Telangana State Tourism Development Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Tourism Development Corporation - TSTDC Tender

Civil And Construction
Building Construction
Opening Date9 Feb 2023
Closing Date17 Feb 2023
Tender Amount₹ 8,51,98,722 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Get the Best Price For TMT
Starting from
₹44,500/MT*
Telangana

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Budget Hotel at Nirmal;Supply, installation,Testing and Comissioning of 32 channel NVR (Network Video Recorder) Max. 12MP Camera supported,256Mbps network camera recording,Support 4K video out on HDMI monitor,Support Dual monitor video out,Support H.265, H.264, MJPEG compression, Wise Stream support, Max. 8 internal HDDs (48TB), e-SATA / iSCSI storage support, Support RAID 5 Easy installation with front swap hard disks ARB & Failover (N+1) support, UL Cerfified NVR. Makes : As per list of recommended brands.

1

-

156750

... More
Construction of Budget Hotel at Nirmal;Supply,Installation,Testing & Commissioining of IP IR Bullet Camera (2 MP Series), 2MP Network IR Bullet Camera 2megapixel (1920 x 1080) resolution,0.1Lux (Color), 0Lux (B/W, IR LED on),2.8mm fixed lens Max. 30fps@2M all resolutions (H.265/H.264) H.265, H.264, MJPEG codec supported, Multiple streaming,Motion detection, Tampering, Defocus detection, Hallway view (90°/270°), LDC support Micro SD/SDHC/SDXC memory slot (Max. 128GB) IR viewable length 20m/25m/ 30m,IP66, IK10, PoE, 12VDC UL Listed Bullet Camera. Makes :Honeywell / Sony /Panasonic.

4

-

75240

... More
Construction of Budget Hotel at Nirmal;Supply,Installation,Testing & Commissioining of IP IR Dome Camera (2 MP Series), 2MP Network IR Dome Camera Max. 2megapixel (1920 x 1080) resolution,0.095Lux (Color), 0Lux (B/W, IR LED on), 3.2 ~ 10mm (3.1x) varifocal lens,Max. 30fps@2M all resolutions (H.265/H.264)H.265, H.264, MJPEG codec supported, Multiple streaming,Motion detection, Tampering, Defocus detection,Hallway view (90°/270°), LDC support,Micro SD/SDHC/SDXC memory slot (Max. 128GB),IR viewable length 20m,PoE/12VDC UL Certified Dome Camera. Makes: Honeywell / Sony /Panasonic.

19

-

357390

... More
Construction of Budget Hotel at Nirmal;Labour charges for run of U.G cable on wall / existing pipe with necessary fixing arrangments such as saddles,clamps,wooden separators etc., (as directed by departmental official) with No.10 SWG G.I wire for eath connections for the cables.

1050

-

58328

... More
Construction of Budget Hotel at Nirmal;16 Sqmm 4 Core Alluminium Cable (D 881)

650

-

174200

... More
Construction of Budget Hotel at Nirmal;35 Sqmm 3.5 Core Alluminium Cable (D 883)

450

-

183600

... More
Construction of Budget Hotel at Nirmal;Supply and Laying of under ground XLPE Armoured cable of the following sizes. Makes: Polycab /Havells / Gloster.

1

-

-

... More
Construction of Budget Hotel at Nirmal;Supply and fixing of suitable out door feeder piller box of size made with 14 SWG CRCA sheet with double door arrangement, making powder coating after processing of 7 Tank process, lock and key, hinges, rubber gasket, danger board,suitable angle iron stand for mounting the feeder pillar with cement concrete, including Supply and fixing of Legrand / Schnieder make 63A, 4 Pole isolator as incomer, 9 Nos 6-32A SP MCBs as out goings, indication lamps, din channel, 6 Sqmm 3 core copper cable for invidual light control, connectors, bus bars, shroudings, gland plates and provision for 3 phase energy meter etc., complete for finished item of work and suitable wiring provision for connecting the nature switch. (D 1403)

1

-

25747

... More
Construction of Budget Hotel at Nirmal;Providing independent earthing by exacavating a pit to a depth of 2.25Mtr in all soils as per size specified in the data for Sophisticated Electronic equipment with 600mm x 600mm x 3.15mm thick copper plate rigidly fixed to 19mm dia 'B' Class G.I Pipe of 2.5Mtr lengthwith funnel as per National Electric Code and earth connection from electrode GI strip of 40mm x 5mm x 200mm length to be bolted with nut bolts to G.I.pipe including 25mm x 3mm copper strip of 6Mtrs length connected from plate to GI strip including filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe and providing CC / Brick massonry chamber 450mmX450mmX400mm and covered with R.C.C. Slab including all accessories and labour charges etc complete as per IS specification 732/1982 (Part II). (D 1564)

4

-

66680

... More
Construction of Budget Hotel at Nirmal;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II) (D 1563)

4

-

23344

... More
Construction of Budget Hotel at Nirmal;Supply, transportation and fixing of 22W, 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 50,000 burning hours with BIS Certification with BIS Certification. LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

45

-

32778

... More
Construction of Budget Hotel at Nirmal;Supply, transportation and fixing of 18W back lit LED Down Light Recessed / Surface mounting round /square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 50,000 burning hours with BIS Certification. LUMINAIRE MAKE : Phillips / OSRAM / Wipro / Crompton LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

285

-

500990

... More
Construction of Budget Hotel at Nirmal;Supply, transportation and fixing of 12W back lit LED Down Light Recessed / Surface mounting round /square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 50,000 burning hours with BIS Certification. LUMINAIRE MAKE : Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

52

-

75029

... More
Construction of Budget Hotel at Nirmal;Supply and fixing of 10W LED mirror light of 600mm length with all standard accessories diffuser etc and including labour charges for fixing etc., complete. Makes: Philips/Crompton/GE.

30

-

14202

... More
Construction of Budget Hotel at Nirmal;Supply and fixing of 15" (375mm), ISI 900 RPM Heavy duty exhaust fan with metal blades, double ball bearing and wire guard etc and labour charges for fixing of Exhaust fan in wall with necessary connections and masonary work of making hole, finishing etc., completeof makes Crompton /Almonard / Havells Turbo Force SP.

6

-

26868

... More
Construction of Budget Hotel at Nirmal;Supply and fixing of 9" (225mm), Light duty exhaust fan with metal blades, double ball bearing and wire guard etc and labour charges for fixing of Exhaust fan in wall with necessary connections and masonary work of making hole, finishing etc., complete of makes Crompton / Havells Ventil Air-DB / Orient hill air.

32

-

68800

... More
Construction of Budget Hotel at Nirmal;Supply and fixing of energy efficient decorative fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMM/W) greater than 8.5, Air delivery minimum 235 CMM, 350 RPM (tolerance as per IS:374-2019), THD less than 10%, remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise = 75 degree C (max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., complete of Makes: Atomberg (Efficio + ) / Havells / Orient and labour charges for fixing of Ceiling fan including transportation and giving connections with twin core wire etc., complete.

51

-

164386

... More
Construction of Budget Hotel at Nirmal;Supply and erecting of Modular Electronic Regulator of 2 modular for ceiling fan sweep complete erected on existing board including labour charges for fixing etc complete. Makes: Legrand Arteor/Honewell Blenge Plus/Cabtree Amare.

51

-

32997

... More
Construction of Budget Hotel at Nirmal;Supply and fixing of 32 A Energy Key fob with two module metal box, cover frame and including labour charges for fixing etc., complete. Makes: Legrand Myrius/Anchor Roma/Crabtree.

25

-

23400

... More
Construction of Budget Hotel at Nirmal;Supply and fixing of ding dong bell on 100 x 178 mm (4"x7") decolam block including giving connections cost of all accessories and all labour charges etc., complete. Makes: Anchor/Gold Medal/GM.

25

-

5451

... More
Construction of Budget Hotel at Nirmal;Supply and fixing of CAT 6 RJ 45 information outlet including labour charges for fixing etc complete. Makes: Legrand/Krone/D Link.

29

-

14386

... More
Construction of Budget Hotel at Nirmal;Supply and run of LAN Cable Cat -6 STP in existing pipe inlcuding all labour charges etc., complete. Makes: D Link/Krone/AMP.

1200

-

66737

... More
Construction of Budget Hotel at Nirmal;Supply and run of RG 6 Co-axil cable in existing pipe inlcuding all labour charges etc., complete. Makes: Finolex/Polycab/Goldmedal.

1000

-

44414

... More
Construction of Budget Hotel at Nirmal;Supply and run of 2 pair 0.5 mm telephone copper wire in existing pipe inlcuding all labour charges etc., complete. Makes: Finolex/Polycab/Delton.

1000

-

20084

... More
Construction of Budget Hotel at Nirmal;Supply and fixing VTPN type Distribution board 4 Way with IP-43 protection suitable for single phase 100 A Four Pole (FP) Isolator as incomer and 4 Nos 6-32 A,10kA TP MCBs as out going including internal connections and labour charges for flush mounting etc., complete. Makes: Legrand/Schneider/Siemens.

2

-

37855

... More
Construction of Budget Hotel at Nirmal;Supply and fixing TPN Distribution board 4 Way with IP-43 protection suitable for single phase 100 A Four Pole (FP) Isolator as incomer and 12 Nos 6-32 A,10kA SP MCBs as out going including internal connections and labour charges for flush mounting etc., complete. Makes: Legrand/Schneider/Siemens.

28

-

308098

... More
Construction of Budget Hotel at Nirmal;Supply and fixing SPN Distribution board 12 Way with IP-43 protection suitable for single phase 63 A Four Pole (FP) Isolator as incomer and 8 Nos 6-32 A,10kA SP MCBs as out going including internal connections and labour charges for flush mounting etc., complete. Makes: Legrand/Schneider/Siemens.

2

-

15551

... More
Construction of Budget Hotel at Nirmal;Supply and fixing of Modular TV antenna outlet including labour charges for fixing etc complete. Makes: Legrand Arteor / MK Blenge /Cabtree Amare.

32

-

11394

... More
Construction of Budget Hotel at Nirmal;Supply and fixing of Modular Telephone jack with Connector including labour charges for fixing etc complete. Makes: Legrand Arteor / MK Blenge / Crabtree Amare.

27

-

9614

... More
Construction of Budget Hotel at Nirmal;Supply and fixing of 20A 3 pin 2 module socket with 20A switch control (with indicator) on a seperate switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes:Legrand Arteor/MK Blenge/Crabtree Amare.

29

-

22823

... More
Construction of Budget Hotel at Nirmal;Supply and fixing of 10A 3/2pin 2 module socket with 10A switch control on a seperate switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes: Legrand Arteor/Honeywell Blenge/Crabtree Amare

80

-

45846

... More
Construction of Budget Hotel at Nirmal;Supply and run of 4 of 140/0.3mm (10 Sq.mm) FRLSH/HFFR P.V.C. insulated flexible copper cable with one run of 140/0.3mm (10 Sqmm) for earth continuity in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Finolex/RR Kabel/Havells/Polycab.

400

-

286560

... More
Construction of Budget Hotel at Nirmal;Supply and run of 4 of 84/0.3mm (6 Sq.mm) FRLSH/HFFR P.V.C. insulated flexible copper cable with one run of 84/0.3mm (6 Sqmm) for earth continuity in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Finolex/RR Kabel/Havells/Polycab.

700

-

318990

... More
Construction of Budget Hotel at Nirmal;Supply and run of 2 of 56/0.3mm (4 Sq.mm) FRLSH/HFFR P.V.C. insulated flexible copper cable with one run of 56/0.3mm (4 Sqmm) for earth continuity in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Finolex/RR Kabel/Havells/Polycab

400

-

80038

... More
Construction of Budget Hotel at Nirmal;Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) FRLSH/HFFR P.V.C. insulated flexible copper cable with one run of 36/0.3mm (2.5 Sqmm) for earth continuity in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Finolex/RR Kabel/Havells/Polycab

1850

-

249326

... More
Construction of Budget Hotel at Nirmal;Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) FRLS/HFFR P.V.C. insulated flexible copper cable (ISI MARK) of makes Finolex/RR Kabel/Havells/Polycab in existing pipe with 10A switch, Ceiling rose and modular frame covering to switch control box including all labour charges etc., complete for light points in Buildings. Makes: Legrand Arteor/Honeywell Blenge Plus/Crabtree Amare

561

-

442723

... More
Construction of Budget Hotel at Nirmal;Supply and Fixing of 25mm dia P.V.C. pipe pipe of medium grade (ISI MARK) with all accessories fixing on chromium plated metallic base saddles (PVC Saddles) for Light, Fan and separate plug point including all labour charges etc., complete. Makes:Sudhakar/Polycab/Finolex.

6500

-

503230

... More
Construction of Budget Hotel at Nirmal;Supply and laying of 25mm dia P.V.C. pipe pipe of medium grade, FRLS (ISI MARK) with IS:9537 part 3 rigid pipe concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well metal deep box including all labour charges etc., complete. Makes: Sudhakar/Polycab/Finolex.

5000

-

431700

... More
Construction of Budget Hotel at Nirmal;Supply and laying of 25mm dia PVC pipe of heavy grade, FRLS (ISI MARK) with IS:9537 part 3 rigid pipe concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes: Sudhakar/Polycab/Finolex.

7700

-

633248

... More
Construction of Budget Hotel at Nirmal;Electrical Items

-

-

-

... More
Construction of Budget Hotel at Nirmal;Supply and delivery of encapsulated plastic steps manufactured as per companies standard specification including cost of materials packing as per companiess standards, loading, transportation, unloading and stacking at site of work , and taxes such as complete sales tax,C.E.D and others etc., as applicable including labour charges for fixing etc. complete for finished item of work.

15

-

3330

... More
Construction of Budget Hotel at Nirmal;Sump Top

26

-

14144

... More
Construction of Budget Hotel at Nirmal;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

-

-

-

... More
Construction of Budget Hotel at Nirmal;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Concrete Batching Plant with 20mm size graded machine crushed hard granite metal(coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using Steel scaffolding pipes, jack props, Steel centering Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402).

-

-

-

... More
Construction of Budget Hotel at Nirmal;300mm thick side walls

84

-

363972

... More
Construction of Budget Hotel at Nirmal;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Concrete Batching Plant with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Steel Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete Mechanically, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

-

-

-

... More
Construction of Budget Hotel at Nirmal;200mm thick bottom slab

39

-

83499

... More
Construction of Budget Hotel at Nirmal;Haunch Concrete

1.3

-

12092.6

... More
Construction of Budget Hotel at Nirmal;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Concrete Batching Plant with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using Steel scaffolding pipes, jack props, wallers, Foot plates, brackets, steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402).

-

-

-

... More
Construction of Budget Hotel at Nirmal;Conveyance of un-useful excavated earth to a distance of 5 KM for disposal including hire charges of T & P, labour charges etc., and overheads & contractors profit complete for finished item of work.

20

-

2280

... More
Construction of Budget Hotel at Nirmal;Sump Items

-

-

-

... More
Construction of Budget Hotel at Nirmal;Construction of brick masonry support for GI pipe of size 304.80mm x 228.60mm x 228.60 mm in CM (1:8) prop including plastering and finishing with 12mm thick in CM (1:5) including cost and conveyance of all materials and all labour charges, overheads & contractors profit complete for finished item of work for all floors.

40

-

4080

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing of SWR PVC pipes (Prince/ Sudhakar/ Kisan/ Supreme or any ISI brand) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) 160mm dia

256

-

167168

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing of SWR PVC pipes (Prince/ Sudhakar/ Kisan/ Supreme or any ISI brand) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) 110mm dia

438

-

155490

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing of SWR PVC pipes (Prince/ Sudhakar/ Kisan/ Supreme or any ISI brand) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) 75mm dia

421

-

107355

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type including cost and conveyance of all materials , labour charges , overheads & contractors profit complete for finished item of work. 65mm Nominal bore

3

-

20655

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type including cost and conveyance of all materials , labour charges , overheads & contractors profit complete for finished item of work. 50mm Nominal bore

6

-

26766

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type including cost and conveyance of all materials , labour charges , overheads & contractors profit complete for finished item of work. 32mm Nominal bore

12

-

27060

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type including cost and conveyance of all materials , labour charges , overheads & contractors profit complete for finished item of work. 25mm Nominal bore

10

-

14840

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type including cost and conveyance of all materials , labour charges , overheads & contractors profit complete for finished item of work. 20mm Nominal bore

20

-

20660

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing 65 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 in ground or on wall with GI fittings such as elbows tees couplings, nipples, plugs including excavation for trenches and refilling the trenches ,chiselling masonry walls and making good the walls & floors to the original surface and fixing MS clamps on TW blocks on walls including cost and conveyance of all materials and labour charges , overheads & contractors profit complete for finished item of work except for GI bends union and GI connectors with checkout and socket Tata or Zenith make or equivalent.

60

-

63780

... More
Construction of Budget Hotel at Nirmal;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels.54.00mm OD pipe

10

-

6740

... More
Construction of Budget Hotel at Nirmal;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels. 41.30mm OD pipe

89

-

41118

... More
Construction of Budget Hotel at Nirmal;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels. 34.90mm OD pipe

26

-

9698

... More
Construction of Budget Hotel at Nirmal;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels. 28.60mm OD pipe

26

-

7124

... More
Construction of Budget Hotel at Nirmal;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels. 22.20mm OD pipe

120

-

27360

... More
Construction of Budget Hotel at Nirmal;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels. 15.90mm OD pipe

229

-

43281

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing of 101.60mm x 609.60mm white glazed porcelain channels 1st quality fixed in brick masonry to the required slopes, white cement pointing including cost and conveyance of all materials and labour charges, overheads & contractors profit complete for finished item of work for all floors..

8

-

7816

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing of 16mm to 20 mm thick polished marble slab partitioins of size 4' 0" x 2' 0" for urinals including full rounding the edges, fixing in position, polishing, including cost and conveyance of all materials and labour charges, overheads & contractors profit complete for finished item of work for all floors.

6

-

15552

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing white glazed flat back half stall urinals of size 590 mm x 375 mm x 390 mm with integral flushing rim fixed with screws complete Indian make (Hindustan Sanitary ware/ Parryware/ Neycer) conforming to IS:2556-1995 as approved by Engineer-in-charge, including supply and fixing 12.7mm PVC connection with brass plumber union nuts CP coated, 12.70mm push cock 1st quality of approved make, 30mm dia PVC flexible waste pipe of 914.4 mm length of Ist quality including cost and conveyance of all materials to site, labour charges etc., overheads & contractors profit complete for finished item of work for all floors.

12

-

58464

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing Chromium plated finish brass body quarter turn Bibcock cum Health Faucet (PREMIUM MAKE - Jaquar/ Hindware) with 1m long tube and wall hook with 7 - 10 years warranty with necessary fittings etc., complete including cost and conveyance of all materials, labour charges, overheads & contractor profit complete for finished item of work in all floors.

51

-

197727

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing 15 mm brass body CP finish self closing tap push type conforming to IS 1711 as approved by the Engineer-In-Charge including cost and conveyance of all materials, labour charges, overheads & contractors profit complete for finished item of work in all floors.

51

-

17391

... More
Construction of Budget Hotel at Nirmal;S&F of 15 mm brass body premium variety Chromium Plated finish bib tap angular shape (Make :Jaguar) with wall flange of not less than 500 grams weight with quarter turn spindle with either internal or external threaded connection conforming to IS 8931 and with 10 years warranty

59

-

85904

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing of 25.4mm dia, 609.6mm long aluminium anodized towel rods with brackets and aluminium screws including cost and conveyance of all materials, labour charges , overheads & contractors profit for finished item of work.

49

-

9751

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing TV shape mirror with plastic frame of size 609.6mm x 457.2mm , plywood back with NP screws 1st quality including cost and conveyance of all materials, labour charges , overheads & contractors profit for finished item of work in all floors.

49

-

30282

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing CP finish brass soap dish of approved make ISI quality including cost and conveyance of all materials, labour charges for fixing, overheads & contractors profit for finished item of work in all floors

59

-

42008

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make heavy duty complete with standard CI brackets including wooden blocks ,1 No.12.70mm PVC connection with brass union nuts CP coated , angle stop cock 12.70mm dia. first quality Indian make heavy duty, 30mm dia. PVC flexible waste pipe 914.4mm length of 1st quality including cost and conveyance of all materials to site, labour charges , overheads & contractors profit for finished item of work. Makes:Hindustan Sanitary ware/ Parryware/ Neycer/ CERA /Jaquar / Somany, Watertec, Kerovit by Kajaria.

59

-

288451

... More
Construction of Budget Hotel at Nirmal;Supply, Installation and commissioning approved make floor mounted Close Coupled wash down EWC conforming to IS:2556 (Part 8)-2004 suit with 'P' ' trap with dual flush porcelain cistern fixed on wash down EWC with all internal parts of dual flush cistern, ultra solid seat cover of approved make with rubber buffer and cap & 15 mm angle stop cock & 450 mm long PVC inter connection pipe wall flanges all of approved make etc. complete for finished item of work in all respects: White Colour Makes:-Hindustan Sanitary ware/ Parryware/ Neycer/ CERA/Jaquar / Somany, Watertec, Kerovit by Kajaria

51

-

668661

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing of 4" (101.6mm) multi floor trap with jali - UPVC/SWR pipe fittings as per site requirements with standard practice for all floors including cost and conveyance of all materials to site, labour charges , overheads & contractors profit etc., complete for finished item of work.

75

-

14025

... More
Construction of Budget Hotel at Nirmal;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing , overheads & contractors profit etc., complete for finished item of work as per Standard specification.

8

-

126512

... More
Construction of Budget Hotel at Nirmal;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing , overheads & contractors profit etc., complete for finished item of work as per Standard specification.

10

-

97790

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing of SWG Gully traps 150mm x 100mm of ISI make confirming to IS 651 & 4127 with C.I grating & constructing cement brick masonry in CM (1:6) prop., intermediate chamber and fitted with 304.8 mm X 288.6 mm (12"x9") C.I Frame with hinged cover of standard make as approved including cost and conveyance of all materials to site, labour charges, overheads & contractors profit etc., complete for finished item of work.

15

-

11520

... More
Construction of Budget Hotel at Nirmal;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber upto 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing , overheads & contractors profit etc., complete for finished item of work as per Standard specification.

35

-

176890

... More
Construction of Budget Hotel at Nirmal;Supplying and laying, filling, jointing and testing SWG SP-1 pipe conforming to ISI 651 & 4127 with air tight Cement joints in CM (1.5:1) prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) and refilling with watering and tamping to the required slope including cost and conveyance of all materials to site and all labour charges , overheads & contractor profit etc., complete for finished item of work (APSS NO 1301 & 1318). 300mm dia upto 1524mm (5') depth

30

-

68490

... More
Construction of Budget Hotel at Nirmal;Supplying and laying, filling, jointing and testing SWG SP-1 pipe conforming to ISI 651 & 4127 with air tight Cement joints in CM (1.5:1) prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) and refilling with watering and tamping to the required slope including cost and conveyance of all materials to site and all labour charges , overheads & contractor profit etc., complete for finished item of work (APSS NO 1301 & 1318). 203.20mm dia upto 1524mm (5') depth

100

-

120900

... More
Construction of Budget Hotel at Nirmal;Supplying and laying, filling, jointing and testing SWG SP-1 pipe conforming to ISI 651 & 4127 with air tight Cement joints in CM (1.5:1) prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) and refilling with watering and tamping to the required slope including cost and conveyance of all materials to site and all labour charges , overheads & contractor profit etc., complete for finished item of work (APSS NO 1301 & 1318). 152.40mm dia upto 1524.0mm (5') depth

150

-

141150

... More
Construction of Budget Hotel at Nirmal;Water Supply & Sanitary Items

-

-

-

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing 50mm dia nominal bore Medium Grade properties & weight as per IS 1239 ISI mark MS Tube for fixing of GI Sheet including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit for finished item of work.etc., complete for finished item of work in all floors for stair case head room roof.

22

-

15356

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing of Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours fixed with G.I ?J? bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled with white lead & including a coat of approved steel primer and two coats of approved paint on over lapping of sheets complete (up to a pitch of 600) etc., complete, excluding the cost of purlins, rafters, trusses including cost and conveyance of all materials , labour charges , overheads and contractors profit etc., complete for finished item of work Head Rooms

36

-

29952

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1993 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall topcoa including overheads and contractor profit etc., complete for finished item of work.

872

-

1062968

... More
Construction of Budget Hotel at Nirmal;Painting two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxide to new iron work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

35

-

6405

... More
Construction of Budget Hotel at Nirmal;Painting to new wood work and flush shutters with lappam finish, over a primary coat and painting two coats of synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre of approved shade including cost and conveyance of all materials to site cost of primer coat and all labour charges etc. complete including applying sand paper on lappam coats for neat finish including sales & other taxes on cost of all materials etc., and overheads & contractors profit complete in all floors (APSS No.1200, 1207 & 1211).

213

-

45582

... More
Construction of Budget Hotel at Nirmal;Providing and applying Exterior grade Texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, scaffolding charges, overheads and contractors profit etc., complete for finished item of work in all floors for external walls.

153.7

-

70241

... More
Construction of Budget Hotel at Nirmal;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ liter for exterior walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.

1537

-

428823

... More
Construction of Budget Hotel at Nirmal;Supply & application of one coat water based cement primer of interior grade I and two coats of acrylic emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for internal walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.

5970

-

1146240

... More
Construction of Budget Hotel at Nirmal;White washing two coats with white cement to ceiling to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., and overheads & contractors profit complete for finished item of work in all floors.

3319

-

159312

... More
Construction of Budget Hotel at Nirmal;Providing and applying Wall putty of White Cement or Polymer or Cement based of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, over heads and contractors profit etc., complete for finished item of work in all floors for Internal walls.

546

-

133224

... More
Construction of Budget Hotel at Nirmal;RCM facia 50mm thick in CM (1:3) using screened sand for drop walls, fins with rabbit wire mesh & nomianl reinforcement as directred by Engineer - In - Charge with dubara sponge finishing,including cost and conveyance of all materials to site, sales & othertaxes on all materials, operationals &incidental, cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work,lift charges etc., and overheads & contractors profit complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work (APSS NO.403&903).

63

-

188937

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing of stainless steel (grade 304) hand railing as per approved drawing with top rail of 50mm dia pipe and 2mm thick medium class and vertical posts of 25mm dia and 1.6mm thick medium class 2 Nos for each step fixed with base plate of 75mm dia using bonding agent and anchor fastner and welding, drilling of 25mm dia holes with pneumatic compressor for fixing railing, buffing, polishing all members of the railing thouroughly, lacquer finishing to present seamless finish including cost and conveyance of all materials, electrodes, welding charges, cost of all consumables, labour charges, overheads & contractors profit etc., complete for finished item of work.

19

-

117154

... More
Construction of Budget Hotel at Nirmal;Supplying and fixing of MS Grill to windows / in open court yards using 25mm x 6mm MS flat alround and 10mm MS square bars horizontally at 125mm centre to centre and vertically at 300mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting grill with one coat of red oxide primer including cost all taxes and conveyance of all materials including cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work.

35

-

49000

... More
Construction of Budget Hotel at Nirmal;Providing and Fixing Structural Glazing fabricated from Roll formed sections made of Pre-painted Steel / Powder coated (Base steel as per IS 513 of ?D? quality, galvanized as per IS 277 with Zinc of 120 Gm/Sqm) with total coated thickness of 0.72mm. The glass holding section made of 304 grade stainless steel of 0.6mm thick as per the design requirement & calculations as given in IS: 875. Primer coat with epoxy primer of 5 ? 7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with Alkyd backer of 5-7 microns or powder coated with pure polyester powder up to 50-60 microns thick. The vertical section should be of 50mm x100mm x 0.72mm, 33mm x 58mm x 0.72mm for frame horizontal section, stiffener section should be 48mm x 98mm x 1mm, cover profiles sections should be of 20mm x 58mm x 0.58mm, Glass holding section should be of 37mm x 37mm & 37mm x 18mm. Including 5mm thick Ocean Blue reflective glass. Brackets made of CRCA powder coated/Electroplated should be used to connect verticalto horizontal, vertical to slab, to fix verticals at top & bottom as per site requirement. Gasket made of Ethyl Propylene Diamine Monomer. Natural cure, with Good U.V. Resistance Silicon to be used. Wall fixing of sections to concrete/ masonry wall should be with self-expanding cap & screws. The rate is inclusive of cost and conveyance of all materials to site, all labour charges, incidental charges, cost of all consumables etc. and scaffolding charges, form work , overheads & contractors profit etc., complete for finished item of work in all floors.

216

-

2031912

... More
Construction of Budget Hotel at Nirmal;Providing, supplying & fixing of Fixed Louvered Ventilator (NCL) made out of multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness. (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin). Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4 mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site including overheads and contractor profit etc., complete for finished item of work.

10.53

-

76648

... More
Construction of Budget Hotel at Nirmal;SSupplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 2 Track?2 Panel Sliding windows (NCL) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (62mm x 60 mm)/(60 mm x 45 mm) x 2.20 mm for outer frames, (66 mm x 38 mm)/(58 mm x 39 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site including overheads and contractors profit etc., complete for finished item of work.

39

-

302094

... More
Construction of Budget Hotel at Nirmal;Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and ISI marked flush door shutters of 35 mm thick single shutter with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos.MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked Aluminium fixtures of 3 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 1 No. tower bolt (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150 mm long handles (IS:208), 1 No. door stopper and 1 No. rubber bush including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (900mm x 2100mm).

56.7

-

271139

... More
Construction of Budget Hotel at Nirmal;Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and ISI marked flush door shutters of 30 mm thick single shutter with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked Brass fixtures of 3 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 1 No. tower bolt (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150 mm long handles (IS:208), 1 No. door stopper and 1 No. rubber bush including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (1000mm x 2100mm)

127.89

-

784221

... More
Construction of Budget Hotel at Nirmal;Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and ISI marked flush door shutters of 30 mm thick double shutters with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked Brass fixtures of 6 Nos. butt hinges (IS:205)150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150 mm long handles (IS:208), 2 Nos. door stoppers and 2 Nos. rubber bushes including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (1800mm x 2100mm)

9.45

-

47968

... More
Construction of Budget Hotel at Nirmal;Providing 160 mm Dia ISI marked PVC down water take pipes with socket , 2.5mm thick 4.0 kg/sq.cm pressure of ISI marked including cost of necessary PVC Bends, shoes, iron / PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials, sales & other taxes on materials to site, operational & incidental charges including all labour charges for fixing at site etc., and overheads & contractors profit complete for finished item of work. (APSS No. 1328)

71

-

48635

... More
Construction of Budget Hotel at Nirmal;First Floor :

14

-

9632

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

75

-

50925

... More
Construction of Budget Hotel at Nirmal;Providing skirting to internal walls 10cm height with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours, length equal to flooring slabs set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work.

-

-

-

... More
Construction of Budget Hotel at Nirmal;First Floor :

5

-

21940

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

17

-

73593

... More
Construction of Budget Hotel at Nirmal;Providing cladding to walls with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours, length equal to flooring slabs set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work.

-

-

-

... More
Construction of Budget Hotel at Nirmal;First Floor :

482

-

397168

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

91

-

73892

... More
Construction of Budget Hotel at Nirmal;Providing dadooing to walls with glazed full body ceramic tiles of any size and thickness between 5 to 7mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Parts 1 to 15) of any colour and finish in all shades and designs with borders as approved by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work. (for Toilets).

-

-

-

... More
Construction of Budget Hotel at Nirmal;First Floor :

861

-

97293

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

274

-

29866

... More
Construction of Budget Hotel at Nirmal;Providing skirting to internal walls up to 10 cm height with with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc.,and overheads & contractors profit complete for finished item of work.(APSS No.701 &707)

-

-

-

... More
Construction of Budget Hotel at Nirmal;First Floor :

1

-

5173

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

5

-

25425

... More
Construction of Budget Hotel at Nirmal;Flooring with 16 to 18 mm thick High Polished Granite stone slabs black colour as approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edge , polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work for Sill slabs (S.S.701 & special)

-

-

-

... More
Construction of Budget Hotel at Nirmal;First Floor :

6

-

26928

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

12

-

53592

... More
Construction of Budget Hotel at Nirmal;Risers of 0.15m height :

-

-

-

... More
Construction of Budget Hotel at Nirmal;First Floor :

10

-

66960

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

20

-

132160

... More
Construction of Budget Hotel at Nirmal;Treads of 0.30m wide :

-

-

-

... More
Construction of Budget Hotel at Nirmal;Providing 16 to 18mm thick high polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work for treads and risers (S.S.701 & special).

-

-

-

... More
Construction of Budget Hotel at Nirmal;Basement Floor :

12

-

5148

... More
Construction of Budget Hotel at Nirmal;Granolithic Concrete flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal and screened sand laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m, using glass strips and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal sand and water and overheads & contractors profit complete for finished item of work. (APSS No.701 & 710)

-

-

-

... More
Construction of Budget Hotel at Nirmal;Basement Floor :

1261

-

885222

... More
Construction of Budget Hotel at Nirmal;Vaccum dewatering cement concrete flooring 75mm thick using M 25 grade design mix corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry in panels as per drawing / design, laid to proper level and slope including consolidating with power driven mechanical vibrators (both needle & screed vibrators), dewatering by vacuum process "Tremix" method, floated with neat cement and power troweled to achieve smooth finishing, including MS Shuttering, finishing, rounding of the edges, curing including cost and conveyance of all materials like cement, coarse aggregate, sand etc., to site, centering, shuttering, machine mixing, laying concrete, vibrating, curing, hire charges of all tools and plants, all other incidental and operational charges, labour charges and all taxes exceluding GST etc., complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work.

-

-

-

... More
Construction of Budget Hotel at Nirmal;Basement Floor :

258

-

226782

... More
Construction of Budget Hotel at Nirmal;Flooring with chequered cement concrete heavy duty tiles confirming to IS:13801 using aggregates, cement, pigments of size 300mm x 300mm and thickness 25mm of any shade as approved by Engineer-In-Charge set over base coat of cement mortar (1:6), 12 mm thick using screened sand over CC bed alredy laid or RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm and jointed with neat white cement to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water and tiles etc.,and overheads & contractors profit complete for finished item of work

-

-

-

... More
Construction of Budget Hotel at Nirmal;First Floor :

3

-

15519

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

6

-

30510

... More
Construction of Budget Hotel at Nirmal;Flooring with 16 to 18 mm thick high polished granite stone slabs black colour as approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edge , polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work for platforms (S.S.701 & special)

-

-

-

... More
Construction of Budget Hotel at Nirmal;First Floor :

6

-

28374

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

102

-

473382

... More
Construction of Budget Hotel at Nirmal;Flooring with 16 to 18mm thick high polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work (S.S.701 & special)

-

-

-

... More
Construction of Budget Hotel at Nirmal;First Floor :

900

-

1028700

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

822

-

900090

... More
Construction of Budget Hotel at Nirmal;Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs as per the approved flooring pattern as directed by the Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707).

-

-

-

... More
Construction of Budget Hotel at Nirmal;First Floor :

136

-

132328

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

24

-

22200

... More
Construction of Budget Hotel at Nirmal;Flooring with non-skid full body ceramic floor tiles of size 300mm x 300mm and thickness between 7 - 8mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Part 1 to 15) of any colour and finish in all shades and designs as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick using screened sand over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, screened sand , water and tiles etc., and overheads & contractors profit complete for finished item of work. (In toilets) (APSS No.701 & 707).

-

-

-

... More
Construction of Budget Hotel at Nirmal;Terrace Floor :

67

-

14606

... More
Construction of Budget Hotel at Nirmal;First Floor :

198

-

40788

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

161

-

31395

... More
Construction of Budget Hotel at Nirmal;Providing impervious coat to exposed RCC roof slab surfaces of sump, sump side wall,sump bottom slab, in side of septic tank, in sunken slabs etc. to required slopes with CM (1:3) prop. using screened sand 12mm thick mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm where ever necessary including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

-

-

-

... More
Construction of Budget Hotel at Nirmal;Terrace Floor :

1235

-

778050

... More
Construction of Budget Hotel at Nirmal;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

-

-

-

... More
Construction of Budget Hotel at Nirmal;Basement :

113

-

19210

... More
Construction of Budget Hotel at Nirmal;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904) for basement.

-

-

-

... More
Construction of Budget Hotel at Nirmal;Terrace Floor :

465

-

281790

... More
Construction of Budget Hotel at Nirmal;First Floor :

381

-

211836

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

576

-

292032

... More
Construction of Budget Hotel at Nirmal;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes exceluding GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work for external walls. (SS 901,903 & 904).

-

-

-

... More
Construction of Budget Hotel at Nirmal;Terrace Floor :

167

-

101202

... More
Construction of Budget Hotel at Nirmal;First Floor :

3789

-

2106684

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

2014

-

1021098

... More
Construction of Budget Hotel at Nirmal;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes exceluding GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work for internal walls (SS 901,903 & 904). (SS 901,903 & 904).

-

-

-

... More
Construction of Budget Hotel at Nirmal;Terrace Floor :

33

-

20823

... More
Construction of Budget Hotel at Nirmal;First Floor :

1055

-

608735

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

2231

-

1164582

... More
Construction of Budget Hotel at Nirmal;Ornamental ceiling plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in- harge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

-

-

-

... More
Construction of Budget Hotel at Nirmal;First Floor :

1.34

-

120829

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

0.3

-

26767

... More
Construction of Budget Hotel at Nirmal;Providing Mild steel (MS) steel bars (Fe 250 grade as per IS 432) of different diameters including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work.(APSS No.126)

-

-

-

... More
Construction of Budget Hotel at Nirmal;Terrace Floor :

8.7

-

787489

... More
Construction of Budget Hotel at Nirmal;First Floor :

75.1

-

6682248

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

202.3

-

17689112

... More
Construction of Budget Hotel at Nirmal;Providing Thermo Mechanically Treated (TMT) (Fe -500/500D/550D from Primary producer TATA, SAIL, VSP, JSW &Shyam Steel etc as per IS 1786-2008) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work. (APSS No.126).

-

-

-

... More
Construction of Budget Hotel at Nirmal;Terrace Floor :

17

-

208335

... More
Construction of Budget Hotel at Nirmal;Reinforced cement concrete (1:5:10) proportion (Cement: fine aggregates: coarse aggregate) using 40mm size (SS5) hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand)(with 50% river sand & 50% manufactured sand), coarse aggregate, water etc., to site including centering using Casurina Ballies , Bamboos , Wooden Reapers , Runners , Wood Posts , Wall Plates etc., shuttering, machine mixing, laying concrete, lifting concrete manually , curing etc., and overheads & contractors profit complete as per drawings but excluding cost of steel and it's fabrication charges for finished item of work (APSS NO. 402 & 403) for Dummy columns.

-

-

-

... More
Construction of Budget Hotel at Nirmal;First Floor :

38

-

192128

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

14

-

69300

... More
Construction of Budget Hotel at Nirmal;Filling with light weight concrete in Cement Concrete (1:5:10) proportion using brick jelly for low roofs including cost and conveyance of all materials like cement, sand, brick bats etc., to site including cost of all labour charges for laying concrete, ramming, curing, overheads & contractors profit etc., complete for finished item of work. (APSS. No. 402).

-

-

-

... More
Construction of Budget Hotel at Nirmal;Terrace Floor :

1

-

5926

... More
Construction of Budget Hotel at Nirmal;First Floor :

5

-

28830

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

3

-

16821

... More
Construction of Budget Hotel at Nirmal;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand)(with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for mixing, laying concrete in position, curing etc., & lift charges , and overheads & contractors profit for Bed Blocks & Hold Fasts for finished item of work. (APSS No. 402)

-

-

-

... More
Construction of Budget Hotel at Nirmal;First Floor :

2

-

14758

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

2

-

14184

... More
Construction of Budget Hotel at Nirmal;Plain Cement Concrete M 20 design mix using Concrete Batching Plant, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 330 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand)(with 50% river sand & 50% manufactured sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work (APSS No. 402 & 403) for steps.

-

-

-

... More
Construction of Budget Hotel at Nirmal;First Floor :

664

-

648728

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

155

-

138105

... More
Construction of Budget Hotel at Nirmal;Reinforced Masonry for partition walls (100 mm thick) in CM (1:4) prop. (Cement : Screened sand) using fly ash cement / lime solid blocks of size 290mm x 100mm x 140mm having minimum compressive strength of 50 Kg/Sq.cmand placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 509)

-

-

-

... More
Construction of Budget Hotel at Nirmal;Terrace Floor :

56

-

518224

... More
Construction of Budget Hotel at Nirmal;First Floor :

216

-

1879848

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

254

-

2070608

... More
Construction of Budget Hotel at Nirmal;Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with fly ash cement solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work. (APSS No. 501 & 504).

-

-

-

... More
Construction of Budget Hotel at Nirmal;First Floor :

1

-

8050

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

2

-

15422

... More
Construction of Budget Hotel at Nirmal;Reinforced Cement Concrete M 20 design mix using 12mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete using Concrete Batching Plant including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, laying concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 & 403) for sill slabs.

-

-

-

... More
Construction of Budget Hotel at Nirmal;First Floor :

3

-

1767

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

18

-

10116

... More
Construction of Budget Hotel at Nirmal;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Concrete Batching Plant with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials , centering using Casurina Ballies , Bamboos , Wooden Reapers , Runners , Wood Posts , Wall Plates etc., for 60cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work. (APSS No. 402, 403 & 903)

-

-

-

... More
Construction of Budget Hotel at Nirmal;Ornamental borders by providing 20mm thick raised bands of 230 mm wide in plain cement mortor bands in CM(1:4) 360 Kg ,including cost and conveyence of all materials, labour charges and scaffolding s etc., curing, overheads & contractors profit etc., complete for finished item of work.

50

-

8150

... More
Construction of Budget Hotel at Nirmal;First Floor :

353

-

804840

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

622

-

1368400

... More
Construction of Budget Hotel at Nirmal;Roof Slabs 225mm thick : upto un supported height of 3.66m

-

-

-

... More
Construction of Budget Hotel at Nirmal;First Floor :

118

-

249098

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

236

-

479316

... More
Construction of Budget Hotel at Nirmal;Roof Slabs 200mm thick : upto un supported height of 3.66m

-

-

-

... More
Construction of Budget Hotel at Nirmal;First Floor :

461

-

894801

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

922

-

1715842

... More
Construction of Budget Hotel at Nirmal;Roof Slabs 175mm thick : upto un supported height of 3.66m

-

-

-

... More
Construction of Budget Hotel at Nirmal;Terrace Floor :

33

-

58905

... More
Construction of Budget Hotel at Nirmal;First Floor :

110

-

192060

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

220

-

368060

... More
Construction of Budget Hotel at Nirmal;Roof Slabs 150mm thick : upto un supported height of 3.66m

-

-

-

... More
Construction of Budget Hotel at Nirmal;Terrace Floor :

45

-

72405

... More
Construction of Budget Hotel at Nirmal;First Floor :

208

-

326560

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

442

-

664768

... More
Construction of Budget Hotel at Nirmal;Roof Slabs 125mm thick : upto un supported height of 3.66m

-

-

-

... More
Construction of Budget Hotel at Nirmal;Terrace Floor :

3

-

40395

... More
Construction of Budget Hotel at Nirmal;First Floor :

141.94

-

1863388

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

284

-

3569880

... More
Construction of Budget Hotel at Nirmal;Roof Beams upto un supported height of 3.66 m

-

-

-

... More
Construction of Budget Hotel at Nirmal;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Concrete Batching Plant with 20mm size graded machine crushed hard granite metal(coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand)(with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using Steel scaffolding pipes, jack props, Steel centering Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402).

-

-

-

... More
Construction of Budget Hotel at Nirmal;Basement Floor :

553

-

2010155

... More
Construction of Budget Hotel at Nirmal;230mm thick Retaining wall

-

-

-

... More
Construction of Budget Hotel at Nirmal;Terrace Floor :

35

-

106435

... More
Construction of Budget Hotel at Nirmal;150mm thick Watertank Side wall

-

-

-

... More
Construction of Budget Hotel at Nirmal;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Concrete Batching Plant with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand)(with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Steel Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete Mechanically, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

-

-

-

... More
Construction of Budget Hotel at Nirmal;First Floor :

3

-

1770

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

6

-

3390

... More
Construction of Budget Hotel at Nirmal;Reinforced Cement Concrete M 20 design mix using 12mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete using Concrete Batching Plant including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, labour charges such as weigh batching, machine mixing, laying concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 & 403) for platforms and shelves.

-

-

-

... More
Construction of Budget Hotel at Nirmal;Terrace Floor :

0.2

-

2850

... More
Construction of Budget Hotel at Nirmal;First Floor :

5

-

68125

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

4

-

51996

... More
Construction of Budget Hotel at Nirmal;Lintels

-

-

-

... More
Construction of Budget Hotel at Nirmal;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Concrete Batching Plant with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand)coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Steel Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402).

-

-

-

... More
Construction of Budget Hotel at Nirmal;Terrace Floor :

9

-

146142

... More
Construction of Budget Hotel at Nirmal;First Floor :

111

-

1747473

... More
Construction of Budget Hotel at Nirmal;Ground Floor :

246

-

3478932

... More
Construction of Budget Hotel at Nirmal;Columns : un supported height up to 3.66 m

-

-

-

... More
Construction of Budget Hotel at Nirmal;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Concrete Batching Plant with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand)(with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using Steel scaffolding pipes, jack props, Steel centering Plates etc. including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

-

-

-

... More
Construction of Budget Hotel at Nirmal;Plinth Beams :

91

-

1235780

... More
Construction of Budget Hotel at Nirmal;Column Pedestals :

54

-

613926

... More
Construction of Budget Hotel at Nirmal;Footings :

187

-

2002209

... More
Construction of Budget Hotel at Nirmal;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Concrete Batching Plant with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand (with 50% river sand & 50% manufactured sand)) coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using Steel scaffolding pipes, jack props, wallers, Foot plates, brackets, steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402).

-

-

-

... More
Construction of Budget Hotel at Nirmal;Vibrated Plain Cement Concrete (1:3:6) nominal mix using 40mm size machine crushed hard granite metal and 20mm graded machine crushed hard granite metal (coarse aggregate) in (2:1) ratio from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand)(with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, sales & other taxes except GST on all materials, all charges for mixing, laying concrete in position, vibrating, curing, centering charges, overheads & contractors profit etc.,for finished item of work for footings and basement.

16

-

93952

... More
Construction of Budget Hotel at Nirmal;Filling with carted gravel by manual means in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., and overheads & contractors profit complete for fnished item of work. (APSS NO. 309 & 310)

100

-

69700

... More
Construction of Budget Hotel at Nirmal;Filling with useful available excavated earth by manual means (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., and overheads & contractors profit complete for finished item of work. (APSS NO. 309 & 310)

419

-

87571

... More
Construction of Budget Hotel at Nirmal;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand(with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402)

157

-

676042

... More
Construction of Budget Hotel at Nirmal;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand(with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402)

16

-

72016

... More
Construction of Budget Hotel at Nirmal;Plain Cement Concrete M 20 design mix using Concrete Batching Plant, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 330 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand)(with 50% river sand & 50% manufactured sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work (APSS No. 402 & 403) for foundations on sheet rock.

9

-

58284

... More
Construction of Budget Hotel at Nirmal;Grouting the holes with neat cement slurry excluding cost of steel but including cost and conveyance of all materials and labour charges etc.,and overheads & contractors profit complete for finished item of work

21

-

2772

... More
Construction of Budget Hotel at Nirmal;Drilling holes of 25 mm dia and 800mm deep in hard rock or sheet rock with pneumatic compressor and placing of 20mm dia Tor steel bars and grouting the holes in CM(1:2) prop. excluding cost of steel and its fabrication charges but including cost and conveyance of all materials and labour charges etc.,and overheads & contractors profit complete for finished item of work

21

-

3780

... More
Construction of Budget Hotel at Nirmal;Earth work excavation for foundations for buildings in hard rock (blasting prohibited) and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

92

-

217580

... More
Construction of Budget Hotel at Nirmal;Earth work excavation for foundations (Mechanical Means) for buildings in ordinary rock (not requiring blasting) and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

698

-

111680

... More
Construction of Budget Hotel at Nirmal;Earth work excavation for foundations (Mechanical Means) for buildings in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308).

7251

-

913626

... More
Construction of Budget Hotel at Nirmal;Civil Items

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.