Telangana State Tourism Development Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Tourism Development Corporation - TSTDC Tender

Pipes and Pipe Related Activities
Opening Date12 Feb 2021
Closing Date26 Feb 2021
Tender Amount₹ 6,18,47,541 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
FOOT BRIDGE;Providing and fixing of guides at ends of the bridge on the Edge block. Including Cost of M.S.Channel - ISMC 100, cost of Hot-Dip Galvanising, Cost and conveyance of tubes with Fabrication charges of the flats, cleats welding etc and Setting the guides on the edge block for the free movement of the bridge and including scaffolding , centring arrangements and safety measurements where ever required as per the site with labour charges and operational, incidental charges etc., complete for finished item of work.

2

-

18152

... More
FOOT BRIDGE;Providing and fixing of guides at ends of the bridge on the deck level beams. Including Cost of M.S.Channel - ISMC 100, cost of Hot-Dip Galvanising, Cost and conveyance of tubes with Fabrication charges of the flats for deck beams cleats welding etc and Setting the guides on the Deck level beams for the free movement of the bridge and including scaffolding , centring arrangements and safety measurements where ever required as per the site with labour charges and operational, incidental charges etc., complete for finished item of work.

2

-

22365

... More
FOOT BRIDGE;Providing and fixing of stiffening girder of ISA 75 X 75X 6 mm for Top & Bottom chord struts with ISA 40 X 40 X 4 mm for both sides of the bridge.(Galvanised). Including cost of Top & Bottom chords of stiffeners ISA 75 X 75 X 6 MM, ISA 40 X 40 X 4MM, and hand railings of 32mm dia-SS , Clamps to fix the stiffeners to the suspenders, Angles straightening, Gas cutting, Joint pieces welding 50x 50 x 5mm , including grill work by 10mm square rod, Angles cutting and straightening charges, Fabrication of stiffening girders to designed alignment transoms etc, and straightening and also launching the stiffeners at different points on the bridge from the float on the river to distribute the load uniformly throughout the bridge, hoisting the stiffeners, setting in position on transoms and clamping to the suspenders. including scaffolding , centring arrangements and safety measurements where ever required as per the site with labour charges and operational, incidental charges etc., complete for finished item of work

432.7

-

14472484

... More
FOOT BRIDGE;Providing and fixing of 6mm thick Hot dip galvanised Chequered Plates. Including cost of 6mm Thick Chequered Plates and Fabrication like flattening, Marking for holes, Holes drilling charges and Fixing it on Deck support Beam at 0.02 M gaps between each plates and including scaffolding , centring arrangements and safety measurements wherever required as per the site with labour charges and operational, incidental charges etc., complete for finished item of work.

328.5

-

5887508

... More
FOOT BRIDGE;Providing and fixing of deck elements to support the deck (Galvanised), Including Cost of Channel - ISMC 75 -2 rows, & Lateral Angle ISA 50x50x5mm and Longitudinal Angler ISA 40x40x6mm, and cost of joint flats 50x12mm, and including Hot-Dip Galvanising and Gas cutting charges , Fabrication like straightening, welding, Marking for holes, Holes drilling charges, Convey of Deck support and, Hoisting it every 1.20M interval and erection charges including scaffolding , centring arrangements and safety measurements on deck level beams etc., where ever required as per the site with labour charges and operational, incidental charges etc., complete for finished item of work.

216

-

7103522

... More
FOOT BRIDGE;Providing and Fixing of D- Shackle, 18mm dia bulldog grip, Turnbuckle and necessary Thimble for tieing the wind guy wire rope

4

-

64317

... More
FOOT BRIDGE;Providing and fixing of Galvanised Wire rope of 18mm dia as windguy cable and arrangment to fix cable to floor beam(226mX2nos). IWRC lubricated RHO,MBL=180KN, min Tensile Grade-1770N/mm². Labour charges for uncoiling,crossing wire rope across the lake and fixing to position, operational, incidental charges etc., complete for finished item of work.

452

-

1848601

... More
FOOT BRIDGE;Providing and fixing of roller of 50mm dia for supporting 18mm dia wind guy cable with necessary arrangement like cleats etc. Complete.

340

-

704795

... More
FOOT BRIDGE;Providing and fixing of Transoms of ISA100*100*6 to the suspenders (Galvanised),including Hot - dip Galvanising, Gas cutting charges , Angles cutting,straightening and marking for holes, holes drilling charges, and both side grinding for smooth finish, Conveyance of transoms in flowing water and Hoisting it in every 1.20 M interval and fixing to Suspenders, Scaffolding and safety measures on Deck level beams including scaffolding, centring arrangements and safety measurements where ever required as per the site with labour charges and operational, incidental charges etc., complete for finished item of work.

170

-

2304869

... More
FOOT BRIDGE;Providing and fixing of suspenders of 16mm dia to the clamps on the rope (Galvanised). Including the cost of 16mm dia rod , hot dip Galvanising with labour for fabrication , coiling,welding and making suspender to designed length, Hoisting the Suspenders at every 1.20 M spacing on the rope with arrangements for the rope to fix the suspenders on the Rope at 1.20 M spacing using Nylon ropes and pipes and ladders including scaffolding , centring arrangements and where ever required as per the site with labour charges and operational , incidental charges etc., complete for finished item of work.

340

-

4381155

... More
FOOT BRIDGE;Providing and fixing of 44 mm dia suspender clamps , double groove forged clamp with necessary design spacing in between ropes to fix the suspenders to rope at 1.20M interval including cost of suspender Clamp, fixing to steel wire rope at site including scaffolding, traversing arrangment over the rope, adjustment for achiving required profile of the bridge after erection, and as per the site with labour charges and operational, incidental charges etc., complete for finished item of work.

340

-

1466735

... More
FOOT BRIDGE;Providing and fixing of 44mm dia Bulldog grips and fixing to the steel wire rope at site including cost and conveyance of materials and labour charges for fixing including earthwork infront of shaft to provide working space, scaffolding arrangements, side protection for soil wherever required as per the site with operational, incidental charges etc for finished item of work.

85

-

172389

... More
FOOT BRIDGE;Providing and fixing of Imported KIS Brand or other reputed make Galvanised rope of Steel Core minimum Tensile grade 1960N/mm² MBL= 1350KN over the frictionless pulleys at column top and ends anchored to blocks with designed dip at centre.Including Nylon ropes, safety net, etc. Stretching the steel wire rope from the wooden reel, Hoisting the ropes to the column top, Tieing the ropes to the Anchor Shaft, 4 turns to the shaft and over lap of 5.0 M over the main rope and adjusting central dip, floating/conveying arrangements throughout the lake alignment with Barrels, empty canes, and other constructional materials, scafolding arrangment around the column and wherever required as per the site to hoist the rope to the column top.

910

-

9370629

... More
FOOT BRIDGE;Providing and fixing of double groove Frictionless pulley held on pin for supporting the wire on the top of the columns with antilift locking arrangement and necessary arrangement to fix the roller cap with necessary lock bolt, labour charges for gas cutting, grinding, machining, marking and drilling holes in plate, hoisting the roller to top of pylon assembly fixing to alignment levelling etc complete including necessary scaffolding.

4

-

286848

... More
FOOT BRIDGE;Providing and fixing of Mild steel Anchor bolts of 20mm dia.- 0.3m long on the top of the Deck beam for Guides, rod cutting, straightening, joint piece welding, threading 4" , setting the Anchor bolts on the top of the deck beam as per alignment including cost and conveyance of materials and labour charges , operational incidental charges etc. complete for finished item of work including scaffolding centring and safety measures to the workmen.

8

-

20617

... More
FOOT BRIDGE;Providing and fixing of welded bolt assembly of 25mm dia.- 45 cm long on the top of the pylon, rod cutting, straightening, joint piece welding, threading 5" , Hoisting the Anchor bolts on the top of the RCC Columns at designed levels,proper aligning including cost and conveyance of materials and labour charges , operational incidental charges etc. complete for finished item of work including scaffolding centring and safety measures to the workmen.

4

-

51543

... More
FOOT BRIDGE;Mechanical Works

-

-

-

... More
FOOT BRIDGE;Dewatering pump 5 hp ( diesel ) including cost and conveyance hire charges , operator labour charges etc., complete for finished item of work. For Col foundations works.

120

-

36102

... More
FOOT BRIDGE;Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental, labour charges, seignorage charges, hire charges of T & P etc., complete for finished item of work. APSS No.309 & 310

790.54

-

216134

... More
FOOT BRIDGE;Painting to external walls with Water Proof Cement Paint two (2) coats all colours and shade as approved by Engineer in charge over a base coat of a cement primer water base exterior Grade-II of approved brand, making three (3) coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work in all floors for external walls (SS 911)

515.96

-

114750

... More
FOOT BRIDGE;Supplying, fitting and placing of HYSD / TMT (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like TATA,SAIL,VSP, Jindal or equalant as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126)

43.36

-

2821319

... More
FOOT BRIDGE;For Beam Fifth Floor 18.30M to 21.96M

1.87

-

27457

... More
FOOT BRIDGE;For Beam fourth Floor 14.64M to 18.30M

0.64

-

9065

... More
FOOT BRIDGE;For Beam Third Floor From 10.98M to 14.64M

0.72

-

9825

... More
FOOT BRIDGE;For Beam First Floor From 3.66M to 7.32M

0.72

-

9021

... More
FOOT BRIDGE;For Beam Ground Floor Up to 3.66 M from GL

0.72

-

8650

... More
FOOT BRIDGE;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance and including charges of all materials ,,like cement, fine aggregate (sand) coarse aggregate, water etc., to site including sales & other taxes on all materials, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overhead charges & Contractors profit and , complete but excluding cost of steel and its fabrication charges, seignorage charges, GST etc for finished item of work (APSS No. 402) for Beams

-

-

-

... More
FOOT BRIDGE;For Columns Seventh Floor From 25.62 M to 28.08 M

0.41

-

7915

... More
FOOT BRIDGE;For Columns Sixth Floor From Feom 21.96 M to 25.62 M

6.93

-

128046

... More
FOOT BRIDGE;For Columns Fifth Floor From 18.30 M to 21.96 M

10.33

-

182341

... More
FOOT BRIDGE;For Columns Fourth Floor From 14.64 M to 18.30 M

14.36

-

241604

... More
FOOT BRIDGE;For Columns Third Floor from 10.98 M to 14.64 M

7.94

-

127013

... More
FOOT BRIDGE;For Columns Second Floor from 7.32 M to 10.98 M

19.76

-

299807

... More
FOOT BRIDGE;For Columns First Floor From 3.66 M to 7.32 M

19.76

-

283468

... More
FOOT BRIDGE;For Columns Ground Floor Up to 3.66 M from GL

19.76

-

267103

... More
FOOT BRIDGE;For Plinth Beam

2.52

-

32723

... More
FOOT BRIDGE;For Pedestals , Starter Column, Straight Column and Anchor Shaft

26.07

-

286885

... More
FOOT BRIDGE;For Footings Base Slab and Pedastal Slab.

33.6

-

349531

... More
FOOT BRIDGE;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

-

-

-

... More
FOOT BRIDGE;For Pedestals Ground Floor Up to 3.66 Mts Level (Anchor Blocks Base Slab - 1,Anchor Block B Slab-2)

204.75

-

2214070

... More
FOOT BRIDGE;For Footings

410.75

-

4194509

... More
FOOT BRIDGE;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

-

-

-

... More
FOOT BRIDGE;Plain Cement Concrete corresponding to M-20 grade as per IS 456 nominal mix using 20mm size graded aggregate machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, all operational, incidental and labour charges such as mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work, for:-Machine Mix-PCC : M-20 NOMINAL MIX for Levelling course

36.56

-

219265

... More
FOOT BRIDGE;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means.

1373.18

-

180038

... More
FOOT BRIDGE;Clearing and grubbing road land by mechanical means including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201 MORD / MORTH complete for finished item of work.

2500

-

5800

... More
FOOT BRIDGE;CIVIL WORKS

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.