Telangana State Tourism Development Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Tourism Development Corporation - TSTDC Tender

Civil And Construction
Excavation
Opening Date26 Sep 2022
Closing Date11 Oct 2022
Tender Amount₹ 11,24,407 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of Basic Amenities at Buddhist Sit;110 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm

25

-

8881

... More
Development of Basic Amenities at Buddhist Sit;75 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm

12

-

2231

... More
Development of Basic Amenities at Buddhist Sit;Supplying and fixing of SWR/ PVC pipes (as per ISI standards) 4 Kg/Sq.cm. Prince/sudhakar or any ISI brand and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)

-

-

-

... More
Development of Basic Amenities at Buddhist Sit;S&F Stainless steel 5" square Grating for nahany or floor trap cover with cockroach trap with or without hole, complete for finished item of work in all respects.

6

-

1248

... More
Development of Basic Amenities at Buddhist Sit;S&F of 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931, complete for finished item of work in all respects.

4

-

2931

... More
Development of Basic Amenities at Buddhist Sit;S&F of 15 mm brass body premium variety Chromium Plated finish bib tap with wall flange of not less than 500 grams weight with quarter turn spindle with either internal or external threaded connection conforming to IS 8931 and with 10 years warranty, complete for finished item of work in all respects.

4

-

4095

... More
Development of Basic Amenities at Buddhist Sit;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cock complete for finished item of work in all respects

2

-

5051

... More
Development of Basic Amenities at Buddhist Sit;Supplying & Fixing white glazed flat back Bowl urinals of size 440 mm x 265 mm x 315 mm with internal flushing rim fixed with screws complete Indian make conforming to IS:2556-1995 complete for finished item of work in all respects

4

-

4767

... More
Development of Basic Amenities at Buddhist Sit;Supply, Installation and commissioning approved make floor mounted Close Coupled wash down EWC conforming to IS:2556 (Part 8)-2004 suit with 'P' ' trap with dual flush porcelain cistern fixed on wash down EWC with all internal parts of dual flush cistern, ultra solid seat cover of approved make with rubber buffer and cap & 15 mm angle stop cock & 450 mm long PVC inter connection pipe wall flanges all of approved make etc. complete for finished item of work in all respects: White Colour

2

-

26193

... More
Development of Basic Amenities at Buddhist Sit;Supplying & Fixing Indian pattern white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-2004 with "P" or "S" trap Hindware/ Parryware/ Neycer - ISI Mark: 580 mm Long

1

-

1785

... More
Development of Basic Amenities at Buddhist Sit;50mm PPR Ball Valve

2

-

1447

... More
Development of Basic Amenities at Buddhist Sit;25mm PPR Ball Valve

4

-

1168

... More
Development of Basic Amenities at Buddhist Sit;Supplying and fixing PPR ball valve of 25mm & 50mm dia confirming to DIN standards 8077/8092 , Indian make heavy type including cost and conveyance of all materials , labour charges etc. complete for finished item of work.

-

-

-

... More
Development of Basic Amenities at Buddhist Sit;Supply and Fixing of CPVC Pipes ( 28.60 mm OD Pipe - SDR 13.5 )and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) of Ashirvad / Ajay Flowguard .

18

-

4622

... More
Development of Basic Amenities at Buddhist Sit;Supply and Fixing of CPVC Pipes ( 22.20mm OD Pipe - SDR 13.5 )and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) of Ashirvad / Ajay Flowguard including cost and conveyance of all material, labour charges, and over heads.

8

-

1554

... More
Development of Basic Amenities at Buddhist Sit;Supply and Fixing of CPVC Pipes ( 15.90mm OD Pipe - SDR 13.5)and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) of Ashirvad / Ajay Flowguard including cost and conveyance of all material, labour charges, and over heads.

20

-

3386

... More
Development of Basic Amenities at Buddhist Sit;Flooring with Supply of precast concrete blocks for paving of M-40 grade and thickness not less than 80 mm for Heavy traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification. Set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & filling the joints with sand, compacting the blocks with vibrator etc., complete including cost, all taxes and conveyance of all materials and water to work site and all operational, incidental, labour charges, lift charges, curing etc., complete for finished item of work.

72

-

68739

... More
Development of Basic Amenities at Buddhist Sit;Supply and fixing of ornamental grill made of 40mm x 40mmx 5mm MS angle alround the opening & 12mm square bars @ 125mm center to center to the peripheral angle for openings as per the approved drawing including cutting to required length, welding, excluding painting with two coats of synthetic enamel paint over red oxide single coat, including cost and conveyance of all materials, labour charges etc., complete for finished item of work for openings in buildings.

1.8

-

4798

... More
Development of Basic Amenities at Buddhist Sit;Roofing with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti capillary grove and including seigniorage charges, etc., complete, excluding the cost of purlins, rafters, trusses & cost of conveyance of all materials & overheads and contractor profit complete for finished item of work.

95.04

-

77654

... More
Development of Basic Amenities at Buddhist Sit;Painting to new iron works with 2 coats of Synthetic Enamel paints in all shades Grade - I having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over 1 coat of Red Oxide Primer Paint for iron works of Grade -1 of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site including cost of primer coat and all operational, incidental, labour charges etc. complete etc., complete including cost of overheads & contractors profit (APSS No.1200, 1207 & 1211) in all floors.

289.87

-

53020

... More
Development of Basic Amenities at Buddhist Sit;Flooring with polished shahabad / Tandur stone slabs of 15mm to 18mm thick of approved size as specified set over a base coat of CM (1:8) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete including seigniorage charges, sales & other taxes on all materials including all labour charges like dressing of flooring stones to the required size, mixing of cement mortar, laying, lift charges , cost of base coat etc., and overheads & contractors profit complete for finished item of work. (APSS No.703 & 701)

72

-

37027

... More
Development of Basic Amenities at Buddhist Sit;Providing Mild Steel Tubes & pipes of all diameters as per IS-1161, of different diameters, cutting, placing in position, including cost and conveyance of all materials to work site and all operational, incidental, labour charges including cost of overheads & contractors profit complete for finished item of work for purlins of sheet roofing.

1028.16

-

167919

... More
Development of Basic Amenities at Buddhist Sit;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats.

45.48

-

9121

... More
Development of Basic Amenities at Buddhist Sit;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer.

70.26

-

10425

... More
Development of Basic Amenities at Buddhist Sit;Supplying and fixing of 28/30 mm thick Wood Plastic Composite (WPC) Door shutter, comprising of 70% virgin polymer, 15% wood powder (fiber), and the remaining 15% additives, comprising of virgin PVC polymer of K value 58-60 (Suspension grade), Calcium carbonate and natural fibers (wood powder) and non toxic additives (maximum toxicity index of 12 for 100 gms) having minimum door density of 650 kg/cum, screw withdrawal strength 1800N (Face) & 900N (Edge), Modulus of Elasticity 900N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk SS screws all as per direction of Engineer -in- Charge (SS butt hinges and SS screws shall be paid separately. icluding the cost of 3no Stainless Steel Butt hinges (IS:12817)- 125 mm Long, 1no Stainless Steel Tower Bolt-10 mm Bolt (IS:15833) 200 mm Long, 1no Stainless Steel Door Handles 150 mm Long, 1no Stainless Steel Aldrops (IS:15834) 250 mm long, 1no Keyless lock set for toilet doors with brass knob handles, 1no Rubber/ Nylon door stop bushes, Drywall Screws, Labour charges for fixing Flush door shutters of any thickness to the existing door frame including fixing the fixtures to the door shutter and overheads & contractors profit complete for finished item of work in all floors.

8.51

-

35010

... More
Development of Basic Amenities at Buddhist Sit;Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and overheads & contractors profit complete for finished item of work in all floors.

29.1

-

24764

... More
Development of Basic Amenities at Buddhist Sit;Dadooing to walls with Digital/ Polished glazed full body porcelain wall tiles of approved size or 300 x 600 mm size with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc.,scratch less, stain free and thickness between 6-8 mm1st quality conforming to IS:13711, IS:13712, IS:13630(Parts 1 to 15) of any colour and finish in all shades and designs with borders as approved by Engineer-in-Charge set over base coat of CM(1:3) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges etc., and overheads & contractors profit complete for finished item of work.

41.52

-

46207

... More
Development of Basic Amenities at Buddhist Sit;Flooring with Ceramic Tiles of 7-8mm thick 1st. quality of any shade of size not less than 300mm x 300mm as approved by Engineer - in - charge set over a base coat of CM (1:8), 12mm thick using natural river sand (screened sand) laid over flooring bed / V.R.C.C. slab, with neat cement slurry of honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m and jointed with neat white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, ceramic tiles etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as mixing of cement mortar, laying, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work.(APSS No.701 & 707) in All Floors

13.32

-

12326

... More
Development of Basic Amenities at Buddhist Sit;Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for External & Uneven Surfaces of Brick Wall and RCC exposed surfaces for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 20 mm

45.48

-

24114

... More
Development of Basic Amenities at Buddhist Sit;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish using Manufactured Sand (Rock sand) and natural river sand (screened sand) in the ratio of 50:50 including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

70.26

-

35310

... More
Development of Basic Amenities at Buddhist Sit;Plastering 12mm thick single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work for basement works. (SS 901,903 & 904)

41.52

-

7136

... More
Development of Basic Amenities at Buddhist Sit;Ceiling plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

23

-

12222

... More
Development of Basic Amenities at Buddhist Sit;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 360 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials , centering using steel scaffolding pipes, Jack props, wallers, Foot plates, brackets, steel centering platesetc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for roof slab 125mm thick.

23

-

34844

... More
Development of Basic Amenities at Buddhist Sit;Supplying, fitting and placing of HYSD / TMT (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126)

0.2

-

18414

... More
Development of Basic Amenities at Buddhist Sit;Sunshade

1.1

-

1418

... More
Development of Basic Amenities at Buddhist Sit;Lintels

0.22

-

2966

... More
Development of Basic Amenities at Buddhist Sit;Supply and placing of RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and centering using steel scaffolding pipes, Jack props, wallers, Foot plates, brackets, steel centering platesetc., including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, overheads & contractors profit etc., etc.,complete but excluding cost of steel and its fabrication charges for finished item of work. (APSS No. 402) for lintels and sunshades

-

-

-

... More
Development of Basic Amenities at Buddhist Sit;Reinforced Brick Masonry for partition walls (115.0 cm thick) in CM (1:4) prop. (Cement : Screened sand) using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sq.cm and placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 501 & 509)

1.49

-

1792

... More
Development of Basic Amenities at Buddhist Sit;Brick Masonry 230mm thick 2nd class Bricks traditional size 23 x 11 x 7 cms in superstructure with CM (1:6) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 501 & 504).

11.54

-

100850

... More
Development of Basic Amenities at Buddhist Sit;Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work (APSS NO.309&310)

31.71

-

12036

... More
Development of Basic Amenities at Buddhist Sit;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., from approved quarry, to site and including seigniorage charges, sales & other taxes on all materials including labour for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing etc.,and overheads & contractors profit complete for finished item of work in foundation and basement. (APSS No. 601 & 615)

28.23

-

128793

... More
Development of Basic Amenities at Buddhist Sit;Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) natural river sand and 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete but excluding seigniorage charges, for finished item of work for Foundations (APSS No. 402) MACHINE MIXING

10.32

-

49787

... More
Development of Basic Amenities at Buddhist Sit;Earth work excavation for foundations (Mechanical Means) for buildings in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

22.7

-

2196

... More
Development of Basic Amenities at Buddhist Sit;Land levelling including removal of boulders, trees and earth cutting etc., using Hydraulic excavator/Shovel 0.50 cum 75 hp including hire charges, fuel and operator charges etc., complete.

24

-

59466

... More
Development of Basic Amenities at Buddhist Sit;Levelling of site including cutting, spreading and cleaning of boulders and trees etc., by using Tractor with rotavator including hire charges, fuel and operator charges etc., complete.

8

-

4726



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.