Transmission Corporation Of Andhra Pradesh Limited Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 18,455Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
574954Tender No
eWT 28/2024-25 of SE/OMC/Sangareddy(Earmarked for SC category)Tender Authority
Transmission Corporation Of Andhra Pradesh Limited ViewPurchaser Address
-Website
http://https://www.tstransco.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of cable duct in switchyard and miscellaneous civil works in control house at 132kV SS;Providing skirting to internal walls to 15 cm height/risers of steps with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 800 x 800 mm and thickness 9-11 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades (Make: H&R Johnson, Kajaria, Cera, Varmora, Somany, RAK) and designs length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per M2 and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete as per the directions of the Engineer in charge for the finished item of work.-Ground Floor
1.5
1275
1912.8
... More
Construction of cable duct in switchyard and miscellaneous civil works in control house at 132kV SS;Supply and fixing in position M.S. grills/Angles/gates of required size of approved design and quality. (for, gates, windows, hand railing in front of portico, retaining walls ,) and painting with two coats of synthetic enamel paint of approved quality, make, colour and shade over one coat of red oxide, complete as per the directions of the Engineer in charge for the finished item of work.
300
123
37131
... More
Construction of cable duct in switchyard and miscellaneous civil works in control house at 132kV SS;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) sliding windows two track sliding duly manufactured using UPVC reinforced profiles of (62 mm x 60 mm)/(60 mm x 45 mm)/ (60 mm x 52mm) x 2.0 mm for outer frames, (66 mm x 38 mm)/(58mm x 39 mm)/ (60 mm x 42 mm) x 2.0 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with TPV Gaskets/ EPDM weathering seal resistant accessories like locking system 1 No., per set of sashes and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc.,including cost and conveyance of all materials, accessories, labour charges for transportation, erectionat site with templates for casement sizing complete as per the directions of Engineer-in-charge for finished item of work . Approved brand - Fenesta/ NCL/ LG.
4
7415
29660
... More
Construction of cable duct in switchyard and miscellaneous civil works in control house at 132kV SS;Supplying and fixing 15.9 mm OD CPVC pipes of SDR 13.50 of premium make Supreme/ Prince/Astral/ Birla Aerocon including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental ,labour charges, etc. complete for finished item of work as directed by Engineer-in-charge.
100
270
27039
... More
Construction of cable duct in switchyard and miscellaneous civil works in control house at 132kV SS;Painting to inner new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 50 grams/ liter of approved brand (Asian Premier or equivalent) and shade over a base coat of appropriate Cement Primer of Interior grade I of approved brand,making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc.complete for finished item of work as per SS 911 for internal walls.
80
148
11866.4
... More
Construction of cable duct in switchyard and miscellaneous civil works in control house at 132kV SS;Flooring with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 800 x 800 mm and thickness 9-11 mm 1st quality conforming to IS:13711, IS:13712,IS:13630 (Parts 1 to 15) of any colour and finish in all in all shades (Make: H&R Johnson, Kajaria, Cera, Varmora, Somany, RAK) and designs as directed by Engineer. in charge, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete as per the directions of the Engineer in charge for the finished item of work. -Ground Floor
32
1266
40531.84
... More
Construction of cable duct in switchyard and miscellaneous civil works in control house at 132kV SS;Laying of Reinforced Cement Concrete (RCC) M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge. Centering should be with Casuarinas Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc. complete. - RCC COVER SLAB
11
8772
96496.07
... More
Construction of cable duct in switchyard and miscellaneous civil works in control house at 132kV SS;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 500/ 500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126) - FOR CONTROL ROOM/ BUILDINGS
1.3
84379
109693.84
... More
Construction of cable duct in switchyard and miscellaneous civil works in control house at 132kV SS;Plastering with CM (1:5), 12 mm thick to the even wall surfaces including cost & conveyance of all materials, labour charges, leads, lifts , scaffolding and curing complete as per the directions of the Engineer in charge for the finished item of work. - Without Scaffolding
77
171
13183.94
... More
Construction of cable duct in switchyard and miscellaneous civil works in control house at 132kV SS;Laying of Plain Cement concrete (PCC) - Nominal Mix (1:3:6) with 20mm graded HBG metal for drains with necessary form work including cost and conveyance of all materials, labour charges, curing and water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge.(IS-456)
4
5595
22380.56
... More
Construction of cable duct in switchyard and miscellaneous civil works in control house at 132kV SS;Brick Masonry in CM (1:6) with common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cms of approved quality, including cost & conveyance of all materials, labour charges, scaffolding leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work . - without Scaffolding
30
7888
236658.3
... More
Construction of cable duct in switchyard and miscellaneous civil works in control house at 132kV SS;Laying of Cement Concrete (1:4:8) mix using 50% of 40mm size and 50% of 20mm HBG machine crushed metal for bed flooring including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.
12
4569
54828.6
... More
Construction of cable duct in switchyard and miscellaneous civil works in control house at 132kV SS;Laying of Cement Concrete (1:4:8) mix using 40mm size HBG metal Machine crushed for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.
15
4471
67074.75
... More
Construction of cable duct in switchyard and miscellaneous civil works in control house at 132kV SS;Earthwork excavation in all types of soils (upto stone matrix) which can be excavated in combination of mechanically and manually with pick axe and crow bars and do not require blasting in all conditions such as dry, wet, slushy etc., covering initial lead and lift etc., and backfilling the foundations (after laying foundations) with excavated earth including watering, compacting as per standard specification and disposing of surplus earth within site (up to 1KM lead) complete as per directions of Engineer in charge at site for finished item of work.
71
172
12275.9
... More
Construction of cable duct in switchyard and miscellaneous civil works in control house at 132kV SS;Dismantling the existing Unreinforced Cement Concrete upto 15 cm thickness and disposing the unserviceable material away from the site with all leads and lifts including T&P complete as per the directions of the Engineer-in- charge for finished item of work.
4
1851
7407.32
... More
Construction of cable duct in switchyard and miscellaneous civil works in control house at 132kV SS;Construction of cable duct in 132kV Pashamailaram SS - Dismantling of existing Brick masonry including clearing away and carefully stacking materials useful for re use and all debris away from the site with lead & lift labour charges, T&P complete as per the directions of the Engineer in charge for the finished item of work.
17
417
7094.44
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%