Telangana State Southern Power Distribution Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Opening Date30 Nov 2021
Closing Date8 Dec 2021
Tender Amount₹ 12,96,554 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Cutting Charges for MS chanl 100x50mm

50

-

450

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Formation of 33kvline vertical cutpoint, Formation of Cut point for 33 KV Double circuit line excluding pole erection and stays

5

-

14255

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;S-MS Bolts & Nuts,Washers etc.,

150

-

10950

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc.

6.48

-

33436.8

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Erec of 9.1 Mts PSCC poles for stuts, Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

12

-

19452

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Stringing 100sqmm 33/11kv Line 6 Cond DC;Paving out and stringing of conductor by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location.

10.5

-

194617.5

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Dismantling of 100 Sqmm conductor SC

10.5

-

68145

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Exca Hard pit w/o blast 0.76X0.76X1.83M, Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders)

12

-

6660

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;SubTrnsprt 9M PSCC Pole incl. L&UL<10KM;SubTrnsprt 9M PSCC Pole incl. L&UL<10KM, Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

12

-

4356

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Transport of Cond Drum,VCBs >30 & <50Km

4

-

17148

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Formation of Cut point for 33 KV Single Circuit line excluding pole erection and stays

8

-

12768

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Survey and tree clearance

8

-

4000

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;UNLOADING of Conductor drums

8

-

776

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;LOADING of Conductor drums

8

-

1616

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Fab V Cross arms with 65x65x6 mm MS angl;1.07 mt. V. Cross arms with 65 x 65x 6 mm MS angle

27

-

1944

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Cutting Charges for MS angle all sizes

52

-

364

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;FABR-Drilling of holes upto 20 mm dia 3

60

-

720

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Cutting Charges for MS chanl 100x50mm

27

-

243

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Ref - Double Jumpering.

2

-

330

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;S-MS Bolts & Nuts,Washers etc.,

50

-

3650

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc.

2.16

-

11145.6

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Erec of 9.1 Mts PSCC poles for stuts, Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

6

-

9726

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Stringing 100sqmm 33/11kv Line 6 Cond DC;Paving out and stringing of conductor by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location.

1.4

-

25949

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Dismantling of 100 Sqmm AAA/ACSR Conductor

1.4

-

9086

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Exca Hard pit w/o blast 0.76X0.76X1.83M, Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders)

6

-

3330

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;SubTrnsprt 9M PSCC Pole incl. L&UL<10KM;SubTrnsprt 9M PSCC Pole incl. L&UL<10KM, Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

6

-

2178

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Transport of Cond Drum,VCBs >30 & <50Km

1

-

4287

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Formation of Cut point for 33 KV Single Circuit line excluding pole erection and stays

1

-

1596

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Survey and tree clearance

1.4

-

700

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;UNLOADING of Conductor drums

2

-

194

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;LOADING of Conductor drums

2

-

404

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;S-MS Bolts & Nuts,Washers etc.,

120

-

8760

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Numbering of poles incl. cost of paint

55

-

1650

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Formation of 33kvline vertical cutpoint, Formation of Cut point for 33 KV Double circuit line excluding pole erection and stays

4

-

11404

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Ref - Double Jumpering.

4

-

660

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Erec of 9.1 Mts PSCC poles for stuts, Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

16

-

25936

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Exca Hard pit w/o blast 0.76X0.76X1.83M, Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders)

16

-

8880

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;SubTrnsprt 9M PSCC Pole incl. L&UL<10KM;SubTrnsprt 9M PSCC Pole incl. L&UL<10KM, Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

16

-

5808

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Erection of 33 KV AB Switch including alignment and earthing

2

-

4096

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Transport of Cond Drum,VCBs >30 & <50Km

1

-

4287

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc.

28.93

-

149304.6

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Exc of Hard pit w/o blast 0.92X0.92X2.3M, Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders)

55

-

56430

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;SubTrnsprt 11M PSCC Pole incl. L&UL<10KM ,Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

55

-

21175

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Errection of 11 M long PSCC pole, Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

55

-

177705

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Formation of Cut point for 33 KV Single Circuit line excluding pole erection and stays

3

-

4788

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Survey and tree clearance

2.5

-

1250

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;UNLOADING of Conductor drums

2

-

194

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;LOADING of Conductor drums

2

-

404

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Stringing 100sqmm 33/11kv Line 3 Cond SC Paving out and stringing of conductor by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location.

2.5

-

30882.5

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Formation of 33kvline vertical cutpoint, Formation of Cut point for 33 KV Double circuit line excluding pole erection and stays

3

-

8553

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;S-MS Bolts & Nuts,Washers etc.,

50

-

3650

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc.

2.7

-

13932

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Erec of 9.1 Mts PSCC poles for stuts, Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

10

-

16210

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Stringing 100sqmm 33/11kv Line 6 Cond DC;Paving out and stringing of conductor by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location.

2.5

-

46337.5

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Dismantling of 100 Sqmm AAA/ACSR Conductor

2.5

-

16225

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Exca Hard pit w/o blast 0.76X0.76X1.83M;Exca Hard pit w/o blast 0.76X0.76X1.83M, Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders)

10

-

5550

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;SubTrnsprt 9M PSCC Pole incl. L&UL<10KM;SubTrnsprt 9M PSCC Pole incl. L&UL<10KM, Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

10

-

3630

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Transport of Cond Drum,VCBs >30 & <50Km

1

-

4287

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Formation of Cut point for 33 KV Single Circuit line excluding pole erection and stays

2

-

3192

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Survey and tree clearance

2.5

-

1250

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;UNLOADING of Conductor drums

2

-

194

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;LOADING of Conductor drums

2

-

404

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;33KV Bay Extn: S-Twin Zebra Connector

3

-

1800

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;33KV Bay Extn: S-T Clamp

6

-

3000

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;33KV Bay Extn: S-Zebra Conductor

0.03

-

8981.07

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Fabricate-CT Mounting Structure

1

-

1000

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Transport of Cond Drum,VCBs upto 10Km;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)

3

-

8001

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;S-GI Bolts & Nuts,Washers etc.,

100

-

9400

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Stringing of bus with panther conductor including jumpering etc., complete to all the equipment in SS fixing to all clamps and equipment.(3 Conductors)

26.67

-

6854.19

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Wirring, commissioning and testing of Indoor Sub-station switchgear duly conducting the pre commissioning test as per relevent standards & issue of certificate by CEIG authorised testing Engineer

1

-

1825

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Fix-FRP CT Marshalling Box Set

1

-

300

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Supply of FRP CT Marshalling Box

1

-

2500

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;EHT SS: S-GI Earth Material 100x16mm

0.1

-

6392.9

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;EHT SS: S-GI Flat 50x8mm

0.1

-

6392.9

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;EHT SS: Erect-33KV BD Boom

2

-

990

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;EHT SS: S-33KV BD Boom Incl Material

2

-

35732

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;EHT SS: Erect-33KV TC Structure

1

-

16241

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;EHT SS: S-33KV TC Structure

1

-

49708

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Erection of Marshalling boxes

1

-

294

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Supply of FRP PT Marshalling Box

1

-

4463

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;S-Earthing GI Wire No 8 incl mat

25

-

2100

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Supply of Spacer T- clamps for suitable for Twin zebra/panther ACSR conductor with 150mm spacing

12

-

6096

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Supply of Copper Brass studs for CT terminals

6

-

2520

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Supply of Alluminum alloy Pad clamps conforming to A6 of IS 617, 4 bolted with hot dip galvanised bolts and double nuts with spring and flat washers of size M10 x 65 i.e(3/8" x 21/2 " to suit for twin panther ACSR/Zebra of pad size 100 X 100 X 15mm for carrying 1200 A current rating .

12

-

3408

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Supply of Tension Hardware 3 Bolted for Twin Zebra/panther with 150 mm spacing.

3

-

7536

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Supply of Tension Hardware 3 Bolted for single Zebra/panther with 150 mm spacing.

3

-

6165

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Supply of Spacer clamps suitable for twin zebra / Panther ACSR conductor with 150mm spacing

6

-

918

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Supply of Spacer T-Clamps with double dropper suitable for Zebra / Panther

8

-

6304

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Labour for Fixing of all types of clamps

53

-

3445

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;S-Flexible Earth Band

3

-

1002

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Painting of Name Plates for any equipmen

1

-

122

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Cement concrete with 40MM metal VCB plin

6

-

30960

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Excavation of Pit for VCB

4.8

-

1588.8

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Laying of Earth mat 50x6mm flat;Laying of earth mat including excavation of trenches of depth 600mm, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication.

41.66

-

2707.9

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Laying of MS/GI 100x16mm earth flat

7.94

-

516.1

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Cable terminations to the switch gear marshalling boxes/panel terminal blocks/control and relay panels LT AC panel including providing suitable ferrules and lugs as per specification (including cost of ferrules, lugs and glands)

110

-

2970

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Laying of 4 core cable includes excavation earth and back filling with sand and earth in alternate layers as shown in the sketch. The cable termination shall be made by providing proper size of lugs at both ends of the cable termination

950

-

14250

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Erection of 33kV Twin feeder control & Relay panel in the control room duly mounting them on channels and grouting them with foundation bolts excluding cost of channels & foundation bolts

1

-

1729

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Excavation of earth pit, supply of cast iron pipe with flange on one end (as per ISS7181/86) of nominal dia 125mm and 2.75 meters long in side the pit including supply and fixing RCC collars 0.75 meter dia (OD), 50mm thick and 0.60meters long complete as per APTRANSCO standards

2

-

19608

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Erection of 33 KV LAS station/Line type including earthing

1

-

880

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Erection of 33 KV AB Switch including alignment and earthing

2

-

4096

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Erection of 33kv CT s

1

-

1079

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Erection of 33 KV VCB with Control Panel

1

-

5022

... More
Bifurcation of 33KV Over loaded Veltoor feeder emanating from 132/33KV SS Thirumalaipally duly provi;Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X 0.50 M height

2

-

772



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.