Telangana State Southern Power Distribution Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Works
Civil And Construction
Electrical and Electronics
Electrical Works
Opening Date18 Dec 2024
Closing Date27 Dec 2024
Tender Amount₹ 76,43,422 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Shifting of lines to Radison hotel;Transport of Cond Drum,VCBs >20 & <30Km

1

3691

3691.38

... More
Shifting of lines to Radison hotel;UNLOADING of MS Channel,Angles,Flats&Rod

0.25

185

46.62

... More
Shifting of lines to Radison hotel;TRANSPORT OF STEEL MATERIAL 20 TO 30KM

0.25

527

132.89

... More
Shifting of lines to Radison hotel;LOADING of MS Channel,Angles,Flats&Rods

0.25

220

55.69

... More
Shifting of lines to Radison hotel;UNLOADING of LT Metal parts - bag of 100

1

35

35

... More
Shifting of lines to Radison hotel;LOADING of LT Metal parts-Bag of 100nos

1

52

52

... More
Shifting of lines to Radison hotel;UNLOADING of LT Shackle insulators

1

21

21

... More
Shifting of lines to Radison hotel;LOADING of LT Shackle insulators

1

26

26

... More
Shifting of lines to Radison hotel;UNLOADING of LT Pin insulators

1

18

18

... More
Shifting of lines to Radison hotel;LOADING of LT Pin insulators

1

26

26

... More
Shifting of lines to Radison hotel;Dismantle-LT AB Cb 3x70+1x16+1x50

1.2

9231

11077.2

... More
Shifting of lines to Radison hotel;Dismantle-8.0 m long PSCC pole

1

501

501.53

... More
Shifting of lines to Radison hotel;Disconnect/Reconnect - Areial

150

75

11250

... More
Shifting of lines to Radison hotel;Stringing of AB cable 3x70 + 1x16 + 1x50

1.2

8450

10140

... More
Shifting of lines to Radison hotel;Labour for 2nd coat Al. Painting.

0.25

481

121.46

... More
Shifting of lines to Radison hotel;Sup Material for 2nd coat Al. Painting.

0.25

1293

325.84

... More
Shifting of lines to Radison hotel;Labour for 1st coat Al. Painting.

0.25

850

214.45

... More
Shifting of lines to Radison hotel;Sup Material for 1st coat Al. Painting.

0.25

2180

549.61

... More
Shifting of lines to Radison hotel;Fabrication of struc.with welding.

0.25

3425

863.35

... More
Shifting of lines to Radison hotel;SubTrnsprt 9M PSCC Pole incl. L&UL<10KM

5

407

2036.45

... More
Shifting of lines to Radison hotel;ERECTION OF LINES-Erection of 9.1M Pole

5

2400

12000

... More
Shifting of lines to Radison hotel;Ex of Hard pit w/o blast 0.6X0.9X1.5M

5

612

3060

... More
Shifting of lines to Radison hotel;Transport of Cond Drum,VCBs upto 10Km

2

2720

5440.68

... More
Shifting of lines to Radison hotel;Erection of 11kv ABSwitch incl earthing

5

3200

16000

... More
Shifting of lines to Radison hotel;Supply of Danger boards with clamps

17

116

1972

... More
Shifting of lines to Radison hotel;UNLOADING of 33 & 11 KV Disc insulator

6

2

12

... More
Shifting of lines to Radison hotel;UNLOADING of 50,63,75&100kva DTR

4

280

1120

... More
Shifting of lines to Radison hotel;UNLOADING of 15&25kva DTR

4

129

516

... More
Shifting of lines to Radison hotel;LOADING of 50,63,75&100kva DTR

4

350

1400

... More
Shifting of lines to Radison hotel;LOADING of 15&25kva DTR

4

129

516

... More
Shifting of lines to Radison hotel;LOADING of 11kv Pin/Post/Solid Core Insu

54

1

54

... More
Shifting of lines to Radison hotel;S-GI Bolts & Nuts,Washers etc.,

50

117

5875

... More
Shifting of lines to Radison hotel;Dismantling of LT Distribution box

4

669

2677.52

... More
Shifting of lines to Radison hotel;Dimantle-11KV HG Fuse Set incl earthing

4

353

1413.72

... More
Shifting of lines to Radison hotel;Dismantle-11KV AB Switch TT Type

4

889

3558.92

... More
Shifting of lines to Radison hotel;Dismantle-3Ph DTR upto 160KVA

4

975

3900.48

... More
Shifting of lines to Radison hotel;Dismantling of DTR plinth

4

2008

8032.52

... More
Shifting of lines to Radison hotel;UNLOADING of MS Channel,Angles,Flats&Rod

5.29

185

978.65

... More
Shifting of lines to Radison hotel;TRANSPORT OF STEEL MATERIAL 20 TO 30KM

5.29

527

2789.63

... More
Shifting of lines to Radison hotel;LOADING of MS Channel,Angles,Flats&Rods

5.29

221

1169.09

... More
Shifting of lines to Radison hotel;Labour for 2nd coat Al. Painting.

0.79

482

380.78

... More
Shifting of lines to Radison hotel;Sup Material for 2nd coat Al. Painting.

0.79

1293

1021.47

... More
Shifting of lines to Radison hotel;Labour for 1st coat Al. Painting.

0.79

851

672.29

... More
Shifting of lines to Radison hotel;Sup Material for 1st coat Al. Painting.

0.79

2181

1722.99

... More
Shifting of lines to Radison hotel;Fabrication of struc.with welding.

0.79

3426

2706.54

... More
Shifting of lines to Radison hotel;S-CI Pipe earthing 80mm dia 2.75m long

5

2789

13945

... More
Shifting of lines to Radison hotel;S-Earthing GI flat 25x3 mm incl material

100

105

10500

... More
Shifting of lines to Radison hotel;Supply of 120 Sqmm Aluminium lugs

48

12

600.96

... More
Shifting of lines to Radison hotel;Laying of 1Core XLPE 120Sqmm Cable

160

20

3200

... More
Shifting of lines to Radison hotel;ERECT. OF LINES-Providing of earthing

20

1234

24684

... More
Shifting of lines to Radison hotel;S-CI Pipe earthing 80mm dia 2.75m long

20

2789

55780

... More
Shifting of lines to Radison hotel;Erection of CT meter on LV side of DTRs

4

900

3600

... More
Shifting of lines to Radison hotel;Erection of LT distribution box

4

1594

6378.68

... More
Shifting of lines to Radison hotel;Erect. of 11kv HG Fuseset incl earthing

4

740

2962.08

... More
Shifting of lines to Radison hotel;Erection of 11kv TT type AB switch

4

1813

7253.96

... More
Shifting of lines to Radison hotel;E/r 3ph DTR inclu L&Un-L,T&C on plinth

4

1650

6600

... More
Shifting of lines to Radison hotel;Column type DTR Plinth topslab 5'x5'x6"

4

25092

100368

... More
Shifting of lines to Radison hotel;Formation of 11kvline vertical cutpoint

9

2241

20175.84

... More
Shifting of lines to Radison hotel;Erection of Three Phase DTRs

4

1139

4559.8

... More
Shifting of lines to Radison hotel;Painting of RS Joist(1C RO, 2C Al.Paint)

9

1132

10188

... More
Shifting of lines to Radison hotel;Fabrication of 175x85/150x75mm RS joist

9

512

4612.95

... More
Shifting of lines to Radison hotel;Erect-12Meter Box pole

9

3901

35112.33

... More
Shifting of lines to Radison hotel;Ex of Hard pit w/o blast 0.75X0.9X1.95M

9

990

8916.12

... More
Shifting of lines to Radison hotel;ERECTION OF LINES-Erection of 9.1M Pole

5

2400

12000

... More
Shifting of lines to Radison hotel;EXCAVATION OF PIT (2.6" x 2.6" x 6.0")

5

700

3500

... More
Shifting of lines to Radison hotel;Mass concreting of supports incl. cement

1.62

6579

10657.98

... More
Shifting of lines to Radison hotel;SubTrnsprt 9M PSCC Pole incl. L&UL<10KM

5

407

2036.45

... More
Shifting of lines to Radison hotel;UNLOADING of Conductor drums

1

100

100

... More
Shifting of lines to Radison hotel;LOADING of Conductor drums

1

202

202

... More
Shifting of lines to Radison hotel;Supply of Danger boards with clamps

19

116

2204

... More
Shifting of lines to Radison hotel;Transport of Cond Drum,VCBs >20 & <30Km

5

3691

18456.9

... More
Shifting of lines to Radison hotel;UNLOADING of 11 KV Metal parts Bag

1

48

48

... More
Shifting of lines to Radison hotel;LOADING of 11 KV Metal parts

1

48

48

... More
Shifting of lines to Radison hotel;UNLOADING of 33 & 11 KV Disc insulator

10

2

20

... More
Shifting of lines to Radison hotel;LOADING of 11kv Pin/Post/Solid Core Insu

10

1

10

... More
Shifting of lines to Radison hotel;LOADING of 11 KV AB Cable (XLPE) 3 Core

2

584

1168

... More
Shifting of lines to Radison hotel;UNLOADING of 11 KV AB Cable (XLPE) 3 Cor

2

438

876

... More
Shifting of lines to Radison hotel;UNLOADING of MS Channel,Angles,Flats&Rod

8.47

185

1566.95

... More
Shifting of lines to Radison hotel;TRANSPORT OF STEEL MATERIAL 20 TO 30KM

8.47

527

4466.57

... More
Shifting of lines to Radison hotel;LOADING of MS Channel,Angles,Flats&Rods

8.47

221

1871.87

... More
Shifting of lines to Radison hotel;Dismantling of 11kV 34/ 55 Sqmm SC

1.35

4500

6075

... More
Shifting of lines to Radison hotel;Dismantle-11KV AB Cb 3x185+70Sqmm

0.6

18972

11383.2

... More
Shifting of lines to Radison hotel;Dismantle-Box pole 9/10/11 Mtr

3

1130

3390

... More
Shifting of lines to Radison hotel;Dismantle-9.1 M long PSCC pole

19

948

18013.71

... More
Shifting of lines to Radison hotel;S-CI Pipe earthing 50mm dia 2m long

4

2441

9764

... More
Shifting of lines to Radison hotel;S-Earthing GI flat 25x3 mm incl material

48

105

5040

... More
Shifting of lines to Radison hotel;S&Erect-T-Branch kit

6

3215

19290

... More
Shifting of lines to Radison hotel;OD/Idoor end termination 11kv 3x185 xlpe

3

2370

7111.89

... More
Shifting of lines to Radison hotel;Straight through joint 11kv 3x185 xlpe

3

3725

11176.35

... More
Shifting of lines to Radison hotel;Raise-SR 11KV 3x185sqmm UG Cb on support

45

126

5680.35

... More
Shifting of lines to Radison hotel;Lay-TR 11KV 3x185sqmm UG Cb CC/BT Compsr

20

1578

31569

... More
Shifting of lines to Radison hotel;S-GI Bolts & Nuts,Washers etc.,

120

117

14100

... More
Shifting of lines to Radison hotel;Supply of 120 Sqmm Aluminium lugs

24

12

300.48

... More
Shifting of lines to Radison hotel;Raise-SR 11KV 3x95sqmm UG Cb on support

10

126

1262.3

... More
Shifting of lines to Radison hotel;Lay-SR 11KV 3x95sqmm UG Cb CC/BT Compsr

20

1065

21303.2

... More
Shifting of lines to Radison hotel;Erection- I Hook

18

55

990

... More
Shifting of lines to Radison hotel;Supply- I Hook

18

158

2844

... More
Shifting of lines to Radison hotel;End Termnatn of AB cable 120 to 185 Sqmm

36

800

28800

... More
Shifting of lines to Radison hotel;S-of 11KV AB cable end kits

36

950

34200

... More
Shifting of lines to Radison hotel;Supply and ere Angle line Asmbly kits

5

2124

10620

... More
Shifting of lines to Radison hotel;Supply and ere Straight line Asmbly kits

18

1661

29898

... More
Shifting of lines to Radison hotel;Strt thr joints of AB cbl 120 to185 Sqmm

12

920

11040

... More
Shifting of lines to Radison hotel;Stringing of AB cbl 11 KV 3x185+70 Sqmm

1.5

41876

62814.15

... More
Shifting of lines to Radison hotel;Formatn of Horiz Cut point for 11KV line

10

1435

14358.1

... More
Shifting of lines to Radison hotel;Stringing 100sqmm 33/11kv Line 3 Cond SC

1.8

13856

24942.06

... More
Shifting of lines to Radison hotel;Labour for 2nd coat Al. Painting.

1.47

482

706.13

... More
Shifting of lines to Radison hotel;Sup Material for 2nd coat Al. Painting.

1.47

1293

1894.25

... More
Shifting of lines to Radison hotel;Labour for 1st coat Al. Painting.

1.47

851

1246.72

... More
Shifting of lines to Radison hotel;Sup Material for 1st coat Al. Painting.

1.47

2181

3195.16

... More
Shifting of lines to Radison hotel;Fabrication of struc.with welding.

1.47

3426

5019.09

... More
Shifting of lines to Radison hotel;Mass concreting of supports incl. cement

14.7

6579

96711.3

... More
Shifting of lines to Radison hotel;Painting of RS Joist(1C RO, 2C Al.Paint)

14

1132

15848

... More
Shifting of lines to Radison hotel;Fabrication of 175x85/150x75mm RS joist

14

512

7175.7

... More
Shifting of lines to Radison hotel;Erect-12Meter Box pole

14

3901

54619.18

... More
Shifting of lines to Radison hotel;Excavation-HardRock(Blasting prohibited)

14

1440

20160

... More
Shifting of lines to Radison hotel;survey line&cabl inc peg mark&tree clear

0.4

765

306

... More
Shifting of lines to Radison hotel;Fix-Bird Guard

25

90

2250

... More
Shifting of lines to Radison hotel;Erect-Tower Top (37Kg) GALV

25

628

15706.5

... More
Shifting of lines to Radison hotel;S-Tower Top (37Kg) GALV

25

2902

72563.5

... More
Shifting of lines to Radison hotel;S-Earthing GI flat 25x3 mm incl material

40

105

4200

... More
Shifting of lines to Radison hotel;ERECT. OF LINES-Providing of RCC collar

4

386

1544

... More
Shifting of lines to Radison hotel;ERECT. OF LINES-Providing of earthing

4

1234

4936.8

... More
Shifting of lines to Radison hotel;S-CI Pipe earthing 80mm dia 2.75m long

4

2789

11156

... More
Shifting of lines to Radison hotel;String-Earth Wire on Tower

1.5

6821

10231.5

... More
Shifting of lines to Radison hotel;UNLOADING of Conductor drums

1

100

100

... More
Shifting of lines to Radison hotel;LOADING of Conductor drums

1

202

202

... More
Shifting of lines to Radison hotel;Supply of Danger boards with clamps

25

116

2900

... More
Shifting of lines to Radison hotel;Unload-11/33KV XLPE UG cable all size

175

18

3150

... More
Shifting of lines to Radison hotel;Load-11/33KV XLPE UG cable all size

175

18

3150

... More
Shifting of lines to Radison hotel;S-GI Bolts & Nuts,Washers etc.,

80

117

9400

... More
Shifting of lines to Radison hotel;Transport of Cond Drum,VCBs >20 & <30Km

3

3691

11074.14

... More
Shifting of lines to Radison hotel;LOADING of 33KV Metal parts-bag of 25no

1

65

65

... More
Shifting of lines to Radison hotel;UNLOADING of 33 KV Pin insulators

12

3

36

... More
Shifting of lines to Radison hotel;LOADING of 33 KV Pin insulators

12

3

36

... More
Shifting of lines to Radison hotel;Dismantling of M type tower

1

3484

3484

... More
Shifting of lines to Radison hotel;Dismantling of 100 Sqmm conductor SC

0.85

8274

7033.54

... More
Shifting of lines to Radison hotel;S-Earthing GI flat 25x3 mm incl material

80

105

8400

... More
Shifting of lines to Radison hotel;ERECT. OF LINES-Providing of earthing

5

1234

6171

... More
Shifting of lines to Radison hotel;S-CI Pipe earthing 50mm dia 2m long

5

2441

12205

... More
Shifting of lines to Radison hotel;S-9" B Class GI pipe 7.3mm thck 28.8Kg/M

30

1113

33390

... More
Shifting of lines to Radison hotel;OD/Idoor end termination 33kv 3x400 xlpe

5

2764

13823.8

... More
Shifting of lines to Radison hotel;Straight through joint 33kv 3x400 xlpe

5

5700

28503.9

... More
Shifting of lines to Radison hotel;Raise-SR 33KV 3x400sqmm UG Cb on support

75

135

10174.5

... More
Shifting of lines to Radison hotel;Lay-2nd Cable in Excavated Trench

80

204

16328

... More
Shifting of lines to Radison hotel;Lay-5R 33KV 3x400sqmm UG Cb CC/BT RdCrsg

20

2384

47685

... More
Shifting of lines to Radison hotel;Stringing 100sqmm 33/11kv Line 3 Cond SC

1.5

13856

20785.05

... More
Shifting of lines to Radison hotel;Labour for 2nd coat Al. Painting.

0.32

482

153.28

... More
Shifting of lines to Radison hotel;Sup Material for 2nd coat Al. Painting.

0.32

1292

411.17

... More
Shifting of lines to Radison hotel;Labour for 1st coat Al. Painting.

0.32

851

270.62

... More
Shifting of lines to Radison hotel;Sup Material for 1st coat Al. Painting.

0.32

2181

693.56

... More
Shifting of lines to Radison hotel;Formation of 33kvline vertical cutpoint

5

3198

15993.6

... More
Shifting of lines to Radison hotel;Excavate-Earth in Hard Murram

118.8

1530

181764

... More
Shifting of lines to Radison hotel;Erect-Extn of 3M for M+3 Tower GALV

25

5168

129223.75

... More
Shifting of lines to Radison hotel;Erect- M+3 Tower GALV

25

64576

1614400

... More
Shifting of lines to Radison hotel;S-Mat. for Extn of M+3 Tower by 3M GALV

25

28520

713016

... More
Shifting of lines to Radison hotel;S-M+3 Tower GALV

25

140674

3516857.5

... More
Shifting of lines to Radison hotel;survey line&cabl inc peg mark&tree clear

1.5

765

1147.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.