Telangana State Tourism Development Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Tourism Development Corporation - TSTDC Tender

Civil And Construction
Building Construction
Opening Date23 Sep 2022
Closing Date10 Oct 2022
Tender Amount₹ 28,21,965 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Entrance Arch to Haritha Kakatiya Hotel at Hanumakonda.;3.60 Mts to 7.20 Mts Level

109

-

494009

... More
Construction of Entrance Arch to Haritha Kakatiya Hotel at Hanumakonda.;Up to 3.60 mts

109

-

488179

... More
Construction of Entrance Arch to Haritha Kakatiya Hotel at Hanumakonda.;Providing cladding to walls with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours, length equal to flooring slabs set over base coat of CM(1:5) 12 mm thick using Manufactured Sand (Rock sand) and natural river sand (Screened sand ) in the ratio of 50:50 with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work.

-

-

-

... More
Construction of Entrance Arch to Haritha Kakatiya Hotel at Hanumakonda.;Manufacturing supplying and fixing of MS gate for compound wall by using MS angles,Flats and square rods as per approved designs and drawings including fixing in position, cost conveyance of all materials and labour charges for finished item of work

1670

-

222377

... More
Construction of Entrance Arch to Haritha Kakatiya Hotel at Hanumakonda.;From 3.60 mts to 7.20 mts level

109

-

63220

... More
Construction of Entrance Arch to Haritha Kakatiya Hotel at Hanumakonda.;Up to 3.60 Mts Level

110

-

58161

... More
Construction of Entrance Arch to Haritha Kakatiya Hotel at Hanumakonda.;Plastering 12mm thick in two coats using Manufactured Sand (Rock sand) and natural river sand (screened sand) in the ratio of 50:50 with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for External walls

-

-

-

... More
Construction of Entrance Arch to Haritha Kakatiya Hotel at Hanumakonda.;Providing Thermo Mechanically Treated (TMT) (from Primary Producers like TATA, SAIL, VSP, Jindal and Shyam Steel as approved by Ministry of Steel) (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work.( APSS No.126)

3.2

-

346755

... More
Construction of Entrance Arch to Haritha Kakatiya Hotel at Hanumakonda.;3.60 Mts to 7.20 Mts Level

11

-

98098

... More
Construction of Entrance Arch to Haritha Kakatiya Hotel at Hanumakonda.;Up to 3.60 Mts Level

12

-

100128

... More
Construction of Entrance Arch to Haritha Kakatiya Hotel at Hanumakonda.;Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 and fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work. (APSS No. 501 & 504).

-

-

-

... More
Construction of Entrance Arch to Haritha Kakatiya Hotel at Hanumakonda.;Columns 3.6mtsto 7.20 mts Levels

5.2

-

91651

... More
Construction of Entrance Arch to Haritha Kakatiya Hotel at Hanumakonda.;Columns up to 3.6mts Levels

1.7

-

25182

... More
Construction of Entrance Arch to Haritha Kakatiya Hotel at Hanumakonda.;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using Steel scaffoldingpipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

-

-

-

... More
Construction of Entrance Arch to Haritha Kakatiya Hotel at Hanumakonda.;Plinth Beam

1.2

-

17007

... More
Construction of Entrance Arch to Haritha Kakatiya Hotel at Hanumakonda.;Footings

6.9

-

77549

... More
Construction of Entrance Arch to Haritha Kakatiya Hotel at Hanumakonda.;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

-

-

-

... More
Construction of Entrance Arch to Haritha Kakatiya Hotel at Hanumakonda.;Random Rubble stone masonry in CM (1:6) prop: (Cement: Screened sand) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 and hard granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., from approved quarry, to site, sales & other taxes on all materials including labour for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing etc.,and overheads & contractors profit complete for finished item of work in foundation and basement. (APSS No. 601 & 615)

7

-

29729

... More
Construction of Entrance Arch to Haritha Kakatiya Hotel at Hanumakonda.;Filling with carted gravel in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310)

36.4

-

8976

... More
Construction of Entrance Arch to Haritha Kakatiya Hotel at Hanumakonda.;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402)

2

-

9182

... More
Construction of Entrance Arch to Haritha Kakatiya Hotel at Hanumakonda.;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402)

4

-

19189

... More
Construction of Entrance Arch to Haritha Kakatiya Hotel at Hanumakonda.;Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and 3m to 4m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

46

-

12365

... More
Construction of Entrance Arch to Haritha Kakatiya Hotel at Hanumakonda.;Civil Items

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.