Transmission Corporation Of Andhra Pradesh Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Transmission Corporation Of Andhra Pradesh Limited - APTRANSCO Tender

Works
Electrical Generators And Transformers
Electrical and Electronics
Opening Date22 Jan 2025
Closing Date17 Feb 2025
Tender Amount₹ 1,04,42,880 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Seignorage charges

1

75006

75006

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II) as directed by the Engineer in charge for the finished item of work.

1

6527

6527.08

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and fixing of 20A SP plug and socket (Legrand/Schindler/ Seimens make) for air conditioners including earth connection all labour charges, complete for finished item of work.

2

1952

3905.52

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply & installation of 1.5 TR 5 Star capable of delivering 18000 BTU/hr and above with operating on refrigerant R-32 / R-410 (Makes : Daikin / Toshibha/ Carrier/Blue Star/ Hitachi) INVERTER Model Cool type split AC unit with high wall mounted Single Split 100% copper indoor unit and outdoor condencing unit Hermetically sealed compressor suitable for operation on 230V, 50Hz, 1Phase AC supply capable of performing Heat cool dehumidifying air circulating and filtering with cooling and condensing units with 3.0 mts of copper piping, insulation kit and 4 mts of 4 core copper flexible chord (Voltage range 160- 264 volts) and cordless remote control with warranty of compressor for 5 years and comprehensive maintenance for 2 years including all labour charges and cost of materials complete as directed by the Engineer in charge for the finished item of work. (Concealed outlet water piping has to be provided for collection and disposal- Rate not included)

2

51143

102287.32

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and fixing in position 32A. Main Switch (Sputnik or equivalent make) and including giving connections and labour charges and cost of materials complete as directed by the Engineer in charge for the finished item of work at all levels of building.

1

885

885

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Run 2 of 36/0.30 (2.5 Sqmm) FRLSH / HFFR PVC insulated 1100V grade as per IS:694 / 2010, IS 17048 specification for Copper cable (Makes: Finolex / RR kabel / Havells /Polycab / Beljin (HFFR) / Finecab Gold (HFFR) / GM (HFFR) / Gold Medal (HFFR) / Million(HFFR) /KEI (HFFR) / V-Guard (HFFR)) in existing pipe for Mains from Distribution board to 15Amps 3 pin Power Plug including giving connections and labour charges and cost of materials complete as directed by the Engineer in charge for the finished item of work at all levels of building.

20

115

2308.8

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Run 2 of 56/0.30 (4.0Sqmm) FRLSH / HFFR PVC insulated 1100V grade as per IS:694 / 2010, IS 17048 specification for Copper cable (Makes: Finolex / RR kabel / Havells /Polycab / Beljin (HFFR) / Finecab Gold (HFFR) / GM (HFFR) / Gold Medal (HFFR) / Million(HFFR) /KEI (HFFR) / V-Guard (HFFR)) in existing pipe for run of Mains from Main switch to Distribution board as per colour code of wires including giving connections and labour charges and cost of materials complete as directed by the Engineer in charge for the finished item of work at all levels of building.

10

175

1753.1

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and fixing of 4 Way SPN DB with IP 20 Protection as per IS:13032 and suitable for 4Nos S.P out goings and for 1 No Incommer etc complete of makes Legrand / Schneider / Siemens / L&T / Cabtree Xpro make) with IP-20 protection suitable for 1 No. 40A single phase ELCB/RCCB/DP Isolator (Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora /Cabtree) as incomer and 4 Nos. 10KA-6-32A SP MCBs (Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora /Cabtree) as out-going including internal connection and labour charges and cost of materials complete as directed by the Engineer in charge for the finished item of work at all levels of building for surface/flush mounting.

1

5292

5292.07

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and Run of 4 of 56/0.30 (4.0Sq mm) FR PVC insulated flexible Copper Cable (Makes: Finolex / RR kabel / Havells /Polycab /Beljin (HFFR) / Finecab Gold (HFFR) / GM (HFFR) / Gold Medal (HFFR) / Million(HFFR) /KEI (HFFR) / V-Guard (HFFR)) in PVC pipe including giving connections, all labour charges and cost of materials complete as directed by the Engineer in charge for the finished item of work at all levels of building from AC distribution board to Power DB.

15

350

5259.45

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and fixing of 6A/10A 3/2 pin modular socket of (Legrand Lyncus / GM Four Five/ Million/ Gold Medal Curve/ Anchor Roma Plus make) etc with 6A modular switch control of same make on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete as per the directions of the Engineer in charge at site.

2

352

704.84

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and fixing of 16A /6 A, 1 way 2 Module Combi Socket with indicator lamp /fuse unit of (Legrand Lyncus / GM Four Five/ Million/ Gold Medal Curve/ Anchor Roma Plus make) etc with 16A modular switch control (same make.)on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete as per the directions of the Engineer in charge at site.

4

499

1999.24

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and fixing of HID / batten holder / slanting holder (Wipro/G.E./Phillips) in lieu of ceiling rose of light point complete with all connections and all labour charges with 9 W LED lamp (Phillips / OSRAM / Crompton / Eveready / Bajaj / Havells / Pharox / Halonix / Greenlites / IB LED/ Jaquar / C&S / GM / Gold Medal / Million / Syska) (for new installation).

4

264

1057.72

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply, Transportation and Fixing of 90W +/-10% (>=9000 Lumens) LED Street light Body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover / temperature protective custom molded polycarbonate diffuser, Thermal shock and impact resistant IK07 fixed to the housing by SS screws Suitable lense on LEDs, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, wide operating voltage range, P.F > 0.90, System having efficacy >120 lumens / watt, with Ingress protection IP66, BIS approved Potted driver, Driver surge protection >10KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>70, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with 5 years warranty. The contractor has to furnish the manufacturer warranty letter, LM 79 and LM 80 certificates.LUMINAIRE MAKE : PHILIPS / OSRAM / GE Venture / CROMPTON / BAJAJ / Surya / Wipro / Jaquar / Eveready / Halonix / Keselec / HAVELLS / POLYCAB / SURYA / Capart / Fortune Arrt / Goldwyn / Panasonic / Arraystorm / GM / Goldmedal / Silicon / Orient / HPL / Valmont / Transrail MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.. including fixing on wall with 1.0mt 40mm dia GI pipe bracket and anti-tilting MS flat, 2.5 Sq.mm flexible copper cable etc.,including all labour charges for mason work and giving connections etc., with all accessories including giving connections, all labour charges and cost of materials complete as directed by the Engineer in charge for the finished item of work.

2

8873

17746.04

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply, Transportation and Fixing of 20W +/-10%, >/ 2000 lumens, 1200mm length LED retro tube light, housing made with PC body, wide operating voltage with Single / double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per IS specifications, minimum CRI=80,.etc complete with 5 years warranty with BIS Certification.. LUMINAIRE MAKE: Phillips / OSRAM / Wipro / Crompton / Bajaj /Havells / Jaquar /Panasonic /Halonix / HPL / Eveready. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs. including fixing on ceiling or wall with all accessories, giving connections, cost & conveyance of all materials and labour charges etc., complete as directed by the Engineer in charge for finished item of work.

4

783

3135.44

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply, Transportation and fixing of 36W +/- 10% (>=3200 Lumens) Back lit, 2' x2' (600mm x 600mm) Recessed / Surface mounted LED luminaire made of CRCA sheet housing with powder coated with high efficiency acrylic wide diffuser, with wide operating voltage range, Power factor > 0.9, Surge protection >2KV, System efficacy of >90 lumens/watt, CCT: 3000K - 6500K as desired by the department, CRI >80, and THD is less than 15% etc., complete complete with 5 years warranty. LUMINAIRE MAKE : Capart/ Kashyap BLU/ Million/ Trinic/ Seiger/ Accent/ Stanjo/ Renesola/ C&S. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM /SAMSUNG / LG LEDs. including cost & conveyance of all materials and labour charges etc., complete as directed by the Engineer in charge for finished item of work.

2

2691

5382.4

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply, Transportation and fixing of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle'kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.0, Air delivery minimum 235 CMM, 350 RPM (tolerance as per IS:374-2019), THD less than 10%. with remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including all standard accessories etc., complete.Makes : Atomberg (Efficio ) / Havells / Orient/ Halonix/ Crompton including cost of all fittings and fixtures, labour for fixing at all positions of building giving electrical connections with necessary tools complete as directed by the Engineer in charge for finished item of work.

1

3759

3759.5

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Wiring with 2 runs of 22/0.30(1.5 M2m) FRLSH / HFFR PVC insulated 1100V grade as per IS:694 / 2010, IS 17048 specification for Copper cable (Makes: Finolex / RR kabel / Havells /Polycab / Beljin (HFFR) / Finecab Gold (HFFR) / GM (HFFR) / Gold Medal (HFFR) / Million(HFFR) /KEI (HFFR) / V-Guard (HFFR)) in existing pipe with 6A Modular switch (Legrand Lyncus / GM Four Five/ Million/ Gold Medal Curve/ Anchor Roma Plus make), Hot dip galvanizes metal (Modular) control box (Similar to switches make) and 6 Modular cover frame (Legrand Arteor /Schneider Zen Celo/ Gold Medal GIFA /Honeywell Blenge Plus/ Million M-Vee make) including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings.

12

973

11687.88

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and Laying of P.V.C casing and caping (Modi make or equivalent )(ISI MARK) with double locking arrangments with groover trunking of size not below 12.5mm height for the following sizes with all accessories, duly sealed at points and erected on Wall / Ceiling including cost of all materials and labour charges complete for the finished item of work as directed by the Engineer-in-charge. 25mm x 12.5mm height

10

78

786.3

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and Laying of P.V.C casing and caping (Modi make or equivalent )(ISI MARK) with double locking arrangments with groover trunking of size not below 12.5mm height for the following sizes with all accessories, duly sealed at points and erected on Wall / Ceiling including cost of all materials and labour charges complete for the finished item of work as directed by the Engineer-in-charge. 19mm / 20mm x 12.5 mm height

15

73

1095.6

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and fixing of BISONLAM wall panelling using 12MM thick prelaminated BISONLAM with frame work made of Aluminiumu box section of size 50mm x 50mm x 1.5mm thick (No. 1425) of Jindal make placed at every 1200mm vertically and at 3 intervals horizontally (top, middle and bottom) fixed to the wall Over 50mm thick thermocole sheets by means of self expansion screws and caps. Placing of T sections at Joints of size 25.4 x 0.83mm thick (No. 16131) and placing of 'L' angles at corners and door sides with section 25 x 25 x 2mm (No. 16422) BISONLAM is to be fixed for frame by means of self-taping screws placed at every 300mm intervals. The cost inclusive of conveyance of materials, labour charges etc., complete as per the direction of Engineer in charge.

130

2356

306406.1

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and fixing in position M.S. grills/Angles/gates of required size of approved design and quality. (for, gates, windows, hand railing in front of portico, retaining walls ,) and painting with two coats of synthetic enamel paint of approved quality, make, colour and shade over one coat of red oxide, complete as per the directions of the Engineer in charge for the finished item of work.

25

128

3210.5

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and fixing in position G.I. chequered plates of required size of approved design and quality. over cable duct in control room including cost of galvanizing complete as per the directions of the Engineer in charge for the finished item of work.

66

120

7981.38

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supplying and fixing of sun control film to the glass openings of PLCC room including cost & conveyance of all materials, labour charges, leads, lifts etc, complete as per the directions of the Engineer in charge for the finished item of work.

1

408

408.39

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Providing and fixing of False ceiling in true horizontal level 600mmx600mm,14mm thick Mineral fibre sheet 600x600 of fissured-ANF(board/Tegular)edge tiles with a humidity resistance of 90% RH,average NRC 0.50,light Reflectance>80% thermal conductivity /\=0.052 to .057w/mk,fire performance class0/class1 using hot dipped galvanised steel section exposed surface with pre-coated capping,main Tee of size24x32mm at every 1200c/c maximum and rotary stiched cross tee of size 24x27mm at every 600mm c/c and sub-cross tee of size 24mmx25mm at 1200mm c/c and wall angle of size 19x19 mm fixed to periphery of the wall and the above grid is suspended at every 1200c/c in both directions using 4.0mm thick pre-straightened GI Rod laying fine fissured butt edge ceiling tiles of 15mm thick mineral fibre board including cost and conveyance of all materials and labour charges such as cutting,fixing of standing of framework exposing roof making complete as per the directions of the engineer in charge for the finished item of work. (Recommended brands:Armstrong,Insula etc.,)

25

1388

34700.75

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Painting to the new steel work with synthetic enamel paint of approved colour and make two coats Over primary coat ( total 3 coats ) including cost and conveyance of all materials labour charges all lead and lifts etc., complete as approved and directed by the engineer-in-charge at site

25

206

5162.25

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Painting to External new walls with 2 coats of acrylic emulsion exterior grade having VOC (Volatile Organic Compound) content less than 50 gms/Ltr of approved brand ( Asian APEX or equivalent) and shade over a base coat of appropriate cement primer of exterior grade I quality approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc.complete for finished item of work as per the directions of the Engineer in charge as per SS 912 for External walls

150

235

35368.54

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Painting to inner new walls with 2 coats of acrylic emulsion interior grade having VOC(Volatile Organic Compound) content less than 50 gms/Ltr of approved brand ( Asian Premier or equivalent) and shade over a base coat of appropriate Cement Primer of Interior grade I of approved brand,making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc.complete for finished item of work as per the directions of the Engineer in charge as per SS 911 for internal walls

150

159

23946.03

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Providing skirting to internal walls to 15 cm height/risers of steps with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 800 x 800 mm and thickness 9-11 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades (Make: H&R Johnson, Kajaria, Cera, Varmora, Somany, RAK) and designs length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per M2 and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., curing complete as per the directions of the Engineer in charge for the finished item of work.

1.5

1334

2002.1

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Flooring with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 800 x 800 mm and thickness 9-11 mm 1st quality conforming to IS:13711, IS:13712,IS:13630 (Parts 1 to 15) of any colour and finish in all in all shades (Make: H&R Johnson, Kajaria, Cera, Varmora, Somany, RAK) and designs as directed by Engineer in charge, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand, water and tiles etc., curing complete as per the directions of the Engineer in charge for the finished item of work.

2.5

1325

3315.42

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Laying of Cement Concrete (1:4:8) mix using 50% of 40mm size and 50% of 20mm HBG metal for bed flooring including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.

3.5

4786

16756.32

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Back Filling the foundation and Basement with borrowed gravel as per requirement and specification including cost & conveyance of all materials, labour charges, leads, lifts , watering and consolidating to required density complete as per the directions of the Engineer in charge for the finished item of the work . ( APSS No. 309&310)

25

421

10549.92

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Plastering to Uneven surfaces of RR /CR, PCC with CM(1:5) 20mm. thick including cost & conveyance of all materials, labour charges, leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work.

4

275

1101.12

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Plastering with CM (1:5), 12 mm thick with sponze finishing to the even wall surfaces including cost & conveyance of all materials, labour charges, leads, lifts , scaffolding and curing complete as per the directions of the Engineer in charge for the finished item of work.

75

194

14619.75

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Plastering with CM 2 coats, 20 mm thick,base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing.on the uneven surfaces of wall including cost & conveyance of all materials, labour charges, leads, lifts, scaffolding and curing complete as per the directions of the Engineer in charge for the finished item of work.

65

563

36629.45

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Providing & Fixing of Scientific Doors with metal door frames and door shutters made of galvanize steel (base steel as per IS 513 of 0.58 mm thick D quality, galvanized as per IS 277 with Zinc of 120 GSM)coated with Zinc Phosphate Primer to receive any paint on site or finished with Thermosetting Polyurethane paint of Aliphatic Grade providing high levels of scratch resistance and durability/Epoxy polyester powder for powder coating paint thickness 50-60 microns (Dry film thickness) outer frame section of 100 x 58 mm x 1.2 mm thick, shutter section of 0.80 mm thick galvanized steel sheet pressed (roll formed) for 46mm thick fully flush, double skin door shell seam joints at stile edges, in-fill of honeycomb kraft paper used to give the required rigidity and effective acoustic insulation with 6? Tower bolt ? 1 No., 6? D handles ? 2 Nos., 10? Aldrop ? 1 No., Butt Hinges ? 3 Nos, Mortise Lock of approved quality ? 1 No, frames fixed to the concrete/masonry wall by means of self expanding screws complete for finished item of work as directed by the Engineer-in-charge. for Single leaf Door

3.5

13528

47348.14

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply, fabrication and erection of Anodized Aluminium glazed ventilator using section of size 81.25mmx38.10mmx1.75mm @ 1.093 Kg/m (Jindal Sec 14071) for frame and 'U' seciton of size 12.50mmx12.50mmx1.00mm @ 0.133 Kg/m (Jindal Sec 17533) for louvers and inserting 5mm thick plain glass panes including cost & conveyance of all materials, labour charges and other incidental charges complete as per the drawing and as per the directions of the Engineer-in-charge for finished item of work.

0.2

4579

915.89

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Laying of Plain Cement concrete (PCC) - Nominal Mix (1:3:6) with 20mm graded HBG metal over RR wall with necessary form work including cost and conveyance of all materials, labour charges, curing and water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (IS-456)

1.5

5864

8796.39

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Construction of Brick Masonry in CM (1:6) with common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cms of approved quality, including cost & conveyance of all materials, labour charges, scaffolding leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work . Without scaffolding

7

8170

57193.57

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Construction of Brick Masonry in CM (1:6) with common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cms of approved quality, including cost & conveyance of all materials, labour charges, scaffolding leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work . Ground Floor

13

8847

115012.3

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Construction of RR Masonry with CM (1:6) using hard CRS , rough granite stone and bond stones (0.16 cum) including cost and conveyance of all matreials., labour charges, water lead , curing, all leads and lifts etc., complete for finished item of work as per directions of the Engineer-in-charge.

10

4399

43994.64

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Laying of Reinforced Cement Concrete (RCC) M25 Grade with standard mix design as per IS 10262:1982 containing minimum cement content 380 kgs, Coarse aggregate 20mm size graded machine crushed hard granite metal and fine aggregate of zone - II as per the mix design approved by the departmental from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as volumetric batching, machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as directed by the Engineer in charge. Centering should be with steel scaffolded pipes, jack props, wallers, foot plates, brackets, steel centering plates etc. complete. For roof slab 125mm thick & staircase slab

4.2

12242

51426.01

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Laying of Reinforced Cement Concrete (RCC) M25 Grade with standard mix design as per IS 10262:1982 containing minimum cement content 380 kgs, Coarse aggregate 20mm size graded machine crushed hard granite metal and fine aggregate of zone - II as per the mix design approved by the departmental from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as volumetric batching, machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as directed by the Engineer in charge. Centering should be with steel scaffolded pipes, jack props, wallers, foot plates, brackets, steel centering plates etc. complete. For Beams

4.3

12839

55260.53

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Laying of Reinforced Cement Concrete (RCC) M25 Grade with standard mix design as per IS 10262:1982 containing minimum cement content 380 kgs, Coarse aggregate 20mm size graded machine crushed hard granite metal and fine aggregate of zone - II as per the mix design approved by the departmental from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as volumetric batching, machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as directed by the Engineer in charge. Centering should be with steel scaffolded pipes, jack props, wallers, foot plates, brackets, steel centering plates etc. complete. For Sunshades 600mm wide ( 75mm avg thk ) GF

1.65

1263

2084.76

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Laying of Reinforced Cement Concrete (RCC) M25 Grade with standard mix design as per IS 10262:1982 containing minimum cement content 380 kgs, Coarse aggregate 20mm size graded machine crushed hard granite metal and fine aggregate of zone - II as per the mix design approved by the departmental from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as volumetric batching, machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as directed by the Engineer in charge. Centering should be with steel scaffolded pipes, jack props, wallers, foot plates, brackets, steel centering plates etc. complete. For Lintels (GF)

0.5

13587

6796.41

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Laying of Reinforced Cement Concrete (RCC) M25 Grade with standard mix design as per IS 10262:1982 containing minimum cement content 380 kgs, Coarse aggregate 20mm size graded machine crushed hard granite metal and fine aggregate of zone - II as per the mix design approved by the departmental from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as volumetric batching, machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as directed by the Engineer in charge. Centering should be with steel scaffolded pipes, jack props, wallers, foot plates, brackets, steel centering plates etc. complete. For Columns GF

2

13569

27138.32

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Laying of Reinforced Cement Concrete (RCC) M25 Grade with standard mix design as per IS 10262:1982 containing minimum cement content 380 kgs, Coarse aggregate 20mm size graded machine crushed hard granite metal and fine aggregate of zone - II as per the mix design approved by the departmental from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as volumetric batching, machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as directed by the Engineer in charge. Centering should be with steel scaffolded pipes, jack props, wallers, foot plates, brackets, steel centering plates etc. complete. For plinth beam

2

10552

21101.62

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Laying of Reinforced Cement Concrete (RCC) M25 Grade with standard mix design as per IS 10262:1982 containing minimum cement content 380 kgs, Coarse aggregate 20mm size graded machine crushed hard granite metal and fine aggregate of zone - II as per the mix design approved by the departmental from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as volumetric batching, machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as directed by the Engineer in charge. Centering should be with steel scaffolded pipes, jack props, wallers, foot plates, brackets, steel centering plates etc. complete. For Foundations

4

9732

38931.72

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply, fabrication and erection of Structural steel channels/angles suitable for fixing cables in control room of required size of approved design and quality and painting with two coats of synthetic enamel paint of approved quality, make, colour and shade over one coat of red oxide, including cost & conveyance of steel and all labour charges etc., complete as per the directions of the Engineer in charge for the finished item of work.

25

110

2763.25

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 500/ 500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors as per the directions of the Engineer-in-charge. ( APSS No.126)

1.2

84246

101117.5

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Laying of Cement Concrete (1:4:8) mix using 40mm size HBG Machine crushed metal for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.

3

4636

13910.34

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Providing Antitermite treatment as per IS 6315 (Part - 2) 2001 (Pre-constructional chemical treatment measures) along the internal & external vertical faces of the columns, plinth beams, basement and top surface of the basement filling below flooring bed as per the specified procedure conforming to IS 6315 (Part-2) 2001 and other relevant approved specification duly using Chlorpyriphos/ Lindane emulsifiable concentrate 20% with 1% concentration @ 7.5 Litres/ sqm of the vertical surface & @ 5.0 Litres/ sqm of the horizontal surface of the substructure to a depth of 500 mm around columns & 300 mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc & cost & conveyance of all materials to the site, cost of labour for spraying, rodding etc complete for finished item of work as per the approval of the Engineer-in-Charge.

25

398

9974.71

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Providing Stone Crusher dust filling below the foundations as per the standard specifications of APDSS in uniform horizontal layers including cost and conveyance of all materials, watering and ramming, tools & tackles, all labour charges, all leads & lifts etc, complete for finished item of work as per directions of the Engineer-in-charge. ( APSS No. 309&310)

1

1428

1428.7

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Earthwork excavation in all types of soils (up to stone matrix) which can be excavated with pick axe and crow bars and do not require blasting in all conditions such as dry, wet and slushy etc. covering initial lead and lift etc and backfilling the foundations (after laying foundations) with excavated earth including watering, compacting as per standard specification and disposing of surplus earth within site complete as per directions of Engineer in charge at site for finished item of work.

30

289

8678.88

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Construction of Brick masonry chamber over the CI gully trap or peet valves & fitted with 304.8mm X 228.6mm size CI frame & Hinged cover as including cost & conveyance of all materials, labour charges, curing complete for finished item of work as per the directions of the Engineer-in-charge

4

752

3010.52

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply & Fixing of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 (Jaquar/ CERA/ H & R Johnson make) including cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of work .

15

323

4848.3

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Providing and fixing in position at all levels of the buildings Bronze GM Ball Valve with SS BALL and spindle Indian make Zoloto/ R-Brand heavy type for water services with hand wheel at all elevations for following sizes including cost of all materials, labour charges, jointing complete as per the directions of the Engineer in charge for the finished item of work. 20mm dia Nominal Bore

4

388

1555.76

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supplying and fixing CPVC pipes - SDR 13.5 of premium make Supreme/ Prince/ Astral/ Birla Aerocon including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge. 15.90 mm Outer dia Pipe

70

279

19543.3

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supplying and fixing CPVC pipes - SDR 13.5 of premium make Supreme/ Prince/ Astral/ Birla Aerocon including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge. 28.6 mm Outer dia Pipe

50

450

22509.5

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and fixing of 110 lb rail pole conforming to Indian Railway specification and fixing on Transformer plinth including the cost of all labour, materials, equipment fixing bolts, base plates etc. but excluding the cost of excavation, concrete, reinforcement, shuttering and guide angles as per specification and approved drawings (top of rail shall flush with top of concrete) complete as approved and directed by the Engineer in - charge at site.

12

5855

70264.44

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Disposing off excess excavated earth available(not usable) after back filling (obtained from the excavation of foundations) with a lead up to 1KM , complete as per the directions of the Engineer in charge for the finished item of work.

70

42

3008.6

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Spreading the useful 20mm graded Metal available from the stacks picked from existing switchyard area to 100mm thickness as directed after doing the micro levelling and providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, head load lead upto 100mts and initial lift etc. complete as per the directions of the Engineer in charge for the finished item of work.

17

306

5211.69

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Labour charges for picking old metal in the existing switch yard area 50 to 100mm thickness grading and stacking the useful 20mm graded metal for re-using including cost andconveyance of all materials labour charges, head load lead upto 100mts and initial lift etc., complete for finished item of work as directed by the Engineer-in-charge at site.

17

284

4837.69

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;White washing with Birla/JK White cement of approved quality with two coats to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered material including cost of all materials, labour charges and incidental charges such as scaffolding , lift etc, complete for finished item of work as directed by the Engineer in charge. Above 3.66m Height

60

54

3262.8

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;White washing with Birla/JK White cement of approved quality with two coats to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered material including cost of all materials, labour charges and incidental charges such as scaffolding , lift etc, complete for finished item of work as directed by the Engineer in charge. Ground level upto 3.66m Height

55

50

2753.85

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and laying of 180 GSM LDPE sheet of approved make in the switch yard including laying the sheet neatly in between layers of crusher dust without folds to avoid the vegetation and weed growth, cutting and jointing the sheet properly including cost & conveyance of all materials, all leads , labour charges for laying complete as per the directions of the Engineer in charge for the finished item of work.

2450

20

49000

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and spreading of crusher dust in the switch yard area (100mm thick) in two layers of 50mm each including Suitable antiweed treatment after completion of final levelling and grading including disposal of surplus earth and filling within switch yard area including cost of all materials, head load lead upto 100 mts and initial lift etc., labour charges complete as per the directions of the Engineer in charge for the finished item of work. (Live SS Work)

245

1584

388148.6

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and Spreading of 20mm size graded Hard Broken Granite metal in switch yard (100mm thick) providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, head load lead upto 100mts and initial lift etc. complete as per the directions of the Engineer in charge for the finished item of work (Live SS Works)

245

1817

445336.5

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Plastering with CM (1:5), 12 mm thick with sponze finishing to the even wall surfaces including cost & conveyance of all materials, labour charges, leads, lifts , scaffolding and curing complete as per the directions of the Engineer in charge for the finished item of work Fire protection wall above 3.66 mts height

60

213

12835.8

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Plastering with CM (1:5), 12 mm thick with sponze finishing to the even wall surfaces including cost & conveyance of all materials, labour charges, leads, lifts , scaffolding and curing complete as per the directions of the Engineer in charge for the finished item of work. Fire protection wall Up to 3.66 mts height

55

194

10721.15

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Plastering with CM (1:5), 12 mm thick with sponze finishing to the even wall surfaces including cost & conveyance of all materials, labour charges, leads, lifts , scaffolding and curing complete as per the directions of the Engineer in charge for the finished item of work. W/O Scaffolding

170

179

30494.6

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Construction of Brick Masonry in CM (1:6) with common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cms of approved quality, including cost & conveyance of all materials, labour charges, scaffolding leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work .

23

8170

187921.73

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Laying of Reinforced Cement Concrete (RCC) M25 Grade with standard mix design as per IS 10262:1982 containing minimum cement content 380 kgs, Coarse aggregate 20mm size graded machine crushed hard granite metal and fine aggregate of zone - II as per the mix design approved by the departmental from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as volumetric batching, machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as directed by the Engineer in charge. Centering should be with steel scaffolded pipes, jack props, wallers, foot plates, brackets, steel centering plates etc. complete. RCC Cover Slab

4

8858

35435.72

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Laying of Reinforced Cement Concrete (RCC) M25 Grade with standard mix design as per IS 10262:1982 containing minimum cement content 380 kgs, Coarse aggregate 20mm size graded machine crushed hard granite metal and fine aggregate of zone - II as per the mix design approved by the departmental from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as volumetric batching, machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as directed by the Engineer in charge. Centering should be with steel scaffolded pipes, jack props, wallers, foot plates, brackets, steel centering plates etc. complete. Fire protection wall upto 7.5m Unsupported height

6

17509

105054

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Laying of Reinforced Cement Concrete (RCC) M25 Grade with standard mix design as per IS 10262:1982 containing minimum cement content 380 kgs, Coarse aggregate 20mm size graded machine crushed hard granite metal and fine aggregate of zone - II as per the mix design approved by the departmental from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as volumetric batching, machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as directed by the Engineer in charge. Centering should be with steel scaffolded pipes, jack props, wallers, foot plates, brackets, steel centering plates etc. complete. Fire protection wall up to 3.66 mts height

8

14359

114875.04

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Laying of Reinforced Cement Concrete (RCC) M25 Grade with standard mix design as per IS 10262:1982 containing minimum cement content 380 kgs, Coarse aggregate 20mm size graded machine crushed hard granite metal and fine aggregate of zone - II as per the mix design approved by the departmental from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as volumetric batching, machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as directed by the Engineer in charge. Centering should be with steel scaffolded pipes, jack props, wallers, foot plates, brackets, steel centering plates etc. complete. Fire protection wall upto GL

11

9914

109063.13

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Laying of Reinforced Cement Concrete (RCC) M25 Grade with standard mix design as per IS 10262:1982 containing minimum cement content 380 kgs, Coarse aggregate 20mm size graded machine crushed hard granite metal and fine aggregate of zone - II as per the mix design approved by the departmental from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as volumetric batching, machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as directed by the Engineer in charge. Centering should be with steel scaffolded pipes, jack props, wallers, foot plates, brackets, steel centering plates etc. complete. Pedestal

42

10460

439341.84

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Laying of Reinforced Cement Concrete (RCC) M25 Grade with standard mix design as per IS 10262:1982 containing minimum cement content 380 kgs, Coarse aggregate 20mm size graded machine crushed hard granite metal and fine aggregate of zone - II as per the mix design approved by the departmental from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as volumetric batching, machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as directed by the Engineer in charge. Centering should be with steel scaffolded pipes, jack props, wallers, foot plates, brackets, steel centering plates etc. complete Footings

60

9732

583975.8

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 500/ 500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work in all floors as per the directions of the Engineer-in-charge. (SWITCHYARD WORK) Above 3.66m Height

0.45

73960

33282.32

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 500/ 500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work in all floors as per the directions of the Engineer-in-charge. (SWITCHYARD WORK) Upto 3.66m Height

6.1

73261

446897.97

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Laying of Cement Concrete (1:4:8) mix using 40mm size HBG Machine crushed metal for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.

45

4636

208641.15

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Providing Stone Crusher dust filling below the foundations as per the standard specifications of APDSS in uniform horizontal layers including cost and conveyance of all materials, watering and ramming, tools & tackles, all labour charges, all leads & lifts etc, complete for finished item of work as per directions of the Engineer-in-charge. ( APSS No. 309&310)

10

1428

14287

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Providing Sand filling below the foundations as per the standard specifications of APDSS in uniform horizontal layers including cost and conveyance of all materials,watering and ramming,tools & tackles,all labour charges,all leads & lifts etc., complete for finished item of work as per the directions of the Engineer-in-charge.( APSS No. 309&310)

14

1552

21730.38

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Excavation in Hard Rock by control blasting method and controlling fly-rock by muffling arrangements where ever necessary. The rate includes labour charges, cost of blasting materials, tools and tackles, safety measures, disposal of unuseful excavted material at all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge.

10

1207

12076.8

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Excavation in Ordinary rock (HDR, soft rock ) (not requiring blasting) The rate includes labour charges, cost of tools and tackles, disposing of unuseful excavated materail at all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge. (For Foundation Works)

10

277

2779

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Earthwork excavation in all types of soils (up to stone matrix) which can be excavated with pick axe and crow bars and do not require blasting in all conditions such as dry, wet and slushy etc. covering initial lead and lift etc and backfilling the foundations (after laying foundations) with excavated earth including watering, compacting as per standard specification and disposing of surplus earth within site complete as per directions of Engineer in charge at site for finished item of work.

380

289

109933.97

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Writing of names in the control room for identification of rooms, on panels, equipment, marshalling boxes, kiosks, with CT ratio etc., & on maingates neatly with superior quality paint brushes & labour etc., complete on the main gate with superior quality synthetic enamel paint with two coats including cost of paint, brushes and labour charges etc complete.

50

132

6600

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Erection of marshalling boxes

3

636

1908

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Erection of control & relay panels,LTAC Panels,PTDB panels etc

3

3894

11682

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Erection of the following equipment at site including insurance etc., and made fit for commissioning 132 KV Bus post type Insulators

4

468

1872

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Erection of the following equipment at site including insurance etc., and made fit for commissioning 220 KV Bus post type Insulators

2

620

1240.8

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Erection of the following equipment at site including insurance etc., and made fit for commissioning 132KV 800A Isolator without Earth switch with SCI

1

7885

7885.2

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Erection of the following equipment at site including insurance etc., and made fit for commissioning 132KV Lightening Arrestors

3

2107

6321.6

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Erection of the following equipment at site including insurance etc., and made fit for commissioning 132KV Feeder CTs( 800-600-400/1-1-1A)

3

4464

13392

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Erection of the following equipment at site including insurance etc., and made fit for commissioning 132KV SF6 Circuit Breakers

1

21918

21918

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Erection of the following equipment at site including insurance etc., and made fit for commissioning 220 KV Isolator with out E/S 800A with SCI

2

10960

21921.6

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Erection of the following equipment at site including insurance etc., and made fit for commissioning 220KV Lightening Arrestors

3

4464

13392

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Erection of the following equipment at site including insurance etc., and made fit for commissioning 220KV SF6 Circuit Breakers

1

30679

30679.2

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Erection of the following equipment at site including insurance etc., and made fit for commissioning 220KV PTR CT(500-300/1-1-1-1-1)

3

6902

20707.2

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and erection of lighting pillar box in switchyard on foundation laid

1

29105

29105.01

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply , Installation, testing and commissioning of 80W LED lamps along with fixtures on switchyard lightining.

8

4894

39155.2

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Cable termination to the switch-gear, marshalling boxes/panel terminal blocks/control & relay panels, LTAC panel, including providing suitable ferrules and lugs as per specification (including cost of ferrules and lugs).Note: Rate to be quoted for termination of one core of cable at both ends.-a) 2.5 sq.mm. copper

800

46

37440

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Laying of control cables of all sizes (from 2 core, 2.5 sqmm to12 core,2.5 sqmm both copper and aluminium) in cable trenches including cost of suitable metallic glands with rubber lining & dressing. This includes running of cables in control room where cables are run on cable racks in cable duct.

6000

15

93600

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Excavation of earth pit, putting cast iron pipe with flange on one end ( as per relevant ISS 7181/86 ), of nominal dia 125 mm and 2.75 metres long inside the pit including supply and fixing of RCC Collars 0.75 mtr dia (OD),50mm thick and 0.6 mtrs long inside the pit, and backfill the pit in 25mm size granules of BH coke for full depth of the pit with alternate layers of BH Coke and salt of 300mm thick around the earth pipe of 150mm on all the sides of the pipe including cost and conveyance of BH Coke, salt, clamps,C.I.Pipe and RCC collars, labour charges for all operational and incidental items of work etc., as directed by the engineer in charge. All earth pits should be connected to the earth mat.

14

18092

253293.6

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and Laying of earth mat including excavation of trenches,welding and fixing lugs,connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts,drilling and connecting earthrods including connecting cast iron pipes as per Drg. No. SET(P)/149/82 including fabrication with 75 x 8mm GI Flat

400

547

219152

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and Laying of earth mat including excavation of trenches,welding and fixing lugs,connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts,drilling and connecting earthrods including connecting cast iron pipes as per Drg. No. SET(P)/149/82 including fabrication with - 75 x 8mm MS Flat

500

446

223495

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and Laying of earth mat including excavation of trenches,welding and fixing lugs,connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts,drilling and connecting earthrods including connecting cast iron pipes as per Drg. No. SET(P)/149/82 including fabrication with 100 x 16mm GI Flat

230

1277

293716.9

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and Laying of earth mat including excavation of trenches,welding and fixing lugs,connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts,drilling and connecting earthrods including connecting cast iron pipes as per Drg. No. SET(P)/149/82 including fabrication with - 100 x 16mm MS Flat

350

1007

352499

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;spacer clamps for Twin moose with 400mm spacing(3000000271and CS9-9)

20

735

14710.8

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Connecting equipment to bus and/or another equipment with Single MOOSE conductor including measuring,cutting clamping and also hoisting of suspension insulator assembly to support the conductor wherever necessary without clamps

40

424

16992

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Hoisting of insulators and hardware, stretching the conductor and stringing of AuX. 132 kV bus section comprising 3-phases with Twin MOOSE to a tension of 1800 Kgs.( The maximum length or up to a length of bus section is 45 mts) under normal condition

1

16232

16232.4

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Hoisting of insulators and hardware, stretching the conductor and stringing of 220 kV bus section comprising 3-phases with Single MOOSE to a tension of 900 Kgs.( The maximum length or up to a length of bus section is 40 mts) under shut down condition

1

11495

11495.4

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Erection of the main and auxiliary structures etc., using Bolts & Nuts under normal condition

17

4383

74521.2

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Fixing hardware, stretching the groundwire and stringing of earth wire to a tension of 450Kgs from pinacle to ground under shutdown condition

40

1717

68680

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Fixing hardware, stretching the groundwire and stringing of earth wire to a tension of 450Kgs from pinacle to ground under normal condition

100

1212

121200

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Fixing hardware, stretching the groundwire and stringing of earth wire to a tension of 450Kgs from pinacle to pinacle under shut down condition

5

1717

8585

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Fixing hardware, stretching the groundwire and stringing of earth wire to a tension of 450Kgs from pinacle to pinacle under normal condition

5

1212

6060

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Setting of stubs with stub setting template for substation structure:'Erection of stub template , fixing of jacks for supporting the template, alignment and levelling of exact location of stubs of stub setting template, dismantling of template after completion of initial curing of CC 132KV Circuit Breakers

1

2752

2752.8

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Setting of stubs with stub setting template for substation structure:'Erection of stub template , fixing of jacks for supporting the template, alignment and levelling of exact location of stubs of stub setting template, dismantling of template after completion of initial curing of CC 220KV Circuit Breakers

1

3670

3670.8

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Setting of stubs with stub setting template for substation structure:'Erection of stub template , fixing of jacks for supporting the template, alignment and levelling of exact location of stubs of stub setting template, dismantling of template after completion of initial curing of CC 132KV Isolators

1

3046

3046.8

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Setting of stubs with stub setting template for substation structure:'Erection of stub template , fixing of jacks for supporting the template, alignment and levelling of exact location of stubs of stub setting template, dismantling of template after completion of initial curing of CC 220KV Isolators

2

4244

8488.8

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Setting of stubs with stub setting template for substation structure:'Erection of stub template , fixing of jacks for supporting the template, alignment and levelling of exact location of stubs of stub setting template, dismantling of template after completion of initial curing of CC CPLs

18

1014

18252

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Setting of stubs with stub setting template for substation structure:'Erection of stub template , fixing of jacks for supporting the template, alignment and levelling of exact location of stubs of stub setting template, dismantling of template after completion of initial curing of CC 132KV Towers

2

4063

8126.4

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Setting of stubs with stub setting template for substation structure:'Erection of stub template , fixing of jacks for supporting the template, alignment and levelling of exact location of stubs of stub setting template, dismantling of template after completion of initial curing of CC 220KV Towers

2

5659

11318.4

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply & Fixing of 105 lb rail poles over the transformer plinths including cost & conveyance of rail pole, fabrication and fixing charges etc., complete for finished item of work

14

4237

59327.66

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;220KV/132kv bays Marking as per approved layout with the help of surveyor

2

18350

36700.8

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Suspension hard ware with earth bond for earth wire

5

861

4305.4

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Tension hard ware with earth bond for earth wire

5

804

4022.15

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;T Clamps for single Moose all three ways

12

492

5908.08

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;post type insulator supporting clamps for single moose conductor for 220KV & 132KV

6

627

3763.62

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;T Clamps for twin zebra/moose to single zebra/moose with 400mm spacing

6

852

5117.04

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;5 Bolted single moose tension hard ware for single moose

6

2152

12916.2

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;5 Bolted twin moose tension hard ware 400mm spacing for 132/220KV bus

6

4058

24349.2

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply & Fixing of GI Flexible earth Bonds

80

222

17798.4

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and fixing of 50 lbs CO2 portable fire extinguishers with first filling Horn and Hose.

2

15626

31252.94

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and fixing of 15 lbs CO2 portable fire extinguishers with first filling Horn and Hose.

2

6924

13848.16

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply and fixing of Insulation of Rubber mats of size 2m x 1m x 6mm confirming to IS 5424/96 and laying in front of panels in the Control Room

3

1059

3177.9

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Supply of hot dip galvanised bolts and nuts of various lengths of 16mm dia, 5.6 grade as per IS 1367, required for all structures and booms fabricated including transportation to sustation site and conforming to Standards specified in the relevant Clauses of the specification and Supply of Electro galvanised spring washers of 16mm size with rectangular cross section 5 mmx 3.5 mm of type B (with flat ends) conforming to IS 3063 for use with 16mm dia.G.I.Bolts as per the relevant clause of the specification including transportation to the substation site.

0.84

79351

66655.01

... More
Augmentation of 3rd 160 MVA PTR at 220 KV Kosigi SS;Material to be supplied by Contractor: Supply of fabricated GI structures from raw steel such as M.S.Angles, Plates,channels R.S.Joists M.S rounds etc., including cost of steel, fabrication and galvanisation of main and auxiliary structures, booms, stubsetting template and foundation bolts 'U' bolts with suitable galvanised nuts for foundation bolts, transportation to substation site

1621

955

1548324.73



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.