Telangana State Tourism Development Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Tourism Development Corporation - TSTDC Tender

Civil And Construction
Building Construction
Opening Date24 Feb 2023
Closing Date6 Mar 2023
Tender Amount₹ 10,63,68,464 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Get the Best Price For TMT
Starting from
₹45,000/MT*
Telangana

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Earth work excavation for (Sumps, Tanks and Open Excavation) and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means - 3M to 4M Depth.

62

89

5518

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cms thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P and cost of overheads & contractors profit etc., complete for finished item of work for (APSS NO.309&310)

3030

174

527220

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Filling with carted gravel in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310).

7697

370

2847890

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing Pre construction Anti termite which is a process in which chemical toxic to sub terrain termites is apply/ inject into soil during early stage of building Construction Treatment of soil Beneath the building and around the foundations conduct and chemical use as per BIS - IS 6313 (Part -2) 2013 code specification & CIB RC registered termiticide which creates a continuous chemical barrier beneath the building which kills or repels terminates & impervious to tremite entry Imidacloprid 30.5% SC (IS 63131) dissolve 2.1 Ml/1 liter of water and apply emulsion/solution @ 7.5 Litres/Square meter (Sqm) of internal, external vertical surface of the columns , plinth beams (Back filling) walls and floor junction, external perimeters, along retaining wall @ 5.0 Liters/Sqm of the horizontal surface of basement top surface of the basement filling below flooring bed (Plinth) & @ 2.0 Litres/ Line meter at expansion joints. The substructure of a depth of 500mm around columns & 300mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc. cost & Conveyance of all materials to the site, cost of labour for spraying, rodding, cost of overheads and contractors profit, etc. complete for furnished item of work as per the approval of the Engineer-in-charge (Plinth area measurements will be taken for payment)

1934

158

305572

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Random Rubble stone masonry in CM (1:6) prop: (Cement: Screened sand) using hard Granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand (with 100% river sand), water, stones etc., to site, labour for cutting stones to required size and shape, mixing of cement mortar, construction, curing and cost of overheads & contractors profit etc.,complete for finished item of work in foundation and basement. (APSS No. 601 & 615).

264

4384

1157376

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) - Ground Floor

139

84570

11755230

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) - First Floor

56

85815

4805640

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) - Second Floor

3.7

87059

322118

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Design and execution of post tensioning work, including supplying, laying of HT tendon strands, decoiling, the strands, cutting to the required lengths, laying of HT strands in sheathing (GI corrugated ducts 0.3mm thick) jointing with couplers and inserting the strands, profiling, fixing live end anchorages, making dead end anchorages, including flowering the strands, fixing tendon support bars, supervising the fixing of antibursting reinforcement, stressing the cables using hydraulic jack, end trimming, grouting the cables, with cement slurry, mixed with admixtures with required tools, plants, and machineries, and consumables etc., including all leads, lifts, coordination, with the posttensioning agency, preparation of drawings, obtaining approval from the Engineer-in-Charge with supply of approved grade tendons but excluding the cost of concrete, reinforcement steel, shuttering, anchors, sheathing duct etc., including all incidental, labour charges, overheads and contractors profit, etc. complete for finished item of work.

9

229847

2068623

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply of Freyssinet type wedge action anchorage cone block, couplers, anchor heads and wedges of cast iron make shot blasting finish complete assembly of size 400 x 300 mm as per IS 1343 : 2012 including all incidental, labour charges, overheads and contractors profit, etc. complete for finished item of work.

170

2300

391000

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply of GI corrugated sheathing duct of 0.3mm thick of 90 mm size for installing the tendons for bonded post tensioning work as per IS 1343 : 2012 including all incidental, labour charges, overheads and contractors profit, etc. complete for finished item of work.

2800

61

170800

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply of HDPE grout hose with flanges for bonded post tensioning work as per IS 1343 : 2012 including all incidental, labour charges, overheads and contractors profit, etc. complete for finished item of work.

315

36

11340

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Masonry work in CM(1:6) prop (Cement : Screened sand) with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand (with 100% river sand), bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) , constructing masonry, lift charges, curing, cost of overheads and contractors profit etc., complete for finished item of work. (APSS No. 501 & 504) - Ground Floor

472

7544

3560768

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Masonry work in CM(1:6) prop (Cement : Screened sand) with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand (with 100% river sand), bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) , constructing masonry, lift charges, curing, cost of overheads and contractors profit etc., complete for finished item of work. (APSS No. 501 & 504) - First Floor

455

8004

3641820

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Masonry work in CM(1:6) prop (Cement : Screened sand) with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand (with 100% river sand), bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) , constructing masonry, lift charges, curing, cost of overheads and contractors profit etc., complete for finished item of work. (APSS No. 501 & 504) - Second Floor

105

8464

888720

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Reinforced Masonry for partition walls (100 mm thick) in CM (1:6) prop. (Cement : Screened sand) using fly ash cement / lime solid blocks of size 290mm x 100mm x 140mm having minimum compressive strength of 50 Kg/Sq.cm and placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand (with 100% river sand), bricks, water etc., to site, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) , constructing masonry, lift charges, curing, and cost of overheads & contractors profit etc., but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 509) - Ground Floor

781

816

637296

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Reinforced Masonry for partition walls (100 mm thick) in CM (1:6) prop. (Cement : Screened sand) using fly ash cement / lime solid blocks of size 290mm x 100mm x 140mm having minimum compressive strength of 50 Kg/Sq.cm and placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand (with 100% river sand), bricks, water etc., to site, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) , constructing masonry, lift charges, curing, and cost of overheads & contractors profit etc., but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 509) - First Floor

449

888

398712

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Reinforced Masonry for partition walls (100 mm thick) in CM (1:6) prop. (Cement : Screened sand) using fly ash cement / lime solid blocks of size 290mm x 100mm x 140mm having minimum compressive strength of 50 Kg/Sq.cm and placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand (with 100% river sand), bricks, water etc., to site, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) , constructing masonry, lift charges, curing, and cost of overheads & contractors profit etc., but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 509) - Second Floor

26

960

24960

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Ornamental ceiling plastering 12mm thick using screened sand (with 100% river sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) - Ground Floor

1711

448

766528

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Ornamental ceiling plastering 12mm thick using screened sand (with 100% river sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) - First Floor

1512

494

746928

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Ornamental ceiling plastering 12mm thick using screened sand (with 100% river sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) - Second Floor

41

539

22099

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Plastering 12mm thick in two coats using screened sand (with 100% river sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) - Ground Floor

6674

427

2849798

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Plastering 12mm thick in two coats using screened sand (with 100% river sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) - First Floor

5623

468

2631564

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Plastering 12mm thick in two coats using screened sand (with 100% river sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) - Second Floor

1078

509

548702

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 100% river sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). - Ground Floor

459

479

219861

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 100% river sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). - First Floor

561

515

288915

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 100% river sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). - Second Floor

1154

551

635854

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 100% river sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for Risers (S.S.701 & special). - Ground Floor

18

4345

78210

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 100% river sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for Risers (S.S.701 & special). - First Floor

13

4396

57148

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 100% river sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for treads (S.S.701 & special). - Ground Floor

47

6310

296570

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 100% river sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for treads (S.S.701 & special). - First Floor

32

6456

206592

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing cladding with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of regular colours (other than black) in single piece set over a base coat of CM (1:3) 20 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 100% river sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work. (APSS No.701 & 707) - Ground Floor

183

4276

782508

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing cladding with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of regular colours (other than black) in single piece set over a base coat of CM (1:3) 20 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 100% river sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work. (APSS No.701 & 707) - First Floor

209

4325

903925

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Flooring with polished shahabad / Tandur stone slabs of 15mm to 18mm thick 0.457m x 0.304m or any other size as specified set over a base coat of CM (1:8) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand (with 100% river sand), water, flooring stones etc. complete, all labour charges like dressing of flooring stones to the required size, mixing of cement mortar, laying, lift charges , cost of base coat etc., and overheads & contractors profit complete for finished item of work. (APSS No.703 & 701) - Ground Floor

549

771

423279

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Flooring with polished shahabad / Tandur stone slabs of 15mm to 18mm thick 0.457m x 0.304m or any other size as specified set over a base coat of CM (1:8) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand (with 100% river sand), water, flooring stones etc. complete, all labour charges like dressing of flooring stones to the required size, mixing of cement mortar, laying, lift charges , cost of base coat etc., and overheads & contractors profit complete for finished item of work. (APSS No.703 & 701) - First Floor

699

803

561297

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing skirting to internal walls to 10.00 cm height with Polished Shahabad/Tandur stone slabs 15mm to 18mm thick, length equal to flooring stones set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand (with 100% river sand) and water etc., complete and overheads & contractors profit complete for finished item of work.(APSS No.701 &707) - Ground Floor

32

830

26560

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing skirting to internal walls to 10.00 cm height with Polished Shahabad/Tandur stone slabs 15mm to 18mm thick, length equal to flooring stones set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand (with 100% river sand) and water etc., complete and overheads & contractors profit complete for finished item of work.(APSS No.701 &707) - First Floor

29

868

25172

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Granolithic Concrete flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal and screened sand laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal sand (with 50% river sand & 50% manufactured sand) and water, overheads & contractors profit, complete for finished item of work. (APSS No.701 & 710) - Ground Floor

33

377

12441

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand (with 100% river sand), water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701) - Ground Floor

258

841

216978

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand (with 100% river sand), water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701) - First Floor

108

880

95040

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Dadooing to walls with digital / polished glazed full body porcelain highlighter wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand (with 100% river sand), water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge. - Ground Floor

812

1069

868028

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Dadooing to walls with digital / polished glazed full body porcelain highlighter wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand (with 100% river sand), water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge. - First Floor

424

1079

457496

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15)of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 100% river sand), water, tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707) - Ground Floor

760

1010

767600

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15)of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 100% river sand), water, tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707) - First Floor

556

1050

583800

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Skirting with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs for internal wall to 10 cm height with length equal to flooring stones and matching the flooring joint lines and set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 100% river sand), water, tiles, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work.(APSS No.701 &707) The skirting should flush online with plastering. - Ground Floor

66

1003

66198

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Skirting with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs for internal wall to 10 cm height with length equal to flooring stones and matching the flooring joint lines and set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 100% river sand), water, tiles, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work.(APSS No.701 &707) The skirting should flush online with plastering. - First Floor

47

1042

48974

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats.

4099

228

934572

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding(with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Putty - Ground Floor

499

401

200099

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding(with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Putty - First Floor

445

406

180670

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding(with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Putty - Second Floor

254

411

104394

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing and applying Exterior grade texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Colouring - Providing / Texture to External walls. - Ground Floor

1162

409

475258

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing and applying Exterior grade texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Colouring - Providing / Texture to External walls. - First Floor

1036

414

428904

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing and applying Exterior grade texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Colouring - Providing / Texture to External walls. - Second Floor

591

419

247629

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer.

12574

128

1609472

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for internal walls - :-Internal Colouring - Providing Putty

12476

221

2757196

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply & applying Melamine Polish Glossy/ Matt finish to the wood works duly cleaning the surface and applying emery paper, Sand the wood with 180 No., emery paper and then with 320 No., emery paper, clean & wipe off loose dust, applying suitable knifing paste filler / wood filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper, apply two component wood sealer, air dry for 24 hrs, Sand with 320 No emery paper, applying one coat of approved spraying thinner (for spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine including cost & labour charges, emery papers, cost of thinner & melamine polish of approved brands such as Jenson & Nicholson, Asian Paints, Berger Paints or equivalent etc., including overheads & contractors profit complete for finished item of work for:-Polishing to wood work - Melamine Polishing to Wood Work.

262

1037

271694

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supplying and fixing stainless steel works such as raling, hand rale, grills etc., using Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit etc ., complete for finished item of work.

1246

731

910826

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1 as per India Gypsum) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1982 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall topcoat, overheads and contractors profit, etc. complete for finished item of work as per Idia Gypsum Ltd specification.

350

1162

406700

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin)of (94 mm x 45 mm)/(80 mm x 52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25 mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site, overhead and contractors profit, etc. complete for finished item of work.

206

8088

1666128

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness. (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin).Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4 mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site, overheads and contractors profit, etc. complete for finished item of work.

61

7279

444019

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supplying & fixing 602 x 602 mm CI man hole frame and cover (light weight) 30 Kgs including cost and conveyance of all materials, accessories, labour charges for transportation, fixing at site, overheads and contractors profit, etc. complete for finished item of work.

4

3974

15896

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Manufacture, supply, delivery and fixing as per company?s standard specification of encapsulated plastic steps for man holes anywhere in T.G. including cost of materials packing as per company?s standards, loading, transportation, unloading and stacking at site of work etc, complete including all incidental, labour charges, overheads and contractors profit, etc. complete for finished item of work.

77

222

17094

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Plain Cement Concrete corresponding to M-20 grade as per IS 456 nominal mix using 20mm size graded aggregate machine crushed hard granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, all operational, incidental and labour charges such as mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING (using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates) etc., but excluding cost of steel and its fabrication charges for finished item of work, for:-Machine Mix-PCC : M-20 NOMINAL MIX Centering with Steel up to 3.66M. FOR STEPS.

1

6849

6849

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Footings

65

9738

632970

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Tie Beams

16

12367

197872

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Plinth Beams

32

12367

395744

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Ground Floor Columns (Unsupported Height upto 3.66M)

30

12615

378450

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For First Floor Columns (Unsupported Height upto 3.66M)

2

13379

26758

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Ground Floor Lintels.

36

12777

459972

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For First Floor Lintels.

27

13453

363231

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Second Floor Lintels.

2

14128

28256

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Ground Floor Roof Beams (Unsupported Height upto 3.66M)

27

11615

313605

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Ground Floor Roof Slab 150mm Thick (Unsupported Height upto 3.66M)

278

1549

430622

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Ground Floor Roof Slab 175mm Thick (Unsupported Height upto 3.66M)

16

1725

27600

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., for 60 cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting concrete, laying concrete, curing, cost of overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work for sunshades (APSS No. 402, 403 & 903) & 903) - For Ground Floor

168

1035

173880

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., for 60 cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting concrete, laying concrete, curing, cost of overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work for sunshades (APSS No. 402, 403 & 903) & 903) - For First Floor

19

1083

20577

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., for 60 cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting concrete, laying concrete, curing, cost of overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work for sunshades (APSS No. 402, 403 & 903) & 903) - For Second Floor

11

1130

12430

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Reinforced Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for Dummy columns using 40mm size (SS5) hard Granite metal from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, machine mixing, vibrating, lifting concrete mechanically, laying concrete, curing , overheads & contractors profit, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc. including all operational, incidental and labour charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work upto un supported height up to 3.66 m for dummy columns (APSS No. 402) - For First Floor

4

11779

47116

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Reinforced Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for Dummy columns using 40mm size (SS5) hard Granite metal from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, machine mixing, vibrating, lifting concrete mechanically, laying concrete, curing , overheads & contractors profit, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc. including all operational, incidental and labour charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work upto un supported height up to 3.66 m for dummy columns (APSS No. 402) - For Second Floor

17

12520

212840

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 30 grade corresponding to IS 456 with minimum cement content of 400 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Bed of Sump / Septic Tank Raft

16

10039

160624

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 30 grade corresponding to IS 456 with minimum cement content of 400 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Ground Floor Columns (Unsupported Height upto 3.66M)

4

12916

51664

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 30 grade corresponding to IS 456 with minimum cement content of 400 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Ground Floor RCC Wall 200mm Thick (Unsupported Height upto 3.66M)

245

3191

781795

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 30 grade corresponding to IS 456 with minimum cement content of 400 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Ground Floor Roof Beams (Unsupported Height upto 3.66M)

3

11916

35748

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 30 grade corresponding to IS 456 with minimum cement content of 400 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Ground Floor Roof Slab 125mm Thick (Unsupported Height upto 3.66M)

128

1428

182784

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING

349

4465

1558285

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Footings

505

10160

5130800

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Tie Beams

68

12789

869652

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Plinth Beams

142

12789

1816038

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Ground Floor Columns (Unsupported Height upto 3.66M)

94

13036

1225384

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For First Floor Columns (Unsupported Height upto 3.66M)

26

13801

358826

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Second Floor Columns (Unsupported Height upto 3.66M)

7

14565

101955

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Ground Floor Roof Beams (Unsupported Height upto 3.66M)

49

12036

589764

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For First Floor Roof Beams (Unsupported Height upto 3.66M)

49

12515

613235

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Second Floor Roof Beams (Unsupported Height upto 3.66M)

8

12993

103944

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Ground Floor Roof Slab 175mm Thick (Unsupported Height upto 3.66M)

295

1798

530410

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For First Floor Roof Slab 175mm Thick (Unsupported Height upto 3.66M)

295

1867

550765

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Second Floor Roof Slab 175mm Thick (Unsupported Height upto 3.66M)

89

1935

172215

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Ground Floor Roof Slab 225mm Thick (Unsupported Height upto 3.66M)

259

2137

553483

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For First Floor Roof Slab 225mm Thick (Unsupported Height upto 3.66M)

259

2216

573944

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For First Floor Roof Slab 275mm Thick (Unsupported Height upto 3.66M)

19

2566

48754

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Ground Floor Steps

2

7997

15994

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For First Floor Steps

2

8302

16604

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Ground Floor Columns (Unsupported Height upto 4.88M)

54

13259

715986

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For First Floor Columns (Unsupported Height upto 4.88M)

54

14042

758268

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Ground Floor Roof Beams (Unsupported Height upto 4.88M)

114

13794

1572516

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For First Floor Roof Beams (Unsupported Height upto 4.88M)

122

14359

1751798

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Ground Floor Roof Slab 175mm Thick (Unsupported Height upto 4.88M)

575

2003

1151725

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For First Floor Roof Slab 175mm Thick (Unsupported Height upto 4.88M)

693

2082

1442826

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For Ground Floor Roof Slab 200mm Thick (Unsupported Height upto 4.88M)

194

2172

421368

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and placing of Design Mix Concrete M 35 grade corresponding to IS 456 with minimum cement content of 420 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) - For First Floor Roof Slab 200mm Thick (Unsupported Height upto 4.88M)

76

2257

171532

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supplying and fixing DOUBLE SHUTTER DOOR using factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fasts, flush shutters with solid bond wood block board type with teak ply on both faces: 35 mm thick conforming to IS:2202 as per drawing including cost of Stainless Steel fixtures such as 2 No tower bolt of 200x10mm dia, 1 No. Aldrops - 300 mm long, 1No. Latche-300mm long, 4 Nos. handles of 150 mm size & 2 No. Heavy duty door stopper, 2 no rubber bushes including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., complete for finished item of work as per APSS 1001 & 1002

15

4752

71280

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supplying and fixing SINGLE shutter door using factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fasts, flush door shutters of 35 mm thick solid bond wood block board type with teak ply on both faces conforming to IS:2202 as per drawing including cost of Stainless Steel fixtures such as 1 No tower bolt of 200x10mm dia, 1 No. Aldrops - 300 mm long, 1No. Latche-300mm long, 2 Nos. handles of 150 mm size & 1 No. Heavy Duty door stopper & 1 no rubber bushe , including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., complete for finished item of work as per APSS 1001 & 1002

54

5716

308664

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supplying and fixing SINGLE shutter toilet door using factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fasts, flush door shutters of 30mm thick solid bond wood block board type with teak veneer on one face and commercial ply on another face (lipping), providing and fixing 1 mm thick PVC door cladding to the flush doors shutter pasted with synthetic glue conforming to IS:2202 as per drawing including cost of Stainless Steel fixtures such as 1 No tower bolt of 200x10mm dia, 1 No. Aldrops - 200 mm long, 1No. Latche-200mm long, 2 Nos. handles of 100 mm size & & 1 no rubber bushes, including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., complete for finished item of work as per APSS 1001 & 1002

77

6845

527065

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Earthwork excavation in soils upto SDR by mechanical means including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete including for finished item of work for trench cutting as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge for Drains

300

133

39900

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Construction of Granular sub-base by providing HBG material confirming to Grading - V of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge.

500

2113

1056500

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density with Paver finisher with sensor etc., as directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th revision) for finished item of work

500

2273

1136500

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing and aplying Prime coat with bitumen emulsion (Slow setting SS1) bulk using emulsion pressure distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of work as per MoRT&H specification 502 (5th Revision) and as directed by the Engineer - in charge.

2000

43

86000

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing and applying tack coat with VG-10 (Bulk) using Bitumen pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

2000

13

26000

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing and laying 50mm thick of Dense Graded Bituminous Macadam in two layers with 100-120 TPH Batch mix plant using HBG crushed aggregates of Grading - II as per table 500-10 of MoRT&H Specification 505 (5th revision) premixed with bitumen VG-30 grade @ 4.50% of weight of total mixture, transported to site, laid over a previously prepared surface with full width paver to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve the desired compaction for finished item of work as directed by the Engineer-in-Charge including hire and operational charges all T&P and all other contingent charges necessary including charges of all materials etc., complete and as per MoRTH specification No. 505(5th Revision)

100

9664

966400

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing 30 mm thick compacted Bituminous Concrete with 100-120 TPH Batch mix plant using HBG crushed aggregates of Grading ? 2 as per table 500-17 of specification 507 of MoRT&H (5th revision), premixed with[] bitumen VG-30 grade @ 5.4% of mix and filler, transporting the hot mix to work site, laying with full width Hydrostatic sensor paver to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge

50

11378

568900

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 450 mm high as shown in drawing in M 20 grade PCC, kerb stone laid with kerb laying machine, all complete as per clause 408

700

412

288400

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supplying of hot applied thermoplastic road marking compound, 2.5mm thick including reflectorising glass beads @ 250gms with Reflectorising Glass Beads on Concrete and bituminous Surface at 250 gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass bead as per MORT&H Section 803.4 and IRC: 35, the material should satisfy the requirements as per MORTH specifications 803.4 and must comply with the following: a) White index for the product should be in the range of 60-70 when measured against standard reference. The applied panel 7/8 number must be submitted for checking up the white index in the department lab. In case the department approves the white index of any vendor, the department engineer may carryout random checking of the applied products at site against the approved panel. In case of any major deviation, beyond acceptance limit, department reserve the right to cancel or reject the total supplied consignment of the said material and will compell the vendor has to replace the full consignment by the desired material as per approved panel at his own cost and additional demurrages may be claimed due to loss of man days (as per the rules of the department). b) Luminance factor of the material should be in the range of 80-85% at 45 degree centigrade as per AASTHOM 249. c) Crack resistance: The applied panel cured for 7 days under ambient condition and then should be tested as per BS3262, Part-1, 1989 and should pass at the range of '0' degree centigrade to '-10' degree centigrade D) Adhesion : Strong E) Softening point: 102 degree centigrade F) Dried film finish : Smooth and uniform G) Night Vision: High as directed by the Engineer-in-Charge and confirming to IS: 164-1961 (1st revision reaffirmed in 1986) and clause conforming to IRC 35 and MORT&H Section 803.4

75

459

34425

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supplying and laying, jointing and testing SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with air tight cement joints in cm (1½:1) prop, including excavation of trenches and socket pits in any soils (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling, watering and tamping, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractors profit, etc. complete for finished item of work - 101.6 mm (4") dia

110

562

61820

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supplying and laying, jointing and testing SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with air tight cement joints in cm (1½:1) prop, including excavation of trenches and socket pits in any soils (except rock requiring blasting) up to 1524mm (5'.0") depth and refilling, watering and tamping, including cost and conveyance of all materials to site, all operational,incidental, labour charges, overheads and contractors profit, etc complete for finished item of work - 152.4 mm (6") dia

280

941

263480

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 & 4127 with C.I Grating & constructing Brick masonry in CM 1:6 prop. over a C.C. (1:5:10) prop. Bed 100mm thick and plastering 12mm thick in CM (1:4) prop. both inside and outside surfaces and fitted with 304.8 mm x 288.6mm (12" x 9") C.I. frame and hinged cover of standard make as directed by the Engineer-in-charge including cost and conveyance of all materials to site, all operational,incidental, labour charges, overheads and contractors profit, etc. complete for finished item of work. (APSS No 1326)

32

820

26240

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing, overheads and contractors profit, etc., complete for finished item of work as per Standard specification. 3'-0" Depth

36

9783

352188

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing, overheads and contractors profit, etc., complete for finished item of work as per Standard specification. 5'-0" Depth

10

15850

158500

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg. including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractors profit, etc. complete for finished item of work.

22

5054

111188

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply, Installation and commissioning approved make floor mounted Close Coupled wash down EWC conforming to IS:2556 (Part 8)-2004 suit with 'P' or 'S' trap with dual flush porcelain cistern fixed on wash down EWC with all internal parts of dual flush cistern, ultra solid seat cover of approved make with rubber buffer and cap & 15 mm angle stop cock & 450 mm long PVC inter connection pipe wall flanges all of approved make, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc. complete for finished item of work in all respects: White Colour

59

13096

772664

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supplying & Fixing Indian make WHITE Flat Back Wash Hand Basin of size 550 x 400 mm with Single C.P. Pillar cock 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963- 1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams, 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931, 15 mm nominal size PVC connection with brass union nut C.P coated, 30 mm nominal size dia PVC flexible waste pipe of 914.4 mm length of Ist quality and standard CI brackets including wooden block, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc. complete for finished item of work in all respects.

53

3378

179034

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader fixed with screws complete Indian make : 590 x 375 x 390 mm, fitted with 15 mm brass body CP finish self closing tap push type conforming to IS 1711 and 30 mm nominal size dia PVC flexible waste pipe of 914.4 mm length of Ist quality including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc. complete for finished item of work in all respects.

14

4689

65646

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded conenction conforming to IS 8931, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work.

20

297

5940

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineer including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge - 20 mm Nominal Bore

40

1033

41320

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineer including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge - 25 mm Nominal Bore

44

1484

65296

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineer including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge - 32 mm Nominal Bore

12

2255

27060

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineer including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge - 40 mm Nominal Bore

15

3041

45615

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineer including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge - 50 mm Nominal Bore

6

4461

26766

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc. complete for finished item of work.

30000

10

309000

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supplying and fixing of SWR PVC pipes of 4 Kg/Sq.cm. and fixing all specials such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps with required number of Bombay nails etc., with solvent jointing as per standard practice including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc., complete for finished item of work at all floor levels . (APSS No. 1302 1319 & 1326) - 75mm Dia

576

325

187200

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supplying and fixing of SWR PVC pipes of 4 Kg/Sq.cm. and fixing all specials such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps with required number of Bombay nails etc., with solvent jointing as per standard practice including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc., complete for finished item of work at all floor levels . (APSS No. 1302 1319 & 1326) - 110mm Dia

408

489

199512

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supplying & fixing of 4" (101.6 mm ) multi floor trap with Jali- UPVC/SWR Pipe fittings, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc. complete for finished item of work.

121

187

22627

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Constructing Brick masonry support for G.I pipe with C.M 304.8 x 228.6 x228.6 mm size including plastering including cost and conveyance of all materials to site, all operational,incidental , labour charges, overhead & contractor's profit etc complete for finished item of work in all floors as directed by Engineer-in-charge.

50

102

5100

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and fixing CP finish brass soap dish of approved make with screws, including cost and conveyance of all materials to site, all operational,incidental , labour charges and overhead & contractor's profit etc. complete for finished item of work as directed by Engineer-in-charge.

28

683

19124

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supplying and fixing Rectangular Mirror Frameless of size 609.6 mm x 914.4 mm including cost and conveyance of all materials to site, all operational,incidental , labour charges etc. overhead & contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge.

53

3430

181790

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supplying & fixing stainless steel sink size 36" x 18" (914.4x457.2mm) 1 mm thick with accessories, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overhead & contractor's profit etc., complete for finished item of work in all floors as directed by Engineer-in-charge.

5

8268

41340

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;S&F of 15 mm premium variety Chromium plated finish brass body wall mixer with hand shower with a provision for over head shower with 115 mm long bend pipe on upper side, connecting legs & wall flanges conforming to IS 8931 with 10 years warranty, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overhead & contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge.

16

4389

70224

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;S&F of Chromium plated finish stainless steel body Toilet paper holder with 10 years warranty, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overhead & contractor's profit etc., complete for finished item of work in all floors as directed by Engineer-in-charge.

59

1051

62009

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supplying & fixing 4 " x 24 " (101.6x609.6mm) white glazed porcelain channel fixed in brick masonry white cement pointing, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overhead & contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge.

57

977

55689

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational,incidental , labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge - SDR 11 - 15.90mm OD

365

189

68985

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational,incidental , labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge - SDR 11 - 22.20 mm OD

371

228

84588

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational,incidental , labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge - SDR 11 - 28.60 mm OD

325

274

89050

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational,incidental , labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge - SDR 11 - 34.90 mm OD

230

373

85790

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational,incidental , labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge - SDR 11 - 41.30 mm OD

430

462

198660

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational,incidental , labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge - SDR 11 - 54.00 mm OD

460

674

310040

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;S&F of Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 10 years warranty, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work.

59

3863

227917

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;S & F 25 mm nominal size dia & 609.6 mm long aluminium anodized towel rod with brackets and aluminium screws, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work.

28

199

5572

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supplying and fixing of 16mm to 20 mm thick polished marble slab partitioins of size 3' 0" x 2' 0" for urinals including full rounding the edges , fixing in position, polishing, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc. complete for finished item of work for all floors.

15

2124

31860

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply, delivery and installation of CI Wafer Lug type Butterfly Valves conforming to IS 13095/1991 (Reaffirmed 1998) including transportation etc., complete. Makes: Audco / Kirloskar / BDK / H-Shankar / Leader/ Zolotto / Intervalve / Honeywell/ Kartar, including all incidental, labour charges, overheads and contractors profit, etc. complete for finished item of work - 50mm Dia.

2

3624

7248

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply, installation, testing and commissioning of dual plate non - return valve of following sizes confirming to IS: 5312 complete with rubber gasket, GI bolts, nuts, washers etc as required Makes: Audco / Kirloskar / BDK / HShankar / Leader/ Zolotto / Intervalve / Honeywell./ Kartar including all incidental, labour charges, overheads and contractors profit, etc. complete for finished item of work - 50mm Dia.

2

3812

7624

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply, installation, testing and commissioning of 25 / 20mm dia Air Release Valve including all incidental, labour charges, overheads and contractors profit, etc. complete for finished item of work.

6

1462

8772

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and laying of 25mm dia PVC pipe of heavy grade, FRLS (ISI MARK) with IS:9537 part 3 rigid pipe concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes: Sudhakar/Polycab/Finolex.

7850

82

645584

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and laying of 25mm dia P.V.C. pipe pipe of medium grade, FRLS (ISI MARK) with IS:9537 part 3 rigid pipe concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well metal deep box including all labour charges etc., complete. Makes: Sudhakar/Polycab/Finolex.

7750

86

669135

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and Fixing of 25mm dia P.V.C. pipe pipe of medium grade (ISI MARK) with all accessories fixing on chromium plated metallic base saddles (PVC Saddles) for Light, Fan and separate plug point including all labour charges etc., complete. Makes:Sudhakar/Polycab/Finolex.

1500

77

116130

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) FRLS/HFFR P.V.C. insulated flexible copper cable (ISI MARK) of makes Finolex/RR Kabel/Havells/Polycab in existing pipe with 10A switch, Ceiling rose and modular frame covering to switch control box including all labour charges etc., complete for light points in Buildings. Makes: Legrand Arteor/Honeywell Blenge Plus/Crabtree Amare

1013

789

799426

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) FRLSH/HFFR P.V.C. insulated flexible copper cable with one run of 36/0.3mm (2.5 Sqmm) for earth continuity in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Finolex/RR Kabel/Havells/Polycab

3970

134

535041

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and run of 2 of 56/0.3mm (4 Sq.mm) FRLSH/HFFR P.V.C. insulated flexible copper cable with one run of 56/0.3mm (4 Sqmm) for earth continuity in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Finolex/RR Kabel/Havells/Polycab

2480

200

496233

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and run of 4 of 84/0.3mm (6 Sq.mm) FRLSH/HFFR P.V.C. insulated flexible copper cable with one run of 84/0.3mm (6 Sqmm) for earth continuity in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Finolex/RR Kabel/Havells/Polycab.

2350

455

1070895

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and run of 4 of 140/0.3mm (10 Sq.mm) FRLSH/HFFR P.V.C. insulated flexible copper cable with one run of 140/0.3mm (10 Sqmm) for earth continuity in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Finolex/RR Kabel/Havells/Polycab.

1400

716

1002960

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and fixing of 10A 3/2pin 2 module socket with 10A switch control on a seperate switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes: Legrand Arteor/Honeywell Blenge/Crabtree Amare

137

573

78511

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and fixing of 20A 3 pin 2 module socket with 20A switch control (with indicator) on a seperate switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes:Legrand Arteor/MK Blenge/Crabtree Amare.

115

787

90505

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and fixing of Modular Telephone jack with Connector including labour charges for fixing etc complete. Makes: Legrand Arteor / MK Blenge / Crabtree Amare.

33

356

11750

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and fixing of Modular TV antenna outlet including labour charges for fixing etc complete. Makes: Legrand Arteor / MK Blenge /Cabtree Amare.

35

356

12462

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and fixing SPN Distribution board 12 Way with IP-43 protection suitable for single phase 63 A Four Pole (FP) Isolator as incomer and 8 Nos 6-32 A,10kA SP MCBs as out going including internal connections and labour charges for flush mounting etc., complete. Makes: Legrand/Schneider/Siemens.

22

7775

171061

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and fixing TPN Distribution board 4 Way with IP-43 protection suitable for single phase 100 A Four Pole (FP) Isolator as incomer and 12 Nos 6-32 A,10kA SP MCBs as out going including internal connections and labour charges for flush mounting etc., complete. Makes: Legrand/Schneider/Siemens.

9

11003

99032

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and fixing VTPN type Distribution board 4 Way with IP-43 protection suitable for single phase 100 A Four Pole (FP) Isolator as incomer and 4 Nos 6-32 A,10kA TP MCBs as out going including internal connections and labour charges for flush mounting etc., complete. Makes: Legrand/Schneider/Siemens.

6

18927

113565

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and run of 2 pair 0.5 mm telephone copper wire in existing pipe inlcuding all labour charges etc., complete. Makes: Finolex/Polycab/Delton.

990

20

19883

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and run of RG 6 Co-axil cable in existing pipe inlcuding all labour charges etc., complete. Makes: Finolex/Polycab/Goldmedal.

990

44

43970

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and run of LAN Cable Cat -6 STP in existing pipe inlcuding all labour charges etc., complete. Makes: D Link/Krone/AMP.

990

55

55058

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and fixing of CAT 6 RJ 45 information outlet including labour charges for fixing etc complete. Makes: Legrand/Krone/D Link.

3

496

1488

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and fixing of ding dong bell on 100 x 178 mm (4"x7") decolam block including giving connections cost of all accessories and all labour charges etc., complete. Makes: Anchor/Gold Medal/GM.

14

218

3052

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and fixing of 32 A Energy Key fob with two module metal box, cover frame and including labour charges for fixing etc., complete. Makes: Legrand Myrius/Anchor Roma/Crabtree.

14

936

13104

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and erecting of Modular Electronic Regulator of 2 modular for ceiling fan sweep complete erected on existing board including labour charges for fixing etc complete. Makes: Legrand Arteor/Honewell Blenge Plus/Cabtree Amare.

106

647

68582

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and fixing of energy efficient decorative fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMM/W) greater than 8.5, Air delivery minimum 235 CMM, 350 RPM (tolerance as per IS:374-2019), THD less than 10%, remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise = 75 degree C (max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., complete of Makes: Atomberg (Efficio + ) / Havells / Orient and labour charges for fixing of Ceiling fan including transportation and giving connections with twin core wire etc., complete.

106

3223

341665

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and fixing of 9" (225mm), Light duty exhaust fan with metal blades, double ball bearing and wire guard etc and labour charges for fixing of Exhaust fan in wall with necessary connections and masonary work of making hole, finishing etc., complete of makes Crompton / Havells Ventil Air-DB / Orient hill air.

63

2150

135451

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and fixing of 15" (375mm), ISI 900 RPM Heavy duty exhaust fan with metal blades, double ball bearing and wire guard etc and labour charges for fixing of Exhaust fan in wall with necessary connections and masonary work of making hole, finishing etc., completeof makes Crompton /Almonard / Havells Turbo Force SP.

6

4478

26868

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and fixing of 10W LED mirror light of 600mm length with all standard accessories diffuser etc and including labour charges for fixing etc., complete. Makes: Philips/Crompton/GE.

72

473

34085

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply, transportation and fixing of 12W back lit LED Down Light Recessed / Surface mounting round /square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 50,000 burning hours with BIS Certification. LUMINAIRE MAKE : Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

64

1442

92343

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply, transportation and fixing of 18W back lit LED Down Light Recessed / Surface mounting round /square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 50,000 burning hours with BIS Certification. LUMINAIRE MAKE : Phillips / OSRAM / Wipro / Crompton LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

278

1757

488685

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply, transportation and fixing of 22W, 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 50,000 burning hours with BIS Certification with BIS Certification. LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

149

728

108532

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II) (D 1563)

4

5836

23344

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Providing independent earthing by exacavating a pit to a depth of 2.25Mtr in all soils as per size specified in the data for Sophisticated Electronic equipment with 600mm x 600mm x 3.15mm thick copper plate rigidly fixed to 19mm dia 'B' Class G.I Pipe of 2.5Mtr lengthwith funnel as per National Electric Code and earth connection from electrode GI strip of 40mm x 5mm x 200mm length to be bolted with nut bolts to G.I.pipe including 25mm x 3mm copper strip of 6Mtrs length connected from plate to GI strip including filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe and providing CC / Brick massonry chamber 450mmX450mmX400mm and covered with R.C.C. Slab including all accessories and labour charges etc complete as per IS specification 732/1982 (Part II). (D 1564)

4

16670

66680

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and fixing of suitable out door feeder piller box of size made with 14 SWG CRCA sheet with double door arrangement, making powder coating after processing of 7 Tank process, lock and key, hinges, rubber gasket, danger board,suitable angle iron stand for mounting the feeder pillar with cement concrete, including Supply and fixing of Legrand / Schnieder make 63A, 4 Pole isolator as incomer, 9 Nos 6-32A SP MCBs as out goings, indication lamps, din channel, 6 Sqmm 3 core copper cable for invidual light control, connectors, bus bars, shroudings, gland plates and provision for 3 phase energy meter etc., complete for finished item of work and suitable wiring provision for connecting the nature switch. (D 1403)

1

25747

25747

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and Laying of under ground XLPE Armoured cable of the following sizes. Makes: Polycab /Havells / Gloster.

1

-

-

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;50 Sqmm 3.5 Core Alluminium Cable (D 884)

250

539

134750

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;35 Sqmm 3.5 Core Alluminium Cable (D 883)

450

408

183600

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;16 Sqmm 4 Core Alluminium Cable (D 881)

650

268

174200

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Labour charges for run of U.G cable on wall / existing pipe with necessary fixing arrangments such as saddles,clamps,wooden separators etc., (as directed by departmental official) with No.10 SWG G.I wire for eath connections for the cables.

1250

55

69438

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply,Installation,Testing & Commissioining of IP IR Dome Camera (2 MP Series), 2MP Network IR Dome Camera Max. 2megapixel (1920 x 1080) resolution,0.095Lux (Color), 0Lux (B/W, IR LED on), 3.2 ~ 10mm (3.1x) varifocal lens,Max. 30fps@2M all resolutions (H.265/H.264)H.265, H.264, MJPEG codec supported, Multiple streaming,Motion detection, Tampering, Defocus detection,Hallway view (90°/270°), LDC support,Micro SD/SDHC/SDXC memory slot (Max. 128GB),IR viewable length 20m,PoE/12VDC UL Certified Dome Camera. Makes: Honeywell / Sony /Panasonic.

22

18810

413820

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply,Installation,Testing & Commissioining of IP IR Bullet Camera (2 MP Series), 2MP Network IR Bullet Camera 2megapixel (1920 x 1080) resolution,0.1Lux (Color), 0Lux (B/W, IR LED on),2.8mm fixed lens Max. 30fps@2M all resolutions (H.265/H.264) H.265, H.264, MJPEG codec supported, Multiple streaming,Motion detection, Tampering, Defocus detection, Hallway view (90°/270°), LDC support Micro SD/SDHC/SDXC memory slot (Max. 128GB) IR viewable length 20m/25m/ 30m,IP66, IK10, PoE, 12VDC UL Listed Bullet Camera. Makes :Honeywell / Sony /Panasonic.

8

18810

150480

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply, installation,Testing and Comissioning of 32 channel NVR (Network Video Recorder) Max. 12MP Camera supported,256Mbps network camera recording,Support 4K video out on HDMI monitor,Support Dual monitor video out,Support H.265, H.264, MJPEG compression, Wise Stream support, Max. 8 internal HDDs (48TB), e-SATA / iSCSI storage support, Support RAID 5 Easy installation with front swap hard disks ARB & Failover (N+1) support, UL Cerfified NVR. Makes : As per list of recommended brands.

1

156750

156750

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and fixing of Surveillance HDD-4 TB. Makes : As per list of recommended brands.

1

18810

18810

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply and installation of 24 inch (60.96cm) Full HD LED Monitor with Wall Mountable Stand, Height Adjustable, HDMI and VGA Ports with all Accessiories Makes : As per list of recommended brands

1

18645

18645

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Supply & Fixing of Cisco small business 8 Port Gigabit POE Managed Switch. Makes : As per list of recommended brands.

4

14300

57200

... More
Construction of Budget Hotel in Manyamkonda, Mahabubnagar District.;Fabrication, supply, transportation and erection of 16SWG CRCA sheet steel enclosure for power control cubicle/panel board etc including cutting, bending drilling, welding and reveting etc complete with 7 tank process and painting with powder coating including cost and conveyance of all materials i.e., Digital Ammeter(0-600A)-1no, Digital Voltmeter(0-500V)-1no,indicator lamps-3nos, selector switches-2nos, 125 A MCCB 4 Pole as incommer and outgoings as 63 A MCCB 4 Pole- 3nos,100 A 4 Pole Isolator-4nos,6-32A MCBs-8nos, 125A Onload Change Over Switch and labour charges for fixing complete finished item of work. Metring equipment makes:HPL/MECO/CONZERVE. SWITCHGEAR Makes:Legrand/Schneider.

2

127298

254596



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.