Telangana State Tourism Development Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
413398Bid Award Id
ViewTender No
34/01/TSTDC/2022-23Tender Authority
Telangana State Tourism Development Corporation ViewPurchaser Address
-Website
http://https://tourism.telangana.gov.in/home
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Development of Landscaping (Soft scape/greenary ) work;Regular watering and removal of weeds, protection etc for 45 days for intial establishment including water and labour charhes etc complete for finished item of work.
1200
9
11868
Development of Landscaping (Soft scape/greenary ) work;Hedge / shrubs: planting : Digging the trenches of size 30 cms depth refilling the trench with red soil, FYM at 4:1 ratio internal transport of plants & planting the plants including the applicatuion of fertilises and pesticides etc.' complete , but excl the cost of fertilizes and plant material.
845
756
639234.05
Development of Landscaping (Soft scape/greenary ) work;Cost of Plant Material for Hedge/Shrub Planting: Supply & Cost of Ornamental Flowering Shrub plants with size 8"X 10" with height 2'.0" ft ( Alamanda, Nicotina, Plambago, Tabernum, Neerium, chianbox, Spider Liily Tecoma Orange Hemiliya petans fountain grass etc, any other oranametal species.
10140
55
557700
Development of Landscaping (Soft scape/greenary ) work;Topiary/Palm/Tree Planting: Digging of 0.60 X 0.60 X0.60 mtrs pit filling with red soil mixture of red soil FYM manual sand at 3:1:1 ratio including internal transport etc., complete for finished item of work.
620
385
239109.2
Development of Landscaping (Soft scape/greenary ) work;Topiary/Palm/Avenue Tree Planting: Cost of Avenue Trees Like, Raavi, Marri, Juvvi, Neem, Spathodia, and other avenue species etc with 25"X25" bag size above 10' feet above including internal transport etc., complete for finished item of work.
500
1200
600000
Development of Landscaping (Soft scape/greenary ) work;Cost of Support Sarvi/Eucalyptus stackes with height 8' Height including transport at site and fixing charges Sarvi Sticks including internal transport etc., complete for finished item of work.
500
130
65000
Development of Landscaping (Soft scape/greenary ) work;Cost of topiory Ficus Black,Ficus Panda and Bougainvillea Topiory etc with Bag size 21"x21" and other topiory plants including internal transport etc., complete for finished item of work.
120
1800
216000
Development of Landscaping (Soft scape/greenary ) work;Ficus multi headed balls spiral, swane 18 inches dia pots including internal transport etc., complete for finished item of work.
50
7500
375000
Development of Landscaping (Soft scape/greenary ) work;Decorative Pot With Dia Size 34 inch and Hight is 22 inch. Including Transportation and Painting etc., complete for finished item of work..
82
2800
229600
Development of Landscaping (Soft scape/greenary ) work;Maintenance of lawns & Garden watering of lawns @10-15 ltrs per sqmt/day basingon the season and weather conditions (Sub soil moisture shall be maintained continuously). The watering shall be carried out daily during non rainy days. lawn moving weeding edging of the the lawns in the frequency.keeping the lawn grass blade not more than 2 CM. Edging of the lawns in such a way that the lawn grass do not penetrate into the plants and in a defined perfect geometric shape or smooth curves. keeping the lawns always in lush green & weed - free condition and application of fertilizers, insecticides fungicides with Manual watering etc as directed by Engineer -in - charge and protection for 03 months etc complete.
3600
792
28515.24
Development of Landscaping (Soft scape/greenary ) work;Maintenance of hedge/shrub planting: Trimming of hedges / shrubs once in 15 days. Watering hedges/ shrubs once in a day @ 5ltrs per sqm/ per day ( sub soil moisture shall be maintained continuously) The watering shall be carried out daily during non rainy days. Formation of basins 1 feet from the hedge. Application of fertilizers, insecticided, fungicides @ 20 gms/pit/sqm) etc plant for 03months
2535
3516
89154.43
Development of Landscaping (Soft scape/greenary ) work;Maintenance of Individual plants, shrubs and palms: Trimming once in 15 days and watering once in a day @ 5 ltrs per plant/ per day (sub soil moisture shall be maintained continuously) The watering shall be carried out daily during non rainy days. Formation of basins 1 feet from the hedge. Application of fertilizers, insecticided, fungicides @ 20 gms/pit/sqm) etc with Manual watering for 03 months etc complete.
1860
525
9766.67
Development of Landscaping (Soft scape/greenary ) work;Supplying and Fixing of Water Fountain 12 feet height made with fiber glass (FRP) including all fittings like inner Pipe line (UPVC), motors of 1HP, 1/2 HP (make:Crompton, texmo, CRI), painting and electrical fittings including cost & conveyance of all materials, labour charges, iternal transportation etc., complete for finished item of work as directed by Engineer in-charge.
1
400000
400000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements