Telangana State Tourism Development Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Tourism Development Corporation - TSTDC Tender

Civil And Construction
Water Storage And Supply
Opening Date29 Aug 2020
Closing Date2 Sep 2020
Tender Amount₹ 61,55,398 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of Recreation Facilities Boating Children Park;S & F of Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook Jaquar make or equalant with 10 yearswarranty with cost and conveyance of materials and labour charges for fixing.

6

-

19967

... More
Development of Recreation Facilities Boating Children Park;S & F brass body CP spreader for urinals Jaquar make or equalant with cost and conveyance of materials and labour charges for fixing.

6

-

968

... More
Development of Recreation Facilities Boating Children Park;S &F CP finish brass bottle trap 250 mm long with wall connection pipe & wall Flange Jaquar make or equalant with c/c of materilals and labour charges for fixing

13

-

12791

... More
Development of Recreation Facilities Boating Children Park;S&F CP finish brass body 32 mm dia nominal size Waste coupling doom type with half/ full thread & brass body check nut Jaquar make or equalant conforming to IS 2963: 1979

13

-

4062

... More
Development of Recreation Facilities Boating Children Park;S & F of 15 mm brass body Premium variety Chromium plated finish Pillar cock with aerator of not less than 500 grams weight quarter turn spindle conforming to IS 8931 of Jaquar make or equalant and with a warranty of 10 years

8

-

7771

... More
Development of Recreation Facilities Boating Children Park;Supplying , fixing and commissioning of oval shape white colour wash basin 520x410mm 1st quality with ISI make fitted in granite counter of 20mm thick stone with all jaquar make Contenental series chromium plated fittings such as 1 No.piller cock, 1 No. waste couplings 1 No. angle stop cock,1 No.bottle trap 38.10mm B class GI pipe for waste water PVC connection including chisselling in brick/stone masony including making holes in granite to size as required and rounding the edges and polishing the edges fixing etc,including all cost and conveyance of all materials, labour charges, fixing charges etc, complete for finished item of work.

8

-

57933

... More
Development of Recreation Facilities Boating Children Park;Supply and fixng of 15 mm nominal size PVC connection with brass union nut C.P coated with cost and conveyance of materials and labour charges for fixing

21

-

2434

... More
Development of Recreation Facilities Boating Children Park;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, ricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

3

-

40056

... More
Development of Recreation Facilities Boating Children Park;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick sing 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, and, ricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift harges, curing etc., complete for finished item of work as per Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all

3

-

25137

... More
Development of Recreation Facilities Boating Children Park;50mm dia CPVC Ball valve

2

-

3936

... More
Development of Recreation Facilities Boating Children Park;40mm dia CPVC Ball valve

2

-

2388

... More
Development of Recreation Facilities Boating Children Park;32mm dia CPVC Ball valve

2

-

1732

... More
Development of Recreation Facilities Boating Children Park;25mm dia CPVC Ball valve

4

-

2044

... More
Development of Recreation Facilities Boating Children Park;Providng Ball valves of CPVC water line with c/c of materials and labour charges for fixing includng operational,incidental charges etc complete for finished item of work.

-

-

-

... More
Development of Recreation Facilities Boating Children Park;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber upto 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg.

14

-

60952

... More
Development of Recreation Facilities Boating Children Park;54.00 mm OD pipe SDR-11

100

-

57944

... More
Development of Recreation Facilities Boating Children Park;41.30mm OD Pipe SDR-11

6

-

2386

... More
Development of Recreation Facilities Boating Children Park;34.90 mm OD pipe SDR-11

50

-

16020

... More
Development of Recreation Facilities Boating Children Park;28.60 mm OD pipe SDR-11

18

-

4233

... More
Development of Recreation Facilities Boating Children Park;22.20mm OD pipe SDR-11

18.46

-

3628

... More
Development of Recreation Facilities Boating Children Park;15.90mm OD pipe SDR-11

17.4

-

2807

... More
Development of Recreation Facilities Boating Children Park;Supply and laying of CPVC Pipes SDR 11, and Fittings or equalant for Hot & Cold conforming to IS 15778:2007 with malleable specials such as Tees,Elbows,check nuts,unions, bushes, etc, Solvent Cement including fixing in walls ceiling floors Include for necessary excavation in all sorts of soils, chasing in the walls etc,refilling consolidation with the excavated earth & Making bores in walls ceiling etc.and making good the chased surface in cement mortar and complete.When making a transition use metal threads fittings, including all taxes for finished item of work as directed by the Engineer In charge.

-

-

-

... More
Development of Recreation Facilities Boating Children Park;Supplying and fixing of SWR / PVC pipes 160mm dia (as per ISI standards) 6 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)

100

-

70593

... More
Development of Recreation Facilities Boating Children Park;Supplying and fixing of SWR PVC pipes (as per ISI standards) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)

7.2

-

2569

... More
Development of Recreation Facilities Boating Children Park;Supplying & Fixing white glazed flat back half stall Urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader fixed with screws,CP finish brass body 32 mm dia nominal size waste couplin doom type with half/ full thread & brass body check nut conforming to IS 2963: 1979 complete Indian make : 590 x 375 x 390 mm with Hindware / Parry ware make or equlant cost and conveyance of materials and labour charges for fixing.

6

-

19380

... More
Development of Recreation Facilities Boating Children Park;Supply, Installation and commissioning approved make floor mounted Close Coupled wash down EWC conforming to IS:2556 (Part 8)-2004 suit with 'P' or'S' trap with dual flush porcelain cistern fixed on wash down EWC with all internal parts of dual flush cistern, ultra solid seat cover of approved make i.e Hindware / Parry ware or equlant make with rubber buffer and cap & 15 mm angle stop cock & 450 mm long PVC inter connection pipe wall flanges all of approved make etc.complete for finished item of work in all respects: White Colour

6

-

54712

... More
Development of Recreation Facilities Boating Children Park;Supply and fixing of Wash basin mirror of size 5'-0" x 2-0" using 5 Ply - 8 mm thick Plywood conforming to IS:303 & Plain Float Glass 5 mm thick using adhesive and teak wood beading with necessary hardware etc., with cost and conveyance of material and labour charges for fixing includng operational, incidental charges etc complete for fixing.

4

-

9610

... More
Development of Recreation Facilities Boating Children Park;Supplying and fixing 630 mm x 450 mm long Orissa pan white glazed Water Closet 1st quality ISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware/ parry ware or equalant with brick masonry seat,fluh tank with disigner cistern of size ;420 x 140 x 340mm if star white in colour ,Supplying & fixing approved make porcelain foot rest for squatting I.W.C. (Rectangular pair) of sizes 250 mm x 125 mm x 15 mm thick each foot rest 1st quality ISI marked conforming to IS:2556-Part-10:1974 P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labour charges and seigniorage charges etc., complete for finished item of work.

4

-

18651

... More
Development of Recreation Facilities Boating Children Park;Supplying and fixing of 4" (101.6mm) multi floor trap with jali - UPVC/SWR pipe fittings as per site requirements with standard practice for all floors including cost and conveyance of all materials to site, labour charges , overheads & contractors profit etc., complete for finished item of work.

27

-

5545

... More
Development of Recreation Facilities Boating Children Park;Painting to new iron works with 2 coats of synthetic enamel paint grade-I VOC content less than 50gms/litre of approved brand and shade over 1 coat of red oxide primer of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials ,to work site including cost of primer coat and all operational, incidental, labour charges etc. complete etc., complete including cost of overhead charges & Contractors profit and , but excluding seignorage charges, GST (APSS No.1200, 1207 & 1211) in all floors.

94.53

-

13601

... More
Development of Recreation Facilities Boating Children Park;Supply and fixing of Hot dipped Galvanized iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979: PVC Coated - 2"x2" (50 mm x 50 mm ) - 8 gauge including cost and conveyance of all materials to site, labour chages for cutting, placing in position, fixing with nuts and bolts to the MS angles/ MS flats (Excluding cost of MS anlges / MS Flats), including wastages, over head charges & Contractors profit but excluding GST, etc, complete for finished item of work.

655

-

505169

... More
Development of Recreation Facilities Boating Children Park;Supply and fixing of M.S. Flats of size 25.4 x 3 mm @ 0.59 kgs/RM ( for Vertical angles) including cost and conveyance of all materials to site, labour chages for cutting, tying, placing in position including wastages, etc., including overhead charges & Contractors profit etc but excluding GST etc, complete for finished item of work.

264

-

21278

... More
Development of Recreation Facilities Boating Children Park;Supply and fixing of M.S. Angles of size 50x50x6mm @ 4.50kgs/RM (Vertical angles) including cost and conveyance of all materials to site, labour chages for cutting, tying, placing in position including wastages, etc., including overhead charges & Contractors profit etc but excluding GST etc, complete for finished item of work.

2521

-

201680

... More
Development of Recreation Facilities Boating Children Park;Providing & Fixing Cement Concrete Kerbing of 100mm thick in PCC (1:2:4) prop using 20 mm to 6 mm HBG Machine Crushed Metal in Nominal mix including machine mixing charges steel Centering charges and Plastering in 12mm thick in single coats in CM (1:4) prop. Including cost and conveyance of all materials and labour charges, transporation to site, loading unlaodings, incidental and operational charges etc., complete for finished item of work ( 380 mm Hight x 100 mm Thk)

160

-

46136

... More
Development of Recreation Facilities Boating Children Park;Providing and laying factory made hydraulically pressed mechanically vibrated and compacted pre-cast Cement Concrete interlocking Regular Pavers of 80 mm thickness of M- 40 Grade of which top 12 mm thick shall be of colour pigmentation with imported colours and white cement to get required reflective glazing of approved design and colour in single layer approved pattern laid in position in pavement/ foot path/ pathways etc., set over sand bed of 75mm thick, filling the joints with sand, compacting the blocks with vibrator etc., complete including cost, all taxes and conveyance of all materials and water to work site and all operational, incidental, labour charges, lift charges, curing etc., complete for finished item of work.

1600

-

1302800

... More
Development of Recreation Facilities Boating Children Park;Supplying & fixing CI steps for sump with cost and conveyance of materials and labour charges for fixng.

18

-

1350

... More
Development of Recreation Facilities Boating Children Park;Supply & fixing RCC cover 22" dia with nominal reinforcement 3 " thick and hooks for lifting with cost and conveyance of materials and labour charges for fixing.

4

-

3345

... More
Development of Recreation Facilities Boating Children Park;Supply and fixing of pre-painted steel casement/ openable windows base steel as per IS 513 of -0.58 mm thick 'D quality, galvanized as per IS ishpainted with a polyester paint,section for outer frame of 46 x 52 mm section forshutter of 46 x 46 mm section for mullion 46 x 70 mm, and section for beading 18 x 25 mm panelled with 5 mm thick plain float glass fitted with EPDM gaskets, handle made of high grade aluminium powder coated frames fixed to the concrete /masonry wall by means of self expanding screws including 10 mm squareguard bars @ 150 mm pitch for Windows: Double shutter 4'-0 x 4 '-0 (1219.2x12.19.2mm) without Mullionsection

3.71

-

27453

... More
Development of Recreation Facilities Boating Children Park;Providing and fixing of top hung Ventilator with fly mesh made of pre-painted steel as per IS 513 of 0.80 mm thick galvanized as per IS 277 with Zinc, finish painted with a polyester paint, section for fly-shutter of 0.6 mm thick and fitted with stainless steel 32 gauge fly mesh of 304 grade and mullions to have double rebate for glazed shutter and fly-shutter with a provision for guard bars/grills and 1 No. of High grade nylon latch handle, window stopper, 2 nos. of with MS Powder coated /SS ball bearing butt Hinges provided per shutter and windows fitted with 4 mm thick plain float glass with rubber gaskets including fixing the frames in concrete/masonry wall by means of self expanding screws, Including 10 mm Square guard bars with 6? (152.4mm) pitch etc., complete for finished item of work for (i) Single fixed Louvers Ventilator window size of 2? 0? x 2? 0? (609.6 x 609.6mm) outer frame box section size of 100 x 45mm, fly mesh shutter frame section size 52 x 25 mm and (ii) Double fixed Louvers ventilator window Size of 4? 0? x 2? 0? (1219.2mm x 609.6mm) outer frame box section size of 100 x 45mm, fly mesh shutter frame section size 52 x 25 mm, vertical mullion section size of 100 x 60 mm and (iii) Double fixed Louvers Ventilator window size of 4?0? x 3?0? size 100 x 45mm , fly mesh shutter frame section size 52 x 25 mm Vertical mullion section size of 100 x 60 mm

15.84

-

91783

... More
Development of Recreation Facilities Boating Children Park;Painting to flush shutters two coats of ready mixed synthetic enamel paint Grade-I of approved shade having VOC (Volatile organic compound)content less than 50 grams/liter over wood primer coat including cost and conveyance of all materials to site cost of primer coat and all labour charges etc. complete including applying sand paper for neat finish etc., complete and including cost of overheads & contractors profit (APSS No.1200, 1207 & 1211) in all floors.

10.08

-

1555

... More
Development of Recreation Facilities Boating Children Park;Supplying and fixing of Single shutter door with Teak wood door frame of size 100x65mm and flush door shutters of 30mm thick solid bond wood block board type with commercial ply ON BOTH faces conforming to IS:2202 including 6 no.s MS Z Hold fasts - 300 mm long, cost of 1 no. BRASS Aldrops (IS:2681) 300 mm long, , 1 no.Brass Tower Bolt-10 mm Bolt (IS:204) 250 mm Long, 2 no.s Brass Door Handles (IS:208) 150 mm Long, 3 no.s Brass Butt hinges (IS:205)- 125 mm Long, 1 no. Rubber/ Nylon door stop bushes including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, overheads & contractors profit etc., complete for finished item of work as per APSS 1001 & 1002

10.12

-

53964

... More
Development of Recreation Facilities Boating Children Park;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) openable doors with openable reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of 60 mm x 55 mm x 2.40 mm for outer frames, 74 mm x 60 mm x 2.40 mm for mullion sections as per the need and 102 mm x 60 mm x 2.40 mm for openable shutter frame capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the door sash shall be fitted with 6 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gaskets for sash & Glazing bead shall be co-extruded with Grey colour soft PVC System shall be provided with 4 no?s of 3D Hinges for each shutter and multipoint locking with keys with raiser wedges for smooth operation and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

12.72

-

116034

... More
Development of Recreation Facilities Boating Children Park;Painting to new walls with two coats of acrylic emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for internal walls approved brand and shade over a base coat of water based cement primer of interior grade-1 of approved brand, making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit but excluding seignorage charges, GST for finished item of work as per SS 911 for internal walls

176.09

-

19520

... More
Development of Recreation Facilities Boating Children Park;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats.

197.15

-

31721

... More
Development of Recreation Facilities Boating Children Park;Dadooing to walls with glazed Supply of glazed red or white full body ceramic wall tiles of size 300 x 600 mm and thickness between 6-8 mm 1st quality conforming to S:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand, water, tiles, coloured cement etc., to site, all labour charges for mixing of cement mortar, laying tiles to level, curing but excluding seignorage charges, GST etc., complete for finished item of work as directed by Engineer-in-charge.

202.51

-

162595

... More
Development of Recreation Facilities Boating Children Park;Flooring with 16 to 18mm thick Polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern and providing the flamming on the granite as approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and seigniorage charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work (S.S.701 & special)

1.88

-

7482

... More
Development of Recreation Facilities Boating Children Park;Flooring with Supply of Non-skid red or white full body Ceramic floor tiles of scratch free-stain free and scratch free-Nano finish of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs of any colour approved brand i.e.Somany, H & R Johnson, Naveen,Ceramics, Kajaria, Nitco, Sphinx, Orient Bell, AGL, Hindware and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistency spread @ 3.3kgs per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand, water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed) includung cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope but excluding seignorage charges, GST as directed by the Engineer-in-charge curing etc., complete for finished item of work. (APSS No.707 & 701).

48.42

-

47326

... More
Development of Recreation Facilities Boating Children Park;Plastering 12mm thick single coat in CM(1:5) for walls using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit but excluding seignorage charges, GST etc i complete for finished item of work.(SS 901,903 & 904)

277.51

-

36354

... More
Development of Recreation Facilities Boating Children Park;Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves but excluding seignorage charges, GST etc., as directed by Engineer - in - charge etc., complete for External & Uneven Surfaces of Brick Wall and RCC exposed surfaces for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 20 mm

280.35

-

104991

... More
Development of Recreation Facilities Boating Children Park;Plastering 12 mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces for finished but excluding seignorage charges, GST etc item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 12 mm

271.67

-

97434

... More
Development of Recreation Facilities Boating Children Park;Ornamental plastering to ceiling 12mm thick in two coats with base coat of 8mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, includijng sale & other taxes on all materials and all operational, inciedental charges, curing on materials and including cutting grooves but excluding seignorage charges, GST etc., as directed by Engineer in charge and overheads & contractors profit etc., completefor RCC exposed faces for finished item of work

144.33

-

54095

... More
Development of Recreation Facilities Boating Children Park;Reinforced Brick Masonry for partition walls (115 mm thick) in CM (1:4) prop.(Cement:Sand) using Bricks second class or ground moulded (Non-Modular or traditional size) of size 23 x 11 x 7 cm from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls wherever applicable including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including cost of scaffolding charges and all labour charges like mixing cement mortar, lift charges, curing, overheads & contractors profit etc., complete but excluding seignorage charges, GST for finished item of work (APSS No. 509 & 501)

7.17

-

54509

... More
Development of Recreation Facilities Boating Children Park;Brick masonry 230 mm thick for panel walls in super structure, parapet walls with cement mortar (1:8) prop (Cement:sand) using Bricks second class of size (Non-Modular or traditional size) 23 x 11 x 7 cm from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing , overheads & contractors profit but excluding seignorage charges, GST etc.,complete for finished item of work as per SS 504.

34.51

-

217368

... More
Development of Recreation Facilities Boating Children Park;Providing impervious coat to exposed RCC roof slab surfaces of sump , sump side wall,sump bottom slab,in side of septic tank , in sunken slabs etc. to required slopes with CM (1:3) prop. using screened sand 12mm thick mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm where ever necessary including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab excluding seignorage charges, GSTetc, and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

73.52

-

11050

... More
Development of Recreation Facilities Boating Children Park;Providing impervious coat to exposed RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with 1 kg water proofing compound per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like sand, water proofing compound, water etc., to site, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing providing rounding off the wall and slab junction excluding seignorage charges, GST etc., complete for finished item of work. (APSS No. 901 & 903) for:-Impervious coat CM(1:3), 20mm

109.1

-

43787

... More
Development of Recreation Facilities Boating Children Park;Supplying, fitting and placing HYSD (Fe 500 grade as per IS 1786-1985 & Ammendments ) bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded including cost and conveyance of bars from approved sources to site of work, binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes, on cost of all materials complete for finished item of work

11.82

-

680597

... More
Development of Recreation Facilities Boating Children Park;Sunshade 75 mm at fixed and 50 mm at free end

3.6

-

3492

... More
Development of Recreation Facilities Boating Children Park;Roof slab 125mm thick

133.1

-

160783

... More
Development of Recreation Facilities Boating Children Park;Roof beams:

8.28

-

83658

... More
Development of Recreation Facilities Boating Children Park;Sump side walls 150mm thicck

37.52

-

169303

... More
Development of Recreation Facilities Boating Children Park;sump base slab 230mm thickk

12

-

15134

... More
Development of Recreation Facilities Boating Children Park;Septick Tank Base slab 150mm thick

1.8

-

3481

... More
Development of Recreation Facilities Boating Children Park;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including sales & other taxes on all materials, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges, seignorage charges, GSTetc for finished item of work (APSS No. 402)

-

-

-

... More
Development of Recreation Facilities Boating Children Park;Raised Pointing to RR/ CRS Masonry in CM (1:3) including cost and conveyance of all materials in site, curing, labour charges etc, overheads & contractors profit, complete for finished item of work.

39

-

3354

... More
Development of Recreation Facilities Boating Children Park;Random Rubble stone masonry in CM (1:6) prop: (Cement: Screened sand) using hard Granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., to site, labour for cutting stones to required size and shape, mixing of cement mortar, construction, curing and cost of overheads & contractors profit etc.,complete for finished item of work in foundation and basement. (APSS No. 601 & 615).

60.62

-

209539

... More
Development of Recreation Facilities Boating Children Park;e)Lintel

0.77

-

8521

... More
Development of Recreation Facilities Boating Children Park;d)Plinth Beams

11.04

-

118357

... More
Development of Recreation Facilities Boating Children Park;c)Column

5.78

-

63043

... More
Development of Recreation Facilities Boating Children Park;b)Pedastal

9.06

-

80609

... More
Development of Recreation Facilities Boating Children Park;a)Footings

45

-

378340

... More
Development of Recreation Facilities Boating Children Park;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges but including sales & other taxes on all materials, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for seignorage charges, GSTetc finished item of work (APSS No. 402)

-

-

-

... More
Development of Recreation Facilities Boating Children Park;Filling with carted coarse sand in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental ,labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310)

10.8

-

10962

... More
Development of Recreation Facilities Boating Children Park;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cms thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P and cost of overheads & contractors profit etc., complete for finished item of work for (APSS NO.309&310)

1822.5

-

65792

... More
Development of Recreation Facilities Boating Children Park;Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to the work site and all operational, incidental, labour charges, hire charges of T & P etc., completebut but excluding seignorage charges, for finished item of work. (APSS NO. 309 & 310)

40.51

-

16783

... More
Development of Recreation Facilities Boating Children Park;P.C.C. (1:2 :4) using 20mm graded nominal size SS5 gauge hard broken Granite metal as per SS 108, Machine mixed laid in position in layers not exceeding 15cm in thickness, excluding cost of seignorage charges and conveyance and including charges of all materials and water from approved sources to work site and all operational, incidental, labour charges such as mixing concrete, laying, tamping, curing, etc. complete for finished item of work .including Over head charges, & contractors profit,But excluding GST & Seignarage charges as per SS 402 for Machine mix footings . (APSS No. 402)

22.05

-

102331

... More
Development of Recreation Facilities Boating Children Park;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations using coarse aggregate 40mm size hard , machine crushed granite metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site,excluding seigniorage charges but including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations , ramming, finishing top surface to the required level, curing etc.,complete and overheads & contractors profitBut excluding GST & Seignarage charges for finished item of work for levelling course under footings . (APSS No. 402)

39.79

-

138032

... More
Development of Recreation Facilities Boating Children Park;Earth work excavation for foundations (By mechanical Means) of buildings, compound wall in ordinary soils and depositing on bank with an initial lead of 10m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work C59seigniorage excluding GST, dewatering charges etc., as per SS 20 B(APSS 308)

3695.25

-

258668

... More
Development of Recreation Facilities Boating Children Park;Earth work excavation for foundations (Manual Means) of septic tank, sump, in ordinary soils and depositing on bank with an initial lead of 10m and and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding GST , Dewatering charges etc., as per SS 20 B(APSS 308)

60

-

11043

... More
Development of Recreation Facilities Boating Children Park;Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding GST, Dewatering charges etc.,as per SS 20B (APSS 308) in Ordinary Soil-Mannual Means.

308.92

-

99503



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.