Telangana State Southern Power Distribution Company Limited Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender
Civil And Construction
Electrical and Electronics
Opening Date27 Jan 2025
Closing Date30 Jan 2025
Tender Amount₹ 11,27,330
Costs
EMD
₹ 26,605Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
572141Tender No
T-16/2024-25Tender Authority
Telangana State Southern Power Distribution Company Limited ViewPurchaser Address
-Website
http://https://www.tssouthernpower.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Erect- M+3 Tower GALV
2
64576
129152
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;S-M+3 Tower GALV
2
140674
281348.6
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Assembly and erection of Stay set11kv< Assembly and erection of stay set including fixing of guy insulators, clamps etc., on the pole and fixing stay wire and binding securely on either side as per standards, transport of material from road side to location and back filling with earth ramming .
4
606
2427.4
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Excavate-StayPit .45x.45x1.34mSoil ex Hr Excavation of Stay pits of size 0.45x0.45x1.34 Mts' for burying the anchor rod with anchor plateof stay sets including dewatering, shoring, shuttering wherever necessary and back filling the pit (after erection and concreting the same whever is necessary) with the excavated earth/extra earth/excavated rock bits any and leveling the site with out any lead.In all soils except Hard gravel Hard Murram, Disintegrated Rock, Hard rock Requiring blasting.
4
520
2080
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Formation of 11kvline vertical cutpoint Formation of Cut point for 11 KV Double circuit line excluding pole erection and stays
6
2038
12232.02
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Formatn of Horiz Cut point for 11KV line Formation of Cut point for 11 KV Single Circuit line excluding pole erection and stays
2
1350
2700
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;AB Switch Coil Earthing GI No. 8 Wire Making of coil earthing pole with 8mm GI wireNut&Bolts for AB Switch
2
146
293.26
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;ERECT. OF LINES-Providing of earthing Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.
4
1234
4936.8
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Erection of 11kv ABSwitch incl earthing Erection of 11KV 400/200A Conventional type AB Switch including fixing of cross angles and alignment complete
2
3200
6400
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Fabricate-Tapping Cross Arm
12
36
432
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Fix-Side/Cross Arm incl strut fr 11KV
12
455
5460
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Fabricate-11KV Side Arm
12
100
1200
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;EXCAV. OF PIT 0.75 M x 0.9 M x 1.95 M
48
619
29743.2
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;SubTrnsprt 11M PSCC Pole incl. L&UL<10KM
48
431
20734.56
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Errection of 11 M long PSCC pole Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation.
48
4165
199933.44
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;S-GI Bolts & Nuts,Washers etc.,
50
117
5875
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Numbering of poles incl. cost of paint
69
32
2208
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;survey line&cabl inc peg mark&tree clear
3
765
2295
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Mass concreting of supports incl. cement Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc.
16.2
6579
106579.8
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Stringing of 55sqmm 33/11kv Line 3 Cond Paving out and stringing of conductor by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location.
3
8500
25500
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;SubTrnsprt 9M PSCC Pole incl. L&UL<10KM
6
407
2443.74
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;EXCAVATION OF PITS (2.6" x 2.6" x 6.0") in all soils except hard rock requiring blasting
6
700
4200
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;ERECTION OF LINES-Erection of 9.1M Pole Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road
6
2400
14400
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;S-GI Bolts & Nuts,Washers etc.,
150
117
17625
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Earthing for raisers of SS Flat 50x6 mm.
25
41
1025
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Laying of earth mat,excavation 75x 8mm Laying of earth mat including excavation of trenches of depth 600mm, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication.
50
65
3250
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Sup Material for 2nd coat Al. Painting. (*)Supply of material cost for Second coat of 1st Grade Aluminium Paint,brushes, etc.
0.6
1293
775.8
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Sup Material for 1st coat Al. Painting. Supply of material cost for First coat of 1st Grade Aluminium Paint,brushes etc.
0.6
2181
1308.6
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Labour for 2nd coat Al. Painting. (*) Labour charges for painting including scratching and cleaning of Sub station structures of 2nd coat of Aluminium .
0.6
482
289.2
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Labour charges for painting including scratching and cleaning of Sub station structures of 1st coat of Aluminiu
0.6
851
510.6
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;S&E-400A 11KV ABSwth Conv 1ph(1/3) in SS Supply & erection of 11 kV 400 A convential single(1/3) phasing AB switches in Sub-Station on 3-Ph AB Switch
2
4232
8464
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Supply of LC Boards
2
116
232
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;AB Switch Coil Earthing GI No. 8 Wire Making of coil earthing pole with 8mm GI wireNut&Bolts for AB Switch
3
146
439.89
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;S&F-33/11KV SS Feeder Indicator Board Supplying and fixing of feeder indicator board, danger boards made of 1'x1' and properly mounted on the structures. The letters written on the borad shall be 2.5"size with blue colour and background shall be of white colour
1
551
551
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Paint-9.1M PSCC Poles as desc SSR
3
485
1455
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Ptg of coping with 2cts white cmnt inclu Paint of coping with 2 coats of white cement incl cost of paints etc
3
48
144
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Painting AB switch OP rods with PO red Painting of operating rods of 33kV, 11kV AB switches with post office red colour (including cost of paint)
3
142
426
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Fixing of I-bolts
6
20
120
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Supply of I-Bolts
6
294
1764
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;S-90W LED fixture set
2
8200
16400
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Fixing of LED/Metal halide complete.
2
1268
2536
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Fixing of Tension clamps
6
176
1056
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Fixing of Pad clamps for AB Switch
18
116
2088
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Erection of 11kv CT s
3
718
2154
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;S-CI Pipe earthing 100mm dia 2.75m long iii)Supply of CI earth pipe 100 mm dia, 2.75 mt long thickness 10mm with flange as per specication
3
3486
10458
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;SubTrnsprt 9M PSCC Pole incl. L&UL<10KM
3
407
1221.87
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Lay-4C/10C 2.5Sqmm Control CableLaying of 4 core/10 core 2.5 sq. mm.Copper control cable in aready excavation trench including cost of providing single compress glands at both ends .
360
27
9720
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Erection of battery & battery chargers
1
5593
5593
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;ERECT. OF LINES-Providing of earthing Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.
3
1234
3702.6
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;ERECT. OF LINES-Providing of RCC collar Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X 0.50 M height
3
386
1158
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Erect of 11kvLA line type incl earthing
3
505
1515
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Stringing of bus with panther conductor including jumpering etc., complete to all the equipment in SS fixing to all clamps and equipment.(3Conductors)
60
327
19660.8
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Mass concreting of supports incl. cement Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc.
1.62
6579
10657.98
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;EXCAVATION OF PITS (2.6" x 2.6" x 6.0") in all soils except hard rock requiring blasting
3
700
2100
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;ERECTION OF LINES-Erection of 9.1M Pole Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation
3
2400
7200
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Fixing of Pad clamps for AB Switch
6
116
696
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Fixing of T- clamp
12
116
1392
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Erection of 11kv ABSwitch incl earthing Erection of 11KV 400/200A Conventional type AB Switch including fixing of cross angles and alignment complete
3
3200
9600
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Erection of 11kv VCB
1
12000
12000
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;Con of Plinth for 11kv VCB 1.8x1.8x0.75m
1
27629
27629
... More
Estimate for bifurcation of 11 KV MC Feeder erection of 3.0 KM 11 KV line along with VCB with Bay Ex;ERECTION OF LINES-Erection of 9.1M Pole Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation
3
2400
7200
Evaluation Notes How It Works ?
Potential Partner