pick axe and crow bars and do not require blasting in all conditions such as dry, wet and slushy etc. covering initial lead and lift etc and backfilling the foundations (after laying foundations) with excavated earth including watering, compacting as per standard specification and disposing of surplus earth within site complete as per directions of Engineer in charge at site for finished item of work.

22

304

6703.18

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Removal of boulders (surfaced/ embedded) with hydraulic excavator including cutting and loading in tippers. The rate includes labour charges, cost of tools and tackles, disposing of unuseful materail at all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge

35

177

6207.6

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Excavation in Hard rock ( Blasting Prohibited) upto 3m depth.The rate includes labour charges, tools and tackles, safety measures, disposal of unuseful excavted material at all leads and lifts, as per drawing removal of stumps and other deleterious material and disposal upto a lead of 50m, complete for finished item of work as per directions of the Engineer-in-charge.

35

2435

85227.45

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Spreading the useful 20mm graded Metal available from the stacks picked from existing switchyard area to 100mm thickness as directed after doing the micro levelling and providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, head load lead upto 100mts and initial lift etc. complete as per the directions of the Engineer in charge for the finished item of work.

10

309

3098.1

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Labour charges for picking old metal in the existing switch yard area 50 to 100mm thickness grading and stacking the useful 20mm graded metal for re-using including cost andconveyance of all materials labour charges, head load lead upto 100mts and initial lift etc., complete for finished item of work as directed by the Engineer-in-charge at site.

10

287

2878.1

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Supply and spreading of crusher dust in the switch yard area (100mm thick) in two layers of 50mm each including Suitable antiweed treatment after completion of final levelling and grading including disposal of surplus earth and filling within switch yard areaincludind cost of all materials, all leads and lifts, labour charges complete as per the directions of the Engineer in charge for the finished item of work

32

1420

45451.2

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Supply and laying of 180 GSM LDPE sheet of approved make in the switch yard including laying the sheet neatly in between layers of crusher dust without folds to avoid the vegetation and weed growth, cutting and jointing the sheet properly including cost & conveyance of all materials, all leads , labour charges for laying complete as per the directions of the Engineer in charge for the finished item of work.

320

20

6400

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Supply and Spreading of 20mm size graded Hard Broken Granite metal in switch yard (100mm thick) including providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of work

23

1984

45634.3

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Construction of Brick masonry chamber over the cully trap or peet valves & fitted with 304.8mm X 228.6mm size CI frame & Hinged cover as including cost & conveyance of all materials, labour charges, curing complete for finished item of work as per the directions of the Engineer-in-charge

2

692

1384.1

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Supply & Fixing of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 (Jaquar/ CERA/ H & R Johnson make) including cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of work .

15

320

4804.8

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Providing and fixing in position at all levels of the buildings 20mm Nominal Bore Bronze Gate (GM peet) Valve / Globe Valve (Tata/Zenith make)as per IS-778 class- 1, Indian make heavy type for water services with hand wheel at all elevations for following sizes including cost of all materials, labour charges, jointing complete as per the directions of the Engineer in charge for the finished item of work.

1

1052

1052.15

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Providing and fixing in position at all levels of the buildings 25mm Nominal Bore Bronze Gate (GM peet) Valve / Globe (Tata/Zenith make)as per IS-778 class- 1, Indian make heavy type for water services with hand wheel at all elevations for following sizesincluding cost of all materials, labour charges, jointing complete as per the directions of the Engineer in charge for the finished item of work.

1

1495

1495.86

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Supplying and fixing 15.9 mm OD CPVC pipes of SDR 13.50 pipes Medium Grade as per IS 15778 of approved make for water supply line to toilets including cost and conveyance of pipe, specials such as elbows, Tees concealing same in walls and floors by cutting 25/ 20/ 15mm dia to be included grooves, packing, finishing after laying pipe in position as per the directions of the Engineer in charge for the finished item of work.

20

210

4215.8

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Supplying and fixing 22.2 mm OD CPVC pipes of SDR 13.50 pipes Medium Grade as per IS 15778 of approved make for water supply line to toilets including cost and conveyance of pipe, specials such as elbows, Tees concealing same in walls and floors by cutting 25/ 20/ 15mm dia to be included grooves, packing, finishing after laying pipe in position as per the directions of the Engineer in charge for the finished item of work.

45

235

10592.1

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Supplying and fixing 28.6 mm OD CPVC pipes of SDR 13.50 pipes Medium Grade as per IS 15778 of approved make for water supply line to toilets including cost and conveyance of pipe, specials such as elbows, Tees concealing same in walls and floors by cutting 25/ 20/ 15mm dia to be included grooves, packing, finishing after laying pipe in position as per the directions of the Engineer in charge for the finished item of work.

55

296

16326.75

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Laying of Plain Cement concrete (PCC) - Nominal Mix (1:3:6) with 12 to 20mm HBG metal for encasing/embedding the structural steel supportng 'Y' angles with necessary form work including cost and conveyance of all materials, labour charges, curing and water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (IS-456)

0.5

6485

3242.86

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 415 grade as per IS 1786-1979) of TISCO/ SAIL/ VSP make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work ( APSS No.126) -FOR BUILDINGS

0.3

89742

26922.85

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Raised Pointing with CM (1:4) to RR Masonry including cost and conveyance of all materials, all leads and lifts complete for the finished item of work as per the directions of the Engineer in charge.

10

133

1339.5

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Construction of RR Masonry with CM (1:6) using hard CRS, rough granite stone and bond stones (0.16 cum) including cost and conveyance of all materials., labour charges, water lead , Curing, all leads and lifts etc., complete for finished item of work as per directions of the Engineer-in-charge.

6

5027

30162.12

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and steel centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work. - ROAD CULVERT

4

9623

38495.4

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Laying of Cement Concrete (1:4:8) mix using 40mm size HBG metal Machine crushed for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.

4

5281

21127.2

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Earthwork excavation in all types of soils (up to stone matrix) which can be excavated with pick axe and crow bars and do not require blasting in all conditions such as dry, wet and slushy etc. covering initial lead and lift etc and backfilling the foundations (after laying foundations) with excavated earth including watering, compacting as per standard specification and disposing of surplus earth within site complete as per directions of Engineer in charge at site for finished item of work.

15

304

4570.35

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;White washing with Birla/JK White cement of approved quality with two coats to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered material including cost of all materials, labour charges and incidental charges such as scaffolding , lift etc, complete for finished item of work as directed by the Engineer in charge. - Ground level (upto 3.66m Height)

90

52

4700.7

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Providing and fixing in position at all levels of the building under floors and against walls 110mm dia (4kg/cm2) PVC pipes of prince / sudhakar or any ISI brand make with specials such as junctions,couplers, bends/Tees etc., with or without access doors as required and with solvent jointing as per standard practice wherever necessary including cost of all materials, labour charges, excavation and refilling wherever required testing etc. complete as per the directions of the Engineer in charge for the finished item of work.

35

224

7874.3

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Raised Pointing with CM (1:4) to RR Masonry including cost and conveyance of all materials, all leads and lifts complete for the finished item of work as per the directions of the Engineer in charge.

55

133

7367.25

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Plastering with CM (1:5), 12 mm thick to the even wall surfaces with sponze finishing including cost & conveyance of all materials, labour charges, leads, lifts , scaffolding and curing complete as per the directions of the Engineer in charge for the finished item of work. - Without Scaffolding

35

196

6870.15

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Laying of Plain Cement concrete (PCC) - Nominal Mix (1:3:6) with 12 to 20mm HBG metal for encasing/embedding the structural steel supportng 'Y' angles with necessary form work including cost and conveyance of all materials, labour charges, curing and water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (IS-456)

2

6485

12971.46

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Construction of RR Masonry with CM (1:6) using hard CRS, rough granite stone and bond stones (0.16 cum) including cost and conveyance of all materials., labour charges, water lead , Curing, all leads and lifts etc., complete for finished item of work as per directions of the Engineer-in-charge.

30

5027

150810.6

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Laying of Cement Concrete (1:4:8) mix using 40mm size HBG metal Machine crushed for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.

5

5281

26409

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Earthwork excavation in all types of soils (up to stone matrix) which can be excavated with pick axe and crow bars and do not require blasting in all conditions such as dry, wet and slushy etc. covering initial lead and lift etc and backfilling the foundations (after laying foundations) with excavated earth including watering, compacting as per standard specification and disposing of surplus earth within site complete as per directions of Engineer in charge at site for finished item of work.

25

304

7617.25

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Construction of Brick Masonry in CM (1:6) with common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cms of approved quality, including cost & conveyance of all materials, labour charges, scaffolding leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work . - without Scaffolding

7

8612

60290.93

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Construction of RR Masonry with CM (1:6) using hard CRS, rough granite stone and bond stones (0.16 cum) including cost and conveyance of all materials., labour charges, water lead , Curing, all leads and lifts etc., complete for finished item of work as per directions of the Engineer-in-charge.

7

5027

35189.14

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Plastering with CM (1:5), 12 mm thick and finishing smooth to the required slope and painting two coats of Janatha Cem including cost & conveyance of all materials, labour charges, leads, lifts and curing including cost of Janatha Cem paint two coats, complete as per the directions of the Engineer in charge for the finished item of work.

55

248

13668.6

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and steel centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work. - SWITCHYARD FOUNDATION

59

11214

661654.32

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 415 grade as per IS 1786-1979) of TISCO/ SAIL/ VSP make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work ( APSS No.126) -Switch Yard Works and Line Works

1.95

78239

152566.21

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Laying of Cement Concrete (1:4:8) mix using 40mm size HBG metal Machine crushed for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.

10

5281

52818

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Earthwork excavation in all types of soils (up to stone matrix) which can be excavated with pick axe and crow bars and do not require blasting in all conditions such as dry, wet and slushy etc. covering initial lead and lift etc and backfilling the foundations (after laying foundations) with excavated earth including watering, compacting as per standard specification and disposing of surplus earth within site complete as per directions of Engineer in charge at site for finished item of work.

225

304

68555.25

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Levelling by filling with borrowed Gravel by mechanical means including cost & conveyance of gravel, prewatering of soils, depositing the soils in filling areas , spreading soils, breaking clods, sectioning and consolidation with three wheel 8 to 10 MT static Road Roller @ OMC to meet requirement as per standard specification , including all hire and operational charges of T&P, contour Surveying, etc. complete for finished item of work as per the directions of the Engineer in Charge. (Payment will be made based on the initial and final levels as per contour survey for finished item of work).

170

285

48473.8

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Dismantling of existing stone masonry up to 3 m height, including carefully stacking materials useful for re use and clearing all debris away from the site with initial lead & lift labour charges, T&P complete as per the directions of the Engineer in charge for the finished item of work.

7

636

4453.82

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Dismantling of existing Brick masonry including clearing away and carefully stacking materials useful for re use and all debris away from the site with lead & lift labour charges, T&P complete as per the directions of the Engineer in charge for the finished item of work.

12

332

3993.36

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Dismantling the existing RCC by mannual means and carefully stacking the reuseful material at site and disposing the unserviceable metraial to any remote place 1000 mts distance away from site with all leads and lifts includung cost of T&P ,labour and as per the directions of the Engineer-in - charge for finished item of work.

10

2694

26946.7

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;TRANSPORTATION OF MATERIAL/ EQUIPMENT

9

3046

27418.5

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;LOADING / UNLOADING OF EQUIPMENT / MATERIAL ETC.

1

30592

30592.2

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;WRITING LETTERS IN CONTROL ROOM PANELS, LETTERING ON PANELS, MARSHALLING BOXES ETC....

30

114

3420.9

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Cable terminations to the switchgear, Marshalling boxes / panel terminal blocks/control and relay Panels, LTAC panel including providng suitable ferrules and lugs as per specification (including cost of ferrules and lugs) (for 220kV and 132kV). 220 and 132kV 1.5/2.5 Sq.mm. Copper with copper lugs each core at both ends..

300

39

11994

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Laying of control cables of all sizes (from 2 core. 1.5/2.5 / 4.0 Sq. mm. to 20 core, 1.5/2.5/4.0sqmm , both copper and alluminium in cable trenches including cost of suitable metalic cable glands with rubber lining. Note: This includes running of cables in control room where cables are run on cable racks in cable duct.

5500

13

73315

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Excavation of earth pit, putting cast iron pipe with flange on one end (as per ISS7181/86) of nominal dia 125mm and 2.75 meters long in side the pit including supply and Fixing RCC collars 0.75 meter dia (OD), 50mm thick and 0.60meters long in side the pit, backfill the pit in the 25mm size granules of BHcoke for full depth of the pit with alternate layers of BH coke and salt of 300mm thick around the earth pipe of 150mm on all the sides of the pipe including cost and conveyance of BH coke, salt, clamps, C.I.Pipes and RCC collars, labour charges for all operational and incidental items of work etc., complete. 220 and 132kV

12

16886

202635

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Connection of equipment to bus and or another equipment with Twin Zebra/Moose/panther Conductor including measuring, cutting,clamping and Hoisting of suspension insulator assembly to support the Conductor wherever necessary. 220 and 132kV. (under shutdown condition)

3

834

2502.36

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Connection of equipment to bus and or another equipment with Twin Zebra/Moose/panther Conductor including measuring, cutting,clamping and Hoisting of suspension insulator assembly to support the Conductor wherever necessary. 220 and 132kV. (under normal condition)

3

614

1843.83

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Connection of equipment to bus and or another equipment with single Zebra/Moose/panther Conductor including measuring, cutting,clamping and Hoisting of suspension insulator assembly to support the Conductor wherever necessary. 220 and 132kV (Single Zebra jumpers from equipment to bus)

60

396

23814

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Erection of Marshalling boxes 220 and 132kV

5

549

2747.2

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Erection of control / relay panels, LTAC panels, announciation, PTDB panels etc.,in the control room duly mounting them on channels and grouting them with foundation bolts excluding cost of channels and foundation bolts (for 220kV and 132kV), including man power support toMRT wing for commissioning. 220 and 132kV .

2

3364

6729.64

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Lightning Arrestors.

15

768

11529.45

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Solid Core Insulators (under sutdown)

3

367

1103.46

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Current Tranformers.

15

1286

19304.7

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Circuit breakers including Ploe to Pole cable wiring and terminations.

5

7633

38165.1

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Isolators including solid core insulators Erection, alignment in full shape for smooth operation. (under shutdown)

1

3340

3340.49

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Isolators including solid core insulators Erection, alignment in full shape for smooth operation.

10

2461

24614.1

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Cable terminations to the switchgear, Marshalling boxes / panel terminal blocks/control and relay Panels, LTAC panel including providng suitable ferrules and lugs as per specification (including cost of ferrules and lugs) (for 220kV and 132kV). 220 and 132kV 1.5/2.5 Sq.mm. Copper with copper lugs each core at both ends.. (Dismantling of cable terminations)

50

43

2177.5

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Erection of Marshalling boxes 220 and 132kV (Dismantling of 33KV CT Marshalling boxes)

2

598

1197

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Lightning Arrestors. (Dismantling of 33KV LAs)

6

837

5023.56

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Current Tranformers. (Dismantling of 3KV CT)

6

1401

8411.34

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Isolators including solid core insulators Erection, alignment in full shape for smooth operation. (Dismantling of 33KV VCB)

2

8314

16629.08

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Isolators including solid core insulators Erection, alignment in full shape for smooth operation. (Dismantling of 33KV isolators)

4

2681

10724.72

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Connection of equipment to bus and or another equipment with single Zebra/Moose/panther Conductor including measuring, cutting,clamping and Hoisting of suspension insulator assembly to support the Conductor wherever necessary. 220 and 132kV (Dismantling of single zebra jumpers from equipment to equipment or uipment to line under shutdown)

24

432

10376.16

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Hoisting of Insulators and hardware, stretching the Conductor and stringing of 33 kv bus comprising of three phases with twin Zebra/Moose Conductor to a tension of 900kgs including Fixing of spacer clamps.( the maximum length or up to a length of bus section of 20m). 220 and 132kV

2

9472

18944.82

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;ERECTION OF THE MAIN AND AUXILIARY STRUCTURES ETC., USING BOLTS AND NUTS. 220 & 132KV

15.25

3788

57772.64

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Laying of earth mat including Excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg. No.SET(P)/149/82 with the following sizes of MS Flats / GI Flats.(for 220kV and 132kV) including fabrication. 220 and 132kV 75x 8mm MS Flat / GI Flat. (75x8mm GI flat)

800

105

84120

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Laying of earth mat including Excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg. No.SET(P)/149/82 with the following sizes of MS Flats / GI Flats.(for 220kV and 132kV) including fabrication. 220 and 132kV 75x 8mm MS Flat / GI Flat. (75x8 mm MS flat)

800

105

84120

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Laying of earth mat including Excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg. No.SET(P)/149/82 with the following sizes of MS Flats / GI Flats.(for 220kV and 132kV) including fabrication. 220 and 132kV 100x16mm MS Flat / GI Flat. (100x16 MS flat)

300

117

35100

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Laying of earth mat including Excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg. No.SET(P)/149/82 with the following sizes of MS Flats / GI Flats.(for 220kV and 132kV) including fabrication. 220 and 132kV 100x16mm MS Flat / GI Flat. (100x16mm GI flat)

300

117

35100

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Setting of stubs with stub setting template for sub-station structure:Erection of stub template, Fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubsetting template, dismantling of template after completion of initial curing of CC 33 kV Breaker

5

1586

7930.7

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;Setting of stubs with stub setting template for sub-station structure:Erection of stub template, Fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubSetting template, dismantling of template after completion of initial curing of CC 33kV towers and CPL's

18

876

15781.5

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;BIMETALLIC CT STUD CLAMP FOR ZEBRA 30MM

30

290

8700

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;33KV POST INSULATOR CLAMP FOR TWIN MOOSE(For Twin zebra)

3

618

1854

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;PAD CLAMP FOR TWIN ZEBRA ACSR CONDUCTOR

6

435

2610

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;PAD CLAMP FOR ACSR ZEBRA CONDUCTOR

90

190

17100

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;TWIN ZEBRA SPACER CLAMP (150 MM)

32

303

9718.4

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;T-CLAMP ZEBRA TO ZEBRA

12

492

5908.08

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;SPACER T CLAMP TWIN ZEBRA TO ZEBRA WITH 150MM SPACING

15

714

10722.3

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;75X8MM GI FLAT

3760

81

306064

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;33KV CT MARSHALLING BOX

5

4088

20441.65

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;3 BOLTED TENSION HARDWARE 150MM

12

3503

42044.4

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;90W LED STREET LIGHT WITH FIXTURE

10

1600

16000

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;ELECTRICALLY INSULATED RUBBER MATS

5

1059

5296.5

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;6.8KG CO2 FIRE EXTINGUISHER

5

6924

34620.4

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;GI EARTH BONDS

60

282

16970.4

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;75X8MM MS FLAT

3760

62

233120

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;100X16MM MS FLAT

3780

62

234360

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;100X16MM GI FLAT

3780

81

307692

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;GI BOLTS & NUTS, SPRING & PACK WASHERS

0.91

79351

72209.59

... More
Erection of 33KV bus for 5No.s 33KV feeder bays with 3 No.s new bays and shifting of 2 No.s bays at;RS JOISTS, MS CHANNELS & MISC. STRUCTURAL STEEL FOR 33KV SWITCHYARD CT'S, LA'S, PT'S , ISOLATORS & HG FUSE SETS

15.25

91695

1398348.75



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.