Telangana State Tourism Development Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Tourism Development Corporation - TSTDC Tender

Civil And Construction
Building Construction
Opening Date30 Jun 2023
Closing Date10 Jul 2023
Tender Amount₹ 1,27,25,074 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Providing skirting to internal walls to 10.00 cm height with Polished Shahabad/Tandur stone slabs 15mm to 18mm thick, length equal to flooring stones set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges etc., and overheads & contractors profit complete for finished item of work.(APSS No.701 &707)

52.06

566

29482.1

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Flooring with polished shahabad / Tandur stone slabs of 15mm to 18mm thick of approved size as specified set over a base coat of CM (1:8) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete excluding seigniorage charges, including all labour charges like dressing of flooring stones to the required size, mixing of cement mortar, laying, lift charges , cost of base coat etc., and overheads & contractors profit complete for finished item of work. (APSS No.703 & 701)

463.5

487

225895.99

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;RCM facia 50mm thick using screened sand for drop walls, fins with rabbit wire mesh & nominal reinforcement as directed by Engineer - In - Charge with dubara sponge finishing,including cost and conveyance of all materials to site, excluding seigniorage charges, operational & incidental,cost and conveyance of cement,wire mesh,water to work site,centering,scaffolding and form work,lift charges etc., and overheads & contractors profit complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work(APSS NO.403&903)

96.8

1794

173672.75

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Painting to new iron works with 2 coats of Synthetic Enamel paints in all shades Grade - I having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over 1 coat of Red Oxide Primer Paint for iron works of Grade -1 of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site including cost of primer coat and all operational, incidental, labour charges etc. complete etc., complete including cost of overheads & contractors profit (APSS No.1200, 1207 & 1211) in all floors.

491.69

182

89935.02

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer.

1801.34

147

265535.53

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats.

739.63

264

195609.95

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Providing and applying wall putty of White cement or Polymer or Cement based putty of average 1 to 2mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 -3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges,over heads & contractor's profit etc. complete for finished item of work for Internal walls

1553.63

244

379349.84

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Ornamental/Ceiling plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

574.71

504

289734.3

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish natural river sand (screened sand) including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

1226.63

505

620269.99

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for External & Uneven Surfaces of Brick Wall and RCC exposed surfaces for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 20 mm

514.28

518

266731.32

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Plastering 12mm thick single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work for basement works. (SS 901,903 & 904)

135.75

163

22212.77

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Reinforced Brick Masonry for partition walls (115.0 cm thick) in CM (1:4) prop. (Cement : Screened sand) using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sq.cm and placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, excluding seigniorage charges, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 501 & 509)

160.2

1225

196280.24

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Brick Masonry 230mm thick 2nd class Bricks traditional size 23 x 11 x 7 cms in superstructure with CM (1:6) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, excluding seigniorage charges, mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 501 & 504).

225.63

8899

2008014.49

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Lintels

0.58

13408

7776.88

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Columns

26.23

13424

352131.72

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 360 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges, centering using steel scaffolding pipes, Jack props, wallers, Foot plates, brackets, steel centering plates. etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS. RCC WALL.

-

-

-

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Slab 125mm Thick

596.4

1466

874560.96

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Beam

30.43

12269

373374.27

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 360 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges, centering using steel scaffolding pipes, Jack props, wallers, Foot plates, brackets, steel centering platesetc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) For RCC SLABS , BEAMS.

-

-

-

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Plinth Beams

20

12983

259668.4

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Column Pedestals

9.72

10772

104710.64

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Footings

64.51

10110

652231.58

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 360 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges, centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) For FOOTING, PLINTH BEAM , PEDESTALS ( Below Plinth)

-

-

-

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Supplying, fitting and placing of HYSD / TMT (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126)

15.18

87058

1321550

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to the work site and all operational, incidental, labour charges, hire charges of T & P etc., completebut but excluding seignorage charges, for finished item of work. (APSS NO. 309 & 310)

1121.75

662

743148.16

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., from approved quarry, to site and excluding seigniorage charges, including labour for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing etc.,and overheads & contractors profit complete for finished item of work in foundation and basement. (APSS No. 601 & 615)

191.97

4686

899653.97

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work (APSS NO.309&310)

21.01

209

4398.23

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using natural river sand, 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete but excluding seigniorage charges, for finished item of work for Foundations (APSS No. 402) MACHINE MIXING

104.09

4269

444383.11

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Earth work excavation for foundations (Mechanical Means) of Structure/Building in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)- ORDINARY SOIL (MECHANICAL MEANS).

704.76

151

106707.71

... More
Construction of Commercial Shops with RCC Structure at Bhudhavanam Project, Nagarjunasagar, Nalgond;Land levelling including removal of boulders, trees and earth cutting etc., using Hydraulic excavator/Shovel 0.50 cum 75 hp including hire charges, fuel and operator charges etc., complete for finished item of work.

64

2477

158576.64



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.