Telangana State Southern Power Distribution Company Limited Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Works
Electrical and Electronics
Electrical Works
Opening Date29 Apr 2025
Closing Soon23 May 2025
Tender Amount₹ 14,73,480 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;FABR-Arc Welding per 25mm thickness

200

7

1400

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;UNLOADING of LINE MATERIALS of Conductor drums

2

100

200

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;LOADING of LINE MATERIALS of ACSR conductor scrap

0.66

491

321.61

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;UNLOADING of LINE MATERIALS of R.S. Joists 175 x 85 mm

12

50

600

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Supply of earthing pipe with materials S-CI Pipe earthing 100mm dia 2.75m long

15

3486

52290

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Formation of Cut point for LT line excluding pole erection and stays for 3/4/5 wire Formation of LTCut point(Ver/ Hor)-1 ckt

5

938

4690

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;UNLOADING of LINE MATERIALS of CT Metering boxes

5

18

90

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Galvanized Suply of M+3 Tower

2

140674

281348.6

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S.Channels etc., by lorries. TRANSPORT OF STEEL 20 TO 30KM

0.3

476

142.9

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;FABR-Gas Welding per 25mm thickness

50

14

700

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Supply and Erection of I Hook and Suspension Hook Erection- I Hook

10

55

550

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Erection of LT distribution box including laying of LT cable from distribution box to LT OH line and DTR to distribution box including earthing of distribution box and crimping of lugs connecting of jumpers etc Erection of LT distribution box

10

1594

15946.7

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Supply of earthing pipe with materials S-MS Bolts & Nuts,Washers etc.,

40

91

3650

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;UNLOADING of LINE MATERIALS of LT Pin insulators

4

18

72

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Cut-Tree Branch(LT/11/33)&Trnsprt Debris

500

4

2000

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;LOADING of LINE MATERIALS - LT Cable(XLPE) 1-core Drum all size

360

1

360

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Dismantling of 11KV 34/55 sqmm SC

1.4

4500

6300

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;UNLOADING of LINE MATERIALS-LT Cable(XLPE)1-core Drum all siz

360

1

360

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Stringing of LT AB Cable Stringing of AB cable 3x70 + 1x16 + 1x50

0.25

8450

2112.5

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation Errection of 11 M long PSCC pole

10

4336

43368.5

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Supply of earthing pipe with materials S-MS Bolts & Nuts,Washers etc.,

100

91

9125

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation Erect-12Meter Box pole

6

3901

23408.22

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;LOADING of LINE MATERIALS of CT Metering boxes

5

18

90

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;LOADING of LINE MATERIALS of 11 KV Metal parts

1

48

48

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Dismantle-AB Swithces (all types)

1

1281

1281.38

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;LOADING of LINE MATERIALS of LTPins

2

54

108

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;LOADING of LINE MATERIALS of 11 KV HG Fuse Sets

6

18

108

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;LOADING of LINE MATERIALS of Conductor drums

2

202

404

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Dismantling of Damaged Poles, not required and available in the middle of roads, transporting to stock point etc. Dismantle-8.0 m long PSCC pole

25

501

12538.25

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Dismantling of 11kV 34/ 55 Sqmm SC

1.2

4500

5400

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Paving out and stringing of conductor by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location. Stringing of LT 3ph line 5 condu(55sqmm)

1.7

10190

17324.39

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Supply of earthing pipe with materials S-Earthing GI flat 25x3 mm incl material

150

105

15750

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Formation of Cut point for 11 KV Single Circuit line excluding pole erection and stays

4

1435

5743.24

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Dismantling of Damaged Poles, not required and available in the middle of roads, transporting to stock point etc. Supply- I Hook

10

158

1580

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Excavation of pits in all soils except hard rock requiring blasting EXCAVATION OF PIT (2.6" x 2.6" x 6.0")

30

700

21000

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Laying of 1Core XLPE 120Sqmm Cable

360

20

7200

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Formation of Cut point for 33 KV Double circuit line excluding pole erection and stays Formation of 33kvline vertical cutpoint

2

3198

6397.44

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;UNLOADING of LINE MATERIALS of LTPins

2

38

76

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;UNLOADING of LINE MATERIALS of 11 KV AB SWCH Con 200/400 A

6

80

480

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Straight through joints of AB cable (each lead) Supply and ere Straight line Asmbly kits

10

1661

16610

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Erection of DTR's including loading and Unloading DTR on the Structure/Plinth etc Erect- 3Ph DTR 160/250KVA

5

1851

9256.5

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Paving out and stringing of conductor by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location Stringing 100sqmm 33/11kv Line 3 Cond SC

1.8

13856

24942.06

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;LOADING of LINE MATERIALS of 11 KV AB SWCH T.T.200/400 A

6

80

480

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;UNLOADING of LINE MATERIALS of MS Scrap

0.02

577

10.4

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;survey line&cabl inc peg mark&tree clear

1.8

765

1377

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;RCC Column type DTR Plinth of size 1'X1'X13',topslab 5'x9'x9" & beam size 5'X9'X9"

5

25092

125460

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Painting of R.S Joist,Box poles including cross arms and clamps with one coat of red oxid and two coats of Al.paint including cost of paint and consumables Painting of RS Joist(1C RO, 2C Al.Paint)

6

1132

6792

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Erection of CT operated meters for LV side of Distribution Transformers Erection of CT meter on LV side of DTRs

5

900

4500

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Dimantle-11KV HG Fuse Set incl earthing

6

353

2120.58

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Paving out and stringing of conductor by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location.Stringing 100sqmm 33/11kv Line 3 Cond SC

1.3

13856

18013.71

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Galvanized Erect of M+3 Tower

2

64576

129152

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;LOADING of LINE MATERIALS of LT Pin insulators

4

26

104

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Dismantling of Damaged Poles, not required and available in the middle of roads, transporting to stock point etc. Dismantle-RS Joists 175 x 85 mm

19

1116

21204

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Fabrication of 175x85/150x75mm RS joist pieces upto 12.5 meters length by welding joint together by means of 50x6mm flat and MS channel on either side including the cost of consumable. Fabricate&Paint-175x85/150x75mm RS Joist

6

512

3075.3

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;UNLOADING of LINE MATERIALS of ACSR conductor scrap

0.27

491

133.06

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X 0.50 M height ERECT. OF LINES-Providing of RCC collar

2

386

772

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;S-Earthing GI flat 25x3 mm incl material

60

105

6300

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Transport of Cond Drum,VCBs >20 & <30Km

2

3691

7382.76

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Dismantle LT CTs&meter from CT meter box

5

120

600

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Dismantling of 100 Sqmm AAA/ACSR Conductor Dismantling of 100 Sqmm conductor SC

1.3

8274

10757.18

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;LOADING of LINE MATERIALS of MS Scrap

0.48

578

278.02

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;LOADING of LINE MATERIALS of MS Scrap

0.02

577

10.4

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Transport of Cond Drum,VCBs >20 & <30Km

2

3691

7382.76

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Formation of Cut point for 33 KV Single Circuit line excluding pole erection and stays Horizontal Cut point for 33 KV line

1

1791

1791.12

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;UNLOADING of LINE MATERIALS of MS Channel,Angles,Flats&Rod

0.74

185

136.9

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Sub-transport of poles upto Workspot upto 10KM (Including loading and unloading) SubTrnsprt 11M PSCC Pole incl. L&UL<10KM

10

431

4319.7

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Dismantling of Damaged Poles, not required and available in the middle of roads, transporting to stock point etc. Dismantle-11 Mtrs PSCC poles

2

1896

3792.36

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Supply of earthing pipe with materials S-Earthing GI Wire No 8 incl mat

4

105

420

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Sub-transport of poles upto Workspot upto 10KM (Including loading and unloading) SubTrnsprt 9M PSCC Pole incl. L&UL<10KM

30

407

12218.7

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Sub-transport of poles upto Workspot upto 10KM (Including loading and unloading) SubTrnsprt 9M PSCC Pole incl. L&UL<10KM

2

407

814.58

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Erection of AB Switch and aligment complete Erection of 11kv TT type AB switch

6

1813

10880.94

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc. Mass concreting of supports incl. cement

10.5

6579

69079.5

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Formation of 11kvline vertical cutpoint

4

2241

8967.04

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;LOADING of LINE MATERIALS of MS Scrap

4.33

578

2503.9

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders) Excvt Pit Hard w/o Blst 1.2Mx1.2Mx3.3M

2

3592

7185.9

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Dismantling of DTR plinth

5

2008

10040.65

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;LOADING of LINE MATERIALS of LT Three phase cross arms

54

3

162

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Dismantling of Damaged Poles, not required and available in the middle of roads, transporting to stock point etc. Dismantle-9.1 M long PSCC pole

31

948

29390.79

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Galvanized Erection of Extension of 3M for M+3 Tower

2

5168

10337.9

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Excavation of pits in all soils except hard rock requiring blasting EXCAVATION OF PIT (2.6" x 2.6" x 6.0")

2

700

1400

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;LOADING of LINE MATERIALS of 33 & 11 KV Disc insulators

6

2

12

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;UNLOADING of LINE MATERIALS of MS Scrap

4.33

578

2503.9

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Dismantle-3Ph DTR upto 160KVA

5

975

4875.6

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;LOADING of LINE MATERIALS of LT Metal parts-Bag of 100nos

1

52

52

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;LOADING of LINE MATERIALS of Conductor drums

2

202

404

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Dismantle-AB Swithces (all types)

1.38

476

657.35

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc Erect. of 11kv HG Fuseset incl earthing

6

740

4443.12

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;UNLOADING of LINE MATERIALS of Conductor drums

2

100

200

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;LOADING of LINE MATERIALS of LT Shackle insulators

1

26

26

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;UNLOADING of LINE MATERIALS of LT Three phase cross arms

54

3

162

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;UNLOADING of LINE MATERIALS of MS Scrap

0.37

578

211.55

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Galvanized Supply of material for Extension of 3Mtrs for M+3

2

28520

57041.28

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;ERECTION OF LINES-Erection of 9.1M Pole

2

2400

4800

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control anels,current transformers, boosters, lightning arrestors, sulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Transport of Cond Drum,VCBs >20 & <30Km

2

3691

7382.76

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;UNLOADING of LINE MATERIALS of 33 & 11 KV Disc insulator

6

2

12

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Dismantling of all types of 33 kV AB switches

6

1281

7688.28

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;UNLOADING of LINE MATERIALS of 11 KV Metal parts Bag

1

48

48

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;LOADING of LINE MATERIALS of ACSR conductor scrap

0.27

491

133.06

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Fab Back clamps with 50 x 6 mm MS Flat

54

15

810

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;UNLOADING of LINE MATERIALS of ACSR conductor scrap

0.66

491

321.61

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;LOADING of LINE MATERIALS of MS Scrap

0.37

578

211.55

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Fabrication of materials including 2 coats of Red oxide painting Fab Back clamps with 50 x 6 mm MS Flat

36

15

540

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Removing and Reconnection of LT Services

200

44

8800

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;UNLOADING of LINE MATERIALS of MS Scrap

0.48

578

278.02

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;S-MS Bolts & Nuts,Washers etc.,

30

91

2737.5

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Supply of CI eath pipe with 80mm dia,2.0 M Length S-CI Pipe earthing 80mm dia 2.75m long

4

2789

11156

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders Ex of Hard pit w/o blast 0.75X0.9X1.95M

10

990

9906.8

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;LOADING of LINE MATERIALS of MS Channel,Angles,Flats&Rods

0.74

221

163.54

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Paiting of Structure code/DTR code and location name with yellow back gound and with black letters including cost of paint

5

110

550

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;UNLOADING of LINE MATERIALS of ACSR conductor scrap

0.66

491

-

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc. Mass concreting of supports incl. cement

22.5

6579

148027.5

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;LOADING of LINE MATERIALS of R.S. Joists 175 x 85 mm

12

76

912

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;UNLOADING of LINE MATERIALS of 11 KV HG Fuse Sets

6

18

108

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;UNLOADING of LINE MATERIALS of LT Shackle insulators

1

21

21

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;UNLOADING of LINE MATERIALS of LT Metal parts - bag of 100

1

35

35

... More
Shifting of Lines and DTRs from Priyadarshini hotel to Balaji Motors;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation ERECTION OF LINES-Erection of 9.1M Pole

30

2400

72000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.