Telangana State Tourism Development Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Tourism Development Corporation - TSTDC Tender

Opening Date26 Jun 2019
Closing Date11 Jul 2019
Tender Amount₹ 1,43,97,536 
This is an estimated amount, exact amount may vary.
Notes
Download

Summary

Construction Of Connectivity Bridge.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Footings

214.37

-

9597.16

... More
Pedestals

7.61

-

10066.39

... More
Plinth beam

7.83

-

11860.37

... More
Columns Ground Floor

13.18

-

11983.05

... More
Columns First Floor

13.18

-

12611.88

... More
Columns Second Floor upto 3.66m

11.85

-

13240.69

... More
Unsupported height Second Floor- 3.66 - 4.27m

1.98

-

13879.5

... More
Unsupported height Second Floor- 4.27 - 4.88m

1.98

-

14518.33

... More
Unsupported height Second Floor- 4.88 - 5.49m

1.98

-

15157.14

... More
Unsupported height Second Floor- 5.49 - 6.10m

1.98

-

15795.96

... More
Unsupported height Second Floor- 6.10 - 6.71m

1.98

-

16434.77

... More
Unsupported height Second Floor- 6.71 - 7.32m

1.98

-

17073.59

... More
Unsupported height Second Floor- 7.32 - 7.93m

1.98

-

17712.4

... More
Slab 150mm thick Ground Floor

70

-

1527.45

... More
Slab 150mm thick First Floor

70

-

1579.17

... More
Roof beam Ground Floor

10.44

-

11297.95

... More
Roof beam First Floor

10.44

-

11691.96

... More
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / (Fe 500 grade as per IS 1786-1979) From Primary products like TATA,SAIL,VSP,Jindal as approved by Ministry of Steel different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance and including punt charges of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance and including punt charges ,of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work.including Over head charges, & contractors profit,But excluding seignorage charges, GST in all floors.( APSS No.126) (LAP SPLICING)

38.16

-

63374.46

... More
Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance and including punt charges of all materials ,,like cement, sand, water etc., to site, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves but excluding seignorage charges, GST etcas directed by Engineer - in - charge etc., complete for External & Uneven Surfaces of Brick Wall and RCC exposed surfaces for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 20 mm

-

-

-

... More
Ground Floor

306.28

-

381.33

... More
First Floor

699.96

-

414.93

... More
Painting to new walls with two coats of Supply of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound ) content less than 50 grams/ liter. for external walls approved brand and shade over a base coat of water based cement primer of interior grade-2 of approved brand, making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance and including punt charges of all materials ,,to work site and all operational, incidental, labour charges etc. complete and cost of overhead charges & Contractors profit and , but excluding seignorage charges, GST for finished item of work as per SS 911 for external walls

543.8

-

190.03

... More
Flooring with 16 to 18mm thick high polished granite stone slabs other than black and regular colours of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using un screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance and including punt charges of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) cost of base coat and all labour charges for mixing of cement mortar, laying tiles, overhead charges & Contractors profit and , but excluding seignorage charges, GST as directed by the Engineer- in-charge etc., complete for finished item of work. (APSS No.701 & 707)

35

-

3496.74

... More
Supplying and fabrication and placing of MS Structural steel including Cost and Convenance of all material and labour charges etc complete. For Truss heavy beams and gridders and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales taxes on all materials etc., complete for finished item of work.including Over head charges, & contractors profit,But excluding GST & in all floors., complete for finished item of work

2

-

88142.53

... More
Providing and fixing of Anchor bolts of 40 mm dia on the top of the RCC columns & Guides rod cutting,strightening,joint piece welding, threading, Hoisting the Anchor bolts on the top of the RCC Columns at designed levels as per site with cost and conveyance of materials and labour charges , operational incidental charges etc. complete for finished item of work including scaffolding centring and safety measures to the workmen.

8

-

1745

... More
Providing and fixing of USHA Martin Galvanised HTS wire rope 49mm Thick of minimum Tensile grade 1960N/mm² MBL= 1450 KN over the rollers and ends anchored to blocks with designed dip at centre including Nylon ropes, safety net etc. Stretching the steel wire rope from the wooden reel ,Hoisting the ropes to the column top , ,Tieing the ropes to the Anchor Shaft, 6 turns to the shaft and over lap of 5.0 M over the main rope and adjusting central dip, Scaffolding arrangements throughout the river width Barrels, empty canes, and other constructional materials to form a floating arrangements to convey the rope across the river including scaffolding , centring arrangements around the column and where ever required as per the site to hoist the rope to the column top.

640

-

4000

... More
Providing and fixing of Rope Clamps 20 mm dia to fix the suspenders on the rope at 1.50M interval including cost of Rope Clamp , fixing to steel wire rope at site including scaffolding , centring arrangements and where ever required as per the site with labour charges and operational, incidental charges etc., complete for finished item of work.

175

-

1350

... More
Providing and fixing of suspenders of 16 mm dia to the clamps on the rope (Galvanised). Including the cost of 16mm dia rod , hot dip Galvanising with labour for fabrication , involves floating arrangements using empty barrels and cans,pipes, bamboos etc., to convey the suspenders, Hoisting the Suspenders on the rope with arrangements for the rope to fix the suspenders on the Rope using Nylon ropes and pipes and ladders including scaffolding , centring arrangements and where ever required as per the site with labour charges and operational , incidental charges etc., complete for finished item of work. .

175

-

7000

... More
Providing & fixing of Transoms of ISA 100*110*6mm to the suspenders 1.5m Long (Galvanised),including Hot - dip Galvanising, Gas cutting charges, M.S.Angles bend removing and marking for holes, holes drilling charges, Convey of transorms in flowing water and Hoisting . Interval and fixng to Suspenders , Scaffolding and safety measures on Deck level beams including scaffolding , centring arrangements and safety measurements where ever required as per the site with labour charges and operational,incidental charges etc., complete for finished item of work.

86

-

10870

... More
Providing and fixing of deck elements to support the deck (Galvanised), Including Cost of M.S.Channel-ISA 75x75x6mm and including Hot-Dip Galvanising and Gas cutting charges, Fabrication like Bend removing welding, Marking for holes, Holes drilling charges, Convey of Deck support in flowing water, Hoisting and erection charges including scaffolding , centring arrangements and safety meaurements on deck level beams etc., where ever required as per the site with labour charges and operational,incidental charges etc., complete for finished item of work.

130

-

2700

... More
Providing, supply and fixing of chequered plates (1.5x1.5x6mm) for deck flooring including fixing accessories, beading, necessary glues etc., complete including scaffolding , centring arrangements and safety meaurements where ever required as per the site with labour charges and operational,incidental charges etc., complete for finished item of work.

195

-

2500

... More
Providing and fixing of stiffening girder with hand railings for SHS 60x60x3.2mm for Top & Bottom chord struts with SHS 25x25x2.6mm for both sides of the bridge. Square Rods, Hot-Dip Galvanising, Clamps to fix the stiffeners to the suspenders, Angles staightening, Gas cutting, Joint pieces welding, Angles cutting and straightening charges, Fabrication of stiffening girders to designed alignment transoms etc, and bend removing and also Arrangement of scaffolding on both sides of lift the stiffeners at different points on the bridge from the float on the river to distribute the load uniformally throughout the bridge, hoisting the stiffeners, setting in position on transoms and clamping to the suspenders. including scaffolding , centring arrangements and safety meaurements where ever required as per the site with labour charges and operational,incidental charges etc., complete for finished item of work.

260

-

200

... More
Providing and fixing of bolts and nuts all galvanised. Including the Cost of Galvanised Bolt and nuts, Labour charges for fixing of galvanised bolt and nuts including transportation of materials and men etc.and including scaffolding , centring arrangements and safety meaurements where ever required as per the site with labour charges and operational,incidental charges etc., complete for finished item of work.

450

-

508

... More
Complete painting of all metal parts, greasing of Steel wire rope, Corrosion protective coating to the rope at anchors and covering over with coal tar to make the embedded rope rust proof. Including Cost of 1st quality Paint, 1st quality Primer, Grease, Resins, Felt Sheet and Coal Tar. Labour charges for cleaning, applying primer and colour enamel, Removing the Grease and oil contents from the HTS Rope with soap powder or diesel and greasing and including scaffolding , centring arrangements and safety meaurements where ever required as per the site with labour charges and operational,incidental charges etc., complete for finished item of work.

130

-

4000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.