For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Tourism Development Corporation - TSTDC Tender

Opening Date7 Oct 2020
Closing Date14 Oct 2020
Tender Amount₹ 82,07,853 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of Trekking Path Steps from Papanashanam;Providing Mild Steel Tubes & pipes of all diameters as per IS-1161, of different diameters, cutting and fabricating to required sizes and shapes,placing in position as per approved designs and drawing to be supplied at the time of execution of work, including cost and conveyance of all Mild steel Tubes & Pipes sections and all wastages such as overlaps, couplings, welede joints, etc., and all operational, incidental, Labour charges for fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, including cost of Labour charges for fabricating all heavy steel works like Trusses, Stanchions, Heavy Beams and Girders including cost of welding rods, power charges, etc including cost of fixing in position etc., complete for finished item of work

4950

-

557073

... More
Development of Trekking Path Steps from Papanashanam;Rough dressing charges for the granite stone including cost or hire charges of materilals for dresssing and all labour charges etc complete for finished item of the work

425.25

-

520081

... More
Development of Trekking Path Steps from Papanashanam;Supply and fixing Granite treads of size 75 to 100 mm thick set over base coat of cement mortar (1:8) 20mm thick using un screened sand over CC bed already laid and jointed neatly with cement paste to full depth including cost and conveyance of all materials like cement, sand, water, bangalore stones, etc., to site (excluding cost of C.C. bed) cost of base coat and all labour charges for mixing of cement mortar, laying bangalore stone including head loads charges , average lifting charges of the stone,cement ,sand , water etc., with chain pulley charges, scaffolding charges inclusive of overheads & contractors profit but excluding seignorage charges, GST as directed by the Engineer- in-charge etc., complete for finished item of work. (APSS No.701 & 707)

480

-

1674667

... More
Development of Trekking Path Steps from Papanashanam;Supply and fixing Hard Granite steps of size 1.80 X 0.45 X 0.15 Mt thick set over base coat of cement mortar (1:8) 20mm thick using un screened sand over CC bed already laid and jointed neatly with cement paste to full depth including cost and conveyance of all materials like cement, sand, water, bangalore stones, etc., to site (excluding cost of C.C. bed) cost of base coat and all labour charges for mixing of cement mortar, laying bangalore stone including head loads charges , average lifting charges of the stone,cement ,sand , water etc., with chain pulley charges, scaffolding charges inclusive of overheads & contractors profit but excluding seignorage charges, GST as directed by the Engineer- in-charge etc., complete for finished item of work. (APSS No.701 & 707)

42.53

-

1652950

... More
Development of Trekking Path Steps from Papanashanam;Plain Cement Concrete (1:3:6) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including ghat allowance, Head loads, delift charges, cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit etc., complete for finished item of work. (APSS No. 402)

84.75

-

490728

... More
Development of Trekking Path Steps from Papanashanam;Random Rubble stone masonry in CM (1:6) prop: (Cement: Screened sand) using hard Granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., to site, including Ghat allowence, Head loads, de lift charges, curing etc., and labour for cutting stones to required size and shape, mixing of cement mortar, construction, curing and cost of overheads & contractors profit etc., complete for finished item of work in foundation and basement. (APSS No. 601 & 615).

159.57

-

779898

... More
Development of Trekking Path Steps from Papanashanam;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including ghat allowance, Head loads, delift charges, cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, all charges for laying concrete under foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit etc., complete for finished item of work. (APSS No. 402):

73.95

-

371978

... More
Development of Trekking Path Steps from Papanashanam;Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to the work site and all operational, incidental, labour charges, hire charges of T & P etc., complete, including Ghat allowence, Head loads, de lift charges, curing etc., complete but excluding seignorage charges, for finished item of work. (APSS NO. 309 & 310)

222.96

-

289195

... More
Development of Trekking Path Steps from Papanashanam;Earth work excavation for foundations for buildings in hard rock (blasting prohibited) and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of workas as per SS 20 B(APSS 308)

70.88

-

139105

... More
Development of Trekking Path Steps from Papanashanam;Earth work excavation for foundations (Manual Means) of buildings in ordinary rock ( not requiring blasting ) and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges as per SS 20 B(APSS 308)

70.88

-

23369

... More
Development of Trekking Path Steps from Papanashanam;Cutting and removing other kind of trees including stacking of girth 100 to 200 cm including all labour charges,excavation,stacking the materials neatly and levelling the surface etc,complete

50

-

2250

... More
Development of Trekking Path Steps from Papanashanam;Clearing Juliflora (Prosafis) jungle including up-rooting and removing of Juliflora stumps including all labour charges etc. complete .

1800

-

8586



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.