Telangana State Tourism Development Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Tourism Development Corporation - TSTDC Tender

Works
Civil And Construction
Building Construction
Opening Date4 Dec 2024
Closing Date20 Dec 2024
Tender Amount₹ 1,58,95,653 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Demolition of Brick work including stacking of serviceable materials and disposal of unserviceable materials within 100 metres lead

11.3

325

3683.69

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Dismantling of Kadapa slabs or Shahabad stone slabs flooring on sand bed including stacking of serviceable materials and disposal of unserviceable materials within 100 metres lead.

193.58

18

3488.31

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Dismantling doors, windows and clear storey windows, ventilators etc.; (wood or steel) shutters including chowkhats, architraves, hold fasts and other attachments etc., complete and stacking them within 100 metre lead. - Not exceeding 3 sq.m. in area

10

289

2890.1

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Carting away of debries to a lead of 5 KM (the rate including conveyance charges, labour charges for loading, unloading charges) including idle hire charges of truck etc. complete as directed by the Departmental Authorities of the work.

71.9

333

23942.7

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc. Ordinary Soil-Manual Means-Upto 3 m depth.

174.64

290

50666.56

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Filling with available excavated earth in trenches, sides of foundations with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. - By Manual means.

44.29

41

1823.86

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Filling with Murram in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

17.09

519

8879.96

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Providing post construction anti termite treatment by drilling 1/2 inch dia., holes at the edges of wall floor junction and pouring anti termite chemical (Imidacloprid 30.5 SC, 10.5 ml for 5 Liters of water as per IS 16131.) with a hand operated pressure pump until refusal or to a maximum of one liter per hole. Holes shall be sealed with cement motor after treatment and providing spraying and injecting termiticides for treating and applying to doors, windows, frames, removing, crusting treating in Treatment along outside of foundations (i.e., Soil in contact with external walls around the building and Concrete or Masonry apron around the building), Treatment of soil under floors - Inside Building, Treatment to voids in masonry, Treatment at points of contact of woodwork, Treatment of Wood Work, Treatment of Electrical Fixtures, as directed in IS 6313 Part 3 2013 with preventive chemicals duly taking precautions for health hazards and safety measures for the occupants including all costs, conveyances of all materials and labour charges etc for finished item of work to the satisfaction of the Engineer-in-Charge. The plinth area of the building each floor shall be taken for the purpose of payment.

25.29

164

4166.27

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Plain Cement concrete (1:4:8) using 40mm metal with Machine mixing including cost and conveyance of all materials, labour charges for laying vibrating curing etc., upto plinth level.

98.5

4871

479838.81

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supply and placing of the M25 grade Standard Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including mixing, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;a)Footings

5.83

11132

64901.13

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;b)Pedestals

10.78

11883

128101.87

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;c)Plinth Beams

2.28

14404

32841.85

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;d)Columns

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;1)Ground Floor

4.5

15016

67572.68

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;e)Lintels

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;1)Ground Floor

1.07

15014

16065.41

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;f)Roof Beams

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;1)Ground Floor

1.67

13803

23051.69

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;g)Slab

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;1)Ground Floor

6.56

12193

79989.75

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Ground Floor

3.77

85945

323757.94

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;CR stone masonry in 2nd sort in CM (1:6) prop: (cement : sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., and overheads & contractors profit, complete for finished item of work in foundation & basement.

46.25

5906

273192.27

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Flush Pointing with CM (1:3) to Brick / CRS Masonry including cost and conveyance of all materials like cement, sand, water etc., to site, labour charges, like mixing cement mortar, overheads and contractors profit etc., complete for finished item of work.

105.78

113

12021.9

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23 x 11 x 7 cms including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, cost of overheads and contractors profit etc., complete for finished item of work. (APSS No. 501 & 504).

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;a)Ground Floor

40.08

9168

367489.11

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;b)First Floor

29.72

9665

287270.55

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using bricks having a crushing strength of not less than 35.00kg/cm2 and using two mild steel bars of 6m dia in every third layer of brick masory, with free joints of the main block work including cost and seignorage charges and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and its fabrication charges for finished item of work as per SS 509.

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Ground Floor

170.38

1111

189439.6

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Plastering 12mm thick for Ceiling Area using screened sand with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Ground Floor

33.64

573

19293.21

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Plastering 12mm thick for internal walls using screened sand with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Ground Floor

461.64

556

257022.69

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Plastering with CM 2 coats for external wall, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Ground Floor

1506.56

569

858016.05

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;First Floor

288.78

625

180530.82

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, including conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work.

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;First Floor

219.39

649

142515.74

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand, water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701)

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Ground Floor

101.71

978

99570.02

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Dadooing to walls withglazed red or white full body ceramic wall tiles of Size 300 x 450 mm / 320 mm x 400 mm and thickness 6 mm and 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:3) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand, water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge.

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Ground Floor

365.06

1132

413361.09

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Flooring with Shahabad / Tandur Rough Stone slabs of all sizes between 25 mm - 40 mm thickness set over base coat of cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, including cost of all materials like flooring stone, cement, sand, and water etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work, .

797.37

755

602054.22

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Flat nosing to Kadapa/ Shahabad stone slabs of any thick including labour and over heads & contractor profit etc.

199.64

89

17919.69

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) of regular colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand, water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707)

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Ground Floor

34.4

4740

163070.1

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Full Rounding the edges of Marble/ Granite stone slabs of all thicknesses including polishing the same and over heads &contractor profit etc.

104

720

74913

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal reinforcement as directed by Engineer-in-charge with dubara sponge finishing, including cost & conveyance of all materials to site, seigniorage charges, sales & other taxes on all materials, operational & incidental, cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work, lift charges etc., complete for finished items of work but including cost of steel & its fabrication charges, for finished item of work. (APSS No.403 & 903)

39.18

6909

270721.26

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Removing white wash or colour wash by steel wire brushing and/or scraping; sand papering and preparing the wall surface smooth including necessary repairs to scratches complete.

1475.26

14

21597.81

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Painting to new walls with one coat water based cement primer of interior grade I and two coats of acrylic emulsion paint having VOC (Volatile Organic Compound) content less than 30 grams/litre for internal walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.

371.12

213

79330.61

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Painting to new walls with one coat water based cement primer of exterior grade II and two coats of Acrylic emulsion paint weather proof water based, modified acrylic with silicon additives exterior grade for exterior walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.

6492.31

297

1931007.76

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of size with encapsulation of 8MM rigid layer on all the six surfaces. The door frame will have a rebat of 32MM. Door Frame section of 63.5x100 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/ assembled door frame is fixed to the wall using hold fast or bolt fasteners. A minimum of 4 No.s of screws to be provided for each vertical member & minimum 2no.s for horizontal member and 28 -30 MM thick solid Wood Polymer Composite(WPC) single extruded door shutter with 3MM top and bottom rigid layer with an overall density of 750kg/Cum. It will be fixed to the frame using 3 inch /4 inch hinges. A minimum of 4 hinges will be required for fixing the door with the frame and Stainless Fixtures are 3 no.s Butt hinges (IS:12817)- 150 mm Long, 2 no.s Door Handles 200 mm Long, 1 no. Tower Bolt-10 mm Bolt (IS:15833) 250 mm Long, 1 no. Aldrops (IS:15834) 300 mm long, 1 no. Aluminium Flat Latches: 300 mm long & 4 no.s MS Z Hold fasts - 300 mm long of 40 x 40 x 5 mm ISA including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., complete for finished item of work. (Door size 0.75 X 2.10m)

37.8

6516

246321.81

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of size with encapsulation of 8MM rigid layer on all the six surfaces. The door frame will have a rebat of 32MM. Door Frame section of 63.5x100 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/ assembled door frame is fixed to the wall using hold fast or bolt fasteners. A minimum of 4 No.s of screws to be provided for each vertical member & minimum 2no.s for horizontal member and 28 -30 MM thick solid Wood Polymer Composite(WPC) single extruded door shutter with 3MM top and bottom rigid layer with an overall density of 750kg/Cum. It will be fixed to the frame using 3 inch /4 inch hinges. A minimum of 4 hinges will be required for fixing the door with the frame and Stainless Fixtures are 3 no.s Butt hinges (IS:12817)- 150 mm Long, 2 no.s Door Handles 200 mm Long, 1 no. Tower Bolt-10 mm Bolt (IS:15833) 250 mm Long, 1 no. Aldrops (IS:15834) 300 mm long, 1 no. Aluminium Flat Latches: 300 mm long & 4 no.s MS Z Hold fasts - 300 mm long of 40 x 40 x 5 mm ISA including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., complete for finished item of work. (Door size 1.0 X 2.10m)

8.4

5599

47037.48

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness. (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin).Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4 mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

12.42

7279

90409.03

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Painting with Red Oxide Primer Paint - one coat and Synthetic Enamel Paints -Two coats -for new Iron work to given an even shade after throughly brushing the surface to remove all dirt and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work.

581.96

210

122659.71

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supplying and fixing stainless steel works such as railing, hand railing, grills etc., using Stainless Steel Tubes of 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit etc ., complete for finished item of work.

3895.76

797

3107842.54

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supplying and fixing 2.1m height fencing with Frame work of Vertical Post - MS Hallow Section 100x100x4mm thk at 3.60m centre to centre with 0.4m embeded in concrete pedestals. Fixing Hot dipped Galvanized Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979 - PVC Coated - 4"x4" (102 mm x 102 mm) - 8 Gauge to posts using of 3 no. of MS Flats 300mmx50mmx3mm thk for each pole etc., as per approved drawing, including cost of welding, bolts and brackets, fabrication and erection in position, cost and conveyance of all materials to work site etc., all operational, incidental labour charges, power charges, overheads & contractors profit etc. complete for finished item of work.

55

2060

113342.9

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supply, Laying and Fixing of precast concrete blocks for paving of M-35 grade and thickness not less than 60 mm for Light traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification set over a base coat of 50mm thk sand bed including cost and conveyance of all materials like sand, water tiles etc.,to site, labour charges for loading & unloading, laying to desired lines and levels complete and Overheads & Contractor Profit etc. for finished item of work.

313.83

782

245433.89

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supplying, installation, testing & commissioning of Drinking Water Point ATM - RO/UV/MGF filter with 500 litres capacity & Accessories including material and labour charges for Installations and contractor profit etc.

1

375000

375000

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supply & Installation of Dustbin (Dry & Wet Wastage Bins) -100 litres capacity each bin with HDPE Material & MS Stand including material & labour charges etc.

6

4500

27000

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supply & Installation of Information Signage - 1.0mx0.6m of Granite Material with engraving of letters including material & labour charges etc.

2

25000

50000

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supply & Installation of Information Signage - 1.0mx0.9m with ACP Sheet on Vinyl Stickering of Letters & SS Poles Supports including material & labour charges etc.

2

45000

90000

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Water Supply, Sanitary & Sewerage works

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supplying & Fixing Orissa Pan White glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware/ Parryware/ Neycer - ISI Mark: 580 mm x 440 mm duly providing constructing Brick masonry seat using 2nd class bricks, CC Squatting plate in P.C.C 1:2:4, S&F PVC Low level system with internal components & short bend: 10 Litres capacity Single Flush, S&F of 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931 and S&F 15 mm nominal size PVC connection with brass union nut C.P coated including cost and conveyance of all materials and labour charges, overheads and contractor's profit etc.,. complete as per standard practice for finished item of work.

3

6248

18745.29

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supply, Installation and commissioning approved make floor mounted Close Coupled wash down EWC conforming to IS:2556 (Part 8)-2004 suit with 'P' ' trap with dual flush porcelain cistern fixed on wash down EWC with all internal parts of dual flush cistern, ultra-solid seat cover of approved make with rubber buffer and cap & 15 mm angle stop cock & 450 mm long PVC inter connection pipe wall flanges all of approved make etc. complete for finished item of work in all respects: White Colour

5

13625

68129.25

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;S&F of Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 10 years warranty including cost and conveyance of all materials and labour charges, overheads and contractor's profit etc.,. complete for finished item of work.

8

4008

32066.72

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader fixed with screws complete Indian make : 590 x 375 x 390 mm including cost and conveyance of all materials, overheads and contractor's profit etc. complete for finished item of work in all respects.

5

4498

22490.1

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 660 x 460 mm - Single C.P. Pillar cock.

6

4534

27206.22

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supplying & Fixing CP finish brass bottle trap 250 mm long with wall connection pipe & wall Flange including cost and conveyance of all materials and labour charges, overheads and contractor's profit etc.,. complete for finished item of work.

6

1212

7274.76

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supplying and fixing of SWR PVC pipes of 4 Kg/Sq.cm. and fixing all specials such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps with required number of Bombay nails etc with solvent jointing as per standard practice including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels.

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;75mm dia Pipe

80

377

30196

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;110mm dia Pipe

60

544

32644.8

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supplying & fixing of 4" (101.6 mm ) multi floor trap with Jali- UPVC/SWR Pipe fittings including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work.

31

194

6022.68

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supplying & fixing premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials and labour charges, overheads and contractor's profit etc.,. complete for finished item of work as directed by Engineer-in-charge.

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;28.60mm OD Pipe - SDR 13.5

70

267

18690

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;34.90mm OD Pipe - SDR 13.5

50

363

18178.5

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supplying & Fixing of 50 mm Nominal Bore GI pipes Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings &labour charges complete including cost and conveyance of all materials and labour charges, overheads and contractor's profit etc.,. complete for finished item of work as directed by Engineer-in-charge.

110

621

68361.7

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supplying & Fixing of 65 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 with GI fittings such as elbows tees couplings, nipples, plugs including excavation for trenches and refilling the trenches complete except for GI bends union and GI connectors with checkout and socket Tata or Zenith make or equivalent.

110

1102

121227.7

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supplying & Fixing of Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type - 50 mm NB Size including cost and conveyance of all materials and labour charges, overheads and contractor's profit etc.,. complete for finished item of work.

4

4622

18491.96

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks.

2000

11

22720

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supplying & Fixing of 15 mm brass body CP finish long body bib tap of not less than 400 grams weight with quarter turn spindle internal / external threaded connection conforming to IS 8931 including cost and conveyance of all materials and labour charges, overheads and contractor's profit etc.,

20

957

19155.4

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supplying & Fixing of CP finish steel towel rod of 600 mm long and 20 mm dia with brackets including cost and conveyance of all materials and labour charges, overheads and contractor's profit etc.,. complete for finished item of work.

22

504

11097.9

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supplying and fixing of 16mm to 20 mm thick polished marble slab partitioins of size 3' 0" x 2' 0" for urinals including full rounding the edges , fixing in position, polishing, including cost and conveyance of all materials and labour charges , overheads & contractors profit complete for finished item of work for all floors excluding cost of seigniorage charges on marble.

5

1735

8679.9

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;S&F CP finish brass soap dish complete for finished item of work in all floors, including cost & conveyance of all materials, labour charges, etc. and overhead & contractor's profit complete for finished item of work as directed by Engineer-in-charge.

22

715

15746.94

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm best quality glass mirror with approved make 1st quality including cost & conveyance of all materials, labour charges, etc. overhead & contractor's profit complete for finished item of work in all floors as directed by Engineer-in-charge.

22

640

14097.38

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 & 4127 with C.I Grating & constructing Brick masonry in CM 1:6 prop. over a C.C. (1:5:10) prop. Bed 100mm thick and plastering 12mm thick in CM (1:4) prop. both inside and outside surfaces and fitted with 304.8 mm x 288.6mm (12" x 9") C.I. frame and hinged cover of standard make as directed by the Engineer-in-charge including cost and conveyance of all materials and labour charges, overheads and contractor's profit etc.,. complete as per standard practice for finished item of work.

8

850

6807.84

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg. including cost and conveyance of all materials and labour charges, overheads and contractor's profit etc.,. complete for finished item of work.

4

5237

20950.6

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supplying, laying, jointing and testing SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1:5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling with watering and tamping.

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;152.4 mm (6") dia

100

913

91350

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;300 mm (12") dia

60

2266

135999.6

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop;½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

2

9870

19741.74

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3prop; ½?thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

2

16004

32009.9

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Electrical works

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supply and laying of 25mm dia PVC pipe of heavy grade with IS:9537 part 3 rigid pipe concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes:Sudhakar/Polycab/Finolex.

25

102

2554.75

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supply and laying of 25mm dia P.V.C. pipe pipe of medium grade with IS:9537 part 3 rigid pipe concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well metal deep box including all labour charges etc., complete. Makes:Sudhakar/Polycab/Finolex.

105

107

11259.15

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supply and Fixing of 25mm dia P.V.C. pipe pipe of medium grade (ISI MARK) with all accessories fixing on chromium plated metallic base saddles (PVC Saddles) for Light, Fan and separate plug point including all labour charges etc., complete. Makes:Sudhakar/Modi/Finolex.

155

96

14934.25

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) FRLS/HFFR P.V.C. insulated flexible copper cable (ISI MARK) of makes Finolex/RR Kabel/Havells/Polycab in existing pipe with 10A switch, Ceiling rose and modular frame covering to switch control box including all labour charges etc., complete for light points in Buildings. Makes: Legrand Arteor/Honeywell Blenge Plus/L & T Englaze

60

993

59625

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) FRLSH/HFFR P.V.C. insulated flexible copper cable IS:694/1990, IS 17048 with one run of 36/0.3mm (2.5 Sqmm) for earth continuity in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Finolex/RR Kabel/Havells/Polycab

560

169

94852.8

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supply and run of 2 of 56/0.3mm (4 Sq.mm) FRLSH/HFFR P.V.C. insulated flexible copper cable IS:694/1990, IS 17048 with one run of 56/0.3mm (4 Sqmm) for earth continuity in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Finolex/RR Kabel/Havells/Polycab

115

221

25436.85

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supply and fixing of 10A 3/2pin 2 module socket with 10A switch control on a seperate switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Legrand Arteor / Schneider Zen celo Blenge / Crabtree Murano.

25

716

17907.25

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supply and fixing of 20A 3 pin 2 module socket with 20A switch control (with indicator) on a seperate switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Legrand Arteor / Schneider Zen celo Blenge / Crabtree Murano.

16

990

15842.4

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supply and fixing SPN Distribution board 8 Way with IP-43 protection suitable for single phase 40 A Double Pole (DP) Isolator as incomer and 6 Nos 6-32 A,10kA SP MCBs as out going including internal connections and labour charges for flush mounting etc., complete. Makes: Legrand DX3/Schneider Acti9/Siemens.

4

7677

30710.12

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supply and fixing of 9" (225mm), Light duty exhaust fan with double ball bearing and wire guard etc and labour charges for fixing of Exhaust fan in wall with necessary connections etc., completeof makes Crompton / Havells Ventil Air-DB / Orient hill air.

8

1993

15945.2

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supply and fixing of 10W LED mirror light of 600mm length with all standard accessories diffuser etc and including labour charges for fixing etc., complete. Makes: Philips/Crompton/GE.

6

498

2992.62

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supply, transportation and fixing of 22W, 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 50,000 burning hours with BIS Certification with BIS Certification. LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

40

760

30403.2

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supply and fixing of KP 3839 Curvy Bishop Lighting pole of height 4.27Mt (Pendant Type) with light fixture of KL 4608 magudam midi 30W LED WW/CW including foundation bolts and labour charges for fixing etc complete item of work. Make : K-Lite/Jaquar Lighting.

34

49015

1666510

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supply and fixing of suitable out door feeder piller box of size made with 14 SWG CRCA sheet with double door arrangement, making powder coating after processing of 7 Tank process, lock and key, hinges, rubber gasket, danger board,suitable angle iron stand for mounting the feeder pillar with cement concrete, including Supply and fixing of Legrand / Schnieder make 63A, 4 Pole isolator as incomer, 9 Nos 6- 32A SP MCBs as out goings, indication lamps, din channel, 6 Sqmm 3 core copper cable for invidual light control, connectors, bus bars, shroudings, gland plates and provision for 3 phase energy meter etc., complete for finished item of work and suitable wiring provision for connecting the nature switch.

3

29255

87767.58

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Fabrication, supply, transportation and erection of outdoor type 16SWG CRCA sheet steel enclosure for power control cubicle/panel board etc including cutting, bending drilling, welding and reveting etc complete with 7 tank process and painting with powder coating including cost and conveyance of all materials i.e., Digital Ammeter(0-600A)-1no, Digital Voltmeter(0-500V)-1no, indicator lamps-3nos, 125 A MCCB 4 Pole as incommer and outgoings as 63 A MCCB 4 Pole- 4nos and labour charges for fixing complete finished item of work. Metring equipment makes:HPL/MECO/CONZERVE. SWITCHGEAR Makes:Legrand/Schneider.

1

141824

141824.2

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supply and Run of 25mm x 6mm G.I Strip including cost of all accessories and labour charges etc., complete.

40

175

7018.8

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

4

6635

26540.48

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Earth work excavation of Trench in hard ground soil, laying of U.G cables upto 70 Sq,mm on sand cushion covering the cable with bricks and back filling of Trench duly providing route indicator embedded in C.C including cost and conveyance of materials and labour charges etc., complete.

220

365

80473.8

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supply and Laying of under ground XLPE Armoured cable of the following sizes. Makes: Polycab /Havells / Finolex.

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;16 Sqmm 4 Core Alluminium Cable

255

318

81120.6

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;50 Sqmm 3.5 Core Alluminium Cable

65

647

42094.65

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Landscaping works

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Earth work in surface excavation not exceeding 30 cm in depth but exceeding1.5 m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, as per directions of Engineer in Incharge:

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;in all kind of soils

75

99

7466.25

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supplying and stacking of good earth at site including royalty and carriage upto 5 k m lead complete (earth measured in stacks will be reduced by 20% for payment).

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;0.10m depth

7.5

500

3751.73

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Supplying and stacking sludge at site including royalty and carriage upto 5 km lead complete (sludge measured in stacks will be reduced by 8% for payment).

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;0.10m depth

7.5

208

1561.58

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately).

15

56

843

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge

15

40

602.1

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, leveling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 m, lift up to 1.5 m complete (cost of sludge, manure or extra earth to be paid for separately).

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Hedge Planting

30

244

7345.5

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately)

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Holes 0.6m dia and 0.6m deep

230

40

9379.4

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Holes 0.45m dia and 0.45m deep

120

16

2014.8

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Providing the following including transportation to site, unloading, stacking, handling, planting with watering and removal of unservisable material etc. complete as per the direction of the Engineer-In-Charge:

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Trees

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Plumeria pink

10

1457

14570

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Plumeria pudica

10

1459

14590

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Terminalia mantaly

100

1259

125900

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Polyathia longifolia

100

1018

101800

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Foxtail Palm

10

1017

10170

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Plants

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Heart to Heart Caladium

30

243

7290

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Duranta Gold

30

97

2910

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Iresine Herbistii

30

97

2910

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Song of India

30

97

2910

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Shrubs

-

-

-

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Ficus Panda

30

1247

37410

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Ixora chinis Pink

30

196

5880

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Ixora Red

30

196

5880

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Providing and fixing Neelgiri/Mexican grass turf with earthy 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden (Dhurmos) and than rolling the surface with light roller make the surface smoothen and light, watering with sprinkler and maintenance for 30 days or more till the grass establish properly as per direction of officer incharge.

50

214

10736

... More
Development of Manthani group of Tempels, Manthani,Peddapalli District.;Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, edge, flower beds, foliages, creepers etc. including hoeing,weeding pruning replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mover and brush cutter, removal of garden waste, applying insecticide, pesticide & fertilizers(whenever required) top dressing of lawn with good earth and menure and maintenance of other garden related works as directed by office-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide, Pesticide, lawn mover and brush cutter with fuel & other T & P material/ articles shall be provided by the department.)

1000

5

5160



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.