For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Tourism Development Corporation - TSTDC Tender

Construction Works
Opening Date13 Nov 2020
Closing Date1 Dec 2020
Tender Amount₹ 10,06,68,158 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Budget Hotel;Erection charges for 4 Mtrs. Long MS / GI Garden post including excavation of pit (0.4x0.4x1.0 Mt), concreting 1:3:6 and painting including cost and conveyance of all materials including fixing of luminaire and labour charges etc., complete.

12

-

11688

... More
Budget Hotel;Fabrication, Supply and fixing of M.S. Poles for garden posts with 'B' class 4mtrs long 60.25mm outer dia with base plate and suitable pole cap including cost and conveyance of all material including CC bed, fixing of pole and labour charges etc., complete.

15

-

24924

... More
Budget Hotel;Providing independent earthing for Sophisticated Electronic equipment with 600mm x 600mm x 3.15mm thick copper plate rigidly fixed to 40mm dia G.I Pipe of 0.3mtr. length connected with reducer providing G.I funnel with wiremesh as per National Electric Code including C.C.Chamber of size 400m x 400m x 400mm covered with R.C.C. Slab filling with salt and charcoal giving earth connection from electrode G.I strip of 25mm x 6mm x 200mm length with all accessories and labour charges complete as per IS specification 732/1982 (Part II).

1

-

13162

... More
Budget Hotel;Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per size 1.5 x 0.6 x 0.9 m , using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring (18'' dia, 3" thick) duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete for small quarters.

15

-

55236

... More
Budget Hotel;Supply and Run of 25mm x 3mm copper strip including cost of all accessories and labour charges etc., complete.

150

-

74247

... More
Budget Hotel;Supply and Run of 25mm x 3mm G.I Strip including cost of all accessories and labour charges etc., complete.

200

-

13760

... More
Budget Hotel;Fabrication, supply, transportation and erection of 16SWG CRCA sheet steel enclosure for power control cubicle/panel board etc including cutting, bending drilling, welding and reveting etc complete with 7 tank process and painting with powder coating including cost and conveyance of all materials i.e., Digital Ammeter(0-400A)-1no,Digital Voltmeter(0-415V)-1no,indicator lamps-3nos, selector switches-2nos, 250 A MCCB 4 Pole as incommer and outgoings as 125 A MCCB 4 Pole- 2nos, 63 A MCCB 4 Pole- 2nos, 100 A 4 Pole Isolator-4nos,6-32A MCBs-4nos, 250A Onload Change Over Switch and labour charges for fixing complete finished item of work. Metring equipment makes: HPL/MECO/CONZERVE. SWITCHGEAR. Makes:Legrand/Schneider/Siemens.

1

-

166385

... More
Budget Hotel;Fabrication, supply, transportation and erection of 16SWG CRCA sheet steel enclosure for power control cubicle/panel board etc including cutting, bending drilling, welding and reveting etc complete with 7 tank process and painting with powder coating including cost and conveyance of all materials i.e., Digital Ammeter(0-400A)-1no,Digital Voltmeter(0-415V)-1no,indicator lamps-3nos, selector switches-2nos, 125 A MCCB 4 Pole as incommer and outgoings as 63 A MCCB 4 Pole- 3nos,100 A 4 Pole Isolator-4nos,6-32A MCBs-8nos, 125A Onload Change Over Switch and labour charges for fixing complete finished item of work. Metring equipment makes:HPL/MECO/CONZERVE. SWITCHGEAR Makes:Legrand/Schneider.

1

-

105596

... More
Budget Hotel;Supply and transportation of 150W LED Flood light Luminaire made of pressure die cast aluminum housing with powder coated, having toughened glass cover, IP 65/66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, input voltage range of 100 to 270 volts AC,power factor = 0.90, high power LED's having efficacy 130 lumens/watt and junction temperature < 85 degree centigrade of IP65 with optics, total harmonic distortion less than 10% at 110 Volts AC, driver efficiency =90% etc complete. LUMINAIRE MAKE : PHILIPS / OSRAM / GE / CROMPTON / BAJAJ. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

8

-

133984

... More
Budget Hotel;Supply and transportation of 90W LED Flood light Luminaire made of pressure die cast aluminum housing with powder coated, having toughened glass cover, IP 65/66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, input voltage range of 100 to 270 volts AC,power factor = 0.90, high power LED's having efficacy 130 lumens/watt and junction temperature < 85 degree centigrade of IP65 with optics, total harmonic distortion less than 10% at 110 Volts AC, driver efficiency =90% etc complete. LUMINAIRE MAKE : PHILIPS / OSRAM / GE / CROMPTON / BAJAJ. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

12

-

119256

... More
Budget Hotel;Labour charges for run of U.G cable on wall / existing pipe with necessary fixing arrangments such as saddles,clamps,wooden separators etc., (as directed by departmental official) with No.10 SWG G.I wire for eath connections for the cables.

300

-

14796

... More
Budget Hotel;Earth work excavation of Trench in hard ground soil, laying of U.G cables from 70 to 400 Sq.mm and above on sand cushion covering the cable with bricks and back filling of Trench duly providing route indicator embedded in C.C including cost and conveyance of materials and labour charges etc., complete.

15

-

5107

... More
Budget Hotel;Earth work excavation of Trench in hard ground soil, laying of U.G cables upto 70 Sq,mm on sand cushion covering the cable with bricks and back filling of Trench duly providing route indicator embedded in C.C including cost and conveyance of materials and labour charges etc., complete.

225

-

43733

... More
Budget Hotel;16 Sqmm 4 Core Alluminium Cable

350

-

62300

... More
Budget Hotel;35 Sqmm 3.5 Core Alluminium Cable

325

-

88400

... More
Budget Hotel;95 Sqmm 3.5 Core Alluminium Cable

300

-

180600

... More
Budget Hotel;150 Sqmm 3.5 Core Alluminium Cable

250

-

209500

... More
Budget Hotel;Supply and Laying of under ground XLPE Armoured cable of the following sizes. Makes: Polycab /Havells / Finolex.

1

-

-

... More
Budget Hotel;Supply, transportation and fixing of 22W, 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 50,000 burning hours with BIS Certification with BIS Certification. LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

25

-

21076

... More
Budget Hotel;Supply, transportation and fixing of 18W back lit LED Down Light Recessed / Surface mounting round /square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 50,000 burning hours with BIS Certification. LUMINAIRE MAKE : Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

225

-

459243

... More
Budget Hotel;Supply, transportation and fixing of 12W back lit LED Down Light Recessed / Surface mounting round /square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 50,000 burning hours with BIS Certification. LUMINAIRE MAKE : Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

300

-

501324

... More
Budget Hotel;Supply and fixing of 32 A Energy Key fob with two module metal box, cover frame and including labour charges for fixing etc., complete. Makes: Legrand Myrius/Anchor Roma/Crabtree.

35

-

28893

... More
Budget Hotel;Supply and fixing of 11W LED mirror light with all standard accessories diffuser etc and including labour charges for fixing etc., complete. Makes: Philips/Crompton/GE.

48

-

28186

... More
Budget Hotel;Supply and fixing of 15" (375mm), ISI 900 RPM Heavy duty exhaust fan with double ball bearing and wire guard etc and labour charges for fixing of Exhaust fan in wall with necessary connections and masonary work of making hole, finishing etc., completeof makes Crompton /Almonard / Havells Turbo Force SP.

4

-

17284

... More
Budget Hotel;Supply and fixing of 9" (225mm), Light duty exhaust fan with double ball bearing and wire guard etc and labour charges for fixing of Exhaust fan in wall with necessary connections and masonary work of making hole, finishing etc., completeof makes Crompton / Havells Ventil Air-DB / Orient hill air.

45

-

91779

... More
Budget Hotel;Supply and fixing of energy efficient decorative fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMM/W) greater than 8.5, Air delivery minimum 235 CMM, 350 RPM (tolerance as per IS:374-2019), THD less than 10%, remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise = 75 degree C (max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., complete of Makes: Atomberg (Efficio + ) / Havells / Orient and labour charges for fixing of Ceiling fan including transportation and giving connections with twin core wire etc., complete.

60

-

188640

... More
Budget Hotel;Supply and erecting of Modular Electronic Regulator of for ceiling fan sweep complete erected on existing board including labour charges for fixing etc complete. Makes:Legrand Arteor/Honewell Blenge Plus/Cabtree Amare.

70

-

36190

... More
Budget Hotel;Supply and run of RG 6 Co-axil cable in existing pipe inlcuding all labour charges etc., complete. Makes: Finolex/Polycab/Goldmedal.

1800

-

57636

... More
Budget Hotel;Supply and run of 2 pair 0.5 mm telephone copper wire in existing pipe inlcuding all labour charges etc., complete. Makes: Finolex/Polycab/Delton.

2200

-

38874

... More
Budget Hotel;Supply and fixing VTPN type Distribution board 4 Way with IP-43 protection suitable for single phase 100 A Four Pole (FP) Isolator as incomer and 4 Nos 6-32 A,10kA TP MCBs as out going including internal connections and labour charges for flush mounting etc., complete. Makes: Legrand/Schneider/Siemens.

8

-

121392

... More
Budget Hotel;Supply and fixing TPN Distribution board 4 Way with IP-43 protection suitable for single phase 100 A Four Pole (FP) Isolator as incomer and 12 Nos 6-32 A,10kA SP MCBs as out going including internal connections and labour charges for flush mounting etc., complete. Makes: Legrand/Schneider/Siemens.

12

-

107004

... More
Budget Hotel;Supply and fixing SPN Distribution board 12 Way with IP-20 protection suitable for single phase 63 A Four Pole (FP) Isolator as incomer and 8 Nos 6-32 A,10kA SP MCBs as out going including internal connections and labour charges for flush mounting etc., complete. Makes: Legrand/Schneider/Siemens.

12

-

69324

... More
Budget Hotel;Supply and fixing SPN Distribution board 8 Way with IP-20 protection suitable for single phase 40 A Double Pole (DP) Isolator as incomer and 6 Nos 6-32 A,10kA SP MCBs as out going including internal connections and labour charges for flush mounting etc., complete. Makes: Legrand/Schneider/Siemens.

12

-

54060

... More
Budget Hotel;Supply and fixing Distribution board with 20A single phase plug and Socket, in sheet steel enclosure with 16/20A SP MCB including internal connection and labour charges for flush mounting etc., complete. Makes: Legrand/Schneider/Siemens.

80

-

188600

... More
Budget Hotel;Supply and fixing of ding dong bell on 100 x 178 mm (4"x7") decolam block including giving connections cost of all accessories and all labour charges etc., complete. Makes: Anchor/Gold Medal/GM.

35

-

6544

... More
Budget Hotel;Supply and fixing of Modular TV antenna outlet including labour charges for fixing etc complete. Makes: Legrand Arteor / MK Blenge /Cabtree Amare.

37

-

10965

... More
Budget Hotel;Supply and fixing of Modular Telephone jack with Connector including labour charges for fixing etc complete. Makes: Legrand Arteor / MK Blenge / Cabtree Amare.

40

-

11854

... More
Budget Hotel;Supply and fixing of 16A 3 pin and 6A pin plug socket with 16A switch control on a seperate switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes:Legrand Arteor/MK Blenge/Cabtree Amare.

150

-

94950

... More
Budget Hotel;Supply and fixing of 10A 3 pin/2pin wall plug socket with 10A switch control on a seperate switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes:Legrand Arteor/Honeywell Blenge/Cabtree Amare.

200

-

93872

... More
Budget Hotel;Supply and run of 1 of 22/0.3mm (1.5 Sq.mm) F.R.L.S P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Finolex/RR Kabel/ Havells/Polycab.

3200

-

77696

... More
Budget Hotel;Supply and run of 2 of 84/0.3mm (6 Sq.mm) F.R.L.S P.V.C. insulated flexible copper cable with one run of 56/0.3mm (4 Sqmm) for earth continuity in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Finolex/RR Kabel/Havells/Polycab.

2800

-

536032

... More
Budget Hotel;Supply and run of 2 of 56/0.3mm (4 Sq.mm) F.R.L.S P.V.C. insulated flexible copper cable with one run of 36/0.3mm (2.5 Sqmm) for earth continuity in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Finolex/RR Kabel/Havells/Polycab.

3000

-

411000

... More
Budget Hotel;Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R.L.S P.V.C. insulated flexible copper cable with one run of 22/0.3mm (1.5 Sqmm) for earth continuity in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Finolex/RR Kabel/Havells/Polycab.

3500

-

322350

... More
Budget Hotel;Wiring with 3 runs of 22/0.3mm (1.5 Sq.mm) FRLS P.V.C. insulated flexible copper cable (ISI MARK) of makes Finolex/RR Kabel/Havells/Polycab in existing pipe with 10A switch, Ceiling rose and modular frame covering to switch control box including all labour charges etc., complete for fan points in Buildings. Makes:Legrand Arteor/Honeywell Blenge/Cabtree Amare.

400

-

302032

... More
Budget Hotel;Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) FRLS/HFFR P.V.C. insulated flexible copper cable (ISI MARK) of makes Finolex/RR Kabel/Havells/Polycab in existing pipe with 10A switch, Ceiling rose and modular frame covering to switch control box including all labour charges etc., complete for light points in Buildings. Makes: Legrand Arteor/Honeywell Blenge Plus/Cabtree Amare.

350

-

218460

... More
Budget Hotel;Supply and Fixing of 25mm dia P.V.C. pipe pipe of medium grade, FRLS (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete. Makes:Sudhakar/VIP/Modi.

3700

-

273356

... More
Budget Hotel;Supply and Fixing of 20mm dia P.V.C. pipe of medium grade, FRLS (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete. Makes:Sudhakar/VIP/Modi.

3800

-

256576

... More
Budget Hotel;Supply and Fixing of 25mm dia PVC pipe of heavy grade, FRLS (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes:Sudhakar/VIP/Modi.

4000

-

273920

... More
Budget Hotel;Electrical works

-

-

-

... More
Budget Hotel;Providing, Laying,Jointing HDPE pipes and specials PE-100 grade conforming to IS4984 by but welding using a hydraulic jack eqipped with heat mirror having digital/guage for temperature and pressure display asper manufactures specifications etc.,complete 75mm OD-10ksc class

180

-

50144

... More
Budget Hotel;Earth work excavation for for pipe lines and and depositing the earth on bank for lifts of 2mts and with initial lead of 10 m in case of head load in mixture of gravel and soft disintigrated rock like shales, ordinary gravel stoney earth and earth mixed with fair sized boulders backfillingn with approved avaible earth in layers of 15cm, consolidating each depoisited layers watering, ramming etc and dispsing of surplus excavated earth including all lead and lift as directed

80

-

40245

... More
Budget Hotel;50mm dia

2

-

311

... More
Budget Hotel;40mm dia

2

-

252

... More
Budget Hotel;32mm dia

6

-

511

... More
Budget Hotel;Supplying and fixing GI Union 1st quality including cost and conveyance of all materials and labour charges etc, complete

-

-

-

... More
Budget Hotel;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks including C/C of all material and L/C etc complete

1500

-

12270

... More
Budget Hotel;50 mm dia GM valve

4

-

12324

... More
Budget Hotel;40 mm dia GM valve

4

-

8532

... More
Budget Hotel;32 mm dia GM valve

8

-

12514

... More
Budget Hotel;25.40 mm dia GM valve

8

-

8388

... More
Budget Hotel;20 mm dia GM valve

12

-

8587

... More
Budget Hotel;Supply, installation, testing and commissioning of 25mm dia Ball valve Makes : Zoloto / Leader / Approved makes including cost and conveyance of all materials & labour charges at all levels in all floors for following.

-

-

-

... More
Budget Hotel;50mm dia GI pipe 'B' class

175

-

94124

... More
Budget Hotel;40mm dia GI pipe 'B' class

190

-

94508

... More
Budget Hotel;32mm dia GI pipe 'B' class

25

-

10878

... More
Budget Hotel;Supplying & fixing GI 'B' class pipes in ground or on wall conforming of relevant IS code including cost of Tees, Elbows,bends, reducers, couplings, running joints,unin flanges etc, with necessary excavation on all types of soil except rock requiring blasting,refilling, chasing masonry walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block on walls,including cost and conveyance of all materials and labour charges complete for finished item of work.

-

-

-

... More
Budget Hotel;Construction of Rain water harvesting structure as per the approved drawing and design of size 2 x 1.5 m x 2.0 m including earth work excavation of pit, filling of 40 mm size HBT metal upto 50% of volume, filling of 20 mm size HBG metal upto 20% of volume filling of coarse sand upto 15% of volume, construction of sidewalls in brickmasonry in CM (1:6) 230 mm thick and 450 mm height, plastering the side walls in CM (1:6) 16 mm thick base coat and top coat of 4mm thick with dubara sponge finish, providing coir mat to avoid spillage of water including cost and conveaynce of all materials to site and all labour charges etc. complete for finished item of work.

6

-

42713

... More
Budget Hotel;supply and fixing 25.4 mm copper ball cock with PVC ball Indian make ISI mark, complete with fitting

48

-

23311

... More
Budget Hotel;S&F tested bib cocks at all levels of size 12.70mm dia of jaquar florentine first quality including cost and conveyance of all materials , labour charges etc, complete for finished item of work in all floors (LONG) 300 grams

48

-

62715

... More
Budget Hotel;Supply & Fixing of Chrome finish Angular stopcock with wall flange Jaquar Continental series, / Jupiter Aqua Lines-JAL-make Nira or equivalent series with 7 years warranty

54

-

46170

... More
Budget Hotel;S&F of Stainless steel sink with drain board of size 914.4mm x 457.2mm, 1mm thick of indian make on cantilever,brackets,with including 31.75 mm C.P waste coupling,supplying and fixing PVC waste pipe of required length including chasing brick masonry wall and making good restoring to original surfaces etc, complete, for finished item of work in all floors.

6

-

44516

... More
Budget Hotel;Construction of brick masonry support for CPVC pipe of size 304.80 x 228.60x228.60mm in CM (1:8) prop including plastering with 12mm thick in CM (1:5) prop including all labour charges etc, complete for finished item of work.

200

-

18724

... More
Budget Hotel;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 1500 mm (5'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

15

-

202206

... More
Budget Hotel;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

18

-

152480

... More
Budget Hotel;Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 1524 mm(5'0") depth and refilling with watering and tamping.

180

-

161725

... More
Budget Hotel;Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0")) depth and refilling with watering and tamping.152.40mm (6") dia SWG pipe upto 3' depth

120

-

95082

... More
Budget Hotel;Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1:5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling with watering and tamping. 101.60mm (4") dia SWG pipe upto 3' depth

225

-

118971

... More
Budget Hotel;Constructing Brick masonry chamber over the gully trap or peet valve and fitted with 304.8 x 228.6 m size CI frame and hinged cover.with material and labour etc complete as per directions of engineer-in-charge.

30

-

15561

... More
Budget Hotel;50 mm dia ppr ball valve

12

-

8386

... More
Budget Hotel;40 mm dia ppr ball valve

12

-

7196

... More
Budget Hotel;32 mm dia ppr ball valve

12

-

3516

... More
Budget Hotel;25 mm dia ppr ball valve

28

-

7820

... More
Budget Hotel;20 mm dia ppr ball valve

28

-

5937

... More
Budget Hotel;Providing and fixing PVC Ball valve (Solvent welded) of following diameter & approved make with material and labour etc complete as per directions of engineer-in-charge.20 mm dia

-

-

-

... More
Budget Hotel;20 mm dia

280

-

32558

... More
Budget Hotel;25.40mm dia

220

-

29845

... More
Budget Hotel;32 mm dia

180

-

40219

... More
Budget Hotel;Providing and fixing PVC ppr unions (Solvent welded) of following diameter & approved make with material and labour etc complete as per directions of engineer-in-charge.

-

-

-

... More
Budget Hotel;15.90mm OD pipes

450

-

73872

... More
Budget Hotel;22.2mm OD pipes

420

-

83790

... More
Budget Hotel;28.6mm OD pipes

320

-

76608

... More
Budget Hotel;34.9mm OD pipes,

290

-

94552

... More
Budget Hotel;41.3mm OD pipes

260

-

105222

... More
Budget Hotel;54.00mm OD pipes

225

-

121838

... More
Budget Hotel;Supply and laying of CPVC Pipes and Fittings or equal ant for Hot & Cold conforming to IS 15778:2007 with malleable specials such as Tees,Elbows,check nuts,unions, bushes, etc, Solvent Cement including fixing in walls ceiling floors Include for necessary excavation in all sorts of soils, chasing in the walls etc,refilling consolidation with the excavated earth & Making bores in walls ceiling etc.and making good the chased surface in cement mortar and complete.When making a transition use metal threads fittings, including all taxes for finished item of work as directed by the Engineer In charge.

-

-

-

... More
Budget Hotel;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber upto 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg.

28

-

123977

... More
Budget Hotel;Supplying & Fixing 76.20 mm (3") CI Nahany trap 1st quality with CP grating,black painted for all floors including cost and conveyance of all materials to site, labour charges etc, complete for finished item of work

37

-

23458

... More
Budget Hotel;Supplying and fixing 89 mm dia A.C Cowls first quality including cost and conveyance of all materials, all labour charges , etc complete for finished item of work.

60

-

4690

... More
Budget Hotel;Supplying and fixing of 110 mm dia single socket SWR PVC pipes (as per ISI standards) 6 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) Rain water pipe line

450

-

212099

... More
Budget Hotel;Supplying and fixing of 75 mm dia Single Socket SWR PVC pipes (as per ISI standards) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)

755

-

179441

... More
Budget Hotel;Supplying and fixing of 110 mm dia Single Socket SWR PVC pipes (as per ISI standards) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)

755

-

258338

... More
Budget Hotel;Supplying and fixing Jaquar make continental series CP brass shower rose with shower arm 190mm long light body with wall flange including cost and conveyance of all materials to site and all operational, incidental labour charges etc, complete for finishe

42

-

66137

... More
Budget Hotel;Supply & fixing of Bottle trap Jaquar make with 7 years warranty: Chrome plated / Jupiter Aqua Lines-JALor equivalent series ssr- 742

42

-

41897

... More
Budget Hotel;Supply & fixing Waste coupling Jaquar make with 7 years warranty: Chrome plated / Jupiter Aqua Lines-JALor equivalent series complete for finished item of work in all floors.As per SSR 741

42

-

11261

... More
Budget Hotel;Supplying and fixing of soap dish jaquar make CP queen series with NP screws etc, complete including cost and conveyance of all materials labour charges complete for finished item of work in all floors.

48

-

28576

... More
Budget Hotel;Supply and fixing of Wall mirrors with ornamental teak wood beading 2"x11/2" all round the mirror with plywood 6 mm back with necessary screws nails Including cost and conveyance of all materials and all labour charges complete for finished item of wotk as directed by Engineer In-ChargeFor Size 0.60 x 0.60 Mts as per approved rate in Vontimitta

42

-

49375

... More
Budget Hotel;Supplying & Fixing CI floor trap 1st quality with NP grating,trap black painted in all floors including cost and conveyance of all materials to site, labour charges etc, complete for finished item of work.CI floor trap 101.6 mm dia

84

-

64802

... More
Budget Hotel;S & F 25mm dia 0.60 mtrs,long cp Jaguar continental towel rail with brackets etc, including cost and conveyance of all materials,labour charges etc, complete for finished item of work

54

-

92155

... More
Budget Hotel;Supply & Fixing of Chrome plated Towel ring Jaquar make contenental series / Jupiter Aqua Lines-JAL-make Nira or equivalent series with 7 years warranty Cat No. 7721

54

-

57005

... More
Budget Hotel;Supply & fixing of toilet paper holder Jaquar make Queen series. with 7 years warranty: Chrome plated / Jupiter Aqua Lines-JAL or equivalent series

42

-

38509

... More
Budget Hotel;Supply & Fixing of Chrome Finish Bibcock cum Health Faucet with 1m long tube and wall hook of Jaquar Continental series, / Jupiter Aqua Lines-JAL-make Nira or equivalent series with 7 years warranty

42

-

142156

... More
Budget Hotel;Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader of overall size 95 x 95 x 57 mm conforming to IS:2556-Part6, Sec-6-1974 fixed with screws complete Indian make (HSW/Parry/Neycer) : 590 x 375 x 390 mm

10

-

29623

... More
Budget Hotel;Supply & Fixing of Chrome finish Wall Mixer with provision for overhead shower and 115mm long bend pipe with wall flange Jaquar make Continental series, / Jupiter Aqua Lines-JAL-make Nira or equivalent series with 7 years warranty.

28

-

107666

... More
Budget Hotel;Providing fixing and commissioning of oval shape white colour wash basin 520x410mm 1st quality with ISI make fitted in granite counter of 16-18 mm thick stone with all jaquar make queen series chromium plated fittings such as 1 No.piller cock, 1 No. waste couplings 1 No. angle stop cock,1 No.bottle trap 38.10mm B class GI pipe for waste water PVC connection including chisselling in brick/stone masony including making holes in granite to size as required and rounding the edges and polishing the edges fixing etc,including all cost and conveyance of all materials, labour charges, fixing charges etc, complete for finished item of work.

42

-

325626

... More
Budget Hotel;Supply, Installation and commissioning approved make floor mounted EWC (suit) CASCADE model 'P' or 'S' trap with dual flush porcelain cistern fixed on EWC with all internal parts of dual flush cistern, Ultra olid seat cover of approved make with rubber buffer and cap 15 mm angle stop cock 450 mm long PVC inter connection pipe wall flanges all of approved make etc.complete for finished item of work in all respects: White Colour

40

-

369654

... More
Budget Hotel;Supply & fixing white glazed European water closet with variety as approved by Engineer-in-charge, P" or S" trap with 4" CI outlet pipe of approved make, plastic seat and lid for EWC and rubber buffers as per ISI 2548 1963 with and 10 lit capacity PVC slimline low level flush tank of approved make with internal components and fixed with wooden gutties with required size nails, 32mm dia short CP bend, 12mm PVC connections with brass union nuts and 12.70 mm (1/2") NP stop cock heavy duty (300 grams), complete including cost and conveyance of all materials to site, for finished item of work for all floors.

2

-

10580

... More
Budget Hotel;Water Supply & Sanitary work

-

-

-

... More
Budget Hotel;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126)

9

-

585606

... More
Budget Hotel;Providing impervious coat to exposed RCC roof slab surfaces 20 mm(ave) thick to required slopes with CM (1:3) prop. using screened sand mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, internal faces of septic tank, finished smooth with a floating coat of neat cement , including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, excluding seigniorage charges but including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth, curing including rounding off junctions of wall and slab etc., and cost of overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

174

-

99312

... More
Budget Hotel;Roof slab 150 mm thick

40.1

-

58592

... More
Budget Hotel;Base slab 300 mm thick

40.1

-

64481

... More
Budget Hotel;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges but including sales & other taxes on all materials, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

-

-

-

... More
Budget Hotel;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges but including sales & other taxes on all materials, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

29

-

154578

... More
Budget Hotel;Plain Cement Concrete (1:3:6) (cement: fine aggregate: Coarse aggregate) using coarse aggregate 40mm size hard , machine crushed granite metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site,excluding seigniorage charges but including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations , ramming, finishing top surface to the required level, curing and cost of overheads & contractors profit etc.,complete for finished item of work . (APSS No. 402)

6.6

-

28172

... More
Budget Hotel;Earth work excavation for Septic tank (open excavation) and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding seigniorage charges , dewatering charges etc as per SS 20B (APSS 308) in Ordinary Soil-Mannual Means-Upto 3M depth.

159

-

36691

... More
Budget Hotel;RCC Sump

-

-

-

... More
Budget Hotel;RCM facia 50mm thick using screened sand for baffle walls with rabbit wire mesh & nominal reinforcement as directred by Engineer - In - Charge with dubara sponge finishing on both sides, including cost and conveyance of all materials to site,excluding seigniorage charges but including sales & other taxes on all materials, operationals &incidental charges,cost and conveyance of cement,wire mesh,water to work site, centering, scaffolding and form work, lift charges etc., and overheads & contractors profit complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work(APSS NO.403&903)

8

-

19779

... More
Budget Hotel;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126)

6

-

390404

... More
Budget Hotel;Providing impervious coat to exposed RCC roof slab surfaces 20 mm(ave) thick to required slopes with CM (1:3) prop. using screened sand mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, internal faces of septic tank, finished smooth with a floating coat of neat cement , including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, excluding seigniorage charges but including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth, curing including rounding off junctions of wall and slab etc., and cost of overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

145

-

82760

... More
Budget Hotel;Roof slab 150 mm thick

33.9

-

49533

... More
Budget Hotel;Base slab 300 mm thick

33.9

-

54511

... More
Budget Hotel;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Sumps and Septic tanks

-

-

-

... More
Budget Hotel;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Sumps and Septic tanks

18

-

95945

... More
Budget Hotel;Plain Cement Concrete (1:3:6) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials but including all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING

5.7

-

24330

... More
Budget Hotel;Earth work excavation for (Sumps, Tanks and Open Excavation) and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mannual Means.

125

-

28845

... More
Budget Hotel;RCC Septic tank

-

-

-

... More
Budget Hotel;Plain Cement Concrete corresponding to M-15 grade as per IS 456 nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, all operational, incidental and labour charges such as mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, for:-Machine Mix-PCC : M-15 MACHINE MIX

10

-

53129

... More
Budget Hotel;Damp proof course 50 mm thick with 1:2:4 cement concrete Nominal mix, using 12mm graded hard broken stone aggregate including cost of all materials, conveyance charges of materials and cost of machinery, labour charges, mixing, placing in position, leveling, vibrating, curing etc and overheads & contractors profit, complete for finished item of work. (Using concrete mixer)

20

-

5324

... More
Budget Hotel;Supplying and fixing Hot dipped Galvanized Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979: 2"x2" (50 mm x 50 mm) supporting with Mild Steel pipes of 80mm nominal bore and outer dia 88mm (i.e., wall thickness of 4mm) as per IS-1161, vertical posts placed at 3.05m center to center and each post of height 3.05m above ground level and 0.75 m below ground level and 2no.s harizontal pipes (1 at top and 1 at middle) as per approved drawing, including cost of bolts and brackets, fabrication and erection in position, including cost and conveyance of all materials to work site etc., all operational, incidental labour charges, power charges, overheads & contractors profit etc. complete for finished item of work.

415

-

705957

... More
Budget Hotel;White washing three coats with paint grade white lime to ceiling and basement to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of alll materials to site , labour charges and incidental charges such as scaffolding , lift charges etc., complete and cost of overheads & contractors profit complete for finished item of work .

290

-

16121

... More
Budget Hotel;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

135

-

60356

... More
Budget Hotel;Plastering 20mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

155

-

71956

... More
Budget Hotel;Brick masonry 230 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using Bricks second class of size (Non-Modular or traditional size) 23 x 11 x 7 cm from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing , overheads & contractors profit but excluding seignorage charges, GST etc.,complete for finished item of work as per SS 504.

45

-

332819

... More
Budget Hotel;Flush Pointing to RR/ CRS Masonry in CM (1:3) including cost and conveyance of all materials in site, curing, labour charges etc, and overheads & contractors profit, complete for finished item of work.

100

-

9220

... More
Budget Hotel;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard Granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., to site, labour for cutting stones to required size and shape, mixing of cement mortar, construction, curing and cost of overheads & contractors profit etc., complete for finished item of work in foundation and basement. (APSS No. 601 & 615).

100

-

359771

... More
Budget Hotel;Plain Cement Concrete (1:3:6) (cement: fine aggregate: Coarse aggregate) using coarse aggregate 40mm size hard , machine crushed Granite metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site,excluding seigniorage charges but including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations , ramming, finishing top surface to the required level, curing and cost of overheads & contractors profit etc.,complete for finished item of work for levelling course under footings . (APSS No. 402)

35

-

149395

... More
Budget Hotel;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding seigniorage charges , dewatering charges etc as per SS 20B (APSS 308) in Ordinary Soil-Mannual Means-Upto 3M depth.

175

-

70672

... More
Budget Hotel;Compound Wall

-

-

-

... More
Budget Hotel;Flooring with Chequered Cement Concrete heavy duty tiles conforming to IS: 13801 using aggregates, cement, pigments of size 300 x 300 mm and thickness 20 mm of any shades set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade, cost of all materials like cement, sand water and tiles etc., overheads and contractors profit, complete for finished item of work.

250

-

196235

... More
Budget Hotel;Providing and Fixing Cement Concrete Kerbing of 100mm thick in PCC(1:1.5:3) prop.using 20mm to 6mm HBG Machine Crushed Metal in Nominal mix including machine mixing charges steel centering charges including cost and conveyance of all materials and labour charges transportation to site, loading unloading, incidental and operational charges etc., complete for finished item of work (400mmx110mm thikc)

360

-

139205

... More
Budget Hotel;Providing and laying factory made hydraulically pressed mechanically vibrated and compacted pre-cast Cement Concrete interlocking Regular Pavers of 80 mm thickness of M- 55 Grade of which top 12 mm thick shall be of colour pigmentation with imported colours and white cement to get required reflective glazing of approved design and colour in single layer approved pattern laid in position in pavement/ foot path/ pathways etc., set over sand bed of 75mm thick, filling the joints with sand, compacting the blocks with vibrator etc., complete including cost, all taxes and conveyance of all materials and water to work site and all operational, incidental, labour charges, lift charges, curing etc., complete for finished item of work.

180

-

174220

... More
Budget Hotel;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

1620

-

924631

... More
Budget Hotel;S.Floor

667

-

693733

... More
Budget Hotel;F.Floor

571

-

593886

... More
Budget Hotel;G.Floor

447

-

464916

... More
Budget Hotel;Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1 as per India Gypsum) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1982 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall topcoat, overheads and contractors profit, etc. complete for finished item of work as per Idia Gypsum Ltd specification.

-

-

-

... More
Budget Hotel;S.Floor

5

-

308874

... More
Budget Hotel;F.Floor

3

-

181316

... More
Budget Hotel;G.Floor

2

-

118205

... More
Budget Hotel;Providing Mild steel (MS) steel bars ( (Fe 250 grade as per IS 432) of different diameters including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to bars, including all wastages such as overlaps, couplings, chairs, spacer bars, including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials and cost of overheads & contractors profit etc., complete for finished item of work in all floors.( APSS No.126)

-

-

-

... More
Budget Hotel;S.Floor

80

-

95811

... More
Budget Hotel;F.Floor

172

-

205994

... More
Budget Hotel;G.Floor

83

-

95861

... More
Budget Hotel;Skirting with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs for internal wall to 10 cm height with length equal to flooring stones and matching the flooring joint lines and set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work.(APSS No.701 &707) The skirting should flush online with plastering.

-

-

-

... More
Budget Hotel;S.Floor

8

-

38325

... More
Budget Hotel;F.Floor

8

-

38325

... More
Budget Hotel;G.Floor

14

-

69665

... More
Budget Hotel;Skirting with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of premium colours (other than black) in single piece with edges flat nosed set over a base coat of CM (1:5) 12 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand, water flooring stones etc. to site , cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work (APSS No.701 & 707)

-

-

-

... More
Budget Hotel;S.Floor

203

-

158340

... More
Budget Hotel;F.Floor

257

-

200460

... More
Budget Hotel;G.Floor

194

-

149357

... More
Budget Hotel;Dadooing to walls with digital / polished glazed full body porcelain highlighter wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand, water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge.

-

-

-

... More
Budget Hotel;S.Floor

793

-

953670

... More
Budget Hotel;F.Floor

1713

-

2060071

... More
Budget Hotel;G.Floor

823

-

954622

... More
Budget Hotel;Flooring with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed), base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707)

-

-

-

... More
Budget Hotel;S.Floor

72

-

344929

... More
Budget Hotel;F.Floor

72

-

344929

... More
Budget Hotel;G.Floor

131

-

616798

... More
Budget Hotel;Providing 16 to 18mm thick high polished granite stone slabs of premium colours (other than black) (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges cost of base coat and overheads & contractors profit, complete for finished item of work for treads (S.S.701 & special)

-

-

-

... More
Budget Hotel;'Reinforced Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for Dummy columns using 40mm size (SS5) hard Granite metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials but including machine mixing, vibrating, lifting concrete mechanically, laying concrete, curing , overheads & contractors profit, centering using Casuarinas Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, etc. including all operational, incidental and labour charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work upto un supported height up to 3.66 m for dummy columns (APSS No. 402)

14

-

178721

... More
Budget Hotel;S.Floor

3

-

16580

... More
Budget Hotel;F.Floor

2

-

10643

... More
Budget Hotel;G.Floor

2

-

10232

... More
Budget Hotel;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, excluding Seigniorage charges, sales & other taxes on all materials but including all charges for mixing, laying concrete in position, curing & lift charges and cost of overheads & contractors profit etc., complete for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING

-

-

-

... More
Budget Hotel;F.Floor

50

-

294434

... More
Budget Hotel;G.Floor

50

-

294434

... More
Budget Hotel;Supplying and fixing of curtain Glazing made of pre painted steel as per IS 513 of 0.58 mm thick D quality, galvanized as per IS 277 Primer coated with epoxy, finish painted with a polyester paint using the section for outer frame of 46 x 52 mm, section for mullion of 46 x 70 mm and section for beading of 18 x 25 mm and the glazing with 5 mm thick plain float glass fitted with EPDM gaskets including handle made of high grade Aluminium powder coated and nylon receiver, corner brackets made of CRCA with zinc hosphating, mullion caps made of Glass filled nylon including fixing the frames in the concrete / masonry wall with self expanding screws, overheads & contractor's profit, etc., complete for finished item.- Fixed Glazing 3'-0 x 3'-0 (914.4x914.4mm) and Fixed Glazing 3'-0 x 4'-0 (914.4x1219.2mm)

-

-

-

... More
Budget Hotel;F.Floor

84

-

619956

... More
Budget Hotel;F.Floor

69

-

509250

... More
Budget Hotel;G.Floor

24

-

177130

... More
Budget Hotel;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 3 track sliding Windows with mesh shutter ? (2-glass shutters and 1-mesh shutter)- 95 - Series duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (108 mm x 45 mm)/(95.50 mm x 60 mm) x 2.20 mm for outer frames, (75 mm x 39 mm)/(66 mm x 42 mm) x 2.20 mm for sliding door shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the door sash shall be fitted with 6 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. Mesh

-

-

-

... More
Budget Hotel;S.Floor

34

-

296362

... More
Budget Hotel;F.Floor

22

-

191764

... More
Budget Hotel;G.Floor

3

-

26150

... More
Budget Hotel;Providing and fixing of top hung Ventilator with fly mesh made of pre-painted steel as per IS 513 of 0.80 mm thick galvanized as per IS 277 with Zinc, finish painted with a polyester paint, section for fly-shutter of 0.6 mm thick and fitted with stainless steel 32 gauge fly mesh of 304 grade and mullions to have double rebate for glazed shutter and fly-shutter with a provision for guard bars/grills and 1 No. of High grade nylon latch handle, window stopper, 2 nos. of with MS Powder coated /SS ball bearing butt Hinges provided per shutter and windows fitted with 4 mm thick plain float glass with rubber gaskets including fixing the frames in concrete/masonry wall by means of self expanding screws, Including 10 mm Square guard bars with 6? (152.4mm) pitch etc., complete for finished item of work for (i) Single open able ventilator shutter window size of 2? 0? x 2? 0? (609.6 x 609.6mm) outer frame section size of 100 x 45mm, Glazed and fly mesh shutter frame section size of 52 x 25mm thick and (ii) Double open able ventilator shutter window Size of 4? 0? x 2? 0? (1219.2mm x 609.6mm) outer frame section size of 100 x 45mm, Glazed and fly mesh shutter frame section size of 52 x 25mm, vertical mullion section size of 100 x 60 mm and (iii) Double open able fix shutter window size of 4?0? x 3?0? (1219.2mm x 914.4mm) outer frame section size 100 x 45mm , Glazed and fly mesh shutter frame section size 52 x 25 mm ,Vertical mullion section size of 100 x 60 mm, including overheads & contractors profit, complete for finished item of work. Providing and fixing of top hung Ventilator with fly mesh made of pre-painted steel as per IS 513 of 0.80 mm thick galvanized as per IS 277 with Zinc, finish painted with a polyester paint, section for fly-shutter of 0.6 mm thick and fitted with stainless steel 32 gauge fly mesh of 304 grade and mullions to have double rebate for glazed shutter and fly-shutter with a provision for guard bars/grills and 1 No. of High grade nylon latch handle, window stopper, 2 nos. of with MS Powder coated /SS ball bearing butt Hinges provided per shutter and windows fitted with 4 mm thick plain float glass with rubber gaskets including fixing the frames in concrete/masonry wall by means of self expanding screws, Including 10 mm Square guard bars with 6? (152.4mm) pitch etc., complete for finished item of work for (i) Single open able ventilator shutter window size of 2? 0? x 2? 0? (609.6 x 609.6mm) outer frame section size of 100 x 45mm, Glazed and fly mesh shutter frame section size of 52 x 25mm thick and (ii) Double open able ventilator shutter window Size of 4? 0? x 2? 0? (1219.2mm x 609.6mm) outer frame section size of 100 x 45mm, Glazed and fly mesh shutter frame section size of 52 x 25mm, vertical mullion section size of 100 x 60 mm and (iii) Double open able fix shutter window size of 4?0? x 3?0? (1219.2mm x 914.4mm) outer frame section size 100 x 45mm , Glazed and fly mesh shutter frame section size 52 x 25 mm ,Vertical mullion section size of 100 x 60 mm, including overheads & contractors profit, complete for finished item of work.

-

-

-

... More
Budget Hotel;Supply and fixing of pre-painted steel top hung and fixed louvered ventilators made of pre - painted steel as per IS 513 of -0.58 mm thick 'D quality, galvanized as per IS 277, finish painted with a polyester paint & 4 mm pinhead glass for ventilators with EPDM Gasket with handle made of high grade aluminium powder coated and nylon receiver, corner brackets made of CRCA with Zinc Phosphate, Mullion caps made of glass filled nylon, frames fixed to the concrete /masonry wall by means of self expanding screws including 10 mm square guard bars with 6 pitch complete for finished item of work for (i) Ventilators: Fixed louvers 2'-0 x 2'-0 (609.6x609.6mm)(Box section) outer frame section size of 33 x 56 mm and (ii) Ventilators: Fixed louvers 4'-0 x 2'-0 (1219.2 x 609.6 mm) (Box section) outer frame section size of 33 x 56 mm Mullion section size of 33 x 56 mm and (iii) Ventilators: Fixed louvers 4'-0 x 3'-0 (1219.2 x 914.4 mm) (Box section) outer frame section size of 33 x 56 mm Mullion section size of 33 x 56 mm including overheads and contractor profit etc., complete for finished item of work

40

-

218731

... More
Budget Hotel;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) openable doors with openable shutters duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of 60 mm x 55 mm x 2.40 mm for outer frames, 74 mm x 60 mm x 2.40 mm for mullion sections as per the need and 102 mm x 60 mm x 2.40 mm for openable shutter frame capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the door sash shall be fitted with 6 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gaskets for sash & Glazing bead shall be co-extruded with Grey colour soft PVC System shall be provided with 4 no?s of 3D Hinges for each shutter and multipoint locking with keys with raiser wedges for smooth operation and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

272

-

1928491

... More
Budget Hotel;Supply and fixing Medium teak wood framed Double shutter door with flush shutter as per approved drawings with Medium teakwood frame of size 115x65mm and Flush door shutters, solid bond wood block board type with teak ply on both faces.: 35 mm thick conforming to IS:2202 as per drawing including cost of fixtures like 6 Nos MS-Z Hold fasts-300 mm long of 40x40x5mm ISA, 6 Nos Brass Butt hinges (IS:205)- 125 mm Long, 2 No Brass Tower Bolt-10 mm Bolt (IS:204) 300 mm Long, 2 No. Brass Aldrop (IS:2681) 350 mm long, 2 Nos. Brass fancy handles 300 mm , 2 No. Brass Door Stoppers, 2 Nos.Rubber/ Nylon door stop bushes including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads and contractor profit etc., complete for finished item of work.

26

-

171848

... More
Budget Hotel;Supplying and fixing of Single shutter door with Teak wood door frame of size 100x65mm and flush door shutters of 35mm thick solid bond wood block board type with commercial ply ON BOTH faces conforming to IS:2202 including 6 no.s MS Z Hold fasts - 300 mm long, cost of 1 no. Aluminium Aldrops (IS:2681) 300 mm long, 1 no. Aluminium Flat Latches: 300 mm long, 1 no. Aluminium Tower Bolt-10 mm Bolt (IS:204) 250 mm Long, 2 no.s Aluminium Door Handles (IS:208) 150 mm Long, 3 no.s Aluminium Butt hinges (IS:205)- 125 mm Long, 1 no. Rubber/ Nylon door stop bushes including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, overheads & contractors profit etc., complete for finished item of work as per APSS 1001 & 1002

210

-

969238

... More
Budget Hotel;Supplying and fixing stainless steel hand railing, balustrade etc using 304 grade stainless steel pipes of 50 mm dia nominal bore for hand railing at 3'0" high from base level and 40 mm dia nominal bore for vertical supports placed at 5'0" c/c and two numbers 25 mm dia nominal bore for horizontal pipes placed below hand railing pipe as per the approved drawing including cost and conveyance of all materials to site, buffing charges, polishing charges, overheads & contractors profit etc using pipes with minimum weight of 4.57kg/Rmt for 50mm dia, 3.61kg/Rmt for 40mm dia and 2.46kg/Rmt for 25mm dia, complete for finished item of work.

1130.15

-

735027

... More
Budget Hotel;S.Floor

9

-

61503

... More
Budget Hotel;F.Floor

9

-

60220

... More
Budget Hotel;G.Floor

46

-

297937

... More
Budget Hotel;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR F STEPS.

-

-

-

... More
Budget Hotel;Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for internal walls - :-Internal Colouring - Providing Putty.

4100

-

876785

... More
Budget Hotel;Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding for:-External Putty

2980

-

1138271

... More
Budget Hotel;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer.

3364

-

439843

... More
Budget Hotel;S.Floor

1600

-

623696

... More
Budget Hotel;F.Floor

2086

-

813144

... More
Budget Hotel;G.Floor

1056

-

411639

... More
Budget Hotel;Providing and applying Exterior grade texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives of NCL/ Saicoat texture paint or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding for:-External Colouring - Providing / Texture to External walls.

-

-

-

... More
Budget Hotel;S.Floor

838.5

-

46612

... More
Budget Hotel;F.Floor

1985

-

110346

... More
Budget Hotel;G.Floor

1985

-

110346

... More
Budget Hotel;White washing three coats with paint grade white lime to ceiling and basement to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of alll materials to site , labour charges and incidental charges such as scaffolding , lift charges etc., complete and cost of overheads & contractors profit complete for finished item of work .

-

-

-

... More
Budget Hotel;S.Floor

838.5

-

473761

... More
Budget Hotel;F.Floor

1985

-

1024359

... More
Budget Hotel;G.Floor

1985

-

927154

... More
Budget Hotel;Ornamental ceiling plastering 12mm thick using screened sand with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)

-

-

-

... More
Budget Hotel;S.Floor

1041

-

557268

... More
Budget Hotel;F.Floor

2835

-

1392552

... More
Budget Hotel;G.Floor

1508

-

674197

... More
Budget Hotel;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

-

-

-

... More
Budget Hotel;S.Floor

1429

-

789494

... More
Budget Hotel;F.Floor

1912

-

971984

... More
Budget Hotel;G.F

696

-

323104

... More
Budget Hotel;Plastering 20mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

-

-

-

... More
Budget Hotel;S.Floor

471

-

556849

... More
Budget Hotel;F.Floor

528

-

583572

... More
Budget Hotel;G.Floor

223

-

229286

... More
Budget Hotel;Reinforced Brick Masonry for partition walls (115 mm thick) in CM (1:4) prop.(Cement:Sand) using Bricks second class or ground moulded (Non-Modular or traditional size) of size 23 x 11 x 7 cm from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls wherever applicable including cost and conveyance and including charges of all materials ,,like cement, sand, bricks, water etc., to site, including cost of scaffolding charges and all labour charges like mixing cement mortar, lift charges, curing, overhead charges & Contractors profit and , etc., complete but excluding seignorage charges, GST for finished item of work (APSS No. 509 & 501)

-

-

-

... More
Budget Hotel;Second.Floor

262

-

2148617

... More
Budget Hotel;F.Floor

201

-

1567499

... More
Budget Hotel;G.F

166

-

1227733

... More
Budget Hotel;Brick masonry 230 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using Bricks second class of size (Non-Modular or traditional size) 23 x 11 x 7 cm from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing , overheads & contractors profit but excluding seignorage charges, GST etc.,complete for finished item of work as per SS 504.

-

-

-

... More
Budget Hotel;Filling with carted gravel in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310)

8352

-

5463628

... More
Budget Hotel;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cms thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P and cost of overheads & contractors profit etc., complete for finished item of work for (APSS NO.309&310)

3858

-

177931

... More
Budget Hotel;S.Floor

24

-

82412

... More
Budget Hotel;F.Floor

22

-

72096

... More
Budget Hotel;Providing and laying cinder concrete in cement cinder mix (1:1.5) prop. using 12.5 mm nominal size cinder laid in layers and compacted as directed for filling sunken floors including cost and conveyance of all materials, water to work site, all operational, incidental, labour charges, such as mixing cement & cinder, cost of overheads and contractor's profit etc. complete for finished item of work. F.F

-

-

-

... More
Budget Hotel;S.Floor

45

-

3048279

... More
Budget Hotel;F.Floor

60

-

3984205

... More
Budget Hotel;G.F

131

-

8523818

... More
Budget Hotel;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1979) Steel Fe 500 /500D / 550D from prime producers like TATA, SAIL, VSP, Jindal & shyam steel etc. of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including soverhead charges & Contractors profit but exlcuding GST and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

-

-

-

... More
Budget Hotel;Sun shades S.Floor

32.5

-

34335

... More
Budget Hotel;Sun shades F.Floor

47

-

47680

... More
Budget Hotel;Sun shades G.Floor

36

-

34816

... More
Budget Hotel;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., for 60 cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting concrete, laying concrete, curing, cost of overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work for sunshades (APSS No. 402, 403 & 903) & 903)

-

-

-

... More
Budget Hotel;Columns Above second floor Level to third floor Level ( S.F)

24

-

336982

... More
Budget Hotel;Columns Above first floor Level to second floor Level ( F.F)

48

-

636434

... More
Budget Hotel;Columns Above FFL up to First floor level(GF)

50

-

623860

... More
Budget Hotel;Columns Up to FF Levels G.F

24

-

299453

... More
Budget Hotel;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS.

-

-

-

... More
Budget Hotel;200 mm thick RCC Retaining wall

1003.93

-

5324624

... More
Budget Hotel;Lintels Second.Floor

6

-

82622

... More
Budget Hotel;Lintels F.Floor

7

-

91510

... More
Budget Hotel;Lintels G.Floor

5

-

61878

... More
Budget Hotel;Roof Beams Second. Floor

56.5

-

671839

... More
Budget Hotel;Roof Beams F. Floor

113

-

1289355

... More
Budget Hotel;Roof Beams G.Floor

113

-

1235031

... More
Budget Hotel;Slabs 200 mm thick Second .Floor

28.5

-

55080

... More
Budget Hotel;Slabs 200 mm thick Frist .Floor

60

-

111433

... More
Budget Hotel;Slabs 200 mm thick G.Floor

60

-

106907

... More
Budget Hotel;Slabs 150 mm thick Second.Floor

807.7

-

1282014

... More
Budget Hotel;Slabs 150 mm thick Frist .Floor

1925

-

2935375

... More
Budget Hotel;Slabs 150 mm thick G.Floor

1925

-

2812714

... More
Budget Hotel;Plinth Beams

35

-

427053

... More
Budget Hotel;Footings

728

-

6911195

... More
Budget Hotel;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR FOOTINGS, PEDESTALS, PLINTH BEAMS, ROOF BEAMS, SLABS AND STEPS.

-

-

-

... More
Budget Hotel;Flush Pointing to RR/ CRS Masonry in CM (1:3) including cost and conveyance of all materials in site, curing, labour charges etc, and overheads & contractors profit, complete for finished item of work.

160

-

14752

... More
Budget Hotel;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard Granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., to site, labour for cutting stones to required size and shape, mixing of cement mortar, construction, curing and cost of overheads & contractors profit etc., complete for finished item of work in foundation and basement. (APSS No. 601 & 615).

99

-

356173

... More
Budget Hotel;Plain Cement Concrete (1:3:6) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials but including all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING

197

-

840879

... More
Budget Hotel;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges in Hard Rock (requiring blasting)-Mechanical Means- Upto 3M depth etc as per SS 20B (ApSS 308)

3616.47

-

3605621

... More
Budget Hotel;Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means.

4420.13

-

579523



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.