Telangana State Tourism Development Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Tourism Development Corporation - TSTDC Tender

Works
Civil And Construction
Water Storage And Supply
Opening Date13 Sep 2024
Closing Date20 Sep 2024
Tender Amount₹ 74,07,374 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
HDPE Pipeline;Supply, Transportation and erection of 30 HP 8 Stage 3 Phase Vertical Openwell Submersible pumpsets in Lake(in water) of CRI/CG/Texmo make as directed by departmental engineer. Data (11.4.4)

2

205947

411894

... More
HDPE Pipeline;Manufacture, Supply & delivery of 110mm of outer dia HDPE pipes lines of 6Kg/Sqcm. Conformimg to IS 4984-1995 including transportation to site including laying and jointing of HDPE pipe as per BIS No.7634 Part -II /75 including fixing required specials /fittings including excavation of trenches up to 0.50mts depth in all soils except rock requires blasting and refilling trenches after laying and jointing of pipes are as per standard specifications including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials ect., complete for finished item of work. HDPE Pipe 110mm dia SDR21 6KG/Sqcm.

720

520

374494

... More
HDPE Pipeline;Supplying & fixing GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fitting in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions ect. With necessary excavation in all types of soils except rock requiring blasting, refilling, chiselling masonary walls and making good the walls & floors to the original surface and fixing MS clamps on TW blocks on walls including cost and conveyance of all materials and labour charges complete for finished item of work. GI PIPE 100mm dia B class Nominal bore. from Down stream near Valley to DAM Water level top.

100

1014

101458

... More
HDPE Pipeline;54mm OD Pipe -SDR 13.5

47.4

1546

73295

... More
HDPE Pipeline;41.30mm OD Pipe - SDR 13.5

16

945

15124

... More
HDPE Pipeline;34.90mm OD Pipe - SDR 13.5

16

657

10525

... More
HDPE Pipeline;28.60mm OD Pipe - SDR 13.5

28

434

12152

... More
HDPE Pipeline;22.20mm OD Pipe - SDR 13.5

200

344

68850

... More
HDPE Pipeline;15.90mm OD Pipe - SDR 13.5

100

260

26018

... More
HDPE Pipeline;S&F premium make CPVC Pipes of SDR 13.5 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge.

-

-

-

... More
HDPE Pipeline;50 mm Ball valve with SS Ball and SS Spindle (Bronze)

8

1934

15479

... More
HDPE Pipeline;25mm Ball valve with SS Ball and SS Spindle (Bronze)

16

529

8471

... More
HDPE Pipeline;20mm Ball valve with SS Ball and SS Spindle (Bronze)

8

376

3009

... More
HDPE Pipeline;15mm Ball valve with SS Ball and SS Spindle (Bronze)

8

261

2090

... More
HDPE Pipeline;S & F Bronze Ball valve with SS Ball and SS Spindle Ball Valve, as per IS - 778 Class - I, Indianmakeheavytype. Including transportation to site including laying and jointing of pipes, including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., as directed by Engineer-in-charge for finished item of work.

-

-

-

... More
HDPE Pipeline;50 mm Nominal Bore GI pipe Medium Grade

16

621

9944

... More
HDPE Pipeline;25 mm Nominal Bore GI pipe Medium Grade

48

370

17778

... More
HDPE Pipeline;20 mm Nominal Bore GI pipe Medium Grade

64

282

18106

... More
HDPE Pipeline;15 mm Nominal Bore GI pipe Medium Grade

24

253

6081

... More
HDPE Pipeline;S& F Nominal Bore GI pipe Medium Grade of different dia, properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings &labour charges complete. Including transportation to site including laying and jointing of pipes, including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., as directed by Engineer-in-charge for finished item of work.

-

-

-

... More
HDPE Pipeline;Pipe Floaters 110mm dia ID of 600mm Length

160

4232

677120

... More
HDPE Pipeline;Supply and Fixing of Pipe Floaters of inner dia 110mm of Length 600mm of polyethylene. Including Galvanised Nut & Bolt, Locating Pins for Ease of Installation, Color - Standard Orange, Heavy Duty, High Impact Rotomoulded Polyethylene Floats, Suitable for floating cables, water pipes & gas pipes etc. Including the cost of conveyance, testing of all materials, transportation upto site, loading, unloading, stacking, providing and fixing etc. Complete as specified and directed by the Departmental Engineers, but excluding of all taxes. as directed by Engineer-in-charge for finished item of work.

-

-

-

... More
HDPE Pipeline;Non Return Valve Dia 150mm PN-30

1

49439

49440

... More
HDPE Pipeline;Non Return Valve Dia 100mm PN-30

4

34959

139838

... More
HDPE Pipeline;Manufacture, Supply and delivery of Cast Carbon Steel Bolted Cover Non Return Valve PN-30 as per IS : 5312 / Part1 /2004. Round body heavy duty material spec. As per IS:1030/1998 with SS Hinge & Seat Rings. including transportation etc., complete. Dia in mm. The cost shall include conveyance, testing of all materials, labour, inspection charges, transportation upto site, loading, unloading, stacking, providing and fixing etc. Complete as specified and directed by the Departmental Engineers, but excluding of all taxes. as directed by Engineer-in-charge for finished item of work

-

-

-

... More
HDPE Pipeline;Rising / Non rising spindle sluice valve Dia 150mm PN-30

1

58428

58429

... More
HDPE Pipeline;Rising / Non rising spindle sluice valve Dia 100mm PN-30

4

38952

155810

... More
HDPE Pipeline;Manufacture, Supply and Delivery of Cast Carbon Steel rising / Non rising spindle sluice valve of Class-300 Body 1100 PSI Seat 750 PSI PN-30, design standard as per IS:14846/2000 for Water Supply Scheme with SS Spindle & SS Working parts the grade of Cast Steel for body Bonnet, Dome, Stool Cover, Wedge, Stuffing Box, Gland Thrust Plate, shall be as per IS : 1030 / 1998. (The valve shall be used for High pressure schemes & pumping stations) including transportation etc., complete. ISI Marked Dia in mm. The cost shall include conveyance, testing of all materials, labour, inspection charges, transportation upto site, loading, unloading, stacking, providing and fixing etc. Complete as specified and directed by the Departmental Engineers, but excluding of all taxes. as directed by Engineer-in-charge for finished item of work.

-

-

-

... More
HDPE Pipeline;DI 150mm dia K9 Nominal bore of 2M Lengt

15

10541

158115

... More
HDPE Pipeline;DI 100mm dia K9 Nominal bore of 2M Length

15

7286

109293

... More
HDPE Pipeline;Supplying & fixing Centrifugally cast (Spun) Ductile Iron pressure pipes with flanged (welded) ends for water, gas, sewage conforming to IS: 8329/2000 in standard working lengths of 1,2,3, 4, 5 mts for classification K9 with cement mortar lining inside the pipes with outside zinc coating. Rates are including Conveyance of Ductile Iron Pressure Pipes and accessories including loading at Factory, un- loading at site and stacking for the following sizes, excluding Polyethylene (PE) Sleeves for Ductile Iron Pipes, excluding Rubber Gaskets suitable for C.I/ D.I S/S pipes, excluding with necessary excavation in all types of soils, including cost of material, loading, incidental handling with companies standard packing, including cost and conveyance of all materials and labour charges complete for finished item of work as per directions of Engineer incharge. (Ductile Iron pressure pipes with flanged (welded) ends DI 100mm dia K9 Nominal bore of 2M Length & DI 150mm dia K9 Nominal bore of 2M Length).

-

-

-

... More
HDPE Pipeline;BENDS OD 160 mm

4

1024

4099

... More
HDPE Pipeline;BENDS OD 110 mm

10

353

3533

... More
HDPE Pipeline;BENDS OD 50 mm

20

55

1113

... More
HDPE Pipeline;TEES OD 160 mm

4

1235

4940

... More
HDPE Pipeline;TEES OD 110 mm

12

346

4158

... More
HDPE Pipeline;TEES OD 50 mm

60

86

5181

... More
HDPE Pipeline;REDUCERS OD 50 mm x 63 mm

16

63

1018

... More
HDPE Pipeline;REDUCERS OD 90 mm x 110 mm

16

204

3272

... More
HDPE Pipeline;REDUCERS OD 140 mm x 160 mm

4

598

2395

... More
HDPE Pipeline;END CAPS OD 50 mm

30

44

1329

... More
HDPE Pipeline;END CAPS OD 110 mm

20

104

2091

... More
HDPE Pipeline;END CAPS OD 160 mm

5

253

1267

... More
HDPE Pipeline;MS FLANGES OD 50 mm

5

109

545

... More
HDPE Pipeline;MS FLANGES OD 110 mm

5

198

994

... More
HDPE Pipeline;MS FLANGES OD 160 mm

5

388

1943

... More
HDPE Pipeline;PIPE ENDS LONG NECK OD 50 mm

12

65

791

... More
HDPE Pipeline;PIPE ENDS LONG NECK OD 110 mm

12

180

2168

... More
HDPE Pipeline;PIPE ENDS LONG NECK OD 160 mm

10

457

4579

... More
HDPE Pipeline;HDPE Pipe 25mm OD 16.0 kg/sqcm (SDR 9)

1600

111

177792

... More
HDPE Pipeline;HDPE Pipe 50mm OD 8.0 kg/sqcm (SDR 17)

2000

169

338120

... More
HDPE Pipeline;HDPE Pipe OD 75 mm 8.0 kg/sqcm (SDR 17)

1076

288

310028

... More
HDPE Pipeline;HDPE Pipe 110mm OD 8.0 kg/sqcm (SDR 17)

200

562

112434

... More
HDPE Pipeline;HDPE Pipe 110mm OD 16.0 kg/sqcm (SDR 9)

400

1021

408468

... More
HDPE Pipeline;HDPE Pipe 160mm OD 10.0 kg/sqcm (SDR 13.6)

570

1330

758214

... More
HDPE Pipeline;HDPE Pipe 160mm OD 12.5 kg/sqcm (SDR 11)

300

1730

519039

... More
HDPE Pipeline;Manufacture, supply, delivery & fixing of HDPE-High Density Polyethylene pipes (PE-100 Grade) for water supply conforming to IS 4984-2016 including transportation to any where in T.G, but excluding GST and specials etc., complete. (Supply upto 90 mm dia in coil & above 90 mm dia stright length in6 M.). Excluding excavation for above 63mm dia of HDPE pipes, including Laying and jointing of HDPE pipes in ready made trench (Excluding excavtion for above 63mm dia hdpe pipes & Including excavation for below 63mm dia HDPE pipes) by butt fusion welding as per IS:7634 ? part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to the required pressure. Including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., but excluding fixing required specials /fittings etc, as directed by Engineer-in-charge for finished item of work.

-

-

-

... More
HDPE Pipeline;Painting to new wall works with 2 coats of Synthetic Enamel paints in all shades Grade - I having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over 1 coat of Red Oxide Primer Paint for Wall works of Grade -1 of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site including cost of primer coat and all operational, incidental, labour charges etc. complete etc., complete including cost of overheads & contractors profit (APSS No.1200, 1207 & 1211) in all floors.

201.96

190

38502

... More
HDPE Pipeline;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats.

1065.72

257

273909

... More
HDPE Pipeline;Ceiling plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

38.88

543

21143

... More
HDPE Pipeline;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish using Manufactured Sand (Rock sand) and natural river sand (screened sand) in the ratio of 50:50 including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

789.42

517

408343

... More
HDPE Pipeline;Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for External & Uneven Surfaces of Brick Wall and RCC exposed surfaces for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 20 mm

168

541

90990

... More
HDPE Pipeline;Plain Cement Concrete M 20 Nominal Mix, 20mm size hard granite machine crushed graded metal (Coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work (APSS No. 402 & 403) for Pedestals

48.6

8013

389463

... More
HDPE Pipeline;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 360 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering using steel scaffolding pipes, Jack props, wallers, Foot plates, brackets, steel centering plates. etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS. RCC WALL.

107.52

2628

282597

... More
HDPE Pipeline;RCC SUMP 60KL

0.55

12652

6984

... More
HDPE Pipeline;Slab 125mm Thick

60.72

909

55221

... More
HDPE Pipeline;Base Slab 200mm Thick

48

1458

70024

... More
HDPE Pipeline;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 360 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials , centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR RCC SLABS, BEAMS

-

-

-

... More
HDPE Pipeline;Random Rubble stone masonry in CM (1:8) prop: (Cement: sand) using hard granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., from approved quarry, to site and including seigniorage charges, sales & other taxes on all materials including labour for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing etc.,and overheads & contractors profit complete for finished item of work in foundation and basement. (APSS No. 601 & 615)

29.7

4793

142373

... More
HDPE Pipeline;Supplying, fitting and placing of HYSD / TMT (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126)

2.71

85756

232126

... More
HDPE Pipeline;Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using natural river sand, 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete but excluding seigniorage charges, for finished item of work for Foundations (APSS No. 402) MACHINE MIXING

5.42

4355

23596

... More
HDPE Pipeline;Earth work excavation for foundations (Mechanical Means) for sump in ordinary Rock and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

542.16

110

59769

... More
HDPE Pipeline;Land levelling including removal of boulders, trees and earth cutting etc., using Hydraulic excavator/Shovel 0.50 cum 75 hp including hire charges, fuel and operator charges etc., complete.

28

2534

70970



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.