Transmission Corporation Of Andhra Pradesh Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Transmission Corporation Of Andhra Pradesh Limited - APTRANSCO Tender
Civil And Construction
Civil Works Others
Construction Works
Opening Date10 Jun 2022
Closing Date11 Jul 2022
Tender Amount₹ 6,87,205
Costs
EMD
₹ 13,744Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
327852Bid Award Id
ViewTender No
EMWT-18/2022-23Tender Authority
Transmission Corporation Of Andhra Pradesh Limited ViewPurchaser Address
-Website
http://https://www.tstransco.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of South side balance compound wall at 132/33 KV SS Achampet.;Laying Of Reinforced Cement Concrete (rcc) M- 20 Nominal Mix (cementKgs ) Using20mm Size Graded Machine Crushed Hard Granite Metal (coarse Aggregate)mm & 12mm(2:1)) From Approved Quarry Including Cost And Conveyance Of AllTerials Like Cement,Fine Aggregate (screened Sand) Coarse Aggregate, Water Etc., To Site AndCluding AllOperational, Incidental And Labour Charges Such As Machine Mixing,Ying Concrete,Curing And Centering, Etc.,complete But Excluding Cost Of Steel And ItsFabrication Charges For Finished Item Of Work(sand 0.45 Cum And Metal90 Cum) AsDirected By The Engineer In Charge - Plinth Beam
2
-
19852.46
... More
Construction of South side balance compound wall at 132/33 KV SS Achampet.;Plastering To Uneven Surfaces Of Rr /cr, Pcc With Cm(1:5) 20mm. Thick Including Cost &Conveyance Of All Materials, Labour Charges, Leads, Lifts And Curing Complete As PerThe Directions Of The Engineer In Charge For The Finished Item Of Work.
180
-
42552
... More
Construction of South side balance compound wall at 132/33 KV SS Achampet.;Plastering With Cm (1:5), 12 Mm Thick To The Even Wall Surfaces With Sponze FinishingIncluding Cost & Conveyance Of All Materials, Labour Charges, Leads, Lifts , ScaffoldingAnd Curing Complete As Per The Directions Of The Engineer In Charge For The FinishedItem Of Work. - Without Scaffolding
115
-
17770.95
... More
Construction of South side balance compound wall at 132/33 KV SS Achampet.;Construction Of Brick Masonry In Cm (1:6) With Common Burnt Clay Bricks Of Class As PerTable-1 Of Is:1077-1992 Non-modular Or Traditional Size 23 X 11 X 7 Cms Of ApprovedQuality, Including Cost & Conveyance Of All Materials, Labour Charges, ScaffoldingLeads, Lifts And Curing Complete As Per The Directions Of The Engineer In Charge ForThe Finished Item Of Work . - For Compound Wall
26
-
178717.76
... More
Construction of South side balance compound wall at 132/33 KV SS Achampet.;Construction Of Rr Masonry With Cm (1:6) Using Hard Crs, Rough GraniteOne And BondStones (0.16 Cum) Including Cost And Conveyance Of All Materials.,Bour Charges,Water Lead , Curing, All Leads And Lifts Etc., Complete For FinishedEm Of Work As PerDirections Of The Engineer-in-charge.
40
-
153954.4
... More
Construction of South side balance compound wall at 132/33 KV SS Achampet.;Providing High Yield Strength Deformed (hysd)/ Thermo MechanicallyEated (tmt) (fe500/ 500d/550d) Grade As Per Is 1786-1979) Of Tisco/ Sail/ Vsp/jindalKe, DifferentDiameters For Rcc Works , Including Labour Charges For Straightening,Tting, BendingTo Required Sizes And Shapes, Placing In Position With Cover Blocks OfProvedMaterials And Size And Tying And Lap-splicing With Binding Wire Of 18G, FormingGrills For Reinforcement Work As Per Approved Designs And Drawings,Cluding Cost AndConveyance Of Steel Bars, Including All Wastages Such As Overlaps,Uplings, Chairs,Spacer Bars Including Cost And Conveyance Of Binding Wire, Cover BlocksD AllIncidental, Operational, Labour Charges Such As Cutting, Bending,Acing In Position,Tying Including Sales And Other Taxes On All Materials Etc., CompleteR Finished Item Of Work In All Floors As Per The Directions Of The Egineer-in-charge.( Apss No.126) -fire Protection Wall - Upto 3.66mIght
0.3
-
26909.84
... More
Construction of South side balance compound wall at 132/33 KV SS Achampet.;Laying Of Plain Cement Concrete (pcc) - Nominal Mix (1:2:4) With 12 ToMm Hbg Metal Including Cost And Conveyance Of All Materials, LabourArges, Curing And Water Charges, Tools And Tackles, All Leads &Fts Etc., Complete For Finished Item Of Work As Per Directions Of TheGineer-in-charge. (is-456)
1
-
6088.51
... More
Construction of South side balance compound wall at 132/33 KV SS Achampet.;Laying Of Plain Cement Concrete (pcc) - Nominal Mix (1:3:6) With 12 ToMm Hbg Metal For Encasing/embedding The Structural Steel Supportng' Angles With Necessary Form Work Including Cost And Conveyance Of AllTerials, Labour Charges, Curing And Water Charges, Tools AndCkles, All Leads & Lifts Etc., Complete For Finished Item OfRk As Per Directions Of The Engineer-in-charge. (is-456)
3
-
16200.12
... More
Construction of South side balance compound wall at 132/33 KV SS Achampet.;Laying Of Cement Concrete (1:4:8) Mix Using 40mm Size Hbg Metal Machine Crushed ForFoundations Including Cost And Conveyance Of All Materials At All Leads And Lifts,Ramming, Consolidating, Curing Etc,complete. For Finished Item Of Work As Per DirectionsOf The Engineer-in-charge.
5
-
20314.65
... More
Construction of South side balance compound wall at 132/33 KV SS Achampet.;Drilling Holes 25 Mm Dia In Hard Granite Or Sheet Rock (manually) AndOuting The Holes With Cement Slurry Including All Labout Etc.,Mplete As Directed By The Engineer In Charge For The Finished Item OfRk.
50
-
14183
... More
Construction of South side balance compound wall at 132/33 KV SS Achampet.;Excavation In Hard Rock ( Blasting Prohibited) Upto 3m Depth.the Rate Includes LabourCharges, Tools And Tackles, Safety Measures, Disposal Of Unuseful Excavted Material AtAll Leads And Lifts, As Per Drawing Removal Of Stumps And Other Deleterious MaterialAnd Disposal Upto A Lead Of 50m, Complete For Finished Item Of Work As Per DirectionsOf The Engineer-in-charge.
10
-
21852.8
... More
Construction of South side balance compound wall at 132/33 KV SS Achampet.;Earthwork Excavation In All Types Of Soils (upto Stone Matrix) Which Can Be ExcavatedIn Combination Of Mechanically And Manually With Pick Axe And Crow Bars And Do NotRequire Blasting In All Conditions Such As Dry, Wet, Slushy Etc., Covering Initial LeadAnd Lift Etc., And Backfilling The Foundations (after Laying Foundations) With Excavated Earth Including Watering, Compacting As Per Standard Specification And Disposing OfSurplus Earth Within Site (up To 1km Lead) Complete As Per Directions Of Engineer InCharge At Site For Finished Item Of Work.
30
-
4863.3
... More
Construction of South side balance compound wall at 132/33 KV SS Achampet.;Clearing Thick Jungle Growth (less Than 50 Percent Open Space) IncludingShes Up To 30 Cm /parthenium And Other Weeds Including Burning OrSposing Off The Same As Directed By Engineer In Charge For TheNished Item Of Work.
500
-
1860
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements