For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 15,991Document Cost
Refer DocumentsTender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
544021Bid Award Id
ViewTender No
05/01/EE/TGTDC/2024-25.Tender Authority
Telangana State Tourism Development Corporation ViewPurchaser Address
-Website
http://https://tourism.telangana.gov.in/home
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;54mm OD Pipe -SDR 13.5
10
1546
15463
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;41.30mm OD Pipe - SDR 13.5
10
945
9453
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;34.90mm OD Pipe - SDR 13.5
15
657
9867
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;28.60mm OD Pipe - SDR 13.5
15
434
6510
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;22.20mm OD Pipe - SDR 13.5
30
344
10328
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;15.90mm OD Pipe - SDR 13.5
30
260
7805
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;S&F premium make CPVC Pipes of SDR 13.5 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge.
-
-
-
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;Painting to new wall works with 2 coats of Synthetic Enamel paints in all shades Grade - I having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over 1 coat of Red Oxide Primer Paint for Wall works of Grade -1 of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site including cost of primer coat and all operational, incidental, labour charges etc. complete etc., complete including cost of overheads & contractors profit (APSS No.1200, 1207 & 1211) in all floors.
22.44
190
4278
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer.
60.56
157
9557
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats.
63.23
257
16251
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;Ceiling plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)
26.32
543
14313
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish using Manufactured Sand (Rock sand) and natural river sand (screened sand) in the ratio of 50:50 including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)
45.3
517
23432
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for External & Uneven Surfaces of Brick Wall and RCC exposed surfaces for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 20 mm
52.98
541
28694
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;Reinforced Brick Masonry for partition walls (115.0 cm thick) in CM (1:4) prop. (Cement : Screened sand) using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sq.cm and placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 501 & 509)
49.5
1241
61464
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;Plain Cement Concrete M 20 Nominal Mix, 20mm size hard granite machine crushed graded metal (Coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work (APSS No. 402 & 403) for Pedestals
1.61
8013
12902
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;LINTELS
0.03
13969
419
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;G-Floor
1.25
13995
17494
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 360 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering using steel scaffolding pipes, Jack props, wallers, Foot plates, brackets, steel centering plates. etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS. RCC WALL.
-
-
-
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;Beam
1.24
12652
15689
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;Slab 125mm Thick
25.76
909
23427
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 360 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials , centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR RCC SLABS, BEAMS
-
-
-
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;Plinth Beams
0.95
13276
12613
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;Column Pedestals
0.44
10893
4793
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;Footings
2.7
10271
27732
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 360 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials , centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) For FOOTING, PLINTH BEAM , PEDESTALS ( Below Plinth)
-
-
-
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;Filling with carted gravel in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all operational,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)
11.15
668
7454
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., from approved quarry, to site and including seigniorage charges, sales & other taxes on all materials including labour for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing etc.,and overheads & contractors profit complete for finished item of work in foundation and basement. (APSS No. 601 & 615)
10.94
4604
50375
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;Supplying, fitting and placing of HYSD / TMT (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126)
0.69
85756
58829
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work (APSS NO.309&310)
21.11
219
4635
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using natural river sand, 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete but excluding seigniorage charges, for finished item of work for Foundations (APSS No. 402) MACHINE MIXING
4.11
4355
17900
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;Earth work excavation for foundations (Mechanical Means) for sump in ordinary Rock and (not requiring blasting) depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)
32.07
110
3536
... More
Construction of RO Plant Room with 2000 LPH RO System (2 No) and Blue Star water cooler at Bhudhavan;Land levelling including removal of boulders, trees and earth cutting etc., using Hydraulic excavator/Shovel 0.50 cum 75 hp including hire charges, fuel and operator charges etc., complete.
2
2534
5069