Telangana State Tourism Development Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Tourism Development Corporation - TSTDC Tender

Civil And Construction
Civil Works Others
Opening Date21 Feb 2023
Closing Date8 Mar 2023
Tender Amount₹ 34,61,21,732 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Get the Best Price For TMT
Starting from
₹45,000/MT*
Telangana
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and Transportation of 5.00 Hp Three phase ISI self priming Mono block IP44 motor pumpset cluding cost & conveyance of all materials etc., complete for finished item of work. Makes: Texmo / CRI / KSB / Aryan Varsha / Lubi / Falcon

6

32422

194532

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Providing, installation, testing and commissioning of 50mm diadual Plate non - return valve of following sizes confirming to IS: 5312 complete with rubber gasket, GI bolts, nuts, washers etc as required. Makes : Audco / Kirloskar / BDK / H. HShankar/ Leader/ Zolotto / Intervalve / Honeywell./ Kartar

8

3811

30494

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Manufacture, Supply and delivery of 50mm dia CI Wafer Lug type Butterfly Valves of 5mm conforming to IS 13095/1991 (Reaffirmed 1998) including transportation, CED and taxes etc., complete for finished item of work. Operation done with worm actuator ISI marked Rate at Ex-Factory. Makes :Audco / Kirloskar / BDK / H-Shankar / Leader/ Zolotto / Intervalve / Honeywell/ Kartar

8

3624

28995

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Providing and placing on terrace (at all floor levels) polyetheylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks including cost and conveyance of all materials to site, labour charges etc.complete for finished item of work. Make:sintex

55000

10

562650

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Construction of brick masonry support for GI pipe of size 304.80mm x 228.60mm x 228.60 mm in CM (1:8) prop including plastering and finishing with 12mm thick in CM (1:5) including cost and conveyance of all materials to site, labour charges etc.complete for finished item of work for all floors.

35

102

3579

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;110mmdia Single socket 4 kgs/sqm

286

344

98456

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;75mmdia Single socket 4 kgs/sqm

383

242

92977

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;50mmdia Single socket 6 kgs/sqm

110

212

23371

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supplying and fixing of SWR PVC pipes (as per ISI standards) and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;50mm Nominal bore

7

4460

31224

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;40mm Nominal bore

14

3041

42581

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;32mm Nominal bore

39

2255

87955

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;25mm Nominal bore

56

1483

83093

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;20mm Nominal bore

62

1032

64031

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supplying and fixing Bronze Gate/ Globe valve as per IS - 778 Class-I, Indian make heavy typeincluding cost and conveyance of all materials, labour charges , overheads & contractors profit etc., complete for finished item of work.

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;54.00 m od pipe SDR-11

310

673

208859

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;41.30mm OD pipe SDR-11

1053

462

486918

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;34.90mm OD pipe SDR-11

1320

372

491911

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;28.60mm OD pipe SDR-11

2777

273

760370

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;22.20mm OD pipe SDR-11

1096.2

228

250339

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;15.90mm OD pipe SDR-11

309.2

188

58315

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials, labour charges , overheads & contractors profit etc., complete for finished item of work at all floor levels.

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and fixing of 15 mm nominal size CP finish brass angled stop valve screw type with flange and all accessories etc., including cost and conveyance of all materials, labour charges , overheads & contractors profit etc., complete for finished item of work.

4

1975

7900

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supplying and fixing of 101.60mm x 609.60mm white glazed porcelain channels 1st quality fixed in brick masonry to the required slopes , white cement pointing including cost and conveyance of all materials, labour charges , overheads & contractors profit etc., complete for finished item of work.

15

595

8930

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supplying and fixing of 16mm to 20 mm thick polished marble slab partitioins of size 4' 0" x 2' 0" for urinals including full rounding the edges, fixing in position, polishing, including cost and conveyance of all materials, labour charges , overheads & contractors profit etc., complete for finished item of work for all floors.

22

1412

31069

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supplying & Fixing white glazed flat back Bowl urinals of size 370 mm x 390 mm x 600 mm Make: Hindware Model: 60020 with internal flushing rim fixed with screws complete Indian make conforming to IS:2556-1995, 32 mm Single Flush Valve Make: Hindware Model: F860045, Control Cock Operation, Square Plate Forged Body S&F brass body plumber union of size 31.75 mm dia with check nut labour charges etc., including cost and conveyance of all materials, labour charges , overheads & contractors profit etc., complete for finished item of work for all floors.

20

8973

179479

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supplying and fixing Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1.2m long tube and wall hook Make: Jaquar Model: FON-40041 with necessary fittings etc., complete including cost and conveyance of all materials, labour charges , overheads & contractors profit etc., complete for finished item of work in all floors.

37

3446

127513

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;S&F of 15 mm CP finish bib cock with flange Make: Jaquar Model: FON-40037 as approved by the Engineer-In-Charge including cost and conveyance of all materials, labour charges , overheads & contractors profit etc., complete for finished item of work.

38

1775

67473

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply & Fixing of Pillar Cock (Straight Line Model) Auto Closing System Make: Jaquar Model: PRS-031,as approved by the Engineer-In-Charge including cost and conveyance of all materials, labour charges , overheads & contractors profit etc., complete for finished item of work.

26

2845

73988

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supplying and fixing TV shape mirror with plastic frame of size 609.6mm x 457.2mm , plywood back with NP screws 1st quality including cost and conveyance of all materials, labour charges , overheads & contractors profit etc., complete for finished item of work.

44

618

27195

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supplting & Fixing of Stainless steel liquid soap container wall mounted and bottle type Make:Jaquar, including cost and conveyance of all materials, labour charges , overheads & contractors profit etc., complete for finished item of work.

14

543

7603

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supplying & Fixing Indian make Flat Back Wash Hand Basin size: 460 x 360 mm of Hindware Make Model: 10036 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread, Bottle Trap 32 mm with 250 mm & 175 mm Long Wall Connection Pipe & Wall Flange (Premium)Make: Hindware Drains Model: F850003 and Waste Coupling 32 mm (Full Thread) Make: Hindware Waste Coupling Model: F850002 and fitted with Angle Stop cock with wall flange Make:Jaquar Cat No.: COP-057PM complete with standard CI brackets ncluding cost and conveyance of all materials, labour charges , overheads & contractors profit etc., complete for finished item of work.

44

5183

228074

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supplying and fixing approved make Wall mounted European Water Closet of 1st quality conforming to IS:2556-Part-2- 2004 of white glazed of Hindware Make Model: 20098(P-23) with 'P' trap, Soft seat lid and concealed dual flush tank Hindware Cat No.: 518236 and face plate (3/6 Ltrs) with rack bolts, ngle Stop cock with wall flange Make:JaquarCat No.: COP-057PM and required accessories.including cost and conveyance of all materials to site, overheads & contractors profit etc., complete for finished item of work for all floors.

37

17754

656935

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supplying & fixing approved make Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-2004 with "P" or "S" trap: Hindware Make: 20018 of size 500 mm x 400 mm with Flush tank Size: 460x450x80mm Hindware Make: CONCEALO NEO (80MM) with face plate and Angle Stop cock with wall flange including with all accessories including cost & conveyance of all materials to site, overheads & contractors profit etc., complete for finished item of work for all floors.

12

7990

95890

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supplying and fixing of 4" (101.6mm) multi floor trap with jali - UPVC/SWR pipe fittings as per site requirements with standard practice for all floors including cost and conveyance of all materials to site, labour charges , overheads & contractors profit etc., complete for finished item of work for all floors.

81

187

15184

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.3' dia and above 5'depth (1524 mm)

19

15850

301158

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.3' dia and upto 3' depth (904 mm)

48

9783

469603

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber upto 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing , overheads & contractors profit etc., complete for finished item of work as per Standard specification.

32

5053

161715

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supplying and fixing of SWG Gully traps 150mm x 100mm of ISI make confirming to IS 651 & 4127 with C.I grating & constructing cement brick masonry in CM (1:6) prop., intermediate chamber and fitted with 304.8 mm X 288.6 mm (12"x9") C.I Frame with hinged cover of standard make as approved including cost and conveyance of all materials to site, labour charges, overheads & contractors profit etc., complete for finished item of work.

21

986

20710

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 1524 mm(5'0") depth and refilling with watering and tamping and including C/c of all material and labour charges etc complete as directed by Engineer - in -charge etc.152.40mm dia upto 1524.0mm (5') depth

590

940

555031

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0")) depth and refilling with watering and tamping and including C/c of all material and labour charges etc complete as directed by Engineer - in -charge etc.152.40mm (6") dia SWG pipe upto 3' depth

55

836

45992

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. Including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 1524 mm(5'0") depth and refilling with watering and tamping.and including C/c of all material and labour charges etc complete as directed by Engineer - in -charge etc.101.60mm (4") dia SWG pipe upto 5' depth

80

651

52081

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1:5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling with watering and tamping including C/c of all material and labour charges etc complete as directed by Engineer - in -charge etc. 101.60mm dia upto 914.40mm (3') depth

260

562

146221

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;WATER SUPPLY & SANITARY

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;INDIVIDUAL SHRUBS:-(13"X13") BAG Size, Height up to 2'0" 1.BOUGAINVILLEA 2.SEFLORA 3.EXORA

250

150

37500

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Shrubs: Digging the pit of size 0.30x0.30x0.30 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.

250

129

32448

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;INDIVIDUAL PLANTS:- (21"X21")BAG Size, Height up to 10'0" to 12'0" 1.FICUS PANDA 2.FICUS BLACK 3.MAHAGANI 4.SPATHODIA

250

675

168750

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Plants: Topiary / Palms / Garden tree planting ? Digging of 60x60x60 cm pit, filling with soil mixture of red soil, farmyard manure, sand at 3:1:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt))

250

385

96415

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;PALM TREES:- (21"X21")BAG Size, Height up to 8'0" 1.FOX TAIL PALM 2.FISH TAIL PALM 3.NUT PALM 4.WITCHIA MARY GREEN

350

1500

525000

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Palm Trees: Topiary / Palms / Garden tree planting ? Digging of 75x75x75 cm pit, filling with soil mixture with red soil and farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of fertilizers (@ 20 gms/pit/sqmt) and plant material)

350

746

261310

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Regular watering and removal of weeds, protection etc for 45 days for initial establishment.

675

9

6676

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;HEDGE/Shrub PLANTS :- (7"X8") BAG Size, Height up to 2'0" 1.SONG OF INDIA 2.DRESINIA MAHATMA 3.KOLORAMA- RED & WHITE 4.NERIUM(DORF VARIETY)

13500

65

877500

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Hedge Plants: Hedge / shrubs: planting : Digging the trenches of size 30 cms depth refilling the trench with red soil, FYM at 4:1 ratio internal transport of plants & planting the plants including the applicatuion of fertilises and pesticides etc.' (@20 gms/pit/sqm) complete , but excluding the cost of fertilizes (@ 20 gms/pit.sqm) and plant material.(One Sqm Not less than 20 Plants) including C/c and labour charges for digging and planting etc as directed by Engineer-in- charge etc complete.

675

756

510631

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Regular watering and removal of weeds, protection etc for 45 days for initial establishment including cost of water and labour charges etc complete.

3700

9

36593

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Labour charges for Dibbling the rooted slips of grass at 3-4" apart and ramming excluding the cost of grass slips) including L/c etc complete.

3700

110

407037

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Cost and transportation charges of FISCUE Grass

3700

8

33041

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;FISCUE/SHADE Grass ( Dibbling): Bed Preparation for FISCUE/SHADE Grass ( Dibbling): Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller (4? thickness after rolling), including the cost and conveyance of material like red earth, sand and labour charges for bed preparation for Fiscue/Shade grass as directed by Engineer -in charge etc complete but excluding the cost of fertilizers, chemicals & grass.

3700

333

1234875

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Regular watering and removal of weeds, protection etc for 45 days for initial establishment including cost of water and labour charges etc complete.

6750

9

66758

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Labour charges for Laying / Turfing /ramming of carpet grass including L/c etc complete.

6750

58

392175

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Cost and transportation charges of carpet grass

6750

225

1518750

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Lawn: Bed Preparation for Carpet Grass -Korean/ Mexican: Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller (4? thickness after rolling), including the cost and conveyance of material like red earth, sand and labour charges for bed preparation for LAWN as directed by Engineer -in charge etc complete but excluding the cost of fertilizers, chemicals & grass.

6750

333

2252813

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and transportation of 60/65W LED Street light Body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, wide operating voltage range, P.F > 0.90, System having efficacy >100 lumens/watt, with Ingress protection IP66, Driver surge protection more than 4KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>80, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with 5 years warranty. LUMINAIRE MAKE :PHILIPS / OSRAM / GE Venture / CROMPTON / BAJAJ / Surya / Wipro / Jaquar / Eveready / Halonix / Keselec / HAVELLS / POLYCAB / SURYA / SYSKA / Capart / Fortune Arrt / FIEM / Panasonic / Arraystorm / GM / Goldmedal / Silicon / Leksa / Orient / HPL. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs

30

5506

165188

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Fabrication, Transportation and supply of 1.5 Mtr decorative galvanized Single arm bracket with PU paint complete with all accessories with MS galvanized 50mm dia Pipe. Makes: BAJAJ / VALMONT / TRANSRAIL /SKIPPER / UTKARSH / LAASMA / CONSOUL/ Lysaght pole

30

5326

159780

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Fabrication, Transportation and supply of hot-dip galvanized Octogonal Pole with BSEN - 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangement, including chain for anti theft mechanism, supply of suitable boards with bakelite sheet, din channel for MCB's as per IS specification suitable to withstand the wind speed of 180 KMPH for 7.00 Mtrs height Pole having dimensions Bottom 130mm, Top 70mm with 3mm thick, base plate 220 x 220 x 12mm and 4 Nos of M20 x 700mm long 'J' bolts along with template or equivalent. Makes: BAJAJ / VALMONT / TRANSRAIL / SKIPPER / UTKARSH / LAASMA / CONSOUL/ Lysaght pole

30

12348

370440

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Labour charges for run of U.G cable on wall / existing pipe with necessary fixing arrangments such as saddles,clamps,wooden separators etc., (as directed by departmental official) with No.10 SWG G.I wire for eath connections for the cables.

1050

55

58328

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;2.5 Sqmm 4 Core Copper Cable (D 232)

700

178

124600

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;16 Sqmm 4 Core Alluminium Cable (D 881)

650

268

174200

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;35 Sqmm 3.5 Core Alluminium Cable (D 883)

450

408

183600

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and Laying of under ground XLPE Armoured cable of the following sizes. Makes: Polycab /Havells / Gloster.

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and fixing of suitable out door feeder piller box of size made with 14 SWG CRCA sheet with double door arrangement, making powder coating after processing of 7 Tank process, lock and key, hinges, rubber gasket, danger board,suitable angle iron stand for mounting the feeder pillar with cement concrete, including Supply and fixing of Legrand / Schnieder make 63A, 4 Pole isolator as incomer, 9 Nos 6-32A SP MCBs as out goings, indication lamps, din channel, 6 Sqmm 3 core copper cable for invidual light control, connectors, bus bars, shroudings, gland plates and provision for 3 phase energy meter etc., complete for finished item of work and suitable wiring provision for connecting the nature switch. (D 1403)

4

25747

102988

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Providing independent earthing by exacavating a pit to a depth of 2.25Mtr in all soils as per size specified in the data for Sophisticated Electronic equipment with 600mm x 600mm x 3.15mm thick copper plate rigidly fixed to 19mm dia 'B' Class G.I Pipe of 2.5Mtr lengthwith funnel as per National Electric Code and earth connection from electrode GI strip of 40mm x 5mm x 200mm length to be bolted with nut bolts to G.I.pipe including 25mm x 3mm copper strip of 6Mtrs length connected from plate to GI strip including filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe and providing CC / Brick massonry chamber 450mmX450mmX400mm and covered with R.C.C. Slab including all accessories and labour charges etc complete as per IS specification 732/1982 (Part II). (D 1564)

4

16670

66680

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II) (D 1563)

4

5836

23344

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply, transportation and fixing of 22W, 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 50,000 burning hours with BIS Certification with BIS Certification. LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

42

728

30593

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply, transportation and fixing of 18W back lit LED Down Light Recessed / Surface mounting round /square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 50,000 burning hours with BIS Certification. LUMINAIRE MAKE : Phillips / OSRAM / Wipro / Crompton LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

110

1757

193365

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply, transportation and fixing of 12W back lit LED Down Light Recessed / Surface mounting round /square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 50,000 burning hours with BIS Certification. LUMINAIRE MAKE : Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

421

1442

607444

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and fixing of 10W LED mirror light of 600mm length with all standard accessories diffuser etc and including labour charges for fixing etc., complete. Makes: Philips/Crompton/GE.

28

473

13255

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and fixing of 15" (375mm), ISI 900 RPM Heavy duty exhaust fan with metal blades, double ball bearing and wire guard etc and labour charges for fixing of Exhaust fan in wall with necessary connections and masonary work of making hole, finishing etc., completeof makes Crompton /Almonard / Havells Turbo Force SP.

38

4478

170166

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and fixing of 9" (225mm), Light duty exhaust fan with metal blades, double ball bearing and wire guard etc and labour charges for fixing of Exhaust fan in wall with necessary connections and masonary work of making hole, finishing etc., complete of makes Crompton / Havells Ventil Air-DB / Orient hill air.

6

2150

12900

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and fixing of energy efficient decorative fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMM/W) greater than 8.5, Air delivery minimum 235 CMM, 350 RPM (tolerance as per IS:374-2019), THD less than 10%, remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise = 75 degree C (max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., complete of Makes: Atomberg (Efficio + ) / Havells / Orient and labour charges for fixing of Ceiling fan including transportation and giving connections with twin core wire etc., complete.

193

3223

622087

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and erecting of Modular Electronic Regulator of 2 modular for ceiling fan sweep complete erected on existing board including labour charges for fixing etc complete. Makes: Legrand Arteor/Honewell Blenge Plus/Cabtree Amare.

193

647

124871

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and fixing of CAT 6 RJ 45 information outlet including labour charges for fixing etc complete. Makes: Legrand/Krone/D Link.

6

496

2976

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and run of LAN Cable Cat -6 STP in existing pipe inlcuding all labour charges etc., complete. Makes: D Link/Krone/AMP.

850

55

47269

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and run of RG 6 Co-axil cable in existing pipe inlcuding all labour charges etc., complete. Makes: Finolex/Polycab/Goldmedal.

750

44

33308

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and run of 2 pair 0.5 mm telephone copper wire in existing pipe inlcuding all labour charges etc., complete. Makes: Finolex/Polycab/Delton.

750

20

15060

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and fixing VTPN type Distribution board 4 Way with IP-43 protection suitable for single phase 100 A Four Pole (FP) Isolator as incomer and 4 Nos 6-32 A,10kA TP MCBs as out going including internal connections and labour charges for flush mounting etc., complete. Makes: Legrand/Schneider/Siemens.

6

18927

113565

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and fixing TPN Distribution board 4 Way with IP-43 protection suitable for single phase 100 A Four Pole (FP) Isolator as incomer and 12 Nos 6-32 A,10kA SP MCBs as out going including internal connections and labour charges for flush mounting etc., complete. Makes: Legrand/Schneider/Siemens.

4

11003

44014

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and fixing SPN Distribution board 12 Way with IP-43 protection suitable for single phase 63 A Four Pole (FP) Isolator as incomer and 8 Nos 6-32 A,10kA SP MCBs as out going including internal connections and labour charges for flush mounting etc., complete. Makes: Legrand/Schneider/Siemens.

15

7775

116633

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and fixing of Modular TV antenna outlet including labour charges for fixing etc complete. Makes: Legrand Arteor / MK Blenge /Cabtree Amare.

6

356

2136

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and fixing of Modular Telephone jack with Connector including labour charges for fixing etc complete. Makes: Legrand Arteor / MK Blenge / Crabtree Amare.

6

356

2136

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and fixing of 20A 3 pin 2 module socket with 20A switch control (with indicator) on a seperate switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes:Legrand Arteor/MK Blenge/Crabtree Amare.

209

787

164483

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and fixing of 10A 3/2pin 2 module socket with 10A switch control on a seperate switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes: Legrand Arteor/Honeywell Blenge/Crabtree Amare

258

573

147852

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and run of 4 of 140/0.3mm (10 Sq.mm) FRLSH/HFFR P.V.C. insulated flexible copper cable with one run of 140/0.3mm (10 Sqmm) for earth continuity in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Finolex/RR Kabel/Havells/Polycab.

120

716

85968

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and run of 4 of 84/0.3mm (6 Sq.mm) FRLSH/HFFR P.V.C. insulated flexible copper cable with one run of 84/0.3mm (6 Sqmm) for earth continuity in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Finolex/RR Kabel/Havells/Polycab.

1235

455

562790

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and run of 2 of 56/0.3mm (4 Sq.mm) FRLSH/HFFR P.V.C. insulated flexible copper cable with one run of 56/0.3mm (4 Sqmm) for earth continuity in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Finolex/RR Kabel/Havells/Polycab

2665

200

533240

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) FRLSH/HFFR P.V.C. insulated flexible copper cable with one run of 36/0.3mm (2.5 Sqmm) for earth continuity in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Finolex/RR Kabel/Havells/Polycab

3995

134

538406

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) FRLS/HFFR P.V.C. insulated flexible copper cable (ISI MARK) of makes Finolex/RR Kabel/Havells/Polycab in existing pipe with 10A switch, Ceiling rose and modular frame covering to switch control box including all labour charges etc., complete for light points in Buildings. Makes: Legrand Arteor/Honeywell Blenge Plus/Crabtree Amare

954

789

752868

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and Fixing of 25mm dia P.V.C. pipe pipe of medium grade (ISI MARK) with all accessories fixing on chromium plated metallic base saddles (PVC Saddles) for Light, Fan and separate plug point including all labour charges etc., complete. Makes:Sudhakar/Polycab/Finolex.

500

77

38710

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and laying of 25mm dia P.V.C. pipe pipe of medium grade, FRLS (ISI MARK) with IS:9537 part 3 rigid pipe concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well metal deep box including all labour charges etc., complete. Makes: Sudhakar/Polycab/Finolex.

3650

86

315141

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and laying of 25mm dia PVC pipe of heavy grade, FRLS (ISI MARK) with IS:9537 part 3 rigid pipe concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes: Sudhakar/Polycab/Finolex.

3750

82

308400

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and fixing of Cast iron ornamental garden benchs of 5' feet long, fitted with cast iron legs with nuts and bolts and 5" wide 8 nosFRP strips for seeting purpose weather proof 450 kg capacit per bench including full finish with enamel paint including cost and conyeyance of all material and Labour charges for loading and unloadinf laying at site as directed by Engineer -in - charge etc complete for finished item of work.

50

8200

410000

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supplying and fixing Hot dipped Galvanized Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979: 2"x2" (50 mm x 50 mm) supporting with Mild Steel pipes of 80mm nominal bore and outer dia 88mm (i.e., wall thickness of 4mm) as per IS-1161, vertical posts placed at 3.05m center to center and each post of height 3.05m above ground level and 0.75 m below ground level and 2no.s harizontal pipes (1 at top and 1 at middle) as per approved drawing, including cost of bolts and brackets, fabrication and erection in position, including cost and conveyance of all materials to work site etc., all operational, incidental labour charges, power charges, overheads & contractors profit etc. complete for finished item of work.

3050

2363

7209072

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Providing and Fixing Cement Concrete Kerbing of 110mm thick in PCC M20 grade mix prop.using 20mm to 6mm HBG Machine Crushed Metal in Nominal mix including machine mixing charges steel centering charges including cost and conveyance of all materials and labour charges transportation to site, loading unloading, incidental and operational charges etc., complete for finished item of work (450mmx110mm thick)

3305

361

1195187

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Flooring with Chequered Cement Concrete heavy duty tiles conforming to IS: 13801 using aggregates, cement, pigments of size 300 x 300 mm and thickness 25 mm of any shades set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade, cost of all materials like cement, sand water and tiles etc., overheads and contractors profit, complete for finished item of work. For Pathways

4000

803

3214960

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Providing and laying factory made hydraulically pressed mechanically vibrated and compacted Supply of precast concrete blocks for paving of M- 35 grade and thickness not less than 60 mm for Medium traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification set over sand bed of 50 mm thick, filling the joints with sand, compacting the blocks with vibrator etc., complete including cost, all taxes and conveyance of all materials and water to work site, electricity and all operational, incidental, labour charges for laying to desired lines , levels & fixing , loading, unloading, lift charges, curing etc., complete for finished item of work.

8126

744

6050213

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Providing and laying factory made hydraulically pressed mechanically vibrated and compacted Supply of precast concrete blocks for paving of M- 40 grade and thickness not less than 80 mm for Medium traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification set over sand bed of 50 mm thick, filling the joints with sand, compacting the blocks with vibrator etc., complete including cost, all taxes and conveyance of all materials and water to work site, electricity and all operational, incidental, labour charges for laying to desired lines , levels & fixing , loading, unloading, lift charges, curing etc., complete for finished item of work.

2160

913

1973894

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and providing of glazed full body glass mosaic tiles of 20 x 20 x 4 mm thick in specified pattern 1st Quality of any colour and design using with specified pattern fixing in specified thick epoxy emulsion grout of epoxy resins and filler powder of approved colour grout including C/c of al material and Labour charges for laying,fixing etc as per approved design and drawing as dirce by Engineer in charge complete for finished item of work

201.5

1811

364921

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supplying and laying of 100 mm x 100mm x 100 mm size granite ( cobble ) stone of any colour with 4 edge machine cutting and laying the stone over 20mm thick CM (1:6) bed including pointing 4 side of the stone with cement mortor (1:6) duly filling joints of size 10mm vide and 50 mm thick neatly, including cost of all materilas like flooring stone, cement, sand and water etc, and labour charges for dressing of stone etc,. as directed by Engineer -in-charge complete for finished item of work. (Cobble Stone) for Pathways

4043

2540

10271242

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Flooring with Flamed Granite 18 to 20 mm thick up to 8'-00 (2.43 M) of regular colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand, water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707)

3920

4497

17629690

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Labour chargesFull Rounding the edges of Marble/ Granite stone slabs of all thicknesses including polishing the same. including cost, all taxes and conveyance of all materials and water to work site, electricity and all operational, incidental, labour charges etc., complete for finished item of work.

168

670

112615

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Labour charges for Half Rounding the edges of Marble/ Granite stone slabs of all thicknesses including polishing the same. including cost, all taxes and conveyance of all materials and water to work site, electricity and all operational, incidental, labour charges complete for finished item of work.

2684

518

1390527

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;First Floor

12.6

4951

62383

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor

12.6

4901

61758

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Providing 16 to 18mm thick high polished granite stone slabs of premium colours (other than black) (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for Risers (S.S.701 & special) Risers of 0.15m height

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;First Floor

25.2

5198

131000

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor

25.2

5121

129062

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Providing 16 to 18mm thick high polished granite stone slabs of premium colours (other than black) (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, cost of base coat and overheads & contractors profit, complete for finished item of work for treads but excluding Half rounding the Edges to Treads (S.S.701 & special)Treads of 0.3 m Width

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Providing & Installation of Bio Toilet Unit ( 5 nos IWC & 5 nos EWC made with: (i) For Indian WC FRP single layer portable toilet of Brand: Green toilet with 1 cabin Indian style toilet and metallic stand, including fixures of premium quality 1 water tap, 1 bulb holder and switch door open style:Swing, exhaust fan, Superstructure:Length-1mtr, Breadth:1mtr, Height:2.6mtr (ii) For Western EWC FRP single layer portable toilet of Brand: Green toilet with 1 cabin western toilet and fibre base, including fixures of premium quality 1 health faucet, 1 bulb holder and switch, exhaust fan, door open style:Swing, Superstructure:Length-1.1 mtr, Breadth:1.1 mtr, Height:2.4 mtr. (iii) FRP Bio Septic Tank (2000 litre capacity for one unit): FRP septic tank (also called FRP septic vessel) which is composed by sythetic resin and fiber reinforced plastic, is designed to treat domestic sewage. The major use of FRP septic tank is to store excreta and treat them with anaerobic digestion to decrease the solod content in sewage. portable Indian toilet 102 - 5 nos, Portable Western Toilet 102-5 nos, FRP Bio septic tank capacity -2000 litre - 2 nos , sock pit - 2 nos, pvc fittings, installation charges & transportation charges etc., (from manufacturing work shop to work site) complete for finished item work. including cost and conveyance of all material and Labour charges for fixing and but excluding GST. for finished item of work as directed by Engineer in Charge.

3

565000

1695000

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor

594

4287

2546478

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Providing cladding with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of regular colours (other than black) in single piece set over a base coat of CM (1:3) 20 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand, water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work. (APSS No.701 & 707)

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor

145.9

5047

736357

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) of premium colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand, water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707)

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor

103.2

796

82197

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Providing skirting to internal walls to 10.00 cm height with Polished Shahabad/Tandur stone slabs 15mm to 18mm thick, length equal to flooring stones set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete and overheads & contractors profit complete for finished item of work.(APSS No.701 &707)

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor

1789.33

738

1320526

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Flooring with polished shahabad / Tandur stone slabs of 15mm to 18mm thick 0.457m x 0.304m or any other size as specified set over a base coat of CM (1:8) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete, all labour charges like dressing of flooring stones to the required size, mixing of cement mortar, laying, lift charges , cost of base coat etc., and overheads & contractors profit complete for finished item of work. (APSS No.703 & 701)

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm Diameter nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as per special Spec: 1108, including overheads and contractor's profit complete for finished item of work.

119

5034

599079

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Providing Mild Steel, Structural Steel, I.e., Angles, Channels, MS Plates and I sections of different sizes, cutting and fabricating to required sizes and shapes, placing in position as per approved designs and drawings, including cost and conveyance of all Mild steel sections and all wastages such as overlaps, couplings, welede joints, etc., and all operational, incidental charges,Including Labour charges for fabricating Gate & Grills including cost of welding rods, power charges, etc and Labour charges for fixing fixing in position by using etc., as directed by Engineer in Charge including overheads and contractor's profit complete for finished item of work.For Compound Wall Grills

18000

122

2210760

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Providing Mild Steel, Structural Steel, I.e., Angles, Channels, MS Plates and I sections of different sizes, cutting and fabricating to required sizes and shapes, placing in position as per approved designs and drawings, including cost and conveyance of all Mild steel sections and all wastages such as overlaps, couplings, welede joints, etc., and all operational, incidental charges,Including Labour charges for fabricating all heavy steel works like Trusses,Stanchions, Heavy Beams and Girders including cost of welding rods, power charges, etc and Labour charges for fixing Trusses, Stanchions, Heavy Beams and Girders erecting and fixing in position by using chain pulley blocks, Derek pole arrangements and cranes etc., including overheads and contractor's profit complete for finished item of work.

10000

147

1478100

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Providing Mild Steel Tubes & pipes of all diameters as per IS-1161, of different diameters, cutting and fabricating to required sizes and shapes,placing in position as per approved designs and drawings, including cost and conveyance of all Mild steel Tubes & Pipes sections and all wastages such as overlaps, couplings, welede joints, etc., and all operational, incidental charges, including Labour charges for fabricating all heavy steel works like Trusses,Stanchions, Heavy Beams and Girders including cost of welding rods, power charges, etc and Labour charges for fixing Trusses, Stanchions, Heavy Beams and Girders erecting and fixing in position by using chain pulley blocks, Derek pole arrangements and cranes etc., including overheads and contractor's profit complete for finished item of work.

12500

163

2041500

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Third Floor

1.15

88234

101470

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Second Floor

8.31

86990

722891

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;First Floor

91.77

85746

7868945

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor

428.9

84502

36243032

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supplying, fitting and placing of HYSD / TMT (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like TATA,SAIL,VSP, Jindal panthar, JSW,Radha, Suguna,MS life/AF Star as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126)

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;First Floor

238.75

724

172855

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor

766.93

714

547588

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Dadooing to walls with Supply of red or white body ceramic wall tiles of size 250 x 375 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand, water, tiles, coloured cement, overheads & contractors profit etc., to site, cost of all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge.

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;First Floor

68.08

4402

299688

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor

200.33

4352

871836

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Skirting with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of regular colours (other than black) in single piece set over a base coat of CM (1:5) 12 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand, water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work (APSS No.701 & 707)

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;First Floor

2250.87

4570

10287939

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor

3686.62

4497

16580094

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) of regular colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand, water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707)

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;First Floor

126

886

111747

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor

392.93

847

332835

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand, water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701)

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Providing Mild Steel Tubes & pipes of all diameters as per IS-1161, of different diameters, cutting and fabricating to required sizes and shapes,placing in position as per approved designs and drawings, including cost and conveyance of all Mild steel Tubes & Pipes sections and all wastages such as overlaps, couplings, welede joints, etc., and all operational, incidental charges, including Labour charges for fabricating steel including cost of welding rods, power charges, etc and Labour charges for fixing of gates and Grills erecting and fixing in position etc., as directed by Engineer in Charge including overheads and contractor's profit complete for finished item of work. For MS Railing

23359

138

3231250

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;304 grade Stainless steel Railing for First Floor

248

731

181372

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;304 grade Stainless steel Railing for Ground Floor

387.32

731

283263

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supplying and fixing stainless steel works such as raling, hand rale, grills etc., using 304 grade Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit as directed by the Engineer-in-charge etc ., complete for finished item of work.

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ventilators First Floor

8

7279

58234

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ventilators Ground Floor

31.44

7279

228862

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness. (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin).Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4 mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Windows First Floor

106

8088

857355

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Windows Ground Floor

172.64

8088

1396355

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles Makes NCL, Fenesta,Everest, Vishaka,Sintex or equalant make(Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin)of (94 mm x 45 mm)/(80 mm x 52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25 mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site as directed by the Engineer-in-charge curing etccomplete for finished item of work for all floors

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor Toilet Doors (750mm x 2100mm)

66.16

8540

565021

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and fixing doors as per drawings with 2nd class teak wood frame of section 125mm x 65mm and ISI marked Flush door shutters, solid bond wood block board type with both one faces commercial ply (lipping): 30 mm thick conforming to IS:2202 and fixing of Teak wood ornamental beading alround door frame including cost and conveyance to site of teak wood frame , flush shutter including supply, 1.00mm thick laminate mat finish sheet both side fixing 6 Nos.MS Z hold fasts of size 300mm x40mm x4mm including cost of ISI marked 3 Nos Brass butt hinges 125 mm long, 2 Nos brass tower bolts of 200mmx10mm dia at top, 1 no Key less lock set with brass handle , 1 nos 150mm long brass handles, 1 nos rubber bushes including fixing and fixtures to door with required number of screws,bold and nuts including labour charges for fixing the frame in position,fixing the shutter to the frame overheads & contractors profit complete etc., for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10mm) (750mm x 2100mm)

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;D4 First Floor

26.46

9430

249519

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;D4 Ground Floor (900mm x 2100mm)

32.13

9430

302987

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and fixing doors as per drawings with 2nd class teak wood frame of section 125mm x 75mm and ISI marked Flush door shutters, solid bond wood block board type with both one faces commercial ply (lipping): 30 mm thick conforming to IS:2202 and fixing of Teak wood ornamental beading alround door frame including cost and conveyance to site of teak wood frame , flush shutter including supply, 1.00mm thick laminate mat finish sheet both side fixing 6 Nos.MS Z hold fasts of size 300mm x40mm x4mm including cost of ISI marked 4 Nos Brass butt hinges 125 mm long, 2 Nos brass tower bolts of 250mmx12mm dia at top, 1 no heavy duty Mortice lock with handle , 1 nos 150mm long brass handles,Heavy duty mortise lock 6/7 levers (IS:2209) with PC or CP handles complete set 1 no, 1 nos rubber bushes including fixing and fixtures to door with required number of screws,bold and nuts including labour charges for fixing the frame in position,fixing the shutter to the frame overheads & contractors profit complete etc.,GST etc, complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10mm) (900mm x 2100mm) Toilet Doors

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;D3 (1050mm x 2100mm)Second Floor

2.21

10489

23183

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;D3 (1050mm x 2100mm) First Floor

17.64

10489

185042

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;D3 (1050mm x 2100mm) Ground Floor

50.72

10489

532048

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and fixing doors as per drawings with 2nd class teak wood frame of section 125mm x 100 mm and ISI marked flush door shutters (Kutty or equivalent) confirming to IS 2002 solid core flush door both sides commercial ply 30 mm thick Single shutters ,providing internal teak wood lipping on all sides including cost and conveyance to site of teak wood frame , flush shutter, 1.00mm thick both sides laminate including supply and fixing 6 Nos.MS Z hold fasts of size 300mm x40mm x4mm cost of ISI marked 4 Nos Brass butt hinges 125 mm long, 1 Nos brass tower bolts of 250mmx10mm dia at top,1 Nos brass tower bolts of 150mmx10mm dia at bottem, 1 no heavy duty Mortice lock with handle , 2 nos 150mm long brass handles, 1 no. Automatic door closer hyper brand, 1 no heavy duty brass door stoper, 1 nos rubber bushes including fixing and fixtures to door with required number of screws,bold and nuts including labour charges for fixing the frame in position,fixing the shutter to the frame overheads & contractors profit complete etc.,,GST etc, complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10mm) (1050mm x 2100mm)

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;D2 (1500mm x 2440mm) First Floor

14.64

22961

336156

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;D2 (1500mm x 2440mm) Ground Floor

29.28

22961

672313

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and fixing doors as per drawings with Medium teak wood frame of section 125mm x 200 mm and Medium teak wood planks for shutter Rails with 50 mm thick and 40 mm for middle Planks with double shutters, including cost and conveyance to site of teak wood frame ,Teak fully pannel shutter, excluding Melamine polish but including supply and fixing 6 Nos.MS Z hold fasts of size 300mm x40mm x4mm including cost of ISI marked 8 Nos Brass butt hinges 125 mm long, 2 Nos brass tower bolts of 300mmx12mm dia at top, 2 nos brass Aldrop 350 mm long, 4 nos 150mm long brass fancy handles, 2 no. Automatic door closer hyper brand, 2 no heavy duty brass door stoper, 2 nos rubber bushes including fixing and fixtures to door with required number of screws,bolt and nuts including labour charges for fixing the frame in position,fixing the shutter to the frame etc, complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10mm) (1500mm x 2440mm) Double Shutter

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Main Doors D1 (1820mm x 2440) Ground Floor

13.33

22065

294128

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and fixing doors as per drawings with Medium teak wood frame of section 125mm x 200 mm and Medium teak wood planks for shutter Rails with 50 mm thick and 40 mm for middle Planks with double shutters, including cost and conveyance to site of teak wood frame ,Teak fully pannel shutter, excluding Melamine polish but including supply and fixing 6 Nos.MS Z hold fasts of size 300mm x40mm x4mm including cost of ISI marked 10 Nos Brass butt hinges 125 mm long, 2 Nos brass tower bolts of 300mmx12mm dia at top, 2 nos brass Aldrop 350 mm long, 4 nos 150mm long brass fancy handles, 2 no. Automatic door closer hyper brand, 2 no heavy duty brass door stoper, 2 nos rubber bushes including fixing and fixtures to door with required number of screws,bolt and nuts including labour charges for fixing the frame in position,fixing the shutter to the frame etc, complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10mm) (1820mm x 2440) Double Shutter

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Painting to new wood work with luppam finish to give even & smooth surface and painting two coats of synthetic enamel paint 1st grade of approved brand and shade to get glossy surface including cost and conveyance of all materials to site, all labour charges etc. complete including sand paper on lappam coats for neat even and glossy surface, overheads & contractors profit, etc. complete for all floors complete for finished item of work as directed by Engineer-in-charge during exection.

165.39

238

39467

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply & applying Melamine Polish Glossy/ Matt finish to the wood works duly cleaning the surface and applying emery paper, Sand the wood with 180 No., emery paper and then with 320 No., emery paper, clean & wipe off loose dust, applying suitable knifing paste filler / wood filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper, apply two component wood sealer, air dry for 24 hrs, Sand with 320 No emery paper, applying one coat of approved spraying thinner (for spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine including cost & labour charges, emery papers, cost of thinner & melamine polish of approved brands such as Jenson & Nicholson, Asian Paints, Berger Paints or equivalent etc., including overheads & contractors profit complete for finished item of work for all floors:-Polishing to wood work - Melamine Polishing to Wood Work.

128.8

1036

133518

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Second Floor

1.35

167

226

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;First Floor

27

167

4523

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor

535.51

167

89698

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Painting to new iron works with 2 coats of Synthetic Enamel paints in all shades Grade - I having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over 1 coat of Red Oxide Primer Paint for iron works of Grade -1 of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site including cost of primer coat and all operational, incidental, labour charges etc. complete etc., complete including cost of overheads & contractors profit (APSS No.1200, 1207 & 1211) in all floors.

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Third Floor

36.68

228

8369

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Second Floor

82.45

228

18811

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;First Floor

3000.12

228

684477

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor

10603.4

228

2419166

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for all floors:-External Colouring - Plastic emulsion paint - 2 Coats + 1 coat primer.

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Third Floor

141.08

127

18043

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Second Floor

363.45

127

46482

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;First Floor

6087.22

127

778495

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor

9640.39

127

1232909

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls for all floors- Plastic emulsion paint - 2 Coats + 1 coat primer.

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Second Floor

223.49

221

49465

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;First Floor

6087.22

221

1347284

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor

9582.05

221

2120795

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Providing and applying synthetic plaster putty (Birla wall care putty or equalant) or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work Puuty for internal walls and Ceiling for all floors

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;First Floor

2826.02

1161

3282535

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor

3367.53

1161

3911521

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1 as per India Gypsum) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1982 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall topcoat, overheads and contractors profit, etc. complete for finished item of work as per Idia Gypsum Ltd specification.

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Second Floor

2982.02

562

1676611

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For First Floor

228

526

120019

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Ground Floor

884.17

490

433747

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor

237.2

459

108882

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for External & Uneven Surfaces of Brick Wall and RCC exposed surfaces for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 20 mm

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Second Floor

268.13

544

146021

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;First Floor

3176.36

499

1585099

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor

4839.47

453

2194506

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ornamental ceiling plastering 12mm thick using screened sand with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Second Floor

87.38

516

45161

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;First Floor

1781.01

475

847333

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor

7877.41

434

3424231

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) For External Walls

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Second Floor

231.69

516

119744

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;First Floor

3303.86

475

1571844

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor

5511.8

434

2395924

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) For Internal Walls

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Bed Block Second Floor

0.09

6242

562

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Bed Blocks First Floor

0.93

6051

5628

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Bed Blocks Ground Floor

4.23

5861

24792

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, all charges for mixing, laying concrete in position, curing & lift charges and cost of overheads & contractors profit etc., complete for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;CHAJJAS/SUNSHADES 0.60 mts wide First Floor

34.03

1114

37927

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;CHAJJAS/SUNSHADES 0.60 mts wide Ground Floor

19.16

1066

20440

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of per 1 cum of concrete 380 kgs using WEIGH BATCHER / MIXER/Batching plant 0.5 cum with 20mm size graded machine crushed hard Granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., for 60 cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting concrete, laying concrete, curing, cost of overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work for sunshades (APSS No. 402, 403 & 903) & 903)

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Lintel Second Floor

0.13

14636

1903

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Lintel First Floor

3.88

13962

54174

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Lintel Ground Floor

10.79

13286

143362

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of per 1 cum of concrete 380 kgs using WEIGH BATCHER / MIXER/Batching plant 0.5 cum with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Lintels

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;First Floor

81.6

924

75398

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor

394.04

852

335722

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Reinforced Masonry for partition walls (100 mm thick) in CM (1:6) prop. (Cement : Screened sand) using fly ash cement / lime solid blocks of size 290mm x 100mm x 140mm having minimum compressive strength of 50 Kg/Sq.cm and placing 2 Nos. of 8 mm steel rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, and cost of overheads & contractors profit etc., but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 509)

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Third Floor

8.69

9302

80836

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Second Floor

108.03

8843

955309

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;First Floor

520.09

8383

4360305

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor

1289.09

7924

10215419

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Masonry work for Super structure in CM(1:6) prop (Cement : Screened sand) with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand (with 100% river sand), bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) , constructing masonry, lift charges, curing, cost of overheads and contractors profit etc., complete for finished item of work. (APSS No. 501 & 504).

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;FOR staircase STEPS First floor

1.74

7428

12926

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;FOR staircase STEPS Ground floor

1.74

7219

12561

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Plain Cement Concrete corresponding to M-20 grade as per IS 456 nominal mix using 20mm size graded aggregate machine crushed hard granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, all operational, incidental and labour charges such as mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work, for:-Machine Mix-PCC : M-20 NOMINAL MIX Centering with Steel up to 3.66M. FOR staircase STEPS.

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Stair case waist Slab 175 mm thick Unsupported height up to 4.27 mts First Floor

33

1990

65677

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Stair case waist Slab 175 mm thick Unsupported height up to 3.66 mts Ground Floor

33

1813

59856

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of per 1 cum of concrete 380 kgs using WEIGH BATCHER / MIXER/Batching plant 0.5 cum with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Stair case waist SLABS.

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of per 1 cum of concrete using WEIGH BATCHER / MIXER/Batching plant 0.5 cum with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR 125 mm thick Grade/Base Slab. Ground Floor

3283

1280

4205425

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Roof Beams Unsupported height up to 3.66 mts Third Floor

2.78

13558

37694

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Roof Beams Unsupported height up to 3.66 mts Second Floor

10.75

13080

140617

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Roof Beam Unsupported height up to 3.66 mts Ground Floor

60.08

12124

728420

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of per 1 cum of concrete 380 kgs using WEIGH BATCHER / MIXER/Batching plant 0.5 cum with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Roof Slab 125 mm thick Unsupported height up to 3.66 mts Ground Floor

553.23

1454

804490

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Roof Slab 150 mm thick Unsupported height up to 3.66 mts Third Floor

26

1812

47118

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Roof Slab 150 mm thick Unsupported height up to 3.66 mts Second Floor

600.04

1749

1050058

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Roof Slab 150 mm thick Unsupported height up to 3.66 mts Ground Floor

194.21

1625

315684

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Roof Slab 125 mm thick Unsupported height up to 4.27 mts Ground Floor

236.51

1553

367480

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Roof Slab 150 mm thick Unsupported height up to 4.27 mts First Floor

2982.02

1792

5344496

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Roof Slab 150 mm thick Unsupported height up to 4.27 mts Ground Floor

2982.02

1725

5144193

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of per 1 cum of concrete 380 kgs using WEIGH BATCHER / MIXER/Batching plant 0.5 cum with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR SLABS.

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Roof Beam Unsupported height up to 7.32 mts Ground Floor

18

17395

313123

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Roof Beam Unsupported height up to 4.27 mts First Floor

179.86

13524

2432490

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Roof Beam Unsupported height up to 4.27 mts Ground Floor

191.29

13002

2487298

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of per 1 cum of concrete 380 kgs using WEIGH BATCHER / MIXER/Batching plant 0.5 cum with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS & Slabs

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Dummy Columns Second Floor

3.42

12889

44082

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Reinforced Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for Dummy columns using 40mm size (SS5) hard Granite metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, machine mixing, vibrating, lifting concrete mechanically, laying concrete, curing , overheads & contractors profit, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc. including all operational, incidental and labour charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work upto un supported height up to 3.66 m for dummy columns (APSS No. 402)

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Raised Pointing to RR/ CRS Masonry in CM (1:3) including cost and conveyance of all materials in site, curing, labour charges etc, overheads & contractors profit, complete for finished item of work.

2520

105

265583

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Random Rubble stone masonry in CM (1:6) prop: (Cement: Screened sand) using hard Granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., to site, labour for cutting stones to required size and shape, mixing of cement mortar, construction, curing and cost of overheads & contractors profit etc., complete for finished item of work in foundation and basement. (APSS No. 601 & 615).

2330.4

4637

10806065

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Columns First Floor Un Supported Height up to 4.27 mts

18.29

14533

265813

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Columns Groundfloor Un Supported Height up to 4.27 mts

18.29

13717

250887

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of per 1 cum of concrete 380 kgs using WEIGH BATCHER / MIXER/Batching plant 0.5 cum with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS Un Supported Height up to 4.27 mts.

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Columns Third floor Un Supported Height up to 3.66 mts

3.42

15418

52731

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Columns Second Floor Un Supported Height up to 3.66 mts

9.58

14652

140374

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Columns First Floor Un Supported Height up to 3.66 mts

114.74

13888

1593565

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Columns above Plinth Beam (Ground Floor) Un Supported Height up to 3.66 mts

218.97

13124

2873791

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Columns Below Plinth Beam ( Ground Floor)

234.48

13124

3077346

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of per 1 cum of concrete 380 kgs using WEIGH BATCHER / MIXER/Batching plant 0.5 cum with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS Un Supported Height up to 3.66 mts.

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For RCC wall 300 mm thick Ground Floor

486.81

4188

2039140

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For RCC wall 200 mm thick for Over Head Tank Second Floor

146

3553

518830

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For RCC wall 200 mm thick Ground Floor

1346.15

3232

4351039

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of per 1 cum of concrete 380 kgs cement using WEIGH BATCHER / MIXER/Batching plant 0.5 cum with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR RCC WALLS in BUILDINGS.

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For 200 mm thick Base / Bottem Slab

194.21

2049

398041

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Plinth Beams

401.43

12876

5169122

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Pedastals

90.62

10807

979406

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;For Footings

1307.42

10247

13398074

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of per 1 cum of concrete 380 kgs cement using WEIGH BATCHER / MIXER /Batching plant 0.5 cum with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR FOOTINGS, PEDESTALS, PLINTH BEAMS.

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Providing post construction anti termite treatment by drilling 1/2 inch dia., holes at the edges of wall floor junction and pouring anti termite chemical (Imidacloprid 30.5 SC, 10.5 ml for 5 Liters of water as per IS 16131.) with a hand operated pressure pump until refusal or to a maximum of one liter per hole. Holes shall be sealed with cement motor after treatment and providing spraying and injecting termiticides for treating and applying to doors, windows, frames, removing, crusting treating in Treatment along outside of foundations (i.e., Soil in contact with external walls around the building and Concrete or Masonry apron around the building),Treatment of soil under floors - Inside Building, Treatment to voids in masonry, Treatment at points of contact of woodwork, Treatment of Wood Work, Treatment of Electrical Fixtures, as directed in IS 6313 Part 3 2013 with preventive chemicals duly taking precautions for health hazards and safety measures for the occupants including all costs, conveyances of all materials and labour charges etc for finished item of work to the satisfaction of the Engineer-in-Charge. The plinth area of the building each floor shall be taken for the purpose of payment. ( Plinth are measurements will be taken for payment)

2983

157

471075

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Filling with carted coarse sand in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental ,labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310).

406.67

1927

783848

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Filling with carted Earth in Open land and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310).

27951.6

414

11589013

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Filling with carted gravel by Manual means in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310).

47168.99

455

21505286

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cms thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P and cost of overheads & contractors profit etc., complete for finished item of work for (APSS NO.309&310) By Manual Means

7293.84

174

1272192

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Ground Floor

94.64

5708

540271

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Plain Cement Concrete corresponding to M-15 grade as per IS 456 nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, all operational, incidental and labour charges such as mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, for:-Machine Mix-PCC : M-15 MACHINE MIX

-

-

-

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING for Levelling Course.

4012.11

4834

19397669

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Carting of excavated use full soil for stocking from building site to within the premises up to 1.00 Km lead including Cost of transportation of vechicle and loading and unloading charges and all operational, incidental labour charges etc complete as per incharge of Engineer - in - charge for finished item of work.

4933.6

113

557990

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Earth work excavation for Kerb Excavation) and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mannual Means.

133

215

28602

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Earth work excavation for (Sumps, Tanks and Open Excavation) and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means

542.43

119

65081

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m and up to 3 m depth including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mannual Means.

708.22

376

266532

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Earth work excavation for foundations (Mechanical Means) for buildings in ordinary rock (not requiring blasting) and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges as per SS 20 B(APSS 308) Upto 3.00 Mts Depth

1063.25

153

162826

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Earth work excavation for foundations for buildings in hard rock (blasting prohibited) and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges as per SS 20 B(APSS 308) Upto 3.00 Mts Depth

1063.25

2141

2276450

... More
Development of Pilgrimage and Heritage Infrastructure at Rudreshwar Temple (Ramappa), Mulugu Distric;Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m and up to including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means Upto 3.00 Mts Depth

11680.44

119

1401419



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.