Transmission Corporation Of Andhra Pradesh Limited Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Transmission Corporation Of Andhra Pradesh Limited - APTRANSCO Tender

Works
Electrical Generators And Transformers
Electrical and Electronics
Opening Date22 Nov 2023
Closing Date12 Jan 2024
Tender Amount₹ 46,61,051 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Augmentation of PTR at 132 KV SS Jadcherla;Seignorage charges

1

28053

28053

... More
Augmentation of PTR at 132 KV SS Jadcherla;Providing and fixing in position at all levels of the buildings Bronze Gate (GM peet) Valve (Tata/Zenith make) as per IS-778 class- 1, Indian make heavy type for water services with hand wheel at all elevations for following sizes including cost of all materials, labour charges, jointing complete as per the directions of the Engineer in charge for the finished item of work. 25mm dia Nominal Bore

3

1477

4433.28

... More
Augmentation of PTR at 132 KV SS Jadcherla;Providing and fixing in position at all levels of the buildings Bronze Gate (GM peet) Valve (Tata/Zenith make) as per IS-778 class- 1, Indian make heavy type for water services with hand wheel at all elevations for following sizes including cost of all materials, labour charges, jointing complete as per the directions of the Engineer in charge for the finished item of work. 32 mm dia Nominal Bore

1

2236

2236.65

... More
Augmentation of PTR at 132 KV SS Jadcherla;Supply & Fixing of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 including cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of work .

10

306

3060.1

... More
Augmentation of PTR at 132 KV SS Jadcherla;Supplying and fixing CPVC pipes of SDR 13.50 pipes Medium Grade as per IS 15778 of approved make for water supply line to toilets including cost and conveyance of pipe, specials such as elbows, Tees concealing same in walls and floors by cutting 25/ 20/ 15mm dia to be included grooves, packing, finishing after laying pipe in position as per the directions of the Engineer in charge for the finished item of work. 22.20 mm Outer dia Pipe

30

213

6397.5

... More
Augmentation of PTR at 132 KV SS Jadcherla;Supplying and fixing CPVC pipes of SDR 13.50 pipes Medium Grade as per IS 15778 of approved make for water supply line to toilets including cost and conveyance of pipe, specials such as elbows, Tees concealing same in walls and floors by cutting 25/ 20/ 15mm dia to be included grooves, packing, finishing after laying pipe in position as per the directions of the Engineer in charge for the finished item of work. 28.6 mm Outer dia Pipe

50

274

13736

... More
Augmentation of PTR at 132 KV SS Jadcherla;Providing and fixing in position at all levels of Masonry walls with 110 mm dia (4kg/cm2) PVC pipes of prince / sudhakar or any ISI brand make as weep holes wherever necessary including fixing in position & at all leads & lifts etc. complete as per the directions of the Engineer in charge for the finished item of work.

32

224

7199.36

... More
Augmentation of PTR at 132 KV SS Jadcherla;Supplying & Fixing of expansion joint filler board conforming to IS: 1838 for CC road in lateral and longitudinal direction complete as per the direction of the Engineer in charge for the finished item of work.

3

384

1154.76

... More
Augmentation of PTR at 132 KV SS Jadcherla;Construction of Plain Cement Concrete Road with M20 Nominal Mix (1:2:4) using 40mm & 20mm HBG metal (50% each), jointed at expansion and construction joint only, over a prepared sub base, with 43 grade cement (330 kgs per Cum) , coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and laid in approved fixed side formwork (steel channel, including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints,, curing of concrete for 14- days, complete as per as per drawing and as directed by the Engineer in charge for the finished item of work.(Technical Specification Clause 1501 MORD).

9

5932

53391.6

... More
Augmentation of PTR at 132 KV SS Jadcherla;Providing, laying, spreading and compacting graded stone aggregates to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed materiald by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100 kN/ Vibratory Roller 80-100 kN weight to achive the desired density including lighting, barricading and maintenance of diversion, etc., as per tables 400.11 & 400.12 and technical specification clause 406 MORD/ MORTH complete as per the directions of the Engineer in charge for the finished item of work.

12

1883

22606.68

... More
Augmentation of PTR at 132 KV SS Jadcherla;White washing with Birla/JK White cement of approved quality with two coats to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered material including cost of all materials, labour charges and incidental charges such as scaffolding , lift etc, complete for finished item of work as directed by the Engineer in charge. Upto 3.66m height

165

45

7552.05

... More
Augmentation of PTR at 132 KV SS Jadcherla;Supply and Spreading of 20mm size graded Hard Broken Granite metal in switch yard (100mm thick) providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of work

30

1598

47959.2

... More
Augmentation of PTR at 132 KV SS Jadcherla;Supply and laying of 180 GSM LDPE sheet of approved make in the switch yard including laying the sheet neatly in between layers of crusher dust without folds to avoid the vegetation and weed growth, cutting and jointing the sheet properly including cost & conveyance of all materials, all leads , labour charges for laying complete as per the directions of the Engineer in charge for the finished item of work.

400

20

8000

... More
Augmentation of PTR at 132 KV SS Jadcherla;Supply and spreading of crusher dust in the switch yard area (100mm thick) in two layers of 50mm each including Suitable antiweed treatment after completion of final levelling and grading including disposal of surplus earth and filling within switch yard area including cost of all materials, all leads and lifts, labour charges complete as per the directions of the Engineer in charge for the finished item of work.

40

1031

41255.6

... More
Augmentation of PTR at 132 KV SS Jadcherla;Spreading the useful 20mm graded Metal available from the stacks picked from existing switchyard area to 100mm thickness as directed after doing the micro levelling and providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, head load lead upto 100mts and initial lift etc. complete as per the directions of the Engineer in charge for the finished item of work.

36

280

10107

... More
Augmentation of PTR at 132 KV SS Jadcherla;Labour charges for picking old metal in the existing switch yard area 50 to 100mm thickness grading and stacking the useful 20mm graded metal for re-using including cost andconveyance of all materials labour charges, head load lead upto 100mts and initial lift etc., complete for finished item of work as directed by the Engineer-in-charge at site.

36

258

9315

... More
Augmentation of PTR at 132 KV SS Jadcherla;Plastering to Uneven surfaces of RR /CR, PCC with CM(1:5) 20mm. thick including cost & conveyance of all materials, labour charges, leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work.

380

247

93871.4

... More
Augmentation of PTR at 132 KV SS Jadcherla;Plastering with CM (1:5), 12 mm thick with sponze finishing to the even wall surfaces including cost & conveyance of all materials, labour charges, leads, lifts , scaffolding and curing complete as per the directions of the Engineer in charge for the finished item of work. Upto 3.66m height

220

161

35435.4

... More
Augmentation of PTR at 132 KV SS Jadcherla;Construction of Brick Masonry in CM (1:6) with common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cms of approved quality, including cost & conveyance of all materials, labour charges, scaffolding leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work .

18

7869

141653.7

... More
Augmentation of PTR at 132 KV SS Jadcherla;Construction of RR Masonry with CM (1:6) using hard CRS , rough granite stone and bond stones (0.16 cum) including cost and conveyance of all matreials., labour charges, water lead , curing, all leads and lifts etc., complete for finished item of work as per directions of the Engineer-in-charge.

8

4011

32088.32

... More
Augmentation of PTR at 132 KV SS Jadcherla;Laying of Reinforced Cement Concrete (RCC) M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (screened sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge. Road culvert SLABS (upto 300 mm thick)

4.5

8358

37614.96

... More
Augmentation of PTR at 132 KV SS Jadcherla;Laying of Reinforced Cement Concrete (RCC) M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (screened sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge. Cable trench cover slabs

1

8572

8572.14

... More
Augmentation of PTR at 132 KV SS Jadcherla;Laying of Reinforced Cement Concrete (RCC) M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (screened sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge. Switchyard Foundations & Pedestals (Including Grouting)

56

9682

542221.68

... More
Augmentation of PTR at 132 KV SS Jadcherla;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 500/ 500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work in all floors as per the directions of the Engineer-in-charge. (SWITCHYARD WORK) upto 3.66m height

3.3

77188

254723.47

... More
Augmentation of PTR at 132 KV SS Jadcherla;Laying of Plain Cement concrete (PCC) - Nominal Mix (1:2:4) with 12 to 20mm HBG metal including cost and conveyance of all materials, labour charges, curing and water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (IS-456)

13

6068

78887.12

... More
Augmentation of PTR at 132 KV SS Jadcherla;Laying of Cement Concrete (1:4:8) mix using 40mm size HBG Machine crushed metal for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.

21

4312

90565.23

... More
Augmentation of PTR at 132 KV SS Jadcherla;Providing Stone Crusher dust filling below the foundations as per the standard specifications of APDSS in uniform horizontal layers including cost and conveyance of all materials, watering and ramming, tools & tackles, all labour charges, all leads & lifts etc, complete for finished item of work as per directions of the Engineer-in-charge. ( APSS No. 309&310)

56

969

54285.28

... More
Augmentation of PTR at 132 KV SS Jadcherla;Providing Sand filling below the foundations as per the standard specifications of APDSS in uniform horizontal layers including cost and conveyance of all materials,watering and ramming,tools & tackles,all labour charges,all leads & lifts etc., complete for finished item of work as per the directions of the Engineer-in-charge.( APSS No. 309&310)

5

1289

6449.7

... More
Augmentation of PTR at 132 KV SS Jadcherla;Excavation in Ordinary rock (HDR, soft rock ) (not requiring blasting) The rate includes labour charges, cost of tools and tackles, disposing of unuseful excavated materail at all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge. (For Foundation Works)

10

261

2615.4

... More
Augmentation of PTR at 132 KV SS Jadcherla;Earthwork excavation in all types of soils (upto stone matrix) which can be excavated in combination of mechanically and manually with pick axe and crow bars and do not require blasting in all conditions such as dry, wet, slushy etc., covering initial lead and lift etc., and backfilling the foundations (after laying foundations) with excavated earth including watering, compacting as per standard specification and disposing of surplus earth within site (up to 1KM lead) complete as per directions of Engineer in charge at site for finished item of work.

210

171

35983.5

... More
Augmentation of PTR at 132 KV SS Jadcherla;Levelling the lowlying areas with excavated earth ( obtained from the foundations of Control house and Switch yard structures) with a lead up to 1 KM over initial lead, depositing the soils in filling areas , spreading soils, and consolidation with three wheel 8 to 10 MT static Road Roller @ OMC to meet requirement as per standard specification , including all hire and operational charges of T&P complete for finished item of work as per the directions of the Engineer in Charge. (Payment will be made based on the initial and final levels as per contour survey for the finished item of work).

25

97

2447

... More
Augmentation of PTR at 132 KV SS Jadcherla;Clearing thick jungle growth (less than 50 percent open space) including bushes up to 30 cm /parthenium and other weeds including burning or disposing off the same as directed by Engineer in charge for the finished item of work.

180

3

711

... More
Augmentation of PTR at 132 KV SS Jadcherla;Providing Transportation to Officers

3000

6

19050

... More
Augmentation of PTR at 132 KV SS Jadcherla;Writing of letters in control room panels of lettering on panels marshalling boxes.

50

132

6600

... More
Augmentation of PTR at 132 KV SS Jadcherla;Supply and Erection of marshalling boxes on the structures of equipment in full shape

3

4724

14172.99

... More
Augmentation of PTR at 132 KV SS Jadcherla;Erection of 132KV Control & Relay Panels

3

3894

11682

... More
Augmentation of PTR at 132 KV SS Jadcherla;erection of 33KV SOLID CORE INSULATORS

6

313

1879.2

... More
Augmentation of PTR at 132 KV SS Jadcherla;erection of 33KV Isolator

1

2848

2848.8

... More
Augmentation of PTR at 132 KV SS Jadcherla;erection of 33KV LA's

3

823

2469.6

... More
Augmentation of PTR at 132 KV SS Jadcherla;erection of 33KV CT's

3

1378

4136.4

... More
Augmentation of PTR at 132 KV SS Jadcherla;Erection of 33KV CB

1

8832

8832

... More
Augmentation of PTR at 132 KV SS Jadcherla;Erection of 132 KV Isolator without E/S(800A) including SCI

3

7885

23655.6

... More
Augmentation of PTR at 132 KV SS Jadcherla;Erection of 132 KV Potential Transformers

3

4464

13392

... More
Augmentation of PTR at 132 KV SS Jadcherla;Erection of 132 KV Lightning Arrestors

3

2107

6321.6

... More
Augmentation of PTR at 132 KV SS Jadcherla;Erection of 132 KV HV Current Transformers

3

4464

13392

... More
Augmentation of PTR at 132 KV SS Jadcherla;Erection of 132 KV SF6 Circuit Breaker

1

21918

21918

... More
Augmentation of PTR at 132 KV SS Jadcherla;Supply & Erection of lighting pillar box in the switchyard on foundation laid.

1

16893

16893.01

... More
Augmentation of PTR at 132 KV SS Jadcherla;cable termination of 2.5 Sqmm Copper Cable with copper lugs each core at both ends.

300

46

14040

... More
Augmentation of PTR at 132 KV SS Jadcherla;Laying of control cables of all sizes (from 2 core, 2.5/4 Sqmm) in cable trenches including cost of suitable metallic cable glands with rubber lining and handling charges etc. NOTE:This includes running of cables in control room where cables are run on cable racks in cable duct.

4600

15

71760

... More
Augmentation of PTR at 132 KV SS Jadcherla;Excavation of earth pit, putting cast iron pipe with flange on one end of nominal dia 125 mm and 2.75 metres long inside the pit including supply and fixing of RCC Collars 1mtr dia and 0.6 mtrs long inside the pit back till the pit in the 25mm size granules of BH coke and earth of 300mm thick around the earth pipe of 150mm on all the sides of the pipe including cost and conveyance of BH Coke and RCC collars, labour charges for all operational and incidental items of work etc., complete but including cost of CI Pipes.

12

18092

217108.8

... More
Augmentation of PTR at 132 KV SS Jadcherla;Laying of earthmat including excavation of trenches, welding and fixing lugs, connection to equipment and connecting lighting shield to earthmat 75 x 8mm GI Flat

220

121

26664

... More
Augmentation of PTR at 132 KV SS Jadcherla;Laying of earthmat including excavation of trenches, welding and fixing lugs, connection to equipment and connecting lighting shield to earthmat 75x 8mm MS Flat

260

121

31512

... More
Augmentation of PTR at 132 KV SS Jadcherla;Laying of earthmat including excavation of trenches, welding and fixing lugs, connection to equipment and connecting lighting shield to earthmat 100 x 16mm GI Flat

140

135

18984

... More
Augmentation of PTR at 132 KV SS Jadcherla;Laying of earthmat including excavation of trenches, welding and fixing lugs, connection to equipment and connecting lighting shield to earthmat 100 x 16mm MS Flat

200

135

27120

... More
Augmentation of PTR at 132 KV SS Jadcherla;Dismantling Twin moose jumpers including measuring, cutting, clamping (shut down condition)

2

699

1399.96

... More
Augmentation of PTR at 132 KV SS Jadcherla;connecting, Twin moose jumpers including measuring, cutting, clamping (shut down condition)

3

933

2799.9

... More
Augmentation of PTR at 132 KV SS Jadcherla;connecting, Twin moose jumpers including measuring, cutting, clamping (normal condition)

24

658

15811.2

... More
Augmentation of PTR at 132 KV SS Jadcherla;connecting, single moose jumpers including measuring, cutting, clamping (shut down condition)

10

601

6018

... More
Augmentation of PTR at 132 KV SS Jadcherla;connecting, single moose jumpers including measuring, cutting, clamping (normal condition)

12

424

5097.6

... More
Augmentation of PTR at 132 KV SS Jadcherla;Fixing of hardware, stretching ground wire and stringing of earth wire to a tension of 450 Kgs from pinacle to Ground

50

1212

60600

... More
Augmentation of PTR at 132 KV SS Jadcherla;Fixing of hardware, stretching ground wire and stringing of earth wire to a tension of 450 Kgs from pinacle to pinacle

2

1212

2424

... More
Augmentation of PTR at 132 KV SS Jadcherla;Hoisting of insulators and Hardware, stretching the conductor and stringing of 33kv bus copmrising of three phases with twin moose conductor

1

10149

10149.6

... More
Augmentation of PTR at 132 KV SS Jadcherla;Erection of 90lb rail poles

11

872

9596.4

... More
Augmentation of PTR at 132 KV SS Jadcherla;Erection of Main & Auxiliary Structures etc, using bolts and nuts.

8.2

4383

35945.52

... More
Augmentation of PTR at 132 KV SS Jadcherla;stub setting of 33KV circuit breaker

1

1836

1836

... More
Augmentation of PTR at 132 KV SS Jadcherla;stub setting of 132KV circuit breaker

1

2752

2752.8

... More
Augmentation of PTR at 132 KV SS Jadcherla;stub setting of 132 KV Isolators

3

3046

9140.4

... More
Augmentation of PTR at 132 KV SS Jadcherla;stub setting of 33 KV Towers & CPL's

11

1014

11154

... More
Augmentation of PTR at 132 KV SS Jadcherla;stub setting of 132 KV TNS & TND Towers

2

4063

8126.4

... More
Augmentation of PTR at 132 KV SS Jadcherla;Marking as per approved layout with the help of surveyor-Bay/Bays in one Sub Station.

1

18350

18350.4

... More
Augmentation of PTR at 132 KV SS Jadcherla;Tension Hardware 7/3.15mm Earth wire

4

804

3217.72

... More
Augmentation of PTR at 132 KV SS Jadcherla;Suspension Hardware 7/3.15mm Earth wire

2

861

1722.16

... More
Augmentation of PTR at 132 KV SS Jadcherla;3 bolted tension H/W for twin moose

6

3502

21012

... More
Augmentation of PTR at 132 KV SS Jadcherla;CT stud clamps suitable for twin moose

6

788

4728

... More
Augmentation of PTR at 132 KV SS Jadcherla;twin moose pad clamps

2

508

1016.4

... More
Augmentation of PTR at 132 KV SS Jadcherla;Through clamps on SCI suitable for twin moose

6

714

4288.92

... More
Augmentation of PTR at 132 KV SS Jadcherla;spacer clamps 150 mm spacing

40

302

12112.8

... More
Augmentation of PTR at 132 KV SS Jadcherla;spacer clamps for Moose 400mm spacing

12

574

6896.88

... More
Augmentation of PTR at 132 KV SS Jadcherla;PG clamps suitable for moose to moose

14

557

7801.22

... More
Augmentation of PTR at 132 KV SS Jadcherla;T clamp suitable all ways moose

12

492

5908.08

... More
Augmentation of PTR at 132 KV SS Jadcherla;Supply of Insulation of Rubber mats and laying in the Control Room including the cost of rubber mat

2

1059

2118.6

... More
Augmentation of PTR at 132 KV SS Jadcherla;Supply and fixing of GI of Earthbonds

52

222

11568.96

... More
Augmentation of PTR at 132 KV SS Jadcherla;Supply and fixing of CO2 with water type portable fire extinguishers with Horn and Hose.

1

2177

2177.78

... More
Augmentation of PTR at 132 KV SS Jadcherla;Foam type portable fire extinguishers with horn and hose pipe.

1

2311

2311.11

... More
Augmentation of PTR at 132 KV SS Jadcherla;DCP type portable fire extinguishers with horn and hose pipe

1

2444

2444.44

... More
Augmentation of PTR at 132 KV SS Jadcherla;Supply and fixing of CO2 fire extinguishers of 50 Lbs capacity with trolley and hose pipe confirming to relevant IS.

1

15626

15626.47

... More
Augmentation of PTR at 132 KV SS Jadcherla;Supply and fixing of CO2 portable fire extinguishers of 15 Lbs capacity without trolley and hose pipe confirming to relevant IS in complete.

1

6924

6924.08

... More
Augmentation of PTR at 132 KV SS Jadcherla;Supply , Installation, testing and commissioning of 100W LED lamps along with fixtures on switchyard lightining.

4

3170

12680

... More
Augmentation of PTR at 132 KV SS Jadcherla;Supply of Rail Pole

11

2478

27264.49

... More
Augmentation of PTR at 132 KV SS Jadcherla;75 x 8mm GI Flat

220

423

93075.73

... More
Augmentation of PTR at 132 KV SS Jadcherla;75x 8mm MS Flat

260

327

85147.4

... More
Augmentation of PTR at 132 KV SS Jadcherla;100 x 16mm GI Flat

140

1128

157946.7

... More
Augmentation of PTR at 132 KV SS Jadcherla;100 x 16mm MS Flat

200

873

174662.63

... More
Augmentation of PTR at 132 KV SS Jadcherla;Supply of Hot Dip galvanised bolts & nuts of various sizes required for all structures and booms fabricated under above Item including transportation to SS site and confirming to standard specification in clause as per the specification.

0.42

78371

32915.95

... More
Augmentation of PTR at 132 KV SS Jadcherla;Supply of fabricated GI structures from raw steel such as M.S.Angles, Plates, Channels, R.S.Joints, M.S. Rounds etc., and fabrication & galvanisation of main and auxiliary structures, Stub Setting templates and foundation bolts, 'U' bolts as per drawing and including cost of welding and cutting and labour charges for all operational and incidental items of work etc. complete including cost of steel and transportation to site.

8.4

92065

773348.52



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.