For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Works
Civil And Construction
Energy, Oil and Gas
Consultancy Services
Civil And Architectural Services
Opening Date31 Dec 2024
Closing Date6 Jan 2025
Tender Amount₹ 2,55,44,725 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Erection of M+3 Tower GALV

95

64576

6134720

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Supply of Mat. for Extn of M+3 Tower by 3M GALV

106

28520

3023187.84

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Supply of M+3 Tower GALV

95

140674

13364058.5

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Running of GI eartn flat of size 25X3mm from all metallic parts of channels, AB Switch, HG fuse set, DTr neutral and LT Distribution box and inter connection of earth pits etc complete

90

14

1262.7

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;S-Earthing GI flat 25x3 mm incl material Supply of GI Flat 25X3 mm

150

105

15750

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;S-GI pipe earthing 40mm dia 2m long Supply of GI eath pipe with 40 mm dia,3mm thcikness with 2.0 M Length

4

698

2792

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Supply&Erec of CI earth Pipe as APTRANCO Excavation of earth pit, supply of cast iron pipe with flange on one end (as per ISS7181/86) of nominal dia 125mm and 2.75 meters long in side the pit including supply and fixing RCC collars 0.75 meter dia (OD), 50mm thick and 0.60meters long complete as per APTRANSCO standards

4

9804

39216

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Numbering of poles incl. cost of paint

95

32

3040

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Formation of 33kvline vertical cutpoint Formation of Cut point for 33 KV Double circuit line excluding pole erection and stays

13

3198

41583.36

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Transport of Cond Drum,VCBs >30 & <50Km Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Above 30 Km and upto 50 Km with Lorry for each trip

3

4372

13118.22

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;UNLOADING of Conductor drums

6

100

600

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;LOADING of Conductor drums

6

202

1212

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Unloading of 11/33KV XLPE UG Cable all sizes

9

1024

9216

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Transport-33KV 3x400sqmm Cb Drum to 50km Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Transport-33KV 3x400sqmm Cb Drum to 50km

5

21423

107115

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Loading of 11/33KV XLPE UG Cable for all sizes

9

1024

9216

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;survey line&cabl inc peg mark&tree clear

4.75

765

3633.75

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Labour for 2nd coat Al. Painting. Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. Labour charges for painting including scratching and cleaning of Sub-station structures of 2nd coat of Aluminium

4.58

482

2207.56

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Labour for 1st coat Al. Painting. Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. Labour charges for painting including scratching and cleaning of Sub-station structures of 1st coat of Aluminium

4.58

851

3897.58

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Sup Material for 2nd coat Al. Painting. Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. Supply of material cost for Second coat of 1st Grade Aluminium Paint, brushes etc.

4.58

1293

5921.94

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Sup Material for 1st coat Al. Painting. Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. Supply of material cost for First coat of 1st Grade Aluminium Paint, brushes etc.

4.58

2181

9988.98

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Earthing for raisers of SS Flat 50x6 mm. Fabrication and connecting to risers from earth mat to structures, equipment, marshalling boxes, electrical panels, PLCC panels, fencing posts etc. M.S./ G.I. Flat 50x6mm / 50 x 8 mm ( Above ground)

50

41

2050

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Fabrication of struc.with welding. Fabrication of Main and Auxiliary structures with welding using raw steel such as RS joist, M.S.Angles, Plates, Channels, including the supply and fabrication of 6mm base plate to the RS-Joist poles excluding cost of Mild Steel and transport charges to substation site, including erection.

0.58

3426

1987.08

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Ptg of coping with 2cts white cmnt inclu Paint of coping with 2 coats of white cement incl cost of paints etc.

8

48

384

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Plastering 2 coats, 20/16 mm (1:6)/(1:4)

4.62

373

1723.26

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;UNLOADING of 33 KV AB SWCH Con 400/800 A

2

79

158

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;LOADING of 33 KV AB SWCH Con 400/800 A

2

126

252

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Painting AB switch OP rods with PO red Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. Painting of operating rods of 33kV, 11kV AB switches with post office red colour (including cost of paint)

2

142

284

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;AB Switch Coil Earthing GI No. 8 Wire Making of coil earthing pole with 8mm GI wireNut&Bolts for AB Switch

2

146

293.26

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;UNLOADING of 33 KV10 KA LAs Station type

6

35

210

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;LOADING of 33 KV10 KA Las Station type

6

41

246

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Cut-Tree Branch(LT/11/33)&Trnsprt Debris

2000

4

8000

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Supply of earthing pipe with materials Supply of GI Bolts & Nuts etc

50

117

5875

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Submission of auto CAD Drawing as per pole schedule (Detailed survey and sketch) CAD Drawing per pole upto 10KM

1

6000

6000

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Painting of feeder name on support including cost of paint

36

53

1908

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Erection of 33 KV LAS station/Line type including earthing

2

880

1760

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Mass concreting of supports incl. Cement Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc. Including the cost of cement

8.4

6579

55263.6

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Ex of Hard pit w/o blast 0.75X0.9X1.95M Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders) 11 Mtrs PSCC Poles/ Box poles 0.75 M x 0.9 M x 1.95 M

8

990

7925.44

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Erect-33KV DP Structure with RS Joist Assembly and erection of Structure as per specification which includes fixing of top channels and cross bracings, transport of all materials from road side to the location, earthing, back filling with earth ramming etc excluding pit excavation and concreting. 33 KV DP Structure with 175x85/150x75mm RS joist

2

5670

11340

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Supply of 4" BClass GI pipe 3.65mm thck 12.2Kg/M

48

740

35520

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Supply of 250 mm Hume pipe of class NP3 Supply of 250 mm Hume pipe of class NP3 with compresive strength of 35N/mm2 for 28 days curing,barewall thickness of 30mm,1.25kG linear/meter and withstanding capability of 22.50KN/linear meter as per IS 458-1993

30

363

10890

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Supply of 6" B Class GI pipe 5mm thck 20Kg/M

60

1044

62640

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;ERECT. OF LINES-Providing of RCC collar Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X 0.50 M height

8

386

3088

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;ERECT. OF LINES-Providing of earthing Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.75M dia x 0.5 M height

8

1234

9873.6

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Supply of CI eath pipe with 80mm dia,2.0 M Length

4

2789

11156

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;TRANSPORT OF STEEL 10 TO 20KM Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) Above 10 KM and upto 20 KM

4.7

412

1936.78

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;UNLOADING of MS Channel,Angles,Flats&Rod etc

0.7

185

129.5

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;LOADING of MS Channel,Angles,Flats&Rods etc

0.7

221

154.7

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Fabrication of 175x85/150x75mm RS joist Fabrication of 175x85/150x75mm RS joist pieces upto 12.5 meters length by welding joint together by means of 50x6mm flat and MS channel on either side including the cost of consumable.

8

512

4100.4

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;UNLOADING of R.S. Joists 175 x 85 mm

16

50

800

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;LOADING of R.S. Joists 175 x 85 mm

16

76

1216

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;R.S. joist box poles erection complete Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation Erection of 5 Mts RS Joist (Bit) Pole including fixing of Pole Mounted Box

4

1044

4176.92

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Erection of 33kv ABSwitch incl earthing Erection of 33 KV AB Switch including alignment and earthing

2

4500

9000

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Stringing 100sqmm 33/11kv Line 3 Cond SC Paving out and stringing of conductor by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location 100 Sqmm Single Circuit (3 Conductors)

0.6

13856

8314.02

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Stringing 100sqmm 33/11kv Line 6 Cond DC Paving out and stringing of conductor by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location 100 Sqmm Double Circuit (6 Conductors)

4.15

26255

108962.32

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Making 33 KV 3x400 Sqmm Cable Out Door/Indoor end termination

20

2764

55295.2

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;UG Cables Joints Making of Straight through joints 33kv 3x400 xlpe

2

5700

11401.56

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Raise-DR 33KV 3x400sqmm UG Cb on support Raising of double run cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe) 33 KV 3x400 Sqmm Cable

250

323

80962.5

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Laying of 2nd cable in excavated trench

400

204

81640

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Lay-DR 33KV 3x400sqmm UG Cb HG/BC/CC/BT Laying of XLPE UG cable Double Run including excavation of trench of size 600mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV from road level and cable separation with machine cut bricks horizontally for every 3 meters , providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and removing the debris from the site inluding the cost of lead and lift etc.. (Second cable laying cost not Included) depth of the trench LT-0.85 mts, In Hard Gravel Soil / BC soil / Red earth / stone and earth mixed with fair boulders / Normal soil/CC 33 KV 3x400 Sqmm Cable

200

749

149800

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Lay-DR 33KV 3x400sqmm UG Cb CC/BT Compsr Excavation & laying of UG Cable (Double Run) Laying of XLPE UG cable Double Run including excavation of trench of size 600mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV from road level and cable separation with machine cut bricks horizontally for every 3 meters , providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and removing the debris from the site inluding the cost of lead and lift etc.. (Second cable laying cost not Included) depth of the trench LT-0.85 mts, Along the CC / BT multi layer road requiring compressor 33 KV 3x400 Sqmm Cable 33 KV 3x400 Sqmm Cable

200

1388

277768

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Raise-SR 33KV 1x630sqmm UG Cb on Support ACSS Dog HTLS Conductor Raising of Single Run 33KV 1x630sqmm UG Cable on Support

400

133

53200

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Install-33KV 1x630Sqmm OD Unit EndTermtn

16

4000

64000

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Supply of 33KV 1x630Sqmm OD Unit End Termination

16

4200

67200

... More
Power evacuation of 33kV New Suraram and 33kV Gagillapur feeder;Lay-8 SC 33KV 630sqmm UG Cb HG/BC/RE/NS 33KV 1-Core Cable Laying of 8No's single core 630 sqmm UG cable(Double circuit with 2 Spare cables) including excavation of trench of size 0.7 Mtrs width and 1.2 Mtrs depth from road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc. In Hard Gravel Soil / BC soil / Red earth / stone and earth mixed with fair boulders / Normal soil

150

4258

638775



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.