Transmission Corporation Of Andhra Pradesh Limited Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Transmission Corporation Of Andhra Pradesh Limited - APTRANSCO Tender
Electrical Generators And Transformers
Electrical and Electronics
Opening Date30 Apr 2025
Closing Date15 May 2025
Tender Amount₹ 4,81,745
Costs
EMD
₹ 9,635Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
592854Tender No
EMWT-05/2025-26Tender Authority
Transmission Corporation Of Andhra Pradesh Limited ViewPurchaser Address
-Website
http://https://www.tstransco.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
EMWT 05 2025 26;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 220 kv Lightning Arrestors. A)Works under SD
3
5580
16740
... More
EMWT 05 2025 26;Loading /Unloading of 120KN Normal disc insulator 220 and 132kV
25
1
39.75
... More
EMWT 05 2025 26;LOADING / UNLOADING OF CONTROL CABLES UP TO 6 CORE 220 & 132KV
1
145
145.56
... More
EMWT 05 2025 26;LOADING / UNLOADING OF TOWER PARTS 220 & 132KV
0.25
220
55.17
... More
EMWT 05 2025 26;DOUBLE TENSION HARDWARE FOR MOOSE(for PTR-II)
6
5860
35164.2
... More
EMWT 05 2025 26;T-CLAMP FOR MOOSE ALL 3 WAYS
18
492
8862.12
... More
EMWT 05 2025 26;220KV ISOLATOR TWIN MOOSE ACSR CONDUCTOR PAD CLAMP(For PTR-2)
6
490
2942.88
... More
EMWT 05 2025 26;Laying of earth mat including Excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg. No.SET(P)/149/82 with the following sizes of MS Flats / GI Flats.(for 220kV and 132kV) including fabrication. 220 and 132kV 100x16mm MS Flat / GI Flat. (Dismantling) A)Works under SD
15
127
1906.95
... More
EMWT 05 2025 26;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv Current Tranformers. (Dismantling) A)Works under SD
3
4185
12555
... More
EMWT 05 2025 26;SUSPENSION CLAMP FOR MOOSE/ZEBRA CONDUCTOR FOR 132KV/220KV BUS(for PTR-II)
6
4058
24349.2
... More
EMWT 05 2025 26;Cases containing CTs, PTs, CVTs 220 and 132kV Above 33kV and up to 132kV
3
485
1456.02
... More
EMWT 05 2025 26;Laying of earth mat including Excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg. No.SET(P)/149/82 with the following sizes of MS Flats / GI Flats.(for 220kV and 132kV) including fabrication. 220 and 132kV 75x 8mm MS Flat / GI Flat. A)Works under SD
25
151
3787.5
... More
EMWT 05 2025 26;Fabrication of Main and Auxiliary structures, stub setting templates, foundation bolts, 'U' bolts etc,.using raw steel such as M.S.angles, Plates, Channels,R.S.Joists, M.S.rounds, excluding cost of Mild steel and transport charges to site. 220 and 132kV A)Works under SD
0.25
17928
4482
... More
EMWT 05 2025 26;GI EARTH BONDS(for PTR-II)
6
222
1334.88
... More
EMWT 05 2025 26;LOADING / UNLOADING OF CONTROL CABLES ABOVE 6 CORE 220 & 132KV
1
194
194.12
... More
EMWT 05 2025 26;LOADING / UNLOADING OF CONTROL CABLES UP TO 6 CORE 220 & 132KV
1
145
145.56
... More
EMWT 05 2025 26;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 220 kv Lightning Arrestors. (Dismantling) A)Works under SD
3
4185
12555
... More
EMWT 05 2025 26;Loading / Unloading of Loading / Unloading of 220 and 132kV 132 kV Hardware double
9
11
105.66
... More
EMWT 05 2025 26;100X16MM GI FLAT(for PTR-IIoctober 23 rates)
346
79
27579.66
... More
EMWT 05 2025 26;75X8MM GI FLAT(for PTR-IIoctober23 rates)
130
79
10362.3
... More
EMWT 05 2025 26;Laying of control cables of all sizes (from 2 core. 1.5/2.5 / 4.0 Sq. mm. to 20 core, 1.5/2.5/4.0sqmm , both copper and alluminium in cable trenches including cost of suitable metalic cable glands with rubber lining. Note: This includes running of cables in control room where cables are run on cable racks in cable duct. A)Works under SD
1600
19
31200
... More
EMWT 05 2025 26;Connection of equipment to bus and or another equipment with Twin Zebra/Moose/panther Conductor including measuring, cutting,clamping and Hoisting of suspension insulator assembly to support the Conductor wherever necessary. 220 and 132kV. A)Works under SD
18
823
14823
... More
EMWT 05 2025 26;Laying of earth mat including Excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg. No.SET(P)/149/82 with the following sizes of MS Flats / GI Flats.(for 220kV and 132kV) including fabrication. 220 and 132kV 100x16mm MS Flat / GI Flat. A)Works under SD
25
169
4237.5
... More
EMWT 05 2025 26;Hoisting of insulators and hardware, stretching the Conductor and stringing of 132 kv bus comprising of three phases with single Zebra/Moose Conductor to a tension of 900kgs.( the maximum length or up to a length of bus section of 45m). 220 and 132kV (Dismantling) A)Works under SD
1
7607
7607.25
... More
EMWT 05 2025 26;5 BOLTED TENSION HARDWARE FOR TWIN MOOSE WITH 400MM SPACING FOR 132 OR 220KV BUS(for PTR-II)
6
4058
24349.2
... More
EMWT 05 2025 26;Connection of equipment to bus and or another equipment with single Zebra/Moose/panther Conductor including measuring, cutting,clamping and Hoisting of suspension insulator assembly to support the Conductor wherever necessary. 220 and 132kV A)Works under SD
12
531
6372
... More
EMWT 05 2025 26;Erection of control / relay panels, LTAC panels, announciation, PTDB panels etc.,in the control room duly mounting them on channels and grouting them with foundation bolts excluding cost of channels and foundation bolts (for 220kV and 132kV), including man power support toMRT wing for commissioning. 220 and 132kV . A)Works under SD
1
4867
4867.5
... More
EMWT 05 2025 26;CT STUD CLAMP FOR MOOSE 40MM(for PTR-II)
6
432
2593.56
... More
EMWT 05 2025 26;TRANSPORTATION OF SUB-STATION MATERIAL / EQUIPMENT / SCRAP FROM ONE SITE TO ANOTHER SITE
1
16831
16831.98
... More
EMWT 05 2025 26;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv Current Tranformers. A)Works under SD
3
5580
16740
... More
EMWT 05 2025 26;Erection of control / relay panels, LTAC panels, announciation, PTDB panels etc.,in the control room duly mounting them on channels and grouting them with foundation bolts excluding cost of channels and foundation bolts (for 220kV and 132kV), including man power support toMRT wing for commissioning. 220 and 132kV . (Dismantling) A)Works under SD
1
3650
3650.63
... More
EMWT 05 2025 26;132KV OR 220KV RIGID SPACER CLAMP FOR TWIN MOOSE WITH 400MM SPACING
15
574
8621.1
... More
EMWT 05 2025 26;Erection of the Main and auxiliary structures etc., using bolts and nuts. 220 and 132kV A)Works under SD
0.25
5479
1369.88
... More
EMWT 05 2025 26;Hoisting of Insulators and hardware, stretching the Conductor and stringing of 132 kV bus comprising of three phases with Twin Zebra/Moose Conductor to a tension of 1800kgs including Fixing of spacer clamps.( The maximum length or up to a length of bus section of 45m). 220 and 132kV A)Works under SD
1
20290
20290.5
... More
EMWT 05 2025 26;LOADING / UNLOADING OF CONTROL CABLES ABOVE 6 CORE 220 & 132KV
1
194
194.12
... More
EMWT 05 2025 26;WRITING LETTERS IN CONTROL ROOM PANELS, LETTERING ON PANELS, MARSHALLING BOXES ETC....
10
110
1100
... More
EMWT 05 2025 26;Connection of equipment to bus and or another equipment with single Zebra/Moose/panther Conductor including measuring, cutting,clamping and Hoisting of suspension insulator assembly to support the Conductor wherever necessary. 220 and 132kV (Dismantling) A)Works under SD
24
398
9558
... More
EMWT 05 2025 26;Loading / Unloading of Loading / Unloading of 220 and 132kV 132 kV Hardware double
9
11
105.66
... More
EMWT 05 2025 26;Fixing of spacers for Twin Moose Conductor 220 and 132kV A)Works under SD
25
201
5025
... More
EMWT 05 2025 26;Loading /Unloading of 120KN Normal disc insulator 220 and 132kV
25
1
39.75
... More
EMWT 05 2025 26;Cases containing CTs, PTs, CVTs 220 and 132kV Above 33kV and up to 132kV
3
485
1456.02
... More
EMWT 05 2025 26;Loading /Unloading of Steel 220 and 132kV
0.48
220
105.92
... More
EMWT 05 2025 26;Laying of control cables of all sizes (from 2 core. 1.5/2.5 / 4.0 Sq. mm. to 20 core, 1.5/2.5/4.0sqmm , both copper and alluminium in cable trenches including cost of suitable metalic cable glands with rubber lining. Note: This includes running of cables in control room where cables are run on cable racks in cable duct. (Dismantling) A)Works under SD
1500
14
21945
... More
EMWT 05 2025 26;DOUBLE SUSPENSION HARDWARE FOR MOOSE WITH AGS(for PTR-II)
3
5108
15326.4
... More
EMWT 05 2025 26;GI LATTICE STRUCTURES FOR SUBSTATIONS(for PTR-IIoctober 23 rates)
0.25
92873
23218.25
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%