Telangana State Southern Power Distribution Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Works
Electrical and Electronics
Electrical Works
Opening Date2 Jan 2025
Closing Soon23 Jan 2025
Tender Amount₹ 39,84,901 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Alternate source to Leninnagar SS;Loading of 33 KV Pins

1

109

109

... More
Alternate source to Leninnagar SS;Un loading of Conductor drums

1

100

100

... More
Alternate source to Leninnagar SS;Loading of Conductor drums

1

202

202

... More
Alternate source to Leninnagar SS;Transport of Above 20 Km and upto 30 Km with Lorry for each trip conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators,transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)

1

3691

3691.38

... More
Alternate source to Leninnagar SS;Un loading of 33KV 800 Amps AB Switch

3

79

237

... More
Alternate source to Leninnagar SS;Loading of 33KV 800 Amps AB Switch

3

126

378

... More
Alternate source to Leninnagar SS;Erection of 33 KV AB Switch including alignment and earthing AB Switch and aligment complete

2

4500

9000

... More
Alternate source to Leninnagar SS;Painting of operating rods of 33kV, 11kV AB switches with post office red colour (including cost of paint)

3

142

426

... More
Alternate source to Leninnagar SS;Erection of 33 KV AB Switch in already existing sub-stations (involving LCs)

1

5342

5342.25

... More
Alternate source to Leninnagar SS;Formation of Cut point for 33 KV Single Circuit line excluding pole erection and stays

1

1791

1791.12

... More
Alternate source to Leninnagar SS;Paving out and stringing of 100 Sqmm Single Circuit (3 Conductors) conductor by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location.

0.5

13856

6928.35

... More
Alternate source to Leninnagar SS;Mass concreting of Including the cost of cement supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc

4.5

6579

29605.5

... More
Alternate source to Leninnagar SS;Sub-transport of 11 Mtrs long PSCC Poles poles upto Workspot upto 10KM (Including loading and unloading)

12

431

5183.64

... More
Alternate source to Leninnagar SS;Erection of 11 Mtrs PSCC poles pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit

12

4336

52042.2

... More
Alternate source to Leninnagar SS;Excavation of 11 Mtrs PSCC Poles/ Box poles 0.75 M x 0.9 M x 1.95 M (1.31cum) pits in all soils except hard rock requiring blasting

12

629

7558.2

... More
Alternate source to Leninnagar SS;Supply of 150 mm Hume pipe of class NP3 with compresive strength of 35N/mm2 for 28 days curing,barewall thickness of 30mm,1.25kG linear/meter and withstanding capability of 22.50KN/linear meter as per IS 458-1993

300

303

90900

... More
Alternate source to Leninnagar SS;Supply of GI Bolts & Nuts etc

250

117

29375

... More
Alternate source to Leninnagar SS;Danger boards with clamps

3

116

348

... More
Alternate source to Leninnagar SS;Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.75M dia x 0.5 M height

11

1234

13576.2

... More
Alternate source to Leninnagar SS;Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X 0.50 M height

11

386

4246

... More
Alternate source to Leninnagar SS;Supply of GI Flat 25X3 mm earthing pipe with materials

165

105

17325

... More
Alternate source to Leninnagar SS;Supply of CI eath pipe with 50mm dia,2.0 M Length earthing pipe with materials

11

2441

26851

... More
Alternate source to Leninnagar SS;Making of 33 KV 3x400 Sqmm Cable Straight through joints

26

5700

148220.28

... More
Alternate source to Leninnagar SS;Making 33 KV 3x400 Sqmm Cable Out Door/Indoor end termination Outdoor/Indoor End Termination

16

2764

44236.16

... More
Alternate source to Leninnagar SS;Supply of 9" B class GI pipe Mtr. ?

48

1113

53424

... More
Alternate source to Leninnagar SS;Transport of Above 20 Km and upto 30 Km with Lorry for each trip conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators,transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)

19

3691

70136.22

... More
Alternate source to Leninnagar SS;Un loading of 11KV/33KV XLPE UG Cable for all sizes

19

1024

19456

... More
Alternate source to Leninnagar SS;Loading of 11KV/33KV XLPE UG Cable for all sizes

19

1024

19456

... More
Alternate source to Leninnagar SS;Laying of Laying of 2nd cable in excavated trench XLPE UG cable Six Run including excavation of trench of size 1050mm wide to 1200mm wide as per the site conditions and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV from road level and cable separation with machine cut bricks horizontally for every 3 meters , providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and removing the debris from the site inluding the cost of lead and lift etc.. (Second,third or more cable laying cost not Included) depth of the trench LT-0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.

2650

204

540865

... More
Alternate source to Leninnagar SS;Raising of 33 KV 3x400 Sqmm Cable double run cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe)

80

323

25908

... More
Alternate source to Leninnagar SS;Laying of 33 KV 3x400 Sqmm Cable XLPE UG cable Double Run including excavation of trench of size 600mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV from road level and cable separation with machine cut bricks horizontally for every 3 meters , providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and removing the debris from the site inluding the cost of lead and lift etc.. (Second cable laying cost not Included) depth of the trench LT-0.85 mts,In Hard Gravel Soil / BC soil / Red earth / stone and earth mixed with fair boulders / Normal soil/CC Along the CC / BT multi layer road requiring compressor

750

1388

1041630

... More
Alternate source to Leninnagar SS;Laying of 33 KV 3x400 Sqmm Cable XLPE UG cable Double Run including excavation of trench of size 600mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV from road level and cable separation with machine cut bricks horizontally for every 3 meters ,providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet,3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and removing the debris from the site inluding the cost of lead and lift etc.. (Second cable laying cost not Included) depth of the trench LT-0.85 mts,In Hard Gravel Soil / BC soil / Red earth / stone and earth mixed with fair boulders / Normal soil/CC

1900

749

1423100

... More
Alternate source to Leninnagar SS;Transport of Above 20 KM and upto 30 KM iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading )

5.93

476

2826.6

... More
Alternate source to Leninnagar SS;Fabrication of Main and Auxiliary structures with welding using raw steel such as RS joist, M.S.Angles, Plates, Channels, including the supply and fabrication of 6mm base plate to the RS-Joist poles excluding cost of Mild Steel and transport charges to substation site, including erection.

1.43

3426

4912.88

... More
Alternate source to Leninnagar SS;Un loading of M.S.Channels, Angles, Flats & Rods etc.,

1.43

185

265.29

... More
Alternate source to Leninnagar SS;Loading of M.S.Channels, Angles, Flats & Rods etc.,

1.43

221

316.91

... More
Alternate source to Leninnagar SS;Un loading of R.S. Joists 175 x 85 mm

18

50

900

... More
Alternate source to Leninnagar SS;Loading of R.S. Joists 175 x 85 mm

18

76

1368

... More
Alternate source to Leninnagar SS;Painting of R.S Joist,Box poles including cross arms and clamps with two coat of Al.paint including cost of paint and consumables

6

656

3936

... More
Alternate source to Leninnagar SS;Painting of R.S Joist,Box poles including cross arms and clamps with one coat of red oxid and two coats of Al.paint including cost of paint and consumables

6

1132

6792

... More
Alternate source to Leninnagar SS;Mass concreting of Including the cost of cement supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc.

3.24

6579

21315.96

... More
Alternate source to Leninnagar SS;Erection of 5 Mts RS Joist (Bit) Pole including fixing of Pole Mounted Box pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

6

1044

6265.38

... More
Alternate source to Leninnagar SS;Fabrication of 175x85/150x75mm RS joist pieces upto 12.5 meters length by welding joint together by means of 50x6mm flat and MS channel on either side including the cost of consumable.

6

512

3075.3

... More
Alternate source to Leninnagar SS;Excavation of 8.0Mtrs PSCC Poles - 0.76 M x 0.76M x 1.52M (2.6" x 2.6" x 5.0') 0.88 cum pits in all soils except hard rock requiring blasting

6

650

3900

... More
Alternate source to Leninnagar SS;Mass concreting of Including the cost of cement supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc.

6.3

6579

41447.7

... More
Alternate source to Leninnagar SS;Erection of Box pole 9/10/11 Mtr pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

6

2643

15862.98

... More
Alternate source to Leninnagar SS;Excavation of 11 Mtrs PSCC Poles/ Box poles 0.75 M x 0.9 M x 1.95 M (1.31 cum) pits in all soils except hard rock requiring blasting

6

629

3779.1

... More
Alternate source to Leninnagar SS;Supply and painting of Black to all earth Flat

115.23

55

6337.82

... More
Alternate source to Leninnagar SS;LC Boards

2

116

232

... More
Alternate source to Leninnagar SS;Danger boards with clamps

3

116

348

... More
Alternate source to Leninnagar SS;Supply & spreading of 20mm machine crushed metal (HBG) including cost of conveneyance of all materials, labour charges etc complete for finished item of work and directed by the engineer incharge

2.5

2113

5282.5

... More
Alternate source to Leninnagar SS;Fixing of I - bolts clamps

6

20

120

... More
Alternate source to Leninnagar SS;Supply of I Bolts

6

294

1764

... More
Alternate source to Leninnagar SS;Supply of MS bolts & nuts and washers etc of all sizes Kg earthing pipe with materials

50

91

4562.5

... More
Alternate source to Leninnagar SS;Un loading of 33KV 800 Amps AB Switch

2

79

158

... More
Alternate source to Leninnagar SS;Loading of 33KV 800 Amps AB Switch

2

126

252

... More
Alternate source to Leninnagar SS;Excavate-Pit for 33KV VCB

4.8

331

1588.8

... More
Alternate source to Leninnagar SS;Painting of operating rods of 33kV, 11kV AB switches with post office red colour (including cost of paint)

2

142

284

... More
Alternate source to Leninnagar SS;Erection of 33 KV AB Switch in already existing sub-stations (involving LCs)

2

5342

10684.5

... More
Alternate source to Leninnagar SS;Connection of equipment to bus and or another equipment with single zebra/Panther conductor including measuring, cutting,clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary

9

224

2016

... More
Alternate source to Leninnagar SS;Erection of 33 KV LAS station/Line type including earthing AB Switches, VCBs, LAs, PTs, CTs, DTRs etc

1

880

880

... More
Alternate source to Leninnagar SS;Dismantling of Labour for Fixing of all types of clamps Equipment

18

65

1170

... More
Alternate source to Leninnagar SS;Supply of Alluminum alloy Pad clamps conforming to A6 of IS 617, 4 bolted with hot dip galvanised bolts and double nuts with spring and flat washers of size M10 x 65 i.e(3/8" x 21/2 " to suit for twin panther ACSR/Zebra of pad size 100 X 100 X 15mm for carrying 1200 A current rating

12

284

3408

... More
Alternate source to Leninnagar SS;Supply of Alluminum alloy T clamps conforming to A6 of IS 617, 4 bolted with hot dip galvanised bolts and double nuts with spring and flat washers of size M10 x 65 i.e(3/8" x 21/2 " to suit for panther ACSR on all three ways /on one side and Zebra ACSR on take off side or any other combination for carrying 800 A current rating .

6

299

1794

... More
Alternate source to Leninnagar SS;Hoisting of Insulators and hardware, stretching the conductor and stringing of 33 kV bus comprising of three phases with Single Zebra/panther conductor to a tension of 450kgs.(Bus section of 4.5mt)

1

781

781

... More
Alternate source to Leninnagar SS;Painting of all suppports to a height of 0.3m coping with bituminous paint (black colour) and painting of coping with two coats of white cement (including cost of paint

2

686

1372

... More
Alternate source to Leninnagar SS;Painting of Labour charges for painting including scratching and cleaning of Sub-station structures of 2nd coat of Aluminium sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes,labour charges etc., complete.

0.8

482

385.6

... More
Alternate source to Leninnagar SS;Painting of Supply of material cost for Second coat of 1st Grade Aluminium Paint, brushes, etc.sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete

0.8

1293

1034.4

... More
Alternate source to Leninnagar SS;Painting of Labour charges for painting including scratching and cleaning of Sub-station structures of 1st coat of Aluminium sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes,labour charges etc., complete.

0.8

851

680.8

... More
Alternate source to Leninnagar SS;Painting of Supply of material cost for First coat of 1st Grade Aluminium Paint, brushes etc.sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete

0.8

2181

1744.8

... More
Alternate source to Leninnagar SS;Fabrication of Main and Auxiliary structures with welding using raw steel such as RS joist, M.S.Angles, Plates, Channels, including the supply and fabrication of 6mm base plate to the RS-Joist poles excluding cost of Mild Steel and transport charges to substation site, including erection

0.8

3426

2740.8

... More
Alternate source to Leninnagar SS;Laying of 4 core/10 core 2.5 sq. mm.Copper control cable in aready excavation trench including cost of providing single compress glands at both ends

250

27

6750

... More
Alternate source to Leninnagar SS;Laying of Painting of Name Plates for any equipment earth mat including excavation of trenches of depth 600mm, welding,connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication

2

122

244

... More
Alternate source to Leninnagar SS;Laying of 75x 8mm MS Flat / GI Flat earth mat including excavation of trenches of depth 600mm, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication

31.9

65

2073.5

... More
Alternate source to Leninnagar SS;M.S./ G.I. Flat 50x6mm / 50 x 8 mm ( Above ground) Fabrication and connecting to risers from earth mat to structures, equipment, marshalling boxes, electrical panels, PLCC panels, fencing posts etc.

83.33

41

3416.65

... More
Alternate source to Leninnagar SS;Transport of Above 20 Km and upto 30 Km with Lorry for each trip conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators,transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)

1

3691

3691.38

... More
Alternate source to Leninnagar SS;Un loading of 33 KV VCBs along with Panel boards

1

1044

1044.48

... More
Alternate source to Leninnagar SS;Loading of 33 KV VCBs along with Panel boards

1

1024

1024

... More
Alternate source to Leninnagar SS;Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.75M dia x 0.5 M height

5

1234

6171

... More
Alternate source to Leninnagar SS;Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X 0.50 M height

5

386

1930

... More
Alternate source to Leninnagar SS;Supply of GI Flat 25X3 mm earthing pipe with materials

75

105

7875

... More
Alternate source to Leninnagar SS;Supply of CI earth pipe 100 mm dia, 2.75 mt long thickness 10mm with flange as per specication earthing pipe with materials

5

3486

17430

... More
Alternate source to Leninnagar SS;Erection of 33 KV VCB with Control Panel AB Switches, VCBs, LAs, PTs, CTs, DTRs etc

1

12500

12500

... More
Alternate source to Leninnagar SS;Cement concrete 1:3:6 ration with 40 MML HBG metal including the cost of all materials and labour complete 1.8 x 1.8 x 0.75 cum for VCB Plinth

6

5160

30960

... More
Alternate source to Leninnagar SS;Transport of Above 20 KM and upto 30 KM iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading )

2.4

476

1143.22

... More
Alternate source to Leninnagar SS;Fabrication of 175x85/150x75mm RS joist pieces upto 12.5 meters length by welding joint together by means of 50x6mm flat and MS channel on either side including the cost of consumable.

2

512

1025.1

... More
Alternate source to Leninnagar SS;Un loading of R.S. Joists 175 x 85 mm

5

50

250

... More
Alternate source to Leninnagar SS;Loading of R.S. Joists 175 x 85 mm

5

76

380

... More
Alternate source to Leninnagar SS;Painting of R.S Joist,Box poles including cross arms and clamps with two coat of Al.paint including cost of paint and consumables.

1

656

656

... More
Alternate source to Leninnagar SS;Painting of R.S Joist,Box poles including cross arms and clamps with one coat of red oxid and two coats of Al.paint including cost of paint and consumables

2

1132

2264

... More
Alternate source to Leninnagar SS;Mass concreting of Including the cost of cement supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc.

0.54

6579

3552.66

... More
Alternate source to Leninnagar SS;Erection of 5 Mts RS Joist (Bit) Pole including fixing of Pole Mounted Box pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

1

1044

1044.23

... More
Alternate source to Leninnagar SS;Excavation of 8.0Mtrs PSCC Poles - 0.76 M x 0.76M x 1.52M (2.6" x 2.6" x 5.0') 0.88 cum pits in all soils except hard rock requiring blasting

1

650

650

... More
Alternate source to Leninnagar SS;Mass concreting of Including the cost of cement supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc.

2.1

6579

13815.9

... More
Alternate source to Leninnagar SS;Erection of Box pole 9/10/11 Mtr pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

2

2643

5287.66

... More
Alternate source to Leninnagar SS;Excavation of 11 Mtrs PSCC Poles/ Box poles 0.75 M x 0.9 M x 1.95 M (1.31 cum) pits in all soils except hard rock requiring blasting

2

629

1259.7



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.