Telangana State Tourism Development Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
394987Bid Award Id
ViewTender No
29/04/SE/SB/TSTDC/2022-23Tender Authority
Telangana State Tourism Development Corporation ViewPurchaser Address
-Website
http://https://tourism.telangana.gov.in/home
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing GLSR Sump 60KLD with RCC Structure at Bhuddhavanam Project;Providing and fixing A-Type trusses using MS square hallow sections for top, bottom& inclined members, etc, fabrication of trusses, stanchions, heavy beams, girders including cost and conveyance of all materials cost of welding rods, power charges, etc including cost of fixing in position and all labour charges for erecting in position and fixing by using chain pulley blocks, Derek pole arrangements and cranes etc., complete in position etc. over heads and Contractors profit etc. complete. Final work will be as per approved drawings and directions of Engineer in Charge.
179.52
123
22231.76
... More
Providing GLSR Sump 60KLD with RCC Structure at Bhuddhavanam Project;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer.
39.03
147
5753.41
... More
Providing GLSR Sump 60KLD with RCC Structure at Bhuddhavanam Project;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats.
135.39
266
36115.28
... More
Providing GLSR Sump 60KLD with RCC Structure at Bhuddhavanam Project;Ceiling plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)
19.44
520
10110.16
... More
Providing GLSR Sump 60KLD with RCC Structure at Bhuddhavanam Project;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish using Manufactured Sand (Rock sand) and natural river sand (screened sand) in the ratio of 50:50 including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)
114.63
494
56666.19
... More
Providing GLSR Sump 60KLD with RCC Structure at Bhuddhavanam Project;Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for External & Uneven Surfaces of Brick Wall and RCC exposed surfaces for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 20 mm
135.39
526
71327.51
... More
Providing GLSR Sump 60KLD with RCC Structure at Bhuddhavanam Project;Reinforced Brick Masonry for partition walls (115.0 cm thick) in CM (1:4) prop. (Cement : Screened sand) using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sq.cm and placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 501 & 509)
39.03
1216
47490.53
... More
Providing GLSR Sump 60KLD with RCC Structure at Bhuddhavanam Project;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 360 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering using steel scaffolding pipes, Jack props, wallers, Foot plates, brackets, steel centering plates. etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS. RCC WALL.
63.84
2524
161159.61
... More
Providing GLSR Sump 60KLD with RCC Structure at Bhuddhavanam Project;Slab 125mm thick
30.36
1451
44062.68
... More
Providing GLSR Sump 60KLD with RCC Structure at Bhuddhavanam Project;Base Slab 200mm thick
24
1946
46722.48
... More
Providing GLSR Sump 60KLD with RCC Structure at Bhuddhavanam Project;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 360 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials , centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR RCC SLABS.
-
-
-
... More
Providing GLSR Sump 60KLD with RCC Structure at Bhuddhavanam Project;Supplying, fitting and placing of HYSD / TMT (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126)
1.35
88490
119461.74
... More
Providing GLSR Sump 60KLD with RCC Structure at Bhuddhavanam Project;Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using natural river sand, 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete but excluding seigniorage charges, for finished item of work for Foundations (APSS No. 402) MACHINE MIXING
2.71
4269
11569.59
... More
Providing GLSR Sump 60KLD with RCC Structure at Bhuddhavanam Project;Earth work excavation for foundations (Mechanical Means) for sump in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)
18.22
124
2260.56
... More
Providing GLSR Sump 60KLD with RCC Structure at Bhuddhavanam Project;Land levelling including removal of boulders, trees and earth cutting etc., using Hydraulic excavator/Shovel 0.50 cum 75 hp including hire charges, fuel and operator charges etc., complete.
8
2477
19822.08
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements