Telangana State Tourism Development Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
416450Bid Award Id
ViewTender No
29/02/SE/SB/TSTDC/2022-23Tender Authority
Telangana State Tourism Development Corporation ViewPurchaser Address
-Website
http://https://tourism.telangana.gov.in/home
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Supplying, fitting and placing of HYSD / TMT (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126)
-
-
-
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Ground Floor
3.28
88490
290247.79
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;First Floor
1.49
90133
134298.24
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Second Floor
2.76
91775
253301.54
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Third Floor
2.83
93418
264375.2
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with minimum cement content of 400 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) Foundations, Plinth, Pedastals (Below Plinth)
-
-
-
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Footings
12.02
10230
122976.5
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Raft Ring Beam
2.97
13103
38918.43
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Pedestal Beam
1.3
10893
14161.07
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Steps
-
-
-
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Ground Floor
1.02
9637
9829.75
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;First Floor
1.02
9722
9917.12
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Second Floor
0.91
9808
8925.59
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Third Floor
1.26
9894
12466.44
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with minimum cement content of 400 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, centering using steel scaffolding pipes, Jack props, wallers, Foot plates, brackets, steel centering plates. etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS. RCC WALL.
-
-
-
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Columns
1.98
13665
27057.95
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;First Floor
6.24
14460
90234.02
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Second Floor
1.51
15255
23035.85
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Third Floor
0.36
16051
5778.66
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;RCC Walls
18.73
3916
73364.66
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with minimum cement content of 400 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, centering using steel scaffolding pipes, Jack props, wallers, Foot plates, brackets, steel centering platesetc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) RCC Slabs, Beams.
-
-
-
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Beams
-
-
-
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Ground Floor
2.6
12390
32214.96
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;First Floor
2.6
12936
33633.6
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Second Floor
3.47
13481
46781.29
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Third Floor
1.74
14027
24407.43
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Roof Slab 150mm thick unsupported height up to 3.66 mtr height
-
-
-
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Second Floor
26.06
1793
46748.77
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Third Floor
46.54
1867
86919.5
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Roof Slab 200mm Thick unsupported height up to 12mtr height
46.54
2766
128731.97
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Reinforced Brick Masonry for partition walls (115.0 cm thick) in CM (1:4) prop. (Cement : Screened sand) using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sq.cm and placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, excluding seigniorage charges, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 501 & 509) (Second Floor Alround the parapet wall)
25.43
1395
35483.24
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for External & Uneven Surfaces of Brick Wall and RCC exposed surfaces for finished item of work. (SS 901,903 & 904) (Third Floor)
188.22
666
125540.86
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish using Manufactured Sand (Rock sand) and natural river sand (screened sand) in the ratio of 50:50 including cost and conveyance of all materials like cement, sand, water etc., to site, on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)
-
-
-
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Ground Floor
103.02
494
50926.91
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;First Floor
103.02
543
56002.7
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Second Floor
108.48
592
64318.88
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Third Floor
178.03
642
114435.9
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Ceiling plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904) (Second Floor)
54.39
629
34234.7
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;RCM facia 50mm thick using screened sand for drop walls, fins with rabbit wire mesh & nominal reinforcement as directed by Engineer - In - Charge with dubara sponge finishing,including cost and conveyance of all materials to site, operational & incidental,cost and conveyance of cement,wire mesh,water to work site,centering,scaffolding and form work,lift charges etc., excluding seignorage charges and overheads & contractors profit complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work(APSS NO.403&903)
-
-
-
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Ground Floor
8
3004
24035.12
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;First Floor
8
3151
25213.92
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Second Floor
5
3299
16495.5
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Third Floor
10
3446
34464.4
Providing QSHR Tank of 100KL Capacity with RCC Structure at Buddhavanam Project,;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats.
605.29
257
155831.91
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements